Search Legislation

The M8/M73/M74 Motorways (30mph, 40mph and 50mph Speed Limit) Regulations 2017

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: The M8/M73/M74 Motorways (30mph, 40mph and 50mph Speed Limit) Regulations 2017

 Help about opening options

Alternative versions:

Status:

This version of this Instrument contains provisions that are prospective. Help about Status

Close

Status

The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section. A version of a provision is prospective either:

  1. where the provision (Part, Chapter or section) has never come into force or;
  2. where the text of the provision is subject to change, but no date has yet been appointed by the appropriate person or body for those changes to come into force.

Commencement Orders listed in the ‘Changes to Legislation’ box as not yet applied may bring this prospective version into force.

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The M8/M73/M74 Motorways (30mph, 40mph and 50mph Speed Limit) Regulations 2017. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to :

Prospective

Scottish Statutory Instruments

2017 No. 286

Road Traffic

The M8/M73/M74 Motorways (30mph, 40mph and 50mph Speed Limit) Regulations 2017

Made

6th September 2017

Laid before the Scottish Parliament

8th September 2017

Coming into force

27th October 2017

The Scottish Ministers make the following Regulations in exercise of the powers conferred by section 17(2), (3) and (3ZA) of the Road Traffic Regulation Act 1984(1)) and all other powers enabling them to do so.

In accordance with section 134(8)(2) of that Act they have consulted with such representative organisations as they think fit.

Prospective

Citation and commencementS

1.  These Regulations may be cited as the M8/M73/M74 Motorways (30mph, 40mph and 50mph Speed Limit) Regulations 2017 and come into force on 27th October 2017.

Commencement Information

I1Reg. 1 in force at 27.10.2017, see reg. 1

InterpretationS

2.  In these Regulations—

“the A725/A726” means the A725/A726 Shawhead – East Kilbride – Phillipshill Roundabout Trunk Road;

“the A8(M)” means the A8(M) Swinton Roundabout – Baillieston Interchange Trunk Road;

“the M8” means the M8 Edinburgh – Greenock Trunk Road;

“the M73” means the M73 Maryville – Mollinsburn Trunk Road;

“the M74” means the M74/A74(M) Glasgow – Carlisle Trunk Road;

“distance” means the distance as measured following the centreline of the relevant carriageway or, as the case may be, the relevant slip road.

Commencement Information

I2Reg. 2 in force at 27.10.2017, see reg. 1

Speed limitsS

3.  No person may drive any motor vehicle at a speed exceeding—

(a)30 miles per hour on the lengths of road specified in Part 1 of the schedule;

(b)40 miles per hour on the lengths of road specified in Part 2 of the schedule;

(c)50 miles per hour on the lengths of road specified in Part 3 of the schedule.

Commencement Information

I3Reg. 3 in force at 27.10.2017, see reg. 1

ExemptionS

4.  No speed limit imposed by these Regulations applies to vehicles falling within regulation 3(4) of the Road Traffic Exemptions (Special Forces) (Variation and Amendment) Regulations 2011(3) when used in accordance with regulation 3(5) of those Regulations.

Commencement Information

I4Reg. 4 in force at 27.10.2017, see reg. 1

H YOUSAF

Authorised to sign by the Scottish Ministers

St Andrew’s House,

Edinburgh

6th September 2017

Prospective

Regulation 3

SCHEDULESSPECIFIED LENGTHS OF ROAD

PART 1SLENGTHS OF ROAD RESTRICTED TO 30 MPH

1.  That length of the M8 being part of the slip road from the eastbound carriageway of the M8 to Easterhouse Road, from a point 150 metres or thereby southeast of the point where the slip road diverges from that carriageway to the point where the slip road merges with Easterhouse Road, a distance of 200 metres or thereby.S

Commencement Information

I5Sch. para. 1 in force at 27.10.2017, see reg. 1

2.  That length of the M8 being part of the slip road from the eastbound carriageway of the M8 to the north roundabout at Eurocentral, from a point 18 metres or thereby southwest of the point where the slip road merges with the circulatory carriageway of that roundabout to the point of that merge, a distance of 18 metres or thereby.S

Commencement Information

I6Sch. para. 2 in force at 27.10.2017, see reg. 1

3.  That length of the M8 being part of the slip road from the south roundabout at Eurocentral to the westbound carriageway of the M8, from a point where that slip road diverges from the circulatory carriageway of that roundabout to a point 51 metres or thereby northwest of the point of that diverge, a distance of 52 metres or thereby.S

Commencement Information

I7Sch. para. 3 in force at 27.10.2017, see reg. 1

4.  That length of the M73 being part of the slip road from Daldowie Junction to the northbound carriageway of the M73, from a point where that slip road diverges from the southbound carriageway of the Daldowie Overbridge to a point 30 metres or thereby southeast of the point of that diverge, a distance of 30 metres or thereby.S

Commencement Information

I8Sch. para. 4 in force at 27.10.2017, see reg. 1

5.  That length of the M74 being part of the slip road from the southbound carriageway of the M73 and part of the slip road from the northbound carriageway of the M74 to Daldowie Junction, from a point 36 metres or thereby southeast of where that slip road merges with the southbound carriageway of the Daldowie Overbridge back to the point of that merge, a distance of 36 metres or thereby.S

Commencement Information

I9Sch. para. 5 in force at 27.10.2017, see reg. 1

6.  That length of the M74 being part of the slip road from Daldowie Junction to the northbound carriageway of the M74, from a point where that slip road diverges from the northbound carriageway of the Daldowie Overbridge to a point 42 metres or thereby north west of the point of that diverge, distance of 42 metres or thereby.S

Commencement Information

I10Sch. para. 6 in force at 27.10.2017, see reg. 1

7.  That length of the M74 being part of the slip road from the southbound carriageway of the M74 to Daldowie Junction, from a point 56 metres or thereby west of where that slip road diverges from the northbound carriageway of the Daldowie Overbridge to the point of that diverge, a distance of 56 metres or thereby.S

Commencement Information

I11Sch. para. 7 in force at 27.10.2017, see reg. 1

PART 2SLENGTHS OF ROAD RESTRICTED TO 40 MPH

8.  That length of the M8 being part of the slip road from the northbound carriageway of the A725/A726 to the eastbound carriageway of the M8, from the point where the slip road diverges from the A725/A726 to a point 191 metres or thereby northwest of where the slip road merges with the eastbound carriageway of the M8, a distance of 788 metres or thereby.S

Commencement Information

I12Sch. para. 8 in force at 27.10.2017, see reg. 1

9.  That length of the M8 being part of the slip road from the westbound carriageway of the M8 to the southbound carriageway of the A725/A726, from a point 112 metres or thereby west of where the slip road diverges from the westbound carriageway of the M8 to the point where the slip road merges with the southbound carriageway of the A725/A726, a distance of 552 metres or thereby.S

Commencement Information

I13Sch. para. 9 in force at 27.10.2017, see reg. 1

10.  That length of the eastbound carriageway of the A8(M) from the point where that carriageway merges with the circulatory carriageway of the Swinton Roundabout to the point where the extended centreline of the eastbound carriageway of the M8 intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout, a distance of 296 metres or thereby.S

Commencement Information

I14Sch. para. 10 in force at 27.10.2017, see reg. 1

11.  That length of the westbound carriageway of the A8(M) from the point where the extended centreline of that carriageway intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to the point where that carriageway merges with the circulatory carriageway of the Swinton Roundabout, a distance of 316 metres or thereby.S

Commencement Information

I15Sch. para. 11 in force at 27.10.2017, see reg. 1

12.  That length of the M8 being the circulatory carriageway of the Baillieston Interchange Roundabout, a distance of 803 metres or thereby.S

Commencement Information

I16Sch. para. 12 in force at 27.10.2017, see reg. 1

13.  That length of the M73 being part of the slip road from the Baillieston Interchange Roundabout to the northbound carriageway of the M73, from a point where the extended centreline of that slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to a point 66 metres or thereby northeast of that point of intersection, a distance of 66 metres or thereby.S

Commencement Information

I17Sch. para. 13 in force at 27.10.2017, see reg. 1

14.  That length of the M73 being part of the slip road from the southbound M73 to the Baillieston Interchange Roundabout, from a point 41 metres or thereby northwest of where the extended centreline of that slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to the point of that intersection, a distance of 41 metres or thereby.S

Commencement Information

I18Sch. para. 14 in force at 27.10.2017, see reg. 1

15.  That length of the M8 being part of the slip road from the Bailliston Interchange Roundabout to the eastbound carriageway of the M8, from a point where the extended centreline of that slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to a point 24 metres or thereby southeast of that point of intersection, a distance of 24 metres or thereby.S

Commencement Information

I19Sch. para. 15 in force at 27.10.2017, see reg. 1

16.  That length of the M8 being part of the slip road from the westbound carriageway of the M8 to the Baillieston Interchange Roundabout, from a point 18 metres or thereby east of where the extended centreline of that slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to the point of that intersection, a distance of 18 metres or thereby.S

Commencement Information

I20Sch. para. 16 in force at 27.10.2017, see reg. 1

17.  That length of the M8 being part of the slip road from the westbound carriageway of the A8 to the westbound carriageway of the M8, from the point where that slip road diverges from the westbound carriageway of the A8 to a point 139 metres or thereby southwest of the point of that diverge, a distance of 139 metres or thereby.S

Commencement Information

I21Sch. para. 17 in force at 27.10.2017, see reg. 1

18.  That length of the M73 being part of the slip road from Baillieston Interchange Roundabout to the southbound carriageway of the M73, from the point where the extended centreline of that slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to a point 70 metres or thereby southwest of the point of that intersection, a distance of 70 metres or thereby.S

Commencement Information

I22Sch. para. 18 in force at 27.10.2017, see reg. 1

19.  That length of the M73 being part of the slip road from the northbound carriageway of the M73 to the Baillieston Interchange Roundabout, from a point 26 metres or thereby south of where the extended centreline of the slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to the point of that intersection, a distance of 26 metres or thereby.S

Commencement Information

I23Sch. para. 19 in force at 27.10.2017, see reg. 1

20.  That length of the M74 being part of the slip road from the A7071 Bellshill Trunk Road to the northbound carriageway of the M74, from the point where the slip road diverges from the A7071 Bellshill Trunk Road to a point 617 metres or thereby southeast of where the slip road merges with the northbound carriageway of the M74, a distance of 383 metres or thereby.S

Commencement Information

I24Sch. para. 20 in force at 27.10.2017, see reg. 1

21.  That length of the M74 being part of the slip road from the Raith Roundabout to the northbound carriageway of the M74, from the point where the slip road diverges from the circulatory carriageway of the Raith Roundabout to a point 116 metres or thereby southeast of where the slip road merges with the northbound carriageway of the M74, a distance of 180 metres or thereby.S

Commencement Information

I25Sch. para. 21 in force at 27.10.2017, see reg. 1

22.  That length of the M74 being part of the slip road from the southbound carriageway of the M74 to the Raith Roundabout, from a point 54 metres or thereby northwest of where the slip road merges with the circulatory carriageway of the Raith Roundabout to the point of that merge, a distance of 54 metres or thereby.S

Commencement Information

I26Sch. para. 22 in force at 27.10.2017, see reg. 1

23.  That length of the M74 being part of the slip road from the northbound carriageway of the M74 to the Raith Roundabout, from a point 58 metres or thereby southeast of where the slip road merges with the circulatory carriageway of the Raith Roundabout to the point of that merge, a distance of 58 metres or thereby.S

Commencement Information

I27Sch. para. 23 in force at 27.10.2017, see reg. 1

24.  That length of the M74 being part of the slip road from the Raith Roundabout to the southbound carriageway of the M74, from the point where that slip road diverges from the circulatory carriageway of the Raith Roundabout to a point 83 metres or thereby southwest of the point of that diverge, a distance of 83 metres or thereby.S

Commencement Information

I28Sch. para. 24 in force at 27.10.2017, see reg. 1

PART 3SLENGTHS OF ROAD RESTRICTED TO 50 MPH

25.  That length of the southbound carriageway of the M73 from a point 16 metres or thereby south of where the centreline of the southbound carriageway of the M73 passes over the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to the point where the southbound carriageway of the M73 splits into the slip roads to the northbound and southbound carriageways of the M74, a distance of 1.6 kilometres or thereby.S

Commencement Information

I29Sch. para. 25 in force at 27.10.2017, see reg. 1

26.  That length of the M73 being part of the slip road from the southbound carriageway of the M73 to the northbound carriageway of the M74, from the point where the southbound carriageway of the M73 splits into the slip roads to the northbound and southbound carriageways of the M74 to a point 710 metres or thereby southwest of the point of that split, a distance of 891 metres or thereby.S

Commencement Information

I30Sch. para. 26 in force at 27.10.2017, see reg. 1

27.  That length of the M73 being part of the slip road from the southbound carriageway of the M73 to the southbound carriageway of the M74, from the point where the southbound carriageway of the M73 splits into the slip roads to the northbound and southbound carriageways of the M74 to a point 609 metres or thereby southwest of the point of that split, a distance of 619 metres or thereby.S

Commencement Information

I31Sch. para. 27 in force at 27.10.2017, see reg. 1

28.  That length of the northbound carriageway of the M73 from the point where the slip roads from the southbound and northbound carriageways of the M74 merge with the northbound carriageway of the M73 to a point 16 metres or thereby south of where the centreline of the northbound carriageway of the M73 passes over the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout, a distance of 1.9 kilometres or thereby.S

Commencement Information

I32Sch. para. 28 in force at 27.10.2017, see reg. 1

29.  That length of the M74 being part of the slip road from the southbound carriageway of the M74 to the northbound carriageway of the M73, from a point 555 metres or thereby southeast of where the slip road diverges from the M74 to the point where that slip road merges with the northbound carriageway of the M73, a distance of 329 metres or thereby.S

Commencement Information

I33Sch. para. 29 in force at 27.10.2017, see reg. 1

30.  That length of the M74 being part of the slip road from the northbound carriageway of the M74 to the northbound carriageway of the M73, from a point 516 metres or thereby northwest of where the slip road passes under the centreline of the Blantyre Farm Road to the point where that slip road merges with the northbound carriageway of the M73, a distance of 446 metres or thereby.S

Commencement Information

I34Sch. para. 30 in force at 27.10.2017, see reg. 1

31.  That length of the M73 being part of the slip road from the northbound carriageway of the M73 to the westbound carriageway of the M8, from the point where the slip road diverges from the northbound carriageway of the M73 to a point 174 metres or thereby northeast of the point of that diverge, a distance of 174 metres or thereby.S

Commencement Information

I35Sch. para. 31 in force at 27.10.2017, see reg. 1

32.  That length of the M8 being part of the slip road from the eastbound carriageway of the M8 to the southbound carriageway of the M73, from a point 655 metres or thereby southeast of where that slip road diverges from the eastbound carriageway of the M8 to the point where the slip road merges with the southbound carriageway of the M73, a distance of 1.2 kilometres or thereby.S

Commencement Information

I36Sch. para. 32 in force at 27.10.2017, see reg. 1

33.  That length of the M73 being part of the slip road from the Baillieston Interchange Roundabout to the southbound carriageway of the M73, from a point 70 metres or thereby southwest of where the extended centreline of that slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout to the point where the slip road merges with the southbound carriageway of the M73, a distance of 276 metres or thereby.S

Commencement Information

I37Sch. para. 33 in force at 27.10.2017, see reg. 1

34.  That length of the M73 being part of the slip road from the northbound carriageway of the M73 to the Baillieston Interchange Roundabout, from the point where the slip road diverges from the northbound carriageway of the M73 to a point 26 metres or thereby southeast of where the extended centreline of the slip road intersects with the centreline of the circulatory carriageway of the Baillieston Interchange Roundabout, a distance of 287 metres or thereby.S

Commencement Information

I38Sch. para. 34 in force at 27.10.2017, see reg. 1

Prospective

EXPLANATORY NOTE

(This note is not part of the Regulations)

These Regulations make provision for speed limits on special roads as part of the M8/M73/M74 Network Improvements Project.

30mph speed limits are imposed on the roads described in Part 1 of the schedule, 40mph speed limits on the roads described in Part 2 of the schedule and 50mph speed limits on the roads described in Part 3 of the schedule.

(1)

1984 c.27. Section 17(2) was amended by the New Roads and Street Works Act 1991 (c.22), schedule 8, paragraph 28, by the Road Traffic Act 1991 (c.40), schedule 4, paragraph 25 and schedule 8, paragraph 1, and by the Scotland Act 2012 (c.11), section 21(3). Section 17(3ZA) was inserted by the Scotland Act 2012, section 21(4).

(2)

Section 134(8) was inserted by the Scotland Act 2016 (c.11) schedule 2, Part 1, paragraph 12(5).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Policy Note

Policy Note sets out a brief statement of the purpose of a Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2012 onwards. Prior to this date these type of notes existed as ‘Executive Notes’ and accompanied Scottish Statutory Instruments from July 2005 until July 2012.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources