PART 6 MISCELLANEOUS AND GENERAL
SCHEDULES
TEMPORARY STOPPING UP OF STREETS, PUBLIC RIGHTS OF WAY AND ACCESS LAND
DEEMED MARINE LICENCE UNDER THE 2009 ACT: PROJECT A
3.The relevant undertaker may engage in the licensed activities related...
4.The coordinates for the disposal sites notified to the MMO...
6.This licence remains in force until the authorised development has...
7.The provisions of section 72 (variation, suspension, revocation and transfer)...
8.With respect to any condition which requires the licensed activities...
12.(1) The relevant undertaker must submit a CEMP covering the...
13.(1) A marine method statement must be submitted to the...
17.The storage, handling, transport and use of fuels, lubricants, chemicals...
18.The relevant undertaker must— (a) not discharge waste concrete slurry...
19.During licensed activities all wastes must be stored in designated...
25.The relevant undertaker must ensure dredge arisings are disposed of...
26.The material to be disposed of within the disposal site...
27.The combined total volume of material for disposal at each...
DEEMED MARINE LICENCE UNDER THE 2009 ACT: PROJECT B
3.The relevant undertaker may engage in the licensed activities related...
4.The coordinates for the disposal sites notified to the MMO...
6.This licence remains in force until the authorised development has...
7.The provisions of section 72 (variation, suspension, revocation and transfer)...
8.With respect to any condition which requires the licensed activities...
12.(1) The relevant undertaker must submit a CEMP covering the...
13.(1) A marine method statement must be submitted to the...
17.The storage, handling, transport and use of fuels, lubricants, chemicals...
18.The relevant undertaker must— (a) not discharge waste concrete slurry...
19.During licensed activities all wastes must be stored in designated...
25.The relevant undertaker must ensure that only inert material of...
26.The material to be disposed of within the disposal site...
PART 1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
1.For the protection of the utility undertakers referred to in...
2.In this Part— “alternative apparatus” means alternative apparatus adequate to...
3.Precedence of the 1991 Act in respect of apparatus in the streets
4.Regardless of the temporary prohibition or restriction of use of...
10.(1) Subject to sub-paragraphs (2) and (3), if by reason...
PART 2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
PART 3 FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION AS ELECTRICITY UNDERTAKER
PART 4 FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER
PART 5 FOR THE PROTECTION OF AIR PRODUCTS PLC
47.For the protection of Air Products the following provisions have...
48.In this Part— “Air Products” means Air Products Public Limited...
49.Precedence of the 1991 Act in respect of apparatus in streets
50.Regardless of the temporary prohibition or restriction of use of...
56.(1) Subject to sub-paragraphs (2) and (3), if by reason...
PART 6 FOR THE PROTECTION OF CATS NORTH SEA LIMITED
58.For the protection of CATS, the following provisions have effect,...
59.In this Part of this Schedule— “CATS” means CATS North...
61.No works comprising any part of the authorised development within...
62.(1) Any approval of CATS required under paragraph 61 must...
63.Where formal consent is required under the CATS requirements for...
PART 7 FOR THE PROTECTION OF CF FERTILISERS UK LIMITED
71.For the protection of CF Fertilisers, the following provisions have...
72.In this Part of this Schedule— “alternative apparatus” means alternative...
73.Precedence of the 1991 Act in respect of apparatus in streets
74.Regardless of the temporary prohibition or restriction of use of...
79.Before commencing any part of the authorised development which would...
80.No works comprising any part of the authorised development which...
81.Any approval of CF Fertilisers required under paragraph 80 must...
82.(1) The authorised development must be carried out in accordance...
86.(1) Subject to sub-paragraphs (2) and (3), if by reason...
PART 8 FOR THE PROTECTION OF EXOLUM SEAL SANDS LTD AND EXOLUM RIVERSIDE LTD
PART 9 FOR THE PROTECTION OF INEOS NITRILES (UK) LIMITED
96.For the protection of INEOS, the following provisions have effect,...
97.In this Part of this Schedule— “INEOS” means INEOS Nitriles...
99.No works comprising any part of the authorised development which...
100.(1) Any approval of INEOS required under paragraph 99 must...
101.Compliance with requirements, etc. applying to the INEOS operations
PART 11 FOR THE PROTECTION OF RAILWAY INTERESTS
111.The provisions of this Part of this Schedule have effect,...
112.(1) In this Part of this Schedule— “construction” includes execution,...
113.(1) Where under this Part of this Schedule Network Rail...
114.The undertaker must not under the powers of this Order...
115.(1) The undertaker must before commencing construction of any specified...
116.(1) Any specified work and any protective works to be...
117.The undertaker must— (a) at all times afford reasonable facilities...
118.Network Rail must at all times afford reasonable facilities to...
119.(1) If any permanent or temporary alterations or additions to...
120.The undertaker must repay to Network Rail all reasonable fees,...
121.(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
123.The undertaker must not provide any illumination or illuminated sign...
124.Any additional expenses which Network Rail may reasonably incur in...
125.(1) The undertaker must pay to Network Rail all reasonable...
127.In the assessment of any sums payable to Network Rail...
128.The undertaker and Network Rail may, subject in the case...
129.Nothing in this Order, or in any enactment incorporated with...
130.The undertaker must give written notice to Network Rail if...
PART 12 FOR THE PROTECTION OF NORTHERN POWERGRID (NORTHEAST) PLC
132.For the protection of Northern Powergrid (Northeast) Plc the following...
133.In this Part of this Schedule— “alternative apparatus” means alternative...
134.This Part of this Schedule does not apply to apparatus...
135.Regardless of the temporary prohibition or restriction of use of...
136.Regardless of any provision in this Order or anything shown...
138.(1) Where, in accordance with the provisions of this Part...
139.(1) Not less than ninety days before starting the execution...
140.(1) Subject to the following provisions of this paragraph, the...
141.(1) Subject to sub-paragraphs (2) and (3), if by reason...
142.Nothing in this Part of this Schedule affects the provisions...
143.Without prejudice to the generality of the protective provisions in...
144.Northern Powergrid and the undertaker must use their reasonable endeavours...
145.Work in relation to which an estimate is submitted must...
146.If Northern Powergrid at any time becomes aware that an...
147.Northern Powergrid may from time to time and at least...
148.The undertaker is not responsible for meeting costs or expenses...
149.Any difference under the provisions of this Part of the...
150.Prior to carrying out any works within the Order limits...
PART 14 FOR THE PROTECTION OF PD TEESPORT LIMITED
159.For the protection of PD Teesport, the following provisions have...
160.In this Part of this Schedule— “PD Teesport” means PD...
162.Any approval of PD Teesport required under paragraph 160 must...
166.No works comprising any part of the authorised development which...
167.Any approval of PD Teesport required under paragraph 165 must...
168.The authorised development must be carried out in accordance with...
PART 15 FOR THE PROTECTION OF REDCAR BULK TERMINAL LIMITED
172.For the protection of RBT, the following provisions have effect,...
173.In this Part of this Schedule— “apparatus” means any mains,...
175.Any approval of RBT required under paragraph 173 must not...
176.Without limiting paragraph 174, it is not reasonable for RBT...
179.No— (a) works comprising any part of the authorised development...
180.Any approval of RBT required under paragraph 178 must not...
181.Without limiting paragraph 179, it is not reasonable for RBT...
182.(1) The authorised development and activities on the wharf and...
PART 16 FOR THE PROTECTION OF SABIC PETROCHEMICALS UK LIMITED
190.Authorisation of works details affecting pipelines or protected crossing
192.(1) Any authorisation by SABIC required under paragraph 190(a) must...
196.(1) All piling within 1.5 metres of the centreline of...
197.(1) Where excavation of trenches (including excavation by dredging) adjacent...
198.(1) Where a trench is excavated across or parallel to...
199.(1) A minimum clearance of 1500 millimetres must be maintained...
202.Compliance with requirements, etc. applying to the protected land
204.(1) In preparing a construction access plan under paragraph 202...
205.(1) No works affecting access rights over the access roads...
207.(1) If SABIC has a dispute about the proposed insurance...
209.Further protection in relation to the exercise of powers under the Order
210.The undertaker, must when requested to do so by SABIC,...
211.Prior to the commencement of the authorised development the undertaker...
PART 17 FOR THE PROTECTION OF THE SEMBCORP PROTECTION CORRIDOR
PART 18 FOR THE PROTECTION OF ANGLO AMERICAN
230.The following definitions apply in this Part of this Schedule—...
242.Any difference in relation to the provisions in this Part...
243.The fees of the expert appointed pursuant to paragraph 241(b)...
244.Where appointed pursuant to paragraph 241(b), the expert must—
245.The expert must consider where relevant— (a) the development outcomes...
246.Any determination by the expert is final and binding which...
PART 19 FOR THE PROTECTION OF SUEZ RECYCLING AND RECOVERY UK LIMITED
247.For the protection of Suez, the following provisions have effect,...
248.In this Part of this Schedule— “the respective authorised developments”...
250.Before commencing any part of the authorised development which would...
251.No works comprising any part of the authorised development which...
252.Any approval of Suez required under paragraph 250 must not...
253.(1) The authorised development must be carried out in accordance...
PART 20 FOR THE PROTECTION OF SOUTH TEES DEVELOPMENT CORPORATION
257.For the protection of South Tees Development Corporation, Teesworks Limited...
260.No works comprising any part of the authorised development including...
261.Any approval of the Teesworks entity required under paragraph 58...
262.The authorised development must be carried out in accordance with...
263.The undertaker must not exercise the powers under Article 14...
265.The undertaker must provide the Teesworks entity with information the...
266.(1) This paragraph applies insofar as— (a) the construction of...
270.If the undertaker intends to change the timing of the...
271.The Teesworks entity may issue a notice (a “diversion notice”)...
272.A diversion notice must set out— (a) the diversion work...
273.If a diversion notice is issued to the undertaker before...
274.In making the decision under paragraph 272 the undertaker must...
275.Where the undertaker gives an information notice to the Teesworks...
276.Where the undertaker notifies the Teesworks entity under paragraph 272(b)...
277.If the undertaker issues an information notice to the Teesworks...
278.If the Teesworks entity submits further information to the undertaker...
279.If the undertaker issues notice to the Teesworks entity under...
280.If the undertaker issues a notice under paragraph 272(a) the...
281.(1) Subject to sub-paragraphs (2) and (3), if a diversion...
282.If a reference is made to arbitration under paragraph 285...
283.Where the arbitrator determines that the terms of the diversion...
284.If— (a) a diversion works agreement is entered into within...
288.Where a notice or information is provided by the undertaker...
PART 21 FOR THE PROTECTION OF THE BREAGH PIPELINE OWNERS
289.For the protection of the Breagh Pipeline Owners, the following...
290.In this Part of this Schedule— “Breagh Pipeline” means the...
292.No works comprising any part of the authorised development which...
293.(1) Any approval of the Breagh Pipeline Owners required under...
294.Compliance with requirements, etc. applying to the Breagh Pipeline and the Breagh Pipeline Operations
PART 22 FOR THE PROTECTION OF TEESSIDE WINDFARM LIMITED
297.For the protection of Teesside Windfarm, the following provisions have...
298.In this Part of this Schedule— “restricted works” means works...
300.Particularly in respect of the restricted works, the undertaker must...
301.No works comprising any part of the authorised development which...
302.Any approval of Teesside Windfarm required under paragraph 300 must...
303.(1) The authorised development must be carried out in accordance...
PART 23 FOR THE PROTECTION OF HUNTSMAN POLYURETHANES (UK) LIMITED
309.Authorisation of works details affecting pipelines or protected crossing
311.(1) Any authorisation by HPU required under paragraph 309(a) must...
315.(1) All piling within 1.5 metres of the centreline of...
316.(1) Where excavation of trenches (including excavation by dredging) adjacent...
317.(1) Where a trench is excavated across or parallel to...
318.(1) A minimum clearance of 1500 millimetres must be maintained...
321.Compliance with requirements, etc. applying to the protected land
323.(1) In preparing a construction access plan under paragraph 321...
324.(1) No works affecting access rights over the access roads...
326.If HPU has a dispute about the proposed insurance (including...
328.Further protection in relation to the exercise of powers under the Order
330.Prior to the commencement of the authorised development the undertaker...
PART 24 FOR THE PROTECTION OF NAVIGATOR TERMINALS SEAL SANDS LIMITED
332.For the protection of Navigator Terminals, the following provisions have...
333.In this Part of this Schedule— “Navigator Terminals” means Navigator...
335.No works comprising any part of the authorised development which...
336.Any approval of Navigator Terminals required under paragraph 334 must...
337.(1) The authorised development must be carried out with good...
PART 25 FOR THE PROTECTION OF NORTHUMBRIAN WATER LIMITED
340.For the protection of NW, the following provisions, unless otherwise...
341.In this Part of this Schedule— “alternative apparatus” means alternative...
342.The undertaker must not within the standard protection strips interfere...
343.The alteration, extension, removal or re-location of any apparatus shall...
344.In the situation, where in exercise of the powers conferred...
345.Regardless of any provision in this Order or anything shown...
346.If in consequence of the exercise of the powers conferred...
347.If in consequence of the exercise of the powers conferred...
348.(1) Subject to sub-paragraphs (2) and (3), if for any...
349.Any dispute arising between the undertaker and NW under this...
350.(1) Where in consequence of the proposed construction of any...
351.Prior to carrying out any works within the Order Limits...
374.For the protection of TGLP, TGPP and NGPL, the following...
375.In this Part of this Schedule— “alternate access agreement” means...
376.No relevant works are to be commenced until the design...
377.Following approval or deemed approval of the design package, the...
378.The undertaker will design and carry out or will procure...
392.Subject to paragraph 393, below, it shall be reasonable for...
393.It will be unreasonable for the NSMP entity to withhold...
394.The undertaker and the NSMP entity must, in carrying out...
396.The undertaker and the NSMP entity must, in carrying out...
397.Compliance with requirements, etc. applying to the NSMP operations
398.In undertaking any works in relation to the NSMP operations...
399.For the benefit of NSMP, the undertaker must not exercise...
404.Where an alternate access agreement has been concluded, reference to...
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: