8. Construct the calibration curve by plotting the corresponding masses of molybdenum in the calibration solutions (7.2) expressed in mg along the abscissa and the corresponding values of the absorbencies (7.4) given by the spectrometer reading along the ordinate.
From this curve determine the mass of molybdenum in the test solution (6.2) and the blank solution (7.1). These masses are designated (xs) and (xb) respectively.
The percentage of molybdenum in the fertiliser is:
If Method 25c has been used:
where:
Mo is the quantity of molybdenum expressed as a percentage of the fertiliser;
a is the volume in ml of the aliquot taken from the last dilute solution (6.2);
xs is the mass in μg of Mo in the test solution (6.2);
xb is the mass in μg of Mo in the blank solution (7.1) the volume of which corresponds to the volume (a) of the aliquot of the test solution (6.2);
V is the volume in ml of the extract solution obtained in accordance with Method 25a or 25b;
D is the factor corresponding to the dilution performed in 6.2;
M is the mass in g of the test sample taken in accordance with Method 25a or 25b.
Calculation of the dilution factor D: where (a1), (a2) are successive aliquot portions and (v1), (v2) are the volumes corresponding to their respective dilutions, the dilution factor D will be:
The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Rule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Part you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Part you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Rule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: