- Latest available (Revised)
- Point in Time (01/04/2014)
- Original (As made)
Point in time view as at 01/04/2014.
There are currently no known outstanding effects for the The Renewables Obligation (Scotland) Order 2009, Section 25.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
25.—(1) Subject to article 26, the RO eligible renewable output of a generating station in any month is equal to—
(a)where the RO input electricity used by the generating station during that month does not exceed 0.5% of the RO output electricity of that station during that month, ; and
(2) In paragraph (1)—
(a)A is equal to
where—
C is the RO output electricity of the generating station during the month in question;
D is the energy content of all of the renewable sources used in generating that station’s RO output electricity during that month, less the energy content of—
any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of sub-head (bb) or (cc) is in part composed);
any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass); and
except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than 2 megajoules per metre cubed; and
E is the energy content of all of the fuels used in generating that station’s RO output electricity during that month;
B is the RO output electricity of that station during that month less the RO input electricity it uses during that month;
C has the same meaning as in sub-paragraph (a)(i); and
F is the total amount of electricity generated by that station from an ineligible renewable source during that month.
(3) Paragraphs (4) and (7) apply for the purposes of this Part and Part 6.
(4) Where during any month the RO eligible renewable output of a generating station is generated in two or more ways, the proportion of the station’s RO eligible renewable output which is generated in each of those ways is—
(a)in the case of electricity generated in the way described as “landfill gas heat recovery” in Schedule 2, ;
(b)in the case of electricity generated using mixed gas in the way described as “AD” in Schedule 2, ;
(c)in the case of electricity generated using mixed gas in the way described as “electricity generated from sewage gas” in Schedule 2, ; and
(d)in the case of electricity generated in a way not falling within sub-paragraph (a), (b) or (c), .
(5) In paragraph (4)—
(a)G is the maximum capacity in that month at which the station could generate electricity—
(i)in the way described as “landfill gas heat recovery” in Schedule 2;
(ii)using RO capacity; and
(iii)for a sustained period without causing damage to the station (assuming the heat used by the station to generate electricity was available to it without interruption);
(b)H is the total installed capacity of the RO capacity of the station in that month;
(c)I is the energy content of the mixed gas used in generating the station’s RO output electricity during that month;
(d)J is the energy content of all of the renewable sources used in generating the station’s RO output electricity during that month;
(e)K is the dry mass of—
(i)any waste which constitutes a renewable source (other than sewage); and
(ii)any biomass (other than sewage);
from which the mixed gas used in generating the station’s RO output electricity during that month is formed, less the dry mass of any digestible fossil fuel from which that waste or biomass is in part composed;
(f)L is the dry mass of all of the material from which the mixed gas used in generating the station’s RO output electricity during that month is formed, less the dry mass of any digestible fossil fuel from which that material is in part composed;
(g)M is the dry mass of all the material from which the mixed gas used in generating the station’s RO output electricity during that month is formed, less the dry mass of any digestible fossil fuel from which that material is in part composed;
(h)N is the energy content of the renewable sources used when generating the station’s RO output electricity in that way during that month less the energy content of—
(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which a fuel the energy content of which is deducted by virtue of head (ii) or (iii) is in part composed);
(ii)any of those renewable sources which is Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass); and
(iii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the station of less than 2 megajoules per metre cubed; and
(i)P is the energy content of all of the renewable sources used in generating the station’s RO output electricity during that month less the energy content of—
(i)any fossil fuel from which those renewable sources are in part composed (other than fossil fuel from which fuel the energy content of which is deducted by virtue of head (ii) or (iii) is in part composed);
(ii)any of those renewable sources which is a Solid Recovered Fuel (other than Solid Recovered Fuel which constitutes biomass); and
(iii)except in the case of an excepted generating station, any of those renewable sources which is a gaseous fuel produced by means of gasification or pyrolysis and which has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals as the inlet to the station of less than 2 megajoules per metre cubed.
(6) References in paragraph (4) to a way of generating RO eligible renewable output are references to—
(a)one of the ways of generating electricity described in Schedule 2;
(b)generating electricity in the way described in article 28D(1)(c) (low-range co-firing of relevant energy crops);
(c)generating electricity in the way described in article 28E(1)(c) (low-range co-firing of relevant energy crops with CHP);
(d)generating electricity from renewable sources in a way not falling within sub-paragraph (a), (b) or (c).
(7) Where during any month two or more types of generating capacity form part of the RO capacity of a generating station, the proportion of the station’s RO eligible renewable output which is generated using each of those types of generating capacity is .
(8) In paragraph (7)—
(a)Q is the total installed capacity of that type of generating capacity of the station in that month (other than any of that type of generating capacity which forms part of the excluded capacity of the station); and
(b)R is the total installed capacity of the RO capacity of the station in that month.
(9) References in paragraph (7) to a type of generating capacity are references to one of the following—
(a)pre-2013 capacity;
(b)2013/14 capacity;
(c)2014/15 capacity;
(d)2015/16 capacity;
(e)post-2016 capacity.
(10) In this article—
“dry mass”, in relation to a fuel, means the mass of the fuel when any water present in it has been removed; and
“mixed gas” means gas formed by the anaerobic digestion of sewage together with—
waste which constitutes a renewable source (other than sewage); or
biomass (other than sewage).]
Textual Amendments
F2Art. 25 substituted (1.4.2014) by The Renewables Obligation (Scotland) Amendment Order 2014 (S.S.I. 2014/94), arts. 1(1), 10 (with art. 27)
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Executive Note sets out a brief statement of the purpose of a Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2005 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: