Search Legislation

The Great Yarmouth Third River Crossing Development Consent Order 2020

Changes over time for: Section 6

 Help about opening options

Alternative versions:

Status:

Point in time view as at 15/10/2020.

Changes to legislation:

There are currently no known outstanding effects for the The Great Yarmouth Third River Crossing Development Consent Order 2020, Section 6. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Limits of deviationE+W+S

6.—(1) The following provisions of this article have effect subject to the requirement that the undertaker must construct the authorised development within the Order limits.

(2) In constructing or maintaining the non-linear works comprised in the authorised development, the undertaker may deviate laterally within the limits of deviation for those works shown on the works plans to the extent the undertaker considers to be necessary or convenient.

(3) In constructing or maintaining the linear works comprised in the authorised development the undertaker may deviate laterally from the lines or situations shown on the works plans to the extent of the Order limits, so far as the undertaker considers to be necessary or convenient, save that—

(a)in constructing or maintaining any linear work, other than Work No. 8C, in deviating laterally from the centre lines shown on the works plans, the situation of the centre line may be varied up to a maximum of 3 metres either side of the centre line of that work as shown on the works plans; and

(b)in constructing or maintaining Work No. 8C, in deviating laterally from the centre line shown on the works plans, the situation of the centre line may be varied up to a maximum of 1 metre either side of the centre line of that work as shown on the works plans.

(4) In constructing or maintaining the new bridge the undertaker must safeguard the width of the navigable channel within the river Yare by preserving a distance of no less than 50 metres between the outer edges of the vessel impact protection systems comprised in Work Nos. 6A, 6B and 8B.

(5) In constructing or maintaining the authorised development, the undertaker may deviate vertically from the levels shown on the engineering plans, drawings and sections—

(a)subject to paragraph (6), to any extent upwards as the undertaker considers to be necessary or convenient but not exceeding 1.0 metre; and

(b)subject to paragraphs (7) and (8), to any extent downwards as the undertaker considers to be necessary or convenient, except in relation to the parts of the authorised development referred to in column (1) of the table below, where the extent of permitted downwards deviation for each such part is set out in the corresponding entry in column (2) of that table.

(1) Numbered Work(2) Downwards vertical limit of deviation
Work No. 1-0.5 metres
Work No. 2-0.5 metres
Work No. 4-0.5 metres
Work No. 5-0.5 metres
Work No. 6-0.5 metres
Work No. 7-1.0 metre
Work No. 8-0.5 metres
Work No. 9-0.5 metres
Work No. 10-0.5 metres

(6) Paragraph (5)(a) does not prevent the undertaker from—

(a)constructing the control tower comprising Work No. 7A to a height up to, but not exceeding, 20 metres above Ordnance Datum; or

(b)constructing the plant room comprising Work No. 7B to a height up to, but not exceeding, 17 metres above Ordnance Datum.

(7) Paragraph (5)(b)—

(a)does not prevent the undertaker in constructing the piles comprising any part of the authorised development, from deviating to any extent downwards as the undertaker considers to be necessary or convenient; and

(b)does not prevent the undertaker from constructing any drainage ponds or carrying out works to any existing drainage infrastructure, to any extent downwards as the undertaker considers to be necessary or convenient.

(8) In constructing or maintaining Work No. 8 the undertaker must—

(a)provide a minimum headroom of no less than 5.3 metres above finished road level beneath the Southtown Road bridge comprising part of Work No. 8A;

(b)provide a minimum headroom of no less than 4.9 metres above finished road level within the new private means of access comprising part of Work No. 8C; and

(c)over the width of the navigable channel, when the new bridge is in the closed position, provide a minimum air draught of no less than 5.36 metres above Ordnance Datum.

(9) Without limitation on the scope of paragraphs (2) to (8) in constructing or maintaining the authorised development the undertaker may—

(a)deviate by up to 3 metres from the points of commencement and termination of any of the linear works; and

(b)deviate from the designs shown on the engineering plans, drawings and sections, provided that any such deviation is in general accordance with the approach to detailed design.

(10) In this article, references to—

(a)“linear works” are references to any works shown on the works plans by way of centre lines; and

(b)“non-linear works” are references to any other works shown on the works plans.

Commencement Information

I1Art. 6 in force at 15.10.2020, see art. 1

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources