Point in time view as at 03/08/2024. This version of this provision has been superseded.
You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.
Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.
There are currently no known outstanding effects for the Compulsory Purchase Act 1965, Section 11.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
(1)If the acquiring authority have served notice to treat in respect of any of the land and have served on the owner, lessee and occupier of that land [F1a notice of entry], the acquiring authority may enter on and take possession of that land, or of such part of that land as is specified in the notice [F2, after the end of a period specified in the notice]; and then any compensation agreed or awarded for the land of which possession is taken shall carry interest at the rate prescribed under section 32 of the M1Land Compensation Act 1961 from the time of entry until the compensation is paid or is paid into court in accordance with this Act.
Where under this subsection a notice is required to be served on an owner of land, and the land is ecclesiastical property as defined in [F3section 12(3) of the Acquisition of Land Act], a like notice shall be served on the [F4Diocesan Board of Finance for the diocese in which the land is situated].
In this subsection “owner” has the meaning given by [F5section 7(1) of the Acquisition of Land Act].
[F6(1A)A notice of entry under subsection (1) must specify the period after the end of which the acquiring authority may enter on and take possession of the land to which the notice relates.
(1B)The period specified in a notice of entry under subsection (1) must not end earlier than the end of the period of 3 months beginning with the day on which the notice is served unless it is a notice to which section 11A(4) or paragraph 13 of Schedule 2A applies.]
[F7(1C)A notice of entry under subsection (1) must explain the effect of section 11B (counter-notice requiring possession to be taken on specified date) and give an address at which the acquiring authority may be served with a counter-notice.]
[F8(1D)An acquiring authority may extend the period specified in a notice of entry under subsection (1) by agreement with each person on whom it was served.
(1E)A reference in this Act to the period specified in a notice of entry under subsection (1) is to the period as extended by any agreement under subsection (1D).]
(2)F9...
F10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(3)For the purpose of [F11surveying, valuing or taking levels] of any of the land subject to compulsory purchase, of probing or boring to ascertain the nature of the soil and of setting out the line of the works, the acquiring authority, after giving not less than three nor more than fourteen days’ notice to the owners or occupiers of that land, may enter on that land, but the acquiring authority shall make compensation for any damage thereby occasioned to the owners or occupiers of the land, and any question of disputed compensation under this subsection shall be referred to the [F12Upper Tribunal].
(4)Except as provided by the foregoing provisions of this section, the acquiring authority shall not, except with the consent of the owners and occupiers, enter on any of the land subject to compulsory purchase until the compensation payable for the respective interests in that land has been agreed or awarded, and has been paid to the persons having those interests or has been paid into court in accordance with this Act.
Textual Amendments
F1Words in s. 11(1) substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 186(2)(a)(i), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)
F2Words in s. 11(1) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 186(2)(a)(ii), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)
F3Words substituted by Acquisition of Land Act 1981 (c. 67, SIF 28:1), Sch. 4 para. 14(3)(a)
F4Words in s. 11 substituted (1.10.2006) by Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 12(1); S.I. 2006/2, Instrument made by Archbishops
F5Words substituted by Acquisition of Land Act 1981 (c. 67, SIF 28:1), Sch. 4 para. 14(3)(b)
F6S. 11(1A)(1B) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 186(2)(b), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)
F7S. 11(1C) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 187(2), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)
F8S. 11(1D)(1E) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 188, 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)
F9S. 11(2) omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 3; S.I. 2016/733, reg. 3(j)
F10S. 11(2) second paragraph repealed by Housing (Consequential Provisions) Act 1985 (c. 71, SIF 61), s. 3, Sch. 1 Pt. 1
F11Words in s. 11(3) substituted (13.7.2016) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 14 para. 6; S.I. 2016/733, reg. 3(h) (with reg. 6)
F12Words in s. 11(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 64 (with Sch. 5)
Modifications etc. (not altering text)
C1Pt. 1 applied (with modifications) (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 29, Sch. 8 paras. 4, 5 (with arts. 24(1)(a), 42, 43, Sch. 12)
C2Pt. 1 applied (with modifications) (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 29 (with arts. 24(1)(a), 42, 43, Sch. 12)
C3Pt. 1 applied (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 30, Sch. 9 paras. 4, 5 (with art. 24, Sch. 11)
C4Pt. 1 applied (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 30 (with art. 24, Sch. 11 paras. 5, 22, 37, 47, 82, 110)
C5Pt. 1 applied (with modifications) (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), art. 1, Sch. 5 paras. 4, 5 (with arts. 18, 35, Sch. 9)
C6Pt. 1 applied (with modifications) (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 25, Sch. 5 paras. 4, 5 (with arts. 18, 21, 35, Sch. 9)
C7Pt. 1 applied (with modifications) (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 32 (with arts. 24, 44, Sch. 15)
C8Pt. 1 applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 32, Sch. 9 paras. 4, 5 (with arts. 21, 25, 41, Sch. 10)
C9Pt. 1 applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), art. 1(2), Sch. 9 paras. 4, 5 (with arts. 21, 41, Sch. 10)
C10Pt. 1 applied (with modifications) (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 23, Sch. 8 paras. 4, 5 (with arts. 18(1), 35, 36, Sch. 14)
C11Pt. 1 applied (with modifications) (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), art. 1, Sch. 8 paras. 4, 5 (with arts. 35, 36, Sch. 14)
C12Pt. 1 applied (with modifications) (13.6.2024) by The Network Rail (Cambridge Re-Signalling) Order 2024 (S.I. 2024/724), arts. 1, 5, Sch. 5 paras. 4, 5 (with arts. 12(1)(a), 13)
C13Pt. 1 applied (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 32 (with arts. 6, 29(1)(a), Sch. 10)
C14Pt. 1 applied (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), art. 1, Sch. 7 paras. 4, 5 (with art. 6, Sch. 10)
C15Pt. 1 applied (with modifications) (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 27, Sch. 10 paras. 4, 5 (with art. 20(1), Sch. 15)
C16Pt. 1 applied (with modifications) (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 25, Sch. 10 paras. 4, 5 (with arts. 19(1)(a), 45, Sch. 14)
C17Pt. 1 applied (with modifications) (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 24, Sch. 9 paras. 4, 5 (with arts. 18, 44, Sch. 12)
C18Pt. 1 modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 23(2)(3)
C19Pt. 1 applied (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), art. 1, Sch. 10 paras. 3(2), 4-9 (with art. 22)
C20Pt. 1 applied (with modifications) (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), art. 1, Sch. 6 para. 3(2)-9 (with arts. 36, 37, Sch. 8 para. 34)
C21Pt. 1 applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 22 (with Sch. 8 para. 20)
C22Pt. 1 applied (with modifications) (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), art. 1, Sch. 1 paras. 2, 3
C23Pt. 1 applied (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), arts. 1, 8(2)
C24Pt. 1 applied (with modifications) (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 19, Sch. 7 paras. 4, 5 (with arts. 28(1)(a), 32(2))
C25Pt. 1 modified (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 27 (with arts. 4, 23, 37)
C26Pt. 1 applied (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 37)
C27Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 32 (with arts. 43(1), 55-57, Sch. 8 para. 13)
C28Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 1, Sch. 3 paras. 1, 4-10 (with arts. 55-57, Sch. 8 para. 13)
C29Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), art. 1, Sch. 6 paras. 4, 5 (with arts. 24(8), 33(2))
C30Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 18, 29 (with arts. 24(8), 33(2))
C31Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 25, Sch. 5 paras. 4, 5
C32Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), art. 1(2), Sch. 5 paras. 4, 5
C33Pt. 1 applied (with modifications) (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 1, 6, 14, Sch. 2 paras. 4, 5
C34Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 19, 28(1)(a) (with art. 31(2))
C35Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), art. 1, Sch. 9 paras. 4, 5 (with art. 31(2))
C36Pt. 1 applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 11, 18(1)(a)
C37Pt. 1 applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), art. 1, Sch. 8 paras. 4, 5
C38Pt. 1 modified (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 25 (with arts. 3(3), 5, 22)
C39Pt. 1 applied (with modifications) (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), art. 1, Sch. 6 paras. 4, 5 (with arts. 3(3), 5)
C40Pt. 1 applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), art. 1, Sch. 5 paras. 4, 5 (with arts. 55, 56)
C41Pt. 1 modified (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 30 (with arts. 55, 56)
C42Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 25
C43Pt. 1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 20(1)(a)
C44Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), art. 1, Sch. 8 paras. 4, 5
C45Pt. 1 applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 5 (with arts. 12(1), 18)
C46Pt. 1 applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 7, Sch. 2 paras. 4, 5 (with arts. 12, 18)
C47Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), art. 1, Sch. 8 paras. 4-10
C48Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 26
C49Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 26
C50Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), art. 1, Sch. 9 paras. 4, 5
C51Pt. 1 applied (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 30 (with Sch. 13 Pt. 1 para. 19)
C52Pt. 1 modified (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 12 paras. 4, 5 (with Sch. 13 Pt. 1 para. 19)
C53Pt. 1 applied (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), art. 1, Sch. 6 paras. 4, 5 (with art. 3(1))
C54Pt. 1 modified (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 29 (with art. 3(1))
C55Pt. 1 applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 29 (with arts. 47, 48, Sch. 10 para. 19)
C56Pt. 1 applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), art. 1, Sch. 5 paras. 4, 5 (with arts. 47, 48, Sch. 10 para. 19)
C57Pt. 1 applied (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), art. 1, Sch. 4 paras. 4, 5 (with art. 7)
C58Pt. 1 modified (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 24 (with art. 7)
C59Pt. 1 applied (with modifications) (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 44)
C60Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 29 (with art. 7)
C61Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), art. 1, Sch. 8 paras. 4, 5 (with art. 7)
C62Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), art. 1, Sch. 7 paras. 4, 5 (with arts. 51, 57)
C63Pt. 1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 25(1)(a) (with arts. 51, 57)
C64Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 32 (with arts. 51, 57)
C65Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), art. 1, Sch. 12 paras. 4, 5
C66Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 30
C67Pt. 1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 26(a) (with art. 37)
C68Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), art. 1, Sch. 9 paras. 4, 5 (with art. 37)
C69Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 29 (with art. 37)
C70Pt. 1 modified (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 25 (with arts. 5, 44)
C71Pt. 1 applied (with modifications) (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 44)
C72Pt. 1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 22(1)(a) (with arts. 5, 44)
C73Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), art. 1, Sch. 6 para. 4 (with art. 37)
C74Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 22 (with art. 37)
C75Pt. 1 modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 23 (with arts. 41, 42, Sch. 16 para. 66)
C76Pt. 1 applied (with modifications) (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), art. 1, Sch. 5 paras. 4, 5 (with art. 5)
C77Pt. 1 modified (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 25 (with art. 5)
C78Pt. 1 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), art. 1, Sch. 7 paras. 4, 5 (with Sch. 9 para. 144)
C79Pt. 1 applied (with modifications) (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 25 (with Sch. 9 para. 144)
C80Pt. 1 applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), Sch. 2 paras. 4, 5
C81Pt. 1 applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), art. 4 (with art. 11(1)(a))
C82Pt. 1 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), art. 1, Sch. 7 paras. 4, 5
C83Pt. 1 modified (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 31
C84Pt. 1 modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 26 (with art. 32, Sch. 9 para. 36)
C85Pt. 1 applied (with modifications) (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), art. 1, Sch. 6 paras. 4, 5 (with art. 32, Sch. 9 para. 36)
C86Pt. 1 applied (with modifications) (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 5 (with art. 16(1))
C87Pt. 1 applied (with modifications) (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 20, 29, Sch. 14 paras. 4, 5
C88Pt. 1 applied (with modifications) (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), art. 1, Sch. 7 paras. 4, 5 (with art. 5, Sch. 27 para. 36)
C89Pt. 1 modified (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 28 (with art. 5, Sch. 27 para. 36)
C90Pt. 1 applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), art. 1, Sch. 7 para. 4 (with Sch. 8 Pt. 6 para. 19)
C91Pt. 1 modified (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 37 (with arts. 62, 76, 87, Sch. 19 paras. 4, 78)
C92Pt. 1 applied (with modifications) (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 40)
C93Pt. 1 applied (with modifications) (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 33, Sch. 6 paras. 4, 5 (with arts. 23, 53, Sch. 9 para. 65)
C94Pt. 1 modified (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 25 (with arts. 5, 40)
C95Pt. 1 applied (with modifications) (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 27, Sch. 12 paras. 4, 5 (with arts. 40, 46(2), Sch. 19 para. 61)
C96Pt. 1 applied (with modifications) (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 30 (with arts. 4, 26, 52, Sch. 9 para. 82)
C97Pt. 1 applied (with modifications) (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 20, Sch. 10 paras. 4, 5 (with arts. 23, 30, 34(2), Sch. 12 paras. 5, 47, 79)
C98Pt. 1 applied (with modifications) (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 25, Sch. 10 paras. 4, 5 (with art. 19) (as amended (21.11.23) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.)
C99Pt. 1 applied (with modifications) (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 25 (with art. 19) (as amended (21.11.23) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), Sch.)
C100Pt. 1 applied (with modifications) (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 31 (with arts. 5, 27, 53, Sch. 8 paras. 6, 64)
C101Pt. 1 applied (with modifications) (2.8.2023) by The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023 (S.I. 2023/815), arts. 1, 19 (with art. 42)
C102Pt. 1 applied (with modifications) (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 26, Sch. 7 para. 4(2)-5 (with arts. 20, 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4) (as amended (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch.)
C103Pt. 1 applied (with modifications) (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), art. 1, Sch. 7 para. 4(2)-5 (with arts. 42, 43, Pt. 3 para. 6(1), 4 para. 20, 9 para. 4, Sch. 9 Pt. 1 para. 4) (as amended (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), Sch.)
C104Pt. 1 applied (with modifications) (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 25, Sch. 5 paras. 4, 5 (with arts. 6(2), 18, 21, Sch. 11 paras. 5, 30)
C105Pt. 1 applied (with modifications) (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), art. 1, Sch. 5 paras. 4, 5 (with arts. 6(2), 18, Sch. 11 paras. 5, 30)
C106Pt. 1 applied (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 29, Sch. 6 paras. 4, 5 (with arts. 4, 25(1)(a), 45, Sch. 9 paras. 6, 46, 54(1))
C107Pt. I applied (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
C108Pt. 1 applied (with modifications) (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 25, Sch. 8 paras. 4-11 (with arts. 36, 37, Sch. 9)
C109Pt. I applied (with modifications) (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), art. 1, Sch. 8 paras. 4-11
C110Pt. 1 applied (with modifications) (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 23, Sch. 9 paras. 4, 5 (with arts. 18(1)(a), 43, Sch. 12)
C111Pt. 1 applied (with modifications) (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), art. 1, Sch. 9 paras. 4, 5 (with art. 43, Sch. 12 paras. 5, 24)
C112Pt. 1 applied (with modifications) (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 36, Sch. 6 paras. 4, 5 (with arts. 4, 29, 52, Sch. 11)
C113Pt. 1 applied (with modifications) (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 36 (with arts. 4, 29, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
C114S. 11: excluded by Compulsory Purchase (Vesting Declarations) Act 1981 (c. 66, SIF 28:1), s. 8(3), Sch. 1 para. 3
S. 11 applied (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss.3(1)(2), 13, Sch. para.4 (with s. 14(3)(e))
C115S. 11 modified by Agriculture (Miscellaneous Provisions) Act 1968 (c. 34), s. 13(3), Sch. 3 paras. 4, 5
C116S. 11 modified (31.3.1994) by British Railways Act 1994 (c. iv), s. 17, Sch. 2 para. 4
C117Pt. 1 applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), art. 1, Sch. 11 paras. 3(2), 4, 5
C118S. 11 modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), art. 1, Sch. 7 para. 6
C119S. 11 modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), art. 1, Sch. 7 para. 7 (with arts. 41, 42, Sch. 16 para. 66)
C120S. 11(1) excluded by Land Compensation Act 1973 (c. 26, SIF 28:1), s. 52(10)(b); modified by Land Compensation Act 1973 (c. 26, SIF 28:1), s. 55(1); and modified by Rural Wales Act 1976 (c. 75, SIF 64), s. 5(1), Sch. 3 para. 31(1)
C121S. 11(1) modified by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), s. 2, Sch. 2 Pt. 1I para. 1
S. 11(1) modified (26.5.1994) by Greater Manchester (Light Rapid Transit System) Act 1994 (c. vi), s. 3(2)
C122S. 11(1) excluded by Agriculture Act 1967 (c. 22), s. 49(7) (ii)
C123S. 11(1) applied (with modifications) by Heathrow Express Railway Act 1991 (c. vii), s. 4(2)
C124S. 11(1) applied (with modifications) by Heathrow Express Railway (No. 2) Act 1991 (c. ix), s. 3(1)(2)
S. 11(1) applied (with modifications) by Killingholme Generating Stations (Ancillary Powers) Act 1991 (c. viii), s. 2(2)(b)
C125S. 11(1) excluded (25.9.1991) by Planning and Compensation Act 1991 (c. 34, SIF 28:1), s. 63(2); S.I. 1991/2067, art.3
C126S. 11(1) modified by 1961 c. 33, s. 5A(5)(6) (as inserted (31.10.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 103(2); S.I. 2004/2593, art. 2(a))
C127S. 11(3) modified (11.11.1996) by S.I. 1996/2714, art. 50(3)
C128S. 11(3) restricted (23.8.1999) by S.I. 1999/2981, art. 28(2), Sch. 10 Pt. 1 para. 2(7)
S. 11(3) restricted (24.12.1999) by S.I. 2000/428, art. 27, Sch. 5 para. 2(3)
S. 11(3) restricted (24.7.2001) by S.I. 2001/3627, art. 64, Sch. 12 para. 5(1) (with Sch. 12 para. 12)
s. 11(3) restricted (14.3.2002) by S.I. 2002/412, art. 36, Sch.6, Pt. 1I para. 2(2)
C129S. 11(3) powers excluded (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), art. 1, Sch. 10 para. 54(1) (with art. 51, Sch. 10 paras. 68, 85)
S. 11(3) restricted (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), art. 1, Sch. 12 para. 4(1) (with arts. 12, 13, Pt. 2 para. 6, 3 para. 5, 4 para. 4, 5 para. 4, Sch. 12 paras. 6(3), 19)
S. 11(3) excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 16 Pt. 4 s. 1 para. 3, Sch. 16 Pt. 4 s. 2 para. 3, Sch. 16 Pt. 4 s. 3 para. 3, Sch. 16 Pt. 5 para. 4(1)
C130S. 11(3) restricted (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 1, Sch. 13 para. 4(1)
C131S. 11(3) restricted (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), art. 1, Sch. 8 para. 3(2) (with arts. 51, 53)
C132S. 11(3) restricted (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), art. 1, Sch. 12 para. 4 (with arts. 40, 41)
C133S. 11(3) excluded (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 1(2), Sch. 12 para. 4(1) (with arts. 37, 38)
C134S. 11(3) excluded (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 1, Sch. 9 para. 23(1)
C135S. 11(3) excluded (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 1(2), Sch. 8 para. 4(1)(k) (with arts. 39, 40, Sch. 8 para. 19)
C136S. 11(3) excluded (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), art. 1, Sch. 9 para. 26(1)
C137S. 11(3) restricted (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), art. 1, Sch. 8 para. 4(1) (with Sch. 8 para. 20)
C138S. 11(3) restricted (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 1, Sch. 7 para. 12(2) (with arts. 55-57, Sch. 8 para. 13)
C139S. 11(3) restricted (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 13 Pt. 1 para. 4(1) (with Sch. 13 Pt. 1 paras. 6(3), 19)
C140S. 11(3) restricted (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), art. 18(1)
C141S. 11(3) restricted (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), art. 17(1)
C142S. 11(3) restricted (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), art. 1, Sch. 9 para. 21(1) (with art. 32, Sch. 9 para. 36)
C143S. 11(3) restricted (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), art. 1, Sch. 11 para. 21(1) (with art. 5, Sch. 27 paras. 23(3), 36)
C144S. 11(3) restricted (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), art. 1, Sch. 8 Pt. 6 para. 4(1)(j) (with Sch. 8 Pt. 6 para. 19)
C145S. 11(3) restricted (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), art. 1, Sch. 19 para. 22(1) (with arts. 62, 76, 87, Sch. 19 paras. 4, 78)
C146S. 11(3) restricted (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), art. 1, Sch. 9 para. 50(1) (with arts. 23, 53, Sch. 9 para. 65)
C147S. 11(3) restricted (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), art. 1, Sch. 19 para. 41(4) (with art. 46(2), Sch. 19 para. 61)
C148S. 11(3) restricted (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), art. 1, Sch. 9 para. 67(1) (with arts. 4, 52, Sch. 9 para. 82)
C149S. 11(3) restricted (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), art. 1, Sch. 15 para. 71(1) (with art. 19)
C150S. 11(3) restricted (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), art. 1, Sch. 9 Pt. 4 para. 4(1) (with (with arts. 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)) (as amended (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch.)
C151S. 11(3) restricted (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), art. 1, Sch. 9 para. 32(1) (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
C152S. 11(3) restricted (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), art. 1, Sch. 11 para. 69(1) (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 71(3), 84)
C153S. 11(3) restricted (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), art. 1, Sch. 9 para. 95(1) (with Sch. 11)
C154S. 11(3) restricted (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), art. 1, Sch. 9 para. 66(1) (with arts. 18, 35, Sch. 9)
C155S. 11(3) restricted (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), art. 1(2), Sch. 10 para. 85(3) (with arts. 21, 41, Sch. 10)
C156S. 11(3) restricted (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), art. 1, Sch. 14 Pt. 3 para. 4(1) (with arts. 35, 36, Sch. 14)
C157S. 11(3) restricted (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), art. 1, Sch. 12 paras. 109(1)(n), 133(1) (with art. 44, Sch. 12)
C158S. 11(3) restricted (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), art. 1, Sch. 15 para. 76(1) (with Sch. 15)
C159S. 11(3) restricted (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), art. 1, Sch. 14 paras. 116(1), 136(3) (with art. 45, Sch. 14)
Marginal Citations
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: