Search Legislation

The Air Quality Standards Regulations (Northern Ireland) 2010

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: The Air Quality Standards Regulations (Northern Ireland) 2010 (Schedules only)

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Air Quality Standards Regulations (Northern Ireland) 2010. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulation 8(1)

SCHEDULE 1N.I.Sampling points for measurement of sulphur dioxide, nitrogen dioxide and oxides of nitrogen, particulate matter, lead, benzene and carbon monoxide in ambient air

PART 1N.I.

GeneralN.I.

1.  Ambient air quality shall be assessed at sampling points located in accordance with this Schedule, except at locations set out in paragraph 2.

Commencement Information

I1Sch. 1 Pt. 1 para. 1 in operation at 11.6.2010, see reg. 1

2.  Compliance with limit values directed at the protection of human health does not need to be assessed at the following locations—

(a)any location situated within areas where members of the public do not have access and there is no fixed habitation;

(b)on factory premises or at industrial locations to which all relevant provisions concerning health and safety at work apply; and

(c)on the carriageway of roads and on the central reservations of roads except where there is normally pedestrian access to the central reservation.

Commencement Information

I2Sch. 1 Pt. 1 para. 2 in operation at 11.6.2010, see reg. 1

3.  Insofar as they are relevant, the principles set out in the Schedule also apply to indicative measurement and modelling.

Commencement Information

I3Sch. 1 Pt. 1 para. 3 in operation at 11.6.2010, see reg. 1

PART 2N.I.Macroscale siting of sampling points

Sampling points for the protection of human healthN.I.

1.  Sampling points directed at the protection of human health must be sited to provide data on—

(a)the areas within zones where the highest concentrations occur to which the population is likely to be directly or indirectly exposed for a period which is significant in relation to the averaging period of the limit values; and

(b)levels in other areas within the zones which are representative of the exposure of the general population.

Commencement Information

I4Sch. 1 Pt. 2 para. 1 in operation at 11.6.2010, see reg. 1

2.  Sampling points shall in general be sited to avoid measuring very small micro-environments in their immediate vicinity. Where feasible, the Department shall locate sampling points so as to be representative of air quality in a street segment of no less than 100 m in length at traffic-orientated sites or an area of at least 250 m x 250 m at industrial sites.

Commencement Information

I5Sch. 1 Pt. 2 para. 2 in operation at 11.6.2010, see reg. 1

3.  Sampling points in urban background locations shall be located so that their pollution level is influenced by the combined contribution from all sources upwind of the station. The pollution level should not be dominated by a single source unless such a situation is typical for a larger urban area. Those sampling points shall, as a general rule, be representative for several square kilometres.

Commencement Information

I6Sch. 1 Pt. 2 para. 3 in operation at 11.6.2010, see reg. 1

4.  Where the objective is to assess rural background levels, the sampling point shall not be influenced by agglomerations or industrial sites in its vicinity, i.e. closer than five kilometres.

Commencement Information

I7Sch. 1 Pt. 2 para. 4 in operation at 11.6.2010, see reg. 1

5.  Where contributions from industrial sources are to be assessed, at least one sampling point shall be installed downwind of the source in the nearest residential area. Where the background concentration is not known, an additional sampling point shall be situated within the main wind direction.

Commencement Information

I8Sch. 1 Pt. 2 para. 5 in operation at 11.6.2010, see reg. 1

6.  Sampling points shall also, where possible, be representative of similar locations not in their immediate vicinity.

Commencement Information

I9Sch. 1 Pt. 2 para. 6 in operation at 11.6.2010, see reg. 1

7.  Account shall be taken of the need to locate sampling points on islands, where it is necessary for the protection of human health.

Commencement Information

I10Sch. 1 Pt. 2 para. 7 in operation at 11.6.2010, see reg. 1

Protection of ecosystems and vegetationN.I.

8.  Sampling points targeted at the protection of ecosystems or vegetation shall be sited more than 20 km from agglomerations or more than 5 km from other built-up areas, industrial installations or motorways or major roads with traffic counts of more than 50,000 vehicles per day. The Department shall locate sampling points so as to be representative of air quality in a surrounding area of at least 1000 km2. A sampling point may be sited at a lesser distance or to be representative of air quality in a less extended area, taking account of geographical conditions or opportunities to protect particularly vulnerable areas. Account shall be taken of the need to assess air quality on islands.

Commencement Information

I11Sch. 1 Pt. 2 para. 8 in operation at 11.6.2010, see reg. 1

PART 3N.I.

Microscale siting of sampling pointsN.I.

9.  Insofar as is practicable, sampling points shall be situated in accordance with the following criteria—

[F1(a)the flow around the inlet sampling probe shall be unrestricted (in general free in an arc of at least 270° or 180° for sampling points at the building line) without any obstructions affecting the airflow in the vicinity of the inlet (normally some metres away from buildings, balconies, trees and other obstacles and at least 0.5 m from the nearest building in the case of sampling points representing air quality at the building line);

(b)in general, the inlet sampling point shall be between 1.5 m (the breathing zone) and 4 m above the ground. Higher siting may also be appropriate if the station is representative of a large area and any derogations should be fully documented;]

(c)the inlet probe shall not be positioned in the immediate vicinity of sources in order to avoid the direct intake of emissions unmixed with ambient air;

(d)the sampler’s exhaust outlet must be positioned so that recirculation of exhaust air to the sampler inlet is avoided;

(e)[F2in relation to the location of traffic-orientated samplers, sampling points must be at least 25 m from the edge of major junctions and no more than 10 m from the kerbside. A “major junction” is a junction which interrupts the traffic flow and causes different emissions (due to vehicles stopping and starting) from the rest of the road.]

10.  The following factors may also be taken into account—

(a)interfering sources;

(b)security;

(c)access;

(d)availability of electrical power and telephone communications;

(e)visibility of the site in relation to its surroundings;

(f)safety of public and operators;

(g)the desirability of co-locating sampling points for different pollutants; and

(h)planning requirements.

Commencement Information

I13Sch. 1 Pt. 3 para. 10 in operation at 11.6.2010, see reg. 1

[F311.  Any deviation from the criteria listed in this Part shall be documented in accordance with Part 4.]

[F4PART 4N.I.Documentation and review of site selection

1.  The Department shall, for all zones and agglomerations, fully document the site-selection procedures and record information to support the network design and choice of location for all monitoring sites.N.I.

2.  The documentation shall include compass-point photographs of the area surrounding monitoring sites and detailed maps.N.I.

3.  Where supplementary methods are used within a zone or agglomeration, the documentation shall include details of these methods and information on how the criteria listed in Article 7(3) of the Directive are met.N.I.

4.  The documentation shall be updated as necessary and reviewed at least every 5 years, to ensure that selection criteria, network design and monitoring site locations remain valid and optimal over time.]N.I.

Regulation 18(1) and (2)

SCHEDULE 2N.I.Limit values

Commencement Information

I14Sch. 2 in operation at 11.6.2010, see reg. 1

Sulphur dioxide

Averaging periodLimit value
One hour350 µg/m3 not to be exceeded more than 24 times a calendar year
One day125 µg/m3 not to be exceeded more than 3 times a calendar year

Nitrogen dioxide

Averaging periodLimit value
One hour200 µg/m3 not to be exceeded more than 18 times a calendar year
Calendar year40 µg/m3

Benzene

Averaging periodLimit value
Calendar year5 µg/m3

Carbon monoxide

Averaging periodLimit value
(1)

The maximum daily eight hour mean concentration of carbon monoxide shall be selected by examining eight hour running averages, calculated from hourly data and updated each hour. Each eight hour average so calculated will be assigned to the day on which it ends, i.e. the first calculation period for any one day will be the period from 17.00 on the previous day to 01.00 on that day, the last calculation period for any one day will be the period from 16.00 to 24.00 on that day.

Maximum daily eight hour mean(1)10 mg/m3

Lead

Averaging periodLimit value
Calendar year0.5 µg/m3

PM10

Averaging periodLimit value
One day50 µg/m3 not to be exceeded more than 35 times a calendar year
Calendar year40 µg/m3

PM2.5

Averaging periodLimit valueMargin of toleranceDate by which limit value is to be met
Calendar year25 µg/m320% on 11 June 2008, decreasing on the next 1 January and every 12 months thereafter by equal annual percentages to reach 0% by 1 January 20151 January 2015

Regulation 19(1)

SCHEDULE 3N.I.Target values

Commencement Information

I15Sch. 3 in operation at 11.6.2010, see reg. 1

Arsenic, cadmium, nickel and benzo(a)pyrene

PollutantTarget value for the total content in the PM10 fraction averaged over a calendar yearDate by which target value should be met
Arsenic6 ng/m331st December 2012
Cadmium5 ng/m331st December 2012
Nickel20 ng/m331st December 2012
Benzo(a)pyrene1 ng/m331st December 2012

Ozone

ObjectiveAveraging periodTarget value
(1)

The maximum daily eight-hour mean concentration shall be selected by examining eight-hour running averages, calculated from hourly data and updated each hour. Each eight-hour average so calculated shall be assigned to the day on which it ends, that is, the first calculation period for any one day will be the period from 17.00 hours on the previous day to 01.00 hours on that day, the last calculation period for any one day will be the period from 16.00 hours to 24.00 hours on the day.

(2)

If the three or five year averages cannot be determined on the basis of a full and consecutive set of annual data, the minimum annual data required for checking compliance with the target values will be valid data for one year in relation to the target value for the protection of human health and valid data for three years in relation to the target value for the protection of vegetation.

Protection of human healthMaximum daily eight hour mean(1)120 µg/m3 not to be exceeded on more than 25 days per calendar year averaged over three years(2)
Protection of vegetationMay to JulyAOT 40 (calculated from 1h values) 18,000 µg/m3.h averaged over five years(2)

PM2.5

Averaging periodTarget value
Calendar year25 µg/m3

Regulation 9(2) and Regulation 21(1)

SCHEDULE 4N.I.Long term objectives for ozone

Commencement Information

I16Sch. 4 in operation at 11.6.2010, see reg. 1

ObjectiveAveraging periodLong term objectiveDate by which long term objective should be met
Protection of human healthMaximum daily eight hour mean within a calendar year120 µg/m3Not defined
Protection of vegetationMay to JulyAOT 40 (calculated from 1h values) 6000 µg/m3.h.Not defined

Regulation 22

SCHEDULE 5N.I.Information and alert thresholds

Commencement Information

I17Sch. 5 in operation at 11.6.2010, see reg. 1

Alert thresholds for Sulphur dioxide and Nitrogen dioxide

PollutantAlert threshold(1)
(1)

To be measured over three consecutive hours at locations representative of air quality over the least 100 km2 or an entire zone, whichever is smaller.

Sulphur dioxide500 µg/m3
Nitrogen dioxide400 µg/m3

Information and alert thresholds for Ozone

PurposeAveraging periodThreshold
Information1 hour180 µg/m3
Alert1 hour240 µg/m3

Regulation 23

SCHEDULE 6N.I.Critical levels for the protection of vegetation

Commencement Information

I18Sch. 6 in operation at 11.6.2010, see reg. 1

Critical levels for the protection of vegetation

Averaging periodCritical level

Sulphur dioxide:

Calendar year and winter (1 October to 31 March)

20 µg/m3

Oxides of nitrogen:

Calendar year

30 µg/m3 NOx

Regulation 25(4)

SCHEDULE 7N.I.Information to be included in air quality plans

1.  Localisation of excess pollution—N.I.

(a)region;

(b)city (map); and

(c)measuring station (map, geographical co-ordinates).

Commencement Information

I19Sch. 7 para. 1 in operation at 11.6.2010, see reg. 1

2.  General information—N.I.

(a)type of zone (city, industrial or rural area);

(b)estimate of the polluted area (km2) and of the population exposed to the pollution;

(c)useful climatic data;

(d)relevant data on topography; and

(e)sufficient information on the type of targets requiring protection in the zone.

Commencement Information

I20Sch. 7 para. 2 in operation at 11.6.2010, see reg. 1

3.  Responsible authorities (names and addresses of persons responsible for the development and implementation of air quality plans).N.I.

Commencement Information

I21Sch. 7 para. 3 in operation at 11.6.2010, see reg. 1

4.  Nature and assessment of pollution—N.I.

(a)concentrations observed over previous years (before the implementation of the improvement measures);

(b)concentrations measured since the beginning of the project; and

(c)techniques used for the assessment.

Commencement Information

I22Sch. 7 para. 4 in operation at 11.6.2010, see reg. 1

5.  Origin of pollution—N.I.

(a)list of the main emission sources responsible for pollution (map);

(b)total quantity of emissions from these sources (tonnes per year); and

(c)information on pollution imported from other regions.

Commencement Information

I23Sch. 7 para. 5 in operation at 11.6.2010, see reg. 1

6.  Analysis of the situation—N.I.

(a)details of those factors responsible for exceeding the limit value or target value (transport, including cross-border transport, formation of secondary pollutants in the atmosphere); and

(b)details of possible measures for improvement of air quality.

Commencement Information

I24Sch. 7 para. 6 in operation at 11.6.2010, see reg. 1

7.  Details of those measures or projects for improvements which existed prior to 11 June 2008—N.I.

(a)local, regional, national and international measures; and

(b)observed effects of those measures.

Commencement Information

I25Sch. 7 para. 7 in operation at 11.6.2010, see reg. 1

8.  Details of those measures or projects adopted with a view to reducing pollution following 11 June 2008—N.I.

(a)listing and description of all the measures set out in the project;

(b)timetable for implementation; and

(c)estimate of the improvement of air quality planned and of the expected time required to attain these objectives.

Commencement Information

I26Sch. 7 para. 8 in operation at 11.6.2010, see reg. 1

9.  Details of the measures or projects planned or being researched for the long term.N.I.

Commencement Information

I27Sch. 7 para. 9 in operation at 11.6.2010, see reg. 1

10.  List of the publications, documents and work etc. used to supplement information required by this Schedule.N.I.

Commencement Information

I28Sch. 7 para. 10 in operation at 11.6.2010, see reg. 1

Regulation 28(2)

SCHEDULE 8N.I.Public information in relation to alert and information thresholds for nitrogen dioxide, sulphur dioxide and ozone

1.  In cases where the information threshold or the alert threshold for nitrogen dioxide, sulphur dioxide or ozone is exceeded the details set out in paragraphs 3 to 6, as a minimum, shall be made available to the public.N.I.

Commencement Information

I29Sch. 8 para. 1 in operation at 11.6.2010, see reg. 1

2.  In cases where either the information or alert thresholds are predicted to be exceeded, the information set out in paragraphs 3 to 6 shall be provided where practicable.N.I.

Commencement Information

I30Sch. 8 para. 2 in operation at 11.6.2010, see reg. 1

3.  Information on any incident where information or alert thresholds are exceeded—N.I.

(a)the location or area where thresholds are exceeded;

(b)the type of threshold exceeded (information or alert threshold);

(c)the time at which the threshold was exceeded and the duration of the incident; and

(d)in the case of ozone, the highest 1-hour and 8-hour mean concentration.

Commencement Information

I31Sch. 8 para. 3 in operation at 11.6.2010, see reg. 1

4.  Forecast for the following afternoon, day or days—N.I.

(a)the geographical area in which it is expected that an information or alert threshold will be exceeded; and

(b)the expected change in pollution, that is, improvement, stabilisation or deterioration, and the reasons for those changes.

Commencement Information

I32Sch. 8 para. 4 in operation at 11.6.2010, see reg. 1

5.  Information on the type of population concerned, possible health effects and recommended conduct in particular—N.I.

(a)information on the population groups at risk;

(b)description of likely symptoms;

(c)recommended precautions to be taken by the population concerned; and

(d)where to find further information.

Commencement Information

I33Sch. 8 para. 5 in operation at 11.6.2010, see reg. 1

6.  Information provided under this Schedule shall also include—N.I.

(a)information on preventive action to reduce pollution or exposure to it;

(b)an indication of main source sectors; and

(c)recommendations for action to reduce emissions.

Commencement Information

I34Sch. 8 para. 6 in operation at 11.6.2010, see reg. 1

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Rule and provides information about its policy objective and policy implications. They aim to make the Statutory Rule accessible to readers who are not legally qualified and accompany any Northern Ireland Statutory Rule or Draft Northern Ireland Statutory Rule laid before the UK Parliament during the suspension of the Northern Ireland Assembly.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources