The Level Crossing (Cullybackey Station) Order (Northern Ireland) 2023

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: The Level Crossing (Cullybackey Station) Order (Northern Ireland) 2023

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Level Crossing (Cullybackey Station) Order (Northern Ireland) 2023. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Statutory Rules of Northern Ireland

2023 No. 10

Road And Railway Transport

The Level Crossing (Cullybackey Station) Order (Northern Ireland) 2023

Made

27th January 2023

Coming into operation

20th February 2023

The railway undertaking made an application to the Department for Infrastructure(1) in accordance with section 66(4) of the Transport Act (Northern Ireland) 1967(2);

Before making the application the railway undertaking gave notice in accordance with section 66(5) and (6) of that Act to the council in whose district the crossing is situated;

The Department did not receive from that council any representation in respect of the said application;

The Department for Infrastructure makes the following Order in exercise of the powers conferred by section 66(1) and (2) of the Transport Act (Northern Ireland) 1967 and now vested in it(3).

Citation, commencement and interpretationN.I.

1.—(1) This Order may be cited as the Level Crossing (Cullybackey Station) Order (Northern Ireland) 2023 and shall come into operation on 20th February 2023.

(2) In this Order “the crossing” means the Cullybackey Station Level Crossing in the Borough of Ballymena and the County of Antrim whereby the road known as Station Road/Fenagh Road is crossed by the railway between Ballymena and Ballymoney Stations (NI Grid Reference D 062 057).

Commencement Information

I1Art. 1 in operation at 20.2.2023, see art. 1(1)

Suspension of statutory provisionsN.I.

2.  While this Order remains in force—

(a)section 47 of the Railways Clauses Consolidation Act 1845(4) (requirements as to gates);

(b)section 6 of the Railways Clauses Act 1863(5) (requirements as to lodges, etc); and

(c)any other statutory provision imposing requirements to the same or similar effect as those contained in the enactments mentioned in paragraphs (a) and (b),

shall not apply in relation to the crossing.

Commencement Information

I2Art. 2 in operation at 20.2.2023, see art. 1(1)

Provision of equipmentN.I.

3.  The railway undertaking shall at the crossing—

(a)provide, maintain and operate the barrier, lights, automatic and other devices, excluding traffic signs specified in Schedule 1, and shall give notice in writing to the Department for Infrastructure as soon as the provision thereof is complete;

(b)secure the provision, maintenance and operation by that Department of the traffic signs specified in Schedule 1; and

(c)comply with the conditions and requirements specified in Schedule 2.

Commencement Information

I3Art. 3 in operation at 20.2.2023, see art. 1(1)

RevocationN.I.

4.  The Level Crossing (Cullybackey Station) Order (Northern Ireland) 1985(6) is hereby revoked.

Commencement Information

I4Art. 4 in operation at 20.2.2023, see art. 1(1)

Sealed with the Official Seal of the Department for Infrastructure on 27th January 2023.

Legal seal

Chris Hughes

A senior officer of the Department for Infrastructure

Article 3 (a) and (b)

SCHEDULE 1N.I.PARTICULARS OF THE BARRIERS, LIGHTS, TRAFFIC SIGNS AND OTHER DEVICES

1.  Cattle-cum-trespass guards of standard railway design shall be provided adjacent to the ground, which is made up to the level of the carriageway. The guards shall extend the full distance between the fence on each side of the railway.N.I.

Commencement Information

I5Sch. 1 para. 1 in operation at 20.2.2023, see art. 1(1)

2.  A barrier shall be provided and pivoted as close to the railway on both sides of the road on each approach to the crossing. Barriers shall be aligned as parallel to the railway as practicable to reduce the crossing length.N.I.

Commencement Information

I6Sch. 1 para. 2 in operation at 20.2.2023, see art. 1(1)

3.  It shall be possible to raise and lower the barriers. When lowered, the barriers shall be as nearly horizontal as possible and shall extend across the full width of the carriageway and the footway.N.I.

Commencement Information

I7Sch. 1 para. 3 in operation at 20.2.2023, see art. 1(1)

4.  When the barriers are fully lowered, their uppermost surfaces shall be not less than 900mm above the road surface at the centre of the carriageway and the under-clearance between the barrier and the road shall not exceed 1 metre.N.I.

Commencement Information

I8Sch. 1 para. 4 in operation at 20.2.2023, see art. 1(1)

5.  When in the fully raised position, the barrier shall be inclined towards the carriageway an angle of between 5 and 10 degrees from the vertical. No part of either barrier or of any attachment thereto which is less than 5 metres above the level of the carriageway shall be horizontally displaced from the nearer edge of the carriageway by less than 450mm. No part of any barrier or any attachment thereto which in either case is less than 2 metres above the level of the footway shall normally be horizontally displaced from the edge of the footway further from the carriageway by less than 150mm.N.I.

Commencement Information

I9Sch. 1 para. 5 in operation at 20.2.2023, see art. 1(1)

6.  The barriers shall be as light as possible but shall also be strong enough to prevent distortion or fracture likely to be caused by wind pressure. It shall be possible to raise them by hand.N.I.

Commencement Information

I10Sch. 1 para. 6 in operation at 20.2.2023, see art. 1(1)

7.  The barriers shall be fitted with skirts so arranged that when the barriers are lowered the skirts fence in the space between the barrier and the ground.N.I.

Commencement Information

I11Sch. 1 para. 7 in operation at 20.2.2023, see art. 1(1)

8.  Three electric lamps, or equivalent (light emitting diodes) each of not less than 5 watts nominal rating or equivalent and with lenses not less than 50mm diameter, shall be fitted to each barrier, one within 150mm of its tip and the other 2 equally spaced. When illuminated, the lamps shall show a red light in each direction along the carriageway.N.I.

Commencement Information

I12Sch. 1 para. 8 in operation at 20.2.2023, see art. 1(1)

9.  The barriers shall display on both front and rear faces alternate red and white bands each approximately 600mm long and to the full depth of the barriers. A band of red retro-reflecting material not less than 50mm deep shall be provided along the length of each red band.N.I.

Commencement Information

I13Sch. 1 para. 9 in operation at 20.2.2023, see art. 1(1)

10.  Suitable screening shall be provided for each barrier machine to guard against danger to persons from the operating mechanisms and moving parts of the machine.N.I.

Commencement Information

I14Sch. 1 para. 10 in operation at 20.2.2023, see art. 1(1)

11.  A traffic light signal of the size, colour and type shown in Diagram 3104 of the Regulations shall be provided on the left-hand side of the road on each approach to the crossing and as close as practicable to the barrier. There shall be an additional traffic light signal of the same type on the right-hand side of the road on each approach to the crossing so located to be either in line with or on the railway side of the stop line mentioned in paragraph 13. The traffic light signals on each side of the railway shall be positioned so as to face outwards from the crossing towards approaching traffic. All the signals shall be capable of directional adjustment.N.I.

Commencement Information

I15Sch. 1 para. 11 in operation at 20.2.2023, see art. 1(1)

12.  An audible warning device shall be provided on or adjacent to each left hand side traffic light signal post on each approach to the crossing. Facilities shall be provided to reduce the sound output of these devices and any reduced sound output shall operate to suit local day and night conditions.N.I.

Commencement Information

I16Sch. 1 para. 12 in operation at 20.2.2023, see art. 1(1)

13.  A reflectorised stop line of the size and type shown in Diagram 1001 in the Regulations shall be provided across the left-hand side of carriageway on each approach to the crossing approximately 1 metre before the left-hand side traffic signal. Where this is not achievable due to crossing skew, the stop line shall be positioned in line with or in front of the duplicate traffic light signal. A stop line shall not be located behind a road traffic light signal in any circumstances.N.I.

Commencement Information

I17Sch. 1 para. 13 in operation at 20.2.2023, see art. 1(1)

14.  Where the road passes over the crossing, reflectorised edge of road markings of the size and type shown in Diagram 1012.1 in the Regulations shall be provided along each edge of the carriageway or made-up ground along each edge of the carriageway.N.I.

Commencement Information

I18Sch. 1 para. 14 in operation at 20.2.2023, see art. 1(1)

15.  The centre line of the carriageway shall be marked on the crossing between the stop lines mentioned in paragraph 13 and for a distance of approximately 38 metres on the north east side and for a distance of 40 metres on the south west side of the railway measured along the centre of the carriageway from stop lines with a reflectorised double continuous line road marking of the size and type shown in Diagram 1013.1A in the Regulations.N.I.

Commencement Information

I19Sch. 1 para. 15 in operation at 20.2.2023, see art. 1(1)

16.  At least two carriageway markings of the size, colour and type shown in Diagram 1014 in the Regulations shall be marked on the carriageway in an appropriate position on the approach side of the road marking described in paragraph 15.N.I.

Commencement Information

I20Sch. 1 para. 16 in operation at 20.2.2023, see art. 1(1)

17.  A traffic sign of the size, colour and type shown in Diagram 770 in the Regulations shall be provided on the left-hand side of each road approach to the crossing facing traffic approaching the crossing. Below this, a traffic sign of the size, colour and type shown in Diagram 773 in the Regulations shall be provided facing traffic approaching the crossing.N.I.

Commencement Information

I21Sch. 1 para. 17 in operation at 20.2.2023, see art. 1(1)

18.  An additional traffic sign of the size, colour and type shown in Diagram 770 in the Regulations shall be provided on the left hand side of the road approach for traffic leaving Ard Na Maine. Below this a traffic sign of the size, colour and type shown in Diagram 773 and 573 in the Regulations shall be provided facing traffic approaching the junction.N.I.

Commencement Information

I22Sch. 1 para. 18 in operation at 20.2.2023, see art. 1(1)

19.  An additional traffic sign of the size, colour and type shown in Diagram 770 in the Regulations shall be provided on the left hand side of the road approach for traffic leaving Markstown Crescent. Below this a traffic sign of the size, colour and type shown in Diagrams 773 and 573 in the Regulations shall be provided facing traffic approaching the junction.N.I.

Commencement Information

I23Sch. 1 para. 19 in operation at 20.2.2023, see art. 1(1)

20.  There shall be a signal control centre at Coleraine. A closed-circuit television camera shall be provided at the crossing and shall be connected to a viewing monitor adjacent to the crossing control point in the control centre.N.I.

Commencement Information

I24Sch. 1 para. 20 in operation at 20.2.2023, see art. 1(1)

21.  The control point shall have push-buttons to:N.I.

(a)lower the barriers – the ‘lower’ push-button;

(b)raise the barriers – the ‘raise’ push-button;

(c)release the protecting signals – the ‘crossing-clear’ push-button; and

(d)stop the lowering or raising of the barriers – the ‘stop’ push-button.

Commencement Information

I25Sch. 1 para. 21 in operation at 20.2.2023, see art. 1(1)

22.  Facilities shall be provided at the crossing to operate the barriers and other protective equipment.N.I.

Commencement Information

I26Sch. 1 para. 22 in operation at 20.2.2023, see art. 1(1)

23.  Lighting shall be provided as necessary so that during the hours of darkness in conditions of normal visibility it can be seen from the control point that the crossing is clear whilst the barriers are being lowered, and until the ‘crossing-clear’ push-button is pressed.N.I.

Commencement Information

I27Sch. 1 para. 23 in operation at 20.2.2023, see art. 1(1)

24.  Protecting railway signals shall be provided. Whilst the barriers are raised the railway signals will be set at danger and it shall not be possible to clear those signals. It will also be possible to raise the barriers from their positions across the carriageway by hand or under local control.N.I.

Commencement Information

I28Sch. 1 para. 24 in operation at 20.2.2023, see art. 1(1)

25.  In this Schedule “the Regulations” means the Traffic Signs Regulations (Northern Ireland) 1997(7).N.I.

Commencement Information

I29Sch. 1 para. 25 in operation at 20.2.2023, see art. 1(1)

Article 3 (c)

SCHEDULE 2N.I.CONDITIONS AND REQUIREMENTS TO BE COMPLIED WITH BY THE RAILWAY UNDERTAKING

1.  The carriageway shall be approximately 6.15 metres wide at the crossing.N.I.

Commencement Information

I30Sch. 2 para. 1 in operation at 20.2.2023, see art. 1(1)

2.  The ground at the two edge of the carriageway over the crossing shall be made-up to the level of the carriageway for the distance of approximately 1.8 metres beyond the edge to the north west and 1.5 metres beyond the edge to the south east, forming footways to either side of the carriageway.N.I.

Commencement Information

I31Sch. 2 para. 2 in operation at 20.2.2023, see art. 1(1)

3.  The surface of the carriageway and footway/run-off areas over the crossing shall be maintained in good and even condition.N.I.

Commencement Information

I32Sch. 2 para. 3 in operation at 20.2.2023, see art. 1(1)

4.  The barriers shall be kept in the fully raised position except during the time when engines, carriages or other vehicles passing along the railway have occasion to cross the road.N.I.

Commencement Information

I33Sch. 2 para. 4 in operation at 20.2.2023, see art. 1(1)

5.  The electric lamps or equivalent (light emitting diodes) on each barrier mentioned in Schedule 1 shall be lit at all times except when the barriers are in the fully raised position.N.I.

Commencement Information

I34Sch. 2 para. 5 in operation at 20.2.2023, see art. 1(1)

6.  The crossing shall be illuminated during the hours of darkness to such a standard that the operator can ascertain in conditions of normal visibility that the crossing is clear before the barriers are fully lowered.N.I.

Commencement Information

I35Sch. 2 para. 6 in operation at 20.2.2023, see art. 1(1)

7.  The protecting signals shall be controlled from the signalling control centre containing the crossing control point.N.I.

Commencement Information

I36Sch. 2 para. 7 in operation at 20.2.2023, see art. 1(1)

8.  The picture of the crossing shall be exhibited on the television monitor before the sequence of events to close the crossing to road traffic begins. The picture shall continue to be exhibited until either the barriers are fully raised after the ‘raise’ push-button is pressed, or if automatic raising is in operation after the ‘crossing-clear’ push-button is pressed.N.I.

Commencement Information

I37Sch. 2 para. 8 in operation at 20.2.2023, see art. 1(1)

9.  Visual indictors and an audible alarm shall be provided at the control point. The indicators shall show when:N.I.

(a)the main power supply is available;

(b)all barriers are fully raised;

(c)all the barriers are fully lowered;

(d)at least one of the intermittent red lights of the traffic light signals on each side of the railway is showing along the carriageway.

Commencement Information

I38Sch. 2 para. 9 in operation at 20.2.2023, see art. 1(1)

10.  The audible alarm shall sound if:N.I.

(a)any barrier is horizontally dislocated when in the fully lowered position;

(b)the main power supply fails;

(c)all the red traffic light signals facing in one direction fail.

Commencement Information

I39Sch. 2 para. 10 in operation at 20.2.2023, see art. 1(1)

11.  When the ‘lower’ push-button is pressed, or the train initiates the automatic lower sequence, the sequence of events to close the crossing to road traffic shall begin. The sequence shall be:N.I.

(a)the amber lamps shall immediately show, and the audible warning shall begin. The lights shall show for approximately 3 seconds;

(b)immediately the amber lamps are extinguished the intermittent red lights shall show;

(c)4 to 6 seconds later, the left-hand side barriers shall begin to descend and shall take a further 6 to 10 seconds to reach the lowered position;

(d)all boom lights shall illuminate when the first barrier moves out of the fully raised position;

(e)once the entrance barriers have reached the down position the right-hand side barriers shall then begin to descend taking 6 to 10 seconds to reach the lowered position;

(f)the audible warning shall stop when all the barriers are fully lowered;

(g)the train can then approach and pass over the crossing.

Commencement Information

I40Sch. 2 para. 11 in operation at 20.2.2023, see art. 1(1)

12.  The arrangements shall be such that the protecting railway signals can only be cleared after the barriers are fully lowered and the ‘crossing clear’ push-button has been pressed. Unless the protecting signals have been cleared for another train, all the barriers shall rise simultaneously either after the ‘raise’ push-button has been pressed or automatically as soon as the train has passed clear of the crossing.N.I.

Commencement Information

I41Sch. 2 para. 12 in operation at 20.2.2023, see art. 1(1)

13.  If a train overruns a protecting signal the arrangements shall be such that the red lights will immediately show omitting the amber sequence, the audible warning shall sound and all barriers remain in the raised position.N.I.

Commencement Information

I42Sch. 2 para. 13 in operation at 20.2.2023, see art. 1(1)

14.  Stowmarket Controls will be provided for signal CE283 at Cullybackey Station. When the Automatic Lower/ Stowmarket sequence is initiated the normal traffic light sequence of amber followed by flashing red lights shall begin. If Automatic Lower is selected and the route is set, the crossing closure sequence shall continue by lowering the barriers. If Automatic Lower is not available and selected or the route not set, an audible alarm shall sound when the traffic light signals are initiated and the barriers shall not lower without the signaller’s intervention. The barriers can be lowered at any time by the operation of the ‘Lower’ button or the traffic light signals can be cancelled by pressing the ‘Stop’ or ‘Raise’ button after a period of time that will have proved the train at a stand.N.I.

Commencement Information

I43Sch. 2 para. 14 in operation at 20.2.2023, see art. 1(1)

15.  The intermittent red lights shall continue to show until the barriers have begun to rise and shall be extinguished before the barriers have risen to an angle of 45 degrees above the horizontal.N.I.

Commencement Information

I44Sch. 2 para. 15 in operation at 20.2.2023, see art. 1(1)

16.  If, during the lowering sequence, both red road lights on any RTL are failed before the point in the sequence that the barriers are due to start lowering, then the barriers shall remain in the raised position. In this situation, the barriers can only be lowered from the local control unit until the fault is rectified. Once the barriers have begun to lower a further red light failure shall not stop or prevent them lowering.N.I.

Commencement Information

I45Sch. 2 para. 16 in operation at 20.2.2023, see art. 1(1)

17.  If the barriers do not achieve the fully raised position within 10 seconds of starting to raise, then the barriers stop in their present positions. The red RTL’s shall re-illuminate and a failed indication and alarm is given at the supervising control centre. A further 2 seconds may be added if required to allow for relay operation.N.I.

Commencement Information

I46Sch. 2 para. 17 in operation at 20.2.2023, see art. 1(1)

18.  A failure indication can only be extinguished when the barriers are either in the fully raised or fully lowered position. In the fully raised position, the failure indication shall only extinguish if the RTL’s are also extinguished. RTL’s shall be taken to be extinguished if the controls are set for them to be extinguished. No light proving is required.N.I.

Commencement Information

I47Sch. 2 para. 18 in operation at 20.2.2023, see art. 1(1)

19.  If automatic lowering or raising should take an abnormally long time an audible and visual warning shall be given at the control point.N.I.

Commencement Information

I48Sch. 2 para. 19 in operation at 20.2.2023, see art. 1(1)

EXPLANATORY NOTE

(This note is not part of the Regulations)

This Order provides for the provision and maintenance of manually controlled barriers supervised by closed circuit television at Cullybackey Station Level Crossing. Section 47 of the Railways Clauses Consolidation Act 1845 (which requires the railway undertaking to provide gates and gate-keepers), section 6 of the Railways Clauses Act 1863 (requirements as to lodges, etc.) and any other statutory provision imposing requirements to the same or similar effect, shall not apply to the crossing whilst this Order remains in force.

Schedule 1 sets out the particulars of barriers, lights, traffic signs and other devices, which are to be provided at the crossing. Schedule 2 states the condition and requirements with which the railway undertaking is to comply in relation to the crossing.

This Order revokes the Level Crossing (Cullybackey Station) Order (Northern Ireland) 1985, (S.R. 1985 No. 339).

(1)

S.I. 1999/283 (N.I.) Article 3(1)

(2)

1967 c. 37 (N.I.); section 66 was substituted by S.I. 1984/ 1986 (N.I. 15) Article 15 and amended by S.I. 1990/994 (N.I. 7) Schedule 2

(3)

The functions of the Ministry of Development under the Transport Act (Northern Ireland) 1967 transferred to the Department of the Environment by S.R. & O (N. I.) No. 1973 No. 504 Article 4 and to the Department for Regional Development by S.R. 1999 No. 481 Article 6(d) and Schedule 4 Part IV, the Department for Regional Development was renamed the Department for Infrastructure by virtue of section 1(6) of 2016 c.5 (N.I.).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Rule and provides information about its policy objective and policy implications. They aim to make the Statutory Rule accessible to readers who are not legally qualified and accompany any Northern Ireland Statutory Rule or Draft Northern Ireland Statutory Rule laid before the UK Parliament during the suspension of the Northern Ireland Assembly.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources