There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Renewables Obligation (Scotland) Order 2009. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
Articles 7, 8, 9, 10 and 12
Obligation period | Number of SROCs per megawatt hour of electricity supplied in Great Britain | Number of SROCs per megawatt hour of electricity supplied in Northern Ireland |
---|---|---|
1st April 2009 to 31st March 2010 | 0.097 | 0.035 |
1st April 2010 to 31st March 2011 | 0.104 | 0.040 |
1st April 2011 to 31st March 2012 | 0.114 | 0.050 |
1st April 2012 to 31st March 2013 | 0.124 | 0.063 |
1st April 2013 to 31st March 2014 | 0.134 | 0.063 |
1st April 2014 to 31st March 2015 | 0.144 | 0.063 |
1st April 2015 to 31st March 2016 | 0.154 | 0.063 |
Each subsequent period of twelve months ending with the period of twelve months ending on 31st March 2027 | 0.154 | 0.063 |
Articles 27, 30, and 33
1.—(1) In this Schedule–
“AD” means electricity generated from gas formed by the anaerobic digestion of material which is neither sewage nor material in a landfill;
“advanced gasification” means electricity generated from a gaseous fuel which is produced from waste or biomass by means of gasification, and has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the generating station of at least 4 megajoules per metre cubed;
“advanced pyrolysis” means electricity generated from a liquid or gaseous fuel which is produced from waste or biomass by means of pyrolysis, and–
in the case of a gaseous fuel, has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the generating station of at least 4 megajoules per metre cubed; and
in the case of a liquid fuel, has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the generating station of at least 10 megajoules per kilogram;
“co-firing of biomass” means electricity generated from regular biomass in a month in which the generating station generates electricity partly from fossil fuel and partly from renewable sources;
“co-firing of biomass with CHP” means electricity generated from regular biomass by a qualifying combined heat and power generating station in a month in which it generates electricity partly from fossil fuel and partly from renewable sources, and where the fossil fuel and regular biomass have been burned in separate boilers or engines;
“co-firing of energy crops” means electricity generated from energy crops in a month in which the generating station generates electricity partly from fossil fuel and partly from renewable sources;
“co-firing of energy crops with CHP” means electricity generated from energy crops by a qualifying combined heat and power generating station in a month in which it generates electricity partly from fossil fuel and partly from renewable sources, and where the fossil fuel and energy crops have been burned in separate boilers or engines;
“dedicated biomass” means electricity generated from regular biomass in a month in which the generating station generates electricity only from regular biomass or only from biomass;
“dedicated energy crops” means electricity generated from energy crops in a month in which the generating station generates electricity only from energy crops or only from biomass;
“electricity generated from landfill gas” means electricity generated from gas formed by the digestion of material in a landfill;
“electricity generated from sewage gas” means electricity generated from gas formed by the anaerobic digestion of sewage (including sewage which has been treated or processed);
“energy from waste with CHP” means electricity generated from the combustion of waste (other than a fuel produced by means of anaerobic digestion, gasification or pyrolysis) in a qualifying combined heat and power generating station in a month in which the station generates electricity only from renewable sources and those renewable sources include waste which is not biomass;
“geopressure” means electricity generated using naturally occurring subterranean pressure;
“geothermal” means electricity generated using naturally occurring subterranean heat;
“hydroelectric” means electricity generated by a hydro generating station;
“offshore wind” means electricity generated from wind by a generating station that is offshore, and a generating station is offshore if–
its turbines are situated wholly in offshore waters; and
it is not connected to dry land by means of a permanent structure which provides access to land above the mean low water mark;
“onshore wind” means electricity generated from wind by a generating station that is not offshore;
“solar photovoltaic” means electricity generated from the direct conversion of sunlight into electricity;
“standard gasification” means electricity generated from a gaseous fuel which is produced from waste or biomass by means of gasification, and has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the generating station which is at least 2 megajoules per metre cubed but is less than 4 megajoules per metre cubed;
“standard pyrolysis” means electricity generated from a gaseous fuel which is produced from waste or biomass by means of pyrolysis, and has a gross calorific value when measured at 25 degrees Celsius and 0.1 megapascals at the inlet to the generating station which is at least 2 megajoules per metre cubed but is less than 4 megajoules per metre cubed;
“tidal impoundment – tidal barrage” means electricity generated by a generating station driven by the release of water impounded behind a barrier using the difference in tidal levels where the barrier is connected to both banks of a river and the generating station has a declared net capacity of less than 1 gigawatt;
“tidal impoundment – tidal lagoon” means electricity generated by a generating station driven by the release of water impounded behind a barrier using the difference in tidal levels where the barrier is not a tidal barrage and the generating station has a declared net capacity of less than 1 gigawatt;
“tidal stream” means electricity generated from the capture of the energy created from the motion of naturally occurring tidal currents in water; and
“wave” means electricity generated from the capture of the energy created from the motion of naturally occurring waves on water.
(2) For the purposes of this Schedule–
(a)fossil fuel does not include waste which is a renewable source; and
(b)in determining how electricity has been generated, no account is to be taken of any fossil fuel or waste which a generating station uses for permitted ancillary purposes.
Generation type | Amount of electricity to be stated in a renewables obligation certificate |
---|---|
Electricity generated from landfill gas | 4 megawatt hours |
Electricity generated from sewage gas | 2 megawatt hours |
Co-firing of biomass | |
Onshore wind | 1 megawatt hour |
Hydro-electric | |
Co-firing of energy crops | |
Energy from waste with CHP | |
Geopressure | |
Co-firing of biomass with CHP | |
Standard gasification | |
Standard pyrolysis | |
Offshore wind | |
Dedicated biomass | ⅔ megawatt hour |
Co-firing of energy crops with CHP | |
Wave | |
Tidal-stream | |
Advanced gasification | |
Advanced pyrolysis | |
AD | |
Dedicated energy crops | |
Dedicated biomass with CHP | ½ megawatt hour |
Dedicated energy crops with CHP | |
Solar photovoltaic | |
Geothermal | |
Tidal impoundment – tidal barrage | |
Tidal impoundment – tidal lagoon |
Generation type | Amount of electricity to be stated in a renewables obligation certificate |
---|---|
Electricity generated from landfill gas | |
Electricity generated from sewage gas | |
Offshore wind | 1 megawatt hour |
Wave | |
Solar photovoltaic |
Generation type | Amount of electricity to be stated in a renewables obligation certificate |
---|---|
Electricity generated from landfill gas | |
Electricity generated from sewage gas | 1 megawatt hour |
Article 48(3)
Obligation period | Amount |
---|---|
1st April 2008 to 31st March 2009 | £910,000 |
1st April 2009 to 31st March 2010 | £970,000 |
1st April 2010 to 31st March 2011 | £1,040,000 |
1st April 2011 to 31st March 2012 | £1,140,000 |
1st April 2012 to 31st March 2013 | £1,240,000 |
1st April 2013 to 31st March 2014 | £1,340,000 |
1st April 2014 to 31st March 2015 | £1,440,000 |
1st April 2015 to 31st March 2016 | £1,540,000 |
Each subsequent period of twelve months ending with the period of twelve months ending on 31st March 2027 | £1,540,000 |
Article 59
1. The Authority must establish and maintain the Register referred to in article 59 (which may be in electronic form) at one or more of its premises.
2. The Register must identify whether or not a SROC subsists and details of its particulars.
3. Particulars of a SROC comprise–
(a)the name of the person to whom the Authority issues the SROC or, where the Authority has amended the Register in dealing with a request for substitution in accordance with paragraph 7, the name of the substitute (“the registered holder”); and
(b)an identifier unique to the SROC (“the SROC identifier”) determined by the Authority and containing the following information (or reference to that information in coded format)–
(i)the month and year during which the electricity was generated;
(ii)the location of the generating station or, where the SROC certifies the matters within section 32B(5), (6) or (8) of the Act, the location of the agent to whom, by virtue of article 35, the SROC was issued;
(iii)a description of that generating station or, where the SROC certifies the matters within section 32B(5), (6) or (8) of the Act, the generating stations to which the SROC relates, including reference to the renewable source or sources used by it or them to generate electricity;
(iv)the date of issue of the SROC; and
(v)the number given to the SROC by the Authority.
4. A person may only be the registered holder of a SROC or have an entry made and maintained in respect of them under article 59(3)(b) if they provide to the Authority in writing–
(a)evidence of their identity; and
(b)where persons are authorised to act on their behalf in respect of the production of SROCs under article 5(2) or in respect of requests for amendments to be made to the Register as provided for in this Schedule, details of those persons.
5. The Authority may from time to time draw up procedural guidelines for itself and others to assist it in maintaining the Register and carrying out its functions in respect thereof.
6. The Authority must delete from the Register any SROC which–
(a)has been revoked by it;
(b)has been produced to it under article 5(2);
(c)is no longer eligible to be produced to it under article 5(2);
(d)it is asked to delete from the Register by the registered holder of the SROC; or
(e)has been (according to the Northern Ireland authority) produced to the Northern Ireland authority by a Northern Ireland supplier under a NIRO Order,
and where a SROC is so deleted, it cannot thereafter be produced to the Authority under article 5(2).
7. Where the registered holder of a SROC and a person whom the holder wishes to be the registered holder of it require the Register to be amended, by substituting for the name of the registered holder the name of the other person (“the substitute”), (who must be a person whose name is included on the list referred to in article 59(3)(b))–
(a)the registered holder and the substitute must each submit to the Authority in writing requests which are identical in all material respects; and
(b)where the requirements of sub-paragraph (a) are met, the Authority must, within 5 banking days after the banking day on which (at the commencement of its working hours) it is first in possession of the requests, amend the particulars of the SROC recorded in the Register to show the substitute as the registered holder.
8. Where the Authority receives requests under paragraph 7(a) it must inform both the registered holder of the SROC and the substitute that the requests have been received and, in the event that the requests are not identical in all material respects, must draw this to their attention.
9. Where–
(a)a SROC is issued under this Order; or
(b)a substitute is recorded as the registered holder of a SROC pursuant to paragraph 7,
the Authority must notify the registered holder or, as the case may be, the former and new registered holder of that fact in writing within 5 banking days of the issue or substitution having taken place.
10. The substitute cannot be the registered holder of a SROC until such time as the particulars of the SROC recorded in the Register identify the substitute as such.
11. The Register may be amended by a decision of the Authority–
(a)where the Authority is satisfied that an entry in the Register has been obtained by fraud;
(b)where a decision of a Court of competent jurisdiction or the operation of law requires the amendment of the Register;
(c)where the Authority is satisfied that, for some other reason, it is necessary to amend the Register (for example, because an entry in it is incorrect).
12. The contents of the Register (including the entries referred to in article 59(3)(b)) must be available for inspection by the public on request at reasonable notice during the Authority's working hours and at the request of any person the Authority must provide a written statement of any entry on the Register including any entry referred to in article 59(3)(b).
13. Where any person considers that an entry maintained in respect of them under article 59(3)(b) should be amended or deleted, they may apply to the Authority in writing requesting that the entry be amended or deleted.
14. The Authority must in any procedural guidelines which it produces provide details of its usual working hours.
15. In this Schedule “banking day” means a day on which banks are generally open in the City of London excluding Saturdays and Sundays.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Executive Note sets out a brief statement of the purpose of a Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2005 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: