Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
27.—(1) A heating measure meets the requirements of this article if—
(a)the measure is not—
(i)the installation of equipment for the generation of heat wholly or partly from coal; or
(ii)the installation of a connection to a district heating system that delivers heat generated wholly or partly from coal;
(b)where the measure is the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, the measure—
(i)is installed at off-gas premises;
(ii)is a repair of a central heating system; and
(iii)complies with the off-gas heating hierarchy in article 30;
(c)where the measure is the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas, the measure—
(i)is installed at off-gas premises;
(ii)is a repair of the district heating connection; and
(iii)complies with the off-gas heating hierarchy in article 30;
(d)where the measure is the installation of equipment for the generation of heat wholly or partly from mains gas, F1... the measure is installed at on-gas premises;
[F2(e)where the measure is the installation of an electric storage heater, but is not a repair—
(i)the measure has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; and
(ii)the measure—
(aa)replaces an electric heating system at on-gas premises;
(bb)is installed at on-gas premises where one or more electric storage heaters are already installed;
(cc)is installed at on-gas premises which, immediately prior to the installation of the measure, have neither an efficient heating system nor an inefficient heating system; or
(dd)is installed at off-gas premises;
(f)where the measure is the installation of an electric heating system, but is not a repair—
(i)the measure has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; and
(ii)the measure—
(aa)replaces an electric heating system at on-gas premises;
(bb)is installed at on-gas premises where one or more electric storage heaters are already installed;
(cc)is installed at on-gas premises which, immediately prior to the installation of the measure, have neither an efficient heating system nor an inefficient heating system; or
(dd)is installed at off-gas premises;]
(g)where the measure is the installation of a central heating system or a district heating connection not referred to in sub-paragraph (f), but is not a repair, the measure is an efficient heating system;
(h)where the measure is the installation of a boiler, but is not a repair—
(i)it is an efficient boiler; and
(ii)where the boiler forms part of a wet central heating system, hydraulic balancing of the central heating system is carried out following the installation of the boiler;
(i)where the measure [F3includes the installation of equipment for the generation of electricity by renewable means], the measure is installed at domestic premises—
(i)at which there is already installed—
(aa)a hydronic heat pump; or
(bb)an electric storage heater or an electric heating system that in either case has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; or
(ii)at which there is installed as part of the same ECO4 project as the measure—
(aa)a hydronic heat pump;
(bb)an electric storage heater, that meets the requirements of sub-paragraph (e)(i) and (ii); or
(cc)an electric heating system, that meets the requirements of sub-paragraph (f)(i) and (ii);
(j)where the measure is the installation of equipment for the generation of heat wholly or partly from biomass, the measure—
(i)is installed at premises which are in a rural area; and
(ii)generates heat from biomass which is wholly woodfuel; and
(k)where the measure is the replacement of an efficient boiler with another efficient boiler, the boiler being replaced is broken down and is not economically repairable.
(2) In paragraph (1)—
“hydraulic balancing” means the carrying out of steps to ensure the temperature difference is the same between the inlet and outlet of each radiator, or other heat emitter, in a heating system;
“mains gas” means a supply of the kind mentioned in section 5(1)(b) of the Gas Act 1986(1);
“woodfuel” has the same meaning as in paragraph 6 of Schedule 4A to the Renewable Heat Incentive Scheme Regulations 2018(2).
Textual Amendments
F1Words in art. 27(1)(d) omitted (14.8.2023) by virtue of The Electricity and Gas (Energy Company Obligation) Order 2023 (S.I. 2023/873), arts. 1(3), 43(a) (with art. 50)
F2Art. 27(1)(e)(f) substituted (14.8.2023) by The Electricity and Gas (Energy Company Obligation) Order 2023 (S.I. 2023/873), arts. 1(3), 43(b) (with art. 50)
F3Words in art. 27(1)(i) substituted (14.8.2023) by The Electricity and Gas (Energy Company Obligation) Order 2023 (S.I. 2023/873), arts. 1(3), 43(c) (with art. 50)
Commencement Information
I1Art. 27 in force at 27.7.2022, see art. 1(1)
Section 5 was substituted by section 3(1) of the Gas Act 1995 (c. 45). Relevant amendments were made by section 108 of, and Schedule 2 to, the Utilities Act 2000 and S.I. 2012/2400.
S.I. 2018/611, amended by S.I. 2021/76. There are other amending instruments, but none is relevant.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: