- Latest available (Revised)
- Point in Time (28/01/2004)
- Original (As made)
Version Superseded: 07/01/2013
Point in time view as at 28/01/2004.
There are currently no known outstanding effects for the The Solvent Emissions (Scotland) Regulations 2004 (revoked).
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Regulation 18(a)
Section7: SED Activities
PART A
NIL
PART B
The activities listed in column 1 of the table below if they are operated above the solvent consumption thresholds specified for those activities as set out in column 2 of that table.
Activity | Solvent consumption threshold in tonnes/year |
---|---|
Heatset web offset printing | 15 |
Publication rotogravure | 25 |
Other rotogravure, flexography, rotary screen printing, laminating or varnishing units | 15 |
Rotary screen printing on textile/cardboard | 30 |
Surface cleaning using substances or preparations which because of their content of volatile organic compounds classified as carcinogens, mutagens or toxic to reproduction under Directive 67/548/EEC M1 are assigned or need to carry one or more of the risk phrases R45, R46, R49, R60 or R61, or halogenated volatile organic compounds which are assigned or need to carry the risk phrase R40 | 1 |
Other surface cleaning | 2 |
Vehicle coating and vehicle refinishing | 0.5 |
Coil coating | 25 |
Other coating activities, including metal, plastic, textile (except rotary screen printing on textile), fabric, film and paper coating | 5 |
Winding wire coating | 5 |
Coating activity applied to wooden surfaces | 15 |
Dry cleaning | 0 |
Wood impregnation | 25 |
Coating activity applied to leather | 10 |
Footwear manufacture | 5 |
Wood and plastic lamination | 5 |
Adhesive coating | 5 |
Manufacture of coating preparations, varnishes, inks and adhesives | 100 |
Rubber conversion | 15 |
Vegetable oil and animal fat extraction and vegetable oil refining activities | 10 |
Manufacturing of pharmaceutical products | 50 |
(1) Expressions used both in this Part and in the Solvent Emissions Directive have the same meaning for the purposes of this Part as they have for the purposes of that Directive.
(2) For the purposes of this Part–
“adhesive” means any preparation, including all the organic solvents or preparations containing organic solvents necessary for its proper application, which is used to adhere separate parts of a product;
“adhesive coating” means any activity in which an adhesive is applied to a surface excluding the application of adhesive and laminating associated with printing activities;
“coating” means any preparation, including all the organic solvents or preparations containing organic solvents necessary for its proper application, which is used to provide a decorative, protective or other functional effect on a surface;
“coating activity” means any activity in which a single or a multiple application of a continuous film of a coating is applied (including a step in which the same article is printed using any technique) but does not include the coating of substrate with metals by electrophoretic and chemical spraying techniques;
“coil coating” means any activity where coiled steel, stainless steel, coated steel, copper alloys or aluminium strip is coated with either a film forming or laminate coating in a continuous process;
“consumption” means the total input of organic solvents into an installation per calendar year, or any other twelve month period, less any volatile organic compounds that are recovered for reuse;
“dry cleaning” means any industrial or commercial activity using volatile organic compounds in an installation to clean garments, furnishing and similar consumer goods excluding the manual removal of stains and spots in the textile and clothing industry;
“flexography” means a printing activity using an image carrier of rubber or elastic photopolymers on which the printing areas are above the non-printing areas and using liquid inks which dry through evaporation;
“footwear manufacture” means any activity of producing complete footwear or parts of footwear;
“halogenated organic solvent” means an organic solvent which contains at least one atom of bromine, chlorine, fluorine or iodine per molecule;
“heatset web offset printing” means a web-fed printing activity using an image carrier in which the printing and non-printing area are in the same plane, where–
the non-printing area is treated to attract water and reject ink;
the printing area is treated to receive and transmit ink to the surface to be printed; and
evaporation takes place in the oven where hot air is used to heat the printed material.
“ink” means a preparation, including all the organic solvents or preparations containing organic solvents necessary for its proper application which is used in a printing activity to impress text or images on to a surface;
“laminating associated to a printing activity” means the adhering together of two or more flexible materials to produce laminates;
“manufacturing of coating preparations, varnishes, inks and adhesives” means the manufacture of coating preparations, varnishes, inks and adhesives as final products and where carried out at the same site the manufacture of intermediates, by the mixing of pigments, resins and adhesive materials with organic solvent or other carrier, including–
dispersion and predispersion activities,
viscosity and tint adjustments, and
operations for filling the final product into its container;
“manufacturing of pharmaceutical products” means one or more of the following activities:
the chemical synthesis;
fermentation;
extraction; or
formulation and finishing,
of pharmaceutical products and where carried out at the same site, the manufacture of intermediate products;
“organic solvent” means any volatile organic compound which is used–
alone or in combination with other agents, and without undergoing a chemical change, to dissolve raw materials, products or waste materials, or;
as a cleaning agent to dissolve contaminants, or
as a dissolver, or
as a dispersion medium, or
as a viscosity adjuster, or
as a surface tension adjuster, or
as a plasticiser, or
as a preservative;
“other coating activities” means a coating activity applied to–
trailers, defined in categories O1, O2, O3 and O4 in Directive 70/156/EEC M2;
metallic and plastic surfaces including surfaces of airplanes, ships, trains;
textile, fabric, film and paper surfaces;
“printing activity” means any activity (not being a step in a coating activity) for reproducing text and/or images in which, with the use of an image carrier, ink is transferred onto any type of surface, including the use of associated varnishing, coating and laminating techniques;
“publication rotogravure” means a rotogravure printing activity used for printing paper for magazines, brochures, catalogues or similar products, using toluene-based inks;
“reuse” means the use of organic solvents recovered from an installation for any technical or commercial purpose and including use as a fuel but excluding the final disposal of such recovered organic solvent as waste;
“rotary screen printing” means a web-fed printing activity in which liquid ink which dries only through evaporation is passed onto the surface to be printed by forcing it through a porous image carrier, in which the printing area is open and the non-printing area is sealed off;
“rotogravure” means a printing activity using a cylindrical image carrier in which the printing area is below the non-printing area and liquid inks which dry through evaporation in which the recesses are filled with ink and the surplus is cleaned off the non-printing area before the surface to be printed contacts the cylinder and lifts the ink from those recesses;
“rubber conversion” means–
any activity of mixing, milling, blending, calendering, extrusion and vulcanisation of natural or synthetic rubber, and
any ancillary operations for converting natural or synthetic rubber into a finished product;
“surface cleaning” means any activity, except dry cleaning, using organic solvents to remove contamination from the surface of material including degreasing but excluding the cleaning of equipment; and a cleaning activity consisting of more than one step before or after any other activity shall be considered as one surface cleaning activity;
“vehicle coating” means a coating activity applied to the following vehicles–
new cars, defined as vehicles of category M1 in Directive 70/156/EEC M3, and of category N1 in so far as they are coated at the same installation as M1 vehicles,
truck cabins, defined as the housing for the driver, and all integrated housing for the technical equipment, of vehicles of categories N2 and N3 in Directive 70/156/EEC,
vans and trucks, defined as vehicles of categories M2 and M3 in Directive 70/156/EEC, but not including truck cabins,
buses, defined as vehicles of categories M2 and M3 in Directive 70/156/EEC;
“varnish” means a transparent coating;
“varnishing” means an activity by which varnish or an adhesive coating for the purpose of sealing the packaging material is applied to a flexible material;
“vegetable oil and animal fat extraction and vegetable oil refining activities” means any activity to extract vegetable oil from seeds and other vegetable matter, the processing of dry residues to produce animal feed, the purification of fats and vegetable oils derived from seeds, vegetable matter or animal matter;
“vehicle refinishing” means any industrial or commercial coating activity and associated degreasing activities performing–
the coating of road vehicles as defined in Directive 70/156/EEC, or part of them, carried out as part of vehicle repair, conservation or decoration outside of manufacturing installations, or
the original coating of road vehicles as defined in Directive 70/156/EEC or part of them with refinishing-type materials, where this is carried out away from the original manufacturing line, or
the coating of trailers (including semi-trailers) (category O);
“web-fed” means that the material to be printed is fed to the machine from a reel as distinct from separate sheets;
“winding wire coating” means any coating activity of metallic conductors used for winding the coils in transformers and motors etc.
“wood and plastic lamination” means any activity to adhere together wood or plastic to produce laminated products; and
“wood impregnation” means any activity giving a loading of preservative in timber;
(3) Without prejudice to sub-paragraph (4), an activity shall be deemed to operate above the solvent consumption threshold specified for that activity under this Part if the activity is likely to be operated above that threshold in any period of 12 months, having regard where relevant to any operation above that threshold in any period of 12 months before the date of coming into force of the SED Regulations.
(4) In this Part, “SED Regulations” shall have the same meaning as it has for the purposes of Parts 3 and 4 of Schedule 3 to these Regulations.”.
Marginal Citations
M1O.J. 196, 16.8.1967, p.1 as last amended by Commission Directive 98/98/EC (O.J. L 355, 30.12.1998, p.1).
M2O.J. L 42, 23.2.1970, p.1; relevant amending directives are: Council Directive 92/53/EEC (O.J. L 225, 10.08.1992, p.1) and Commission Directive 2001/116/EC (O.J L. 18, 21.1.2002, p.1).
M3O.J. L 42, 23.2.1970, p.1 as amended by Directive 97/27/EC (O.J. L 233, 25.8.1997, p.1).
Regulation 19(c)
12. The prescribed date for a new SED installation is–
(a)in relation to a new SED installation brought into operation before the date of coming into force of the SED Regulations–
(i)where an application for a permit to operate the SED installation is made before the expiry of a period 4 months beginning on the date of coming into force of the SED Regulations, the determination date for the SED installation;
(ii)where no such application is made, the day after the expiry of the period of 4 months beginning on the date of coming into force of the SED Regulations; and
(b)in relation to all other new SED installations, the date of coming into force of the SED Regulations.
13.—(1) Subject to paragraphs 14 and 15, the prescribed date for an existing SED installation is–
(a)where an application for a permit to operate the SED installation is duly made by the relevant date, the determination date for the SED installation;
(b)where no such application is made, 1st November 2006.
(2) For the purposes of sub-paragraph (1) the relevant date for an existing SED installation is–
(a)for installations wishing to use the reduction scheme, 31st October 2005; and
(b)for all other installations, 31st October 2006.
14.—(1) Where on or after 1st April 2001 and before the date of coming into force of the SED Regulations there was a substantial change in the operation of an existing SED installation, the prescribed date for the affected part shall be–
(a)where an application for a permit authorising the operation of that part of the installation is duly made before the expiry of a period 4 months beginning on the date of coming into force of the SED Regulations, the determination date for the SED installation;
(b)where no such application is made, the day after the expiry of a period of 4 months beginning on the date of coming into force of the SED Regulations.
(2) Where after the date of coming into force of the SED Regulations, an existing SED installation undergoes a substantial change in operation, the prescribed date for the affected part shall be the date on which the change is made, if earlier than the date which would be the prescribed date for the SED installation under this Part.
(3) Sub paragraphs (1) and (2) do not apply to that part of the SED installation which undergoes a substantial change in operation where the total emissions of the SED installation do not exceed those that would have been permitted had the affected part been subject to a permit containing conditions necessary to ensure that the SED installation complied with the requirements of Articles 5, 8 and 9 of the Solvent Emissions Directive.
15.—(1) Where on or after 1st April 2001 and before the date of coming into force of the SED Regulations, abatement equipment was installed in an existing SED installation, the prescribed date for the affected part shall be–
(a)where an application for a permit authorising the operation of the affected part is duly made before the expiry of a period of 4 months beginning on the date of coming into force of the SED Regulations, the determination date for the SED installation;
(b)where no such application is made, the day after the expiry of a period of 4 months beginning on the date of coming into force of the SED Regulations.
(2) Subject to sub-paragraph (3), where after the date of coming into force of the SED Regulations abatement equipment is installed in an installation, the prescribed date for the affected part shall be the date on which the abatement equipment is installed if earlier than the date which would be the prescribed date for the SED installation under this Part.
(3) Where the abatement equipment is to be installed in an installation in respect of which the operator has made an application to use a reduction scheme, the prescribed date for the affected part shall be the determination date for that part.
16.—(1) Where an existing SED installation uses at the date of coming into force of the SED Regulations a risk phrase substance or preparation, the prescribed date for the SED installation shall be–
(a)where an application for a permit authorising the operation of the part of the installation in which the substance or preparation is used is duly made before the expiry of a period 4 months beginning on the date of coming into force of the SED Regulations, the determination date for the SED installation;
(b)where no such application is made, the day after the expiry of a period of 4 months beginning on the date of coming into force of the SED Regulations.
(2) Where after the date of coming into force of the SED Regulations, an existing SED installation begins using a risk phrase substance or preparation, the prescribed date for the SED installation shall be the date on which the substance or preparation is first used.
(3) Where after the date of coming into force of the SED Regulations a substance or preparation used in an existing SED installation becomes a risk phrase substance or preparation, the prescribed date for the SED installation shall be the date four months after the date on which the risk phrase is assigned to that substance or preparation.
17.—(1) Expressions used both in this Part and Part 4 and in the Solvent Emissions Directive have the same meaning for the purposes of those Parts as they have for the purposes of that Directive.
(2) In this Part–
“abatement equipment” means equipment used to abate the effects of emissions of volatile organic compounds;
“affected part” means that part of an SED installation which undergoes a substantial change in operation or in which abatement equipment is installed or in which a risk phrase substance or preparation is used or assigned;
“determination date” means–
for an SED installation or part of an SED installation, in relation to which a permit is granted, the date on which it is granted, whether in pursuance of the application for the permit, or, on an appeal, of a direction to grant it;
for an SED installation or part of an SED installation, in relation to which a permit is refused, and
if the applicant for the permit appeals against the refusal, the date of the affirmation of the refusal;
if no appeal is made to the Scottish Ministers against the refusal, the date immediately following the last day, determined in accordance with paragraph 2 of Schedule 8, on which notice of appeal might have been given;
following the determination of an appeal to the Scottish Ministers, no appeal is then made to the sheriff, the twenty second day after that determination;
where any further appeal is taken, the day after the expiry of the period allowed for appeal therefrom or, if there is no such date, the date of final determination of such appeal;
for an SED installation or part of an SED installation in relation to which an application is withdrawn in accordance with regulation 5(5) or is deemed to have been withdrawn in accordance with paragraph 4 of Schedule 4, the date the application is withdrawn, or is deemed to have been withdrawn;
“existing SED installation” means an SED installation which was–
put into operation before 1st April 2001; or
put into operation on or after that date but before 1st April 2002, provided that–
the operation of the installation was authorised by the grant of a permit or authorisation before 1st April 2001; or
an application for such a permit or authorisation was duly made before that date,
and where an installation becomes authorised as an SED installation for the first time as a result of a variation granted for the purposes of sections 10 or 11 of the Environmental Protection Act 1990 or regulation 13 of the 2000 Regulations, references in this definition to the grant of a permit or authorisation shall be construed as references to that variation and not to the original grant of the permit or authorisation, and references to the grant of a permit or authorisation shall be construed as references to the service of a notice giving effect to that variation;
“halogenated volatile organic compound” means a volatile organic compound containing bromine, chlorine, fluorine or iodine;
“new SED installation” means a SED installation which is put into operation on or after 1st April 2001, other than an existing SED installation; and
“risk phrase substance or preparation” means–
in relation to an SED activity other than dry cleaning (as defined in paragraph (2) of Part B of Chapter 7 of Part 1 of Schedule 1), a substance or preparation which, because of its content of volatile organic compounds classified as carcinogens, mutagens, or toxic to reproduction under Directive 67/548/EEC M4 is assigned or needs to carry the risk phrases R45, R46, R49, R60 and R61 or, in the case of halogenated volatile organic compounds, is assigned or needs to carry the risk phrase R40 and a substance or preparation “becomes a risk phrase substance or preparation” when, because of its content of volatile organic compounds or, as the case may be, halogenated volatile organic compounds, it is assigned or needs to carry one or more of those risk phrases;
in relation to dry-cleaning (as defined in paragraph (2) of Part B of Chapter 7 of Part 1 of Schedule 1), “risk phrase substance or preparation” means a substance or preparation which, because of its content of volatile organic compounds classified as carcinogens, mutagens, or toxic to reproduction under Directive 67/548/EEC M5 is assigned or needs to carry the risk phrases R45, R46, R49, R60 and R61; and a substance or preparation “becomes a risk phrase substance or preparation” when, because of its content of volatile organic compounds, it is assigned or needs to carry one or more of those risk phrases; and
“the SED Regulations” means the Solvent Emissions (Scotland) Regulations 2004.
18.—(1) Parts 1 to 3 of this Schedule shall apply subject to the provisions of this Part.
(2) Where an installation is wholly an SED installation and only carries out activities which do not fall within any section of Chapters 1 to 6 of Part 1 of Schedule 1 the prescribed date for that installation shall be determined in accordance with Part 3.
(3) Subject to sub-paragraphs (4) to (7), the prescribed date for installations which carry out an activity falling within a description in any section of Chapters 1 to 6 of Part 1 of Schedule 1 (and any directly associated activities) shall be determined in accordance with Parts 1 or 2.
(4) Subject to sub-paragraphs (5) to (7), where an SED installation carries out activities which are also wholly or partly activities falling within any description in any section of Chapters 1 to 6 of Part 1 of Schedule 1 (and any directly associated activities), the prescribed date for that installation shall be determined in accordance with paragraphs 12 and 13 of Part 3 unless–
(a)the activities carried out in the SED installation fall wholly within any description of processes set out in Schedule 1 to the 1991 Regulations whether under the heading “Part A” or “Part B” and are wholly covered by an authorisation granted under section 6 of the Environmental Protection Act 1990;
(b)the anticipated prescribed date for the installation under Part 1 or 2 is earlier than the anticipated prescribed date for the SED installation under paragraph 12 or 13 of Part 3; or
(c)an application to operate the installation has already been made or is already deemed to have been made at the date of coming into force of the SED Regulations.
(5) Subject to sub-paragraph (6), where an installation–
(a)carries out an SED activity and directly associated activities which are only partly also activities falling within a description in any section of Chapters 1 to 6 of Part 1 of Schedule 1 (and any directly associated activities); and
(b)falls within sub-paragraph (4)(b),
the installation shall be regarded, for the purposes of this Schedule, as if it were two separate installations one consisting of the part of the installation carrying out activities under any section of Chapters 1 to 6 in Part 1 of Schedule 1 (and any directly associated activities) for which the prescribed date shall be determined in accordance with Parts 1 or 2 and the other consisting of the remainder of the installation for which the prescribed date shall be determined in accordance with Part 3.
(6) Where sub paragraph (5) applies the operator may apply in writing to SEPA for consent to make an application at the earliest anticipated prescribed date covering the whole installation.
(7) Where–
(a)an installation carries out an SED activity and any directly associated activities which are–
(i)only partly also activities falling within a description in any section of Chapters 1 to 6 of Part 1 of Schedule 1 (and any directly associated activities); and
(ii)the part of the installation falling within that description is subject to an authorisation;
(b)the anticipated prescribed date for that installation under Part 1 or 2 is later than the anticipated prescribed date for the SED installation under Part 3; and
(c)before the anticipated prescribed date for the SED installation under Part 3, an application for a variation of the authorisation is made in respect of the SED activity,
the prescribed date for the whole installation (including the part containing the SED installation) shall be determined in accordance with Parts 1 or 2.
(8) Where abatement equipment is installed in an existing SED installation or that installation undergoes a substantial change in operation the prescribed date for the affected part shall be determined in accordance with paragraphs 14 or 15 of Part 3 unless–
(a)the prescribed date for the installation under Parts 1 or 2 or paragraphs 12 or 13 of Part 3 is earlier than the prescribed date for the affected part of the SED installation under paragraphs 14 or 15 of Part 3, or
(b)in relation to an SED installation at which abatement equipment is installed, the activities carried out by the affected part fall wholly within any description of processes set out in Schedule 1 to the 1991 Regulations whether under the heading “Part A” or “Part B” and are wholly covered by an authorisation granted under section 6 of the Environmental Protection Act 1990.
19. In this Part–
“the 1991 Regulations” mean the Environmental Protection (Prescribed Processes and Substances) Regulations 1991 M6;
“affected part” shall have the same meaning as it has for the purposes of Part 3 of this Schedule;
“anticipated prescribed date” means–
in relation to a prescribed date under Part 1 of this Schedule, the last day of a period of 4 months beginning on the last day for making an application for a permit under that Part;
in relation to a prescribed date for a deemed application under paragraph 3 of Part 2 of this Schedule, the last day of a period of 12 months beginning on the relevant date specified in paragraph 10 of that Part;
in relation to a prescribed date under paragraphs 12 and 13 of Part 3, the last day of a period of 4 months beginning on the last day for making an application for a permit under this Part;
“existing SED installation” shall have the same meaning as it has for the purposes of Part 3 of this Schedule; and
“the SED Regulations” shall have the same meaning as it has for the purposes of Part 3 of this Schedule.”
Marginal Citations
M4O.J. 196, 16.8.1967, p.1 as last amended by Commission Directive 98/98/EC (O.J. L 355, 30.12.1998, p.1).
M5O.J. 196, 16.8.1967, p.1 as last amended by Commission Directive 98/98/EC (O.J. L 355, 30.12.1998, p.1).
M6S.I. 1991/472; as amended by S.I. 1993/1749, 2405, 1995/3247, 1998/767 and S.S.I. 2000/323.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: