Search Legislation

Electricity Act 1989

Changes to legislation:

Electricity Act 1989 is up to date with all changes known to be in force on or before 27 November 2024. There are changes that may be brought into force at a future date. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

  1. Introductory Text

  2. Part I ELECTRICITY SUPPLY

    1. Introductory

      1. 1. The Director General of Electricity Supply.

      2. 2. Consumers’ committees.

      3. 3. General duties of Secretary of State and Director.

      4. 3A. The principal objective and general duties of the Secretary of State and the Authority.

      5. 3B. Guidance on social and environmental matters.

      6. 3C. Health and safety.

      7. 3D. Exceptions from sections 3A to 3C.

    2. Licensing of supply etc.

      1. 4. Prohibition on unlicensed supply etc.

      2. 5. Exemptions from section 4.

      3. 6. Licences authorising supply etc.

      4. 6A. Procedure for licence applications.

      5. 6B. Applications for transmission licences.

      6. 7. Conditions of licences: general.

      7. 7A. Transfer of licences.

      8. 7B. Uniform prices etc. in certain areas of Scotland.

      9. 8. Conditions for funding certain companies engaged in nuclear generation in Scotland.

      10. 8A. Standard conditions of licences.

      11. 9. General duties of licence holders.

      12. 10. Powers etc. of licence holders.

    3. Modification of licences

      1. 11. Modification by agreement.

      2. 11A. Modification of standard conditions of licences.

      3. 12. Modification references to Monopolies Commission.

      4. 12A. References under section 12: time limits

      5. 12B. References under section 12: powers of investigation

      6. 13. Reports on modification references.

      7. 14. Modification following report.

      8. 14A. Competition Commission’s power to veto modifications following report.

      9. 15. Modification by order under other enactments.

      10. 15A. Licence modifications relating to new electricity trading arrangements.

    4. Supply by public electricity suppliers

      1. 16. Duty to supply on request.

      2. 16A. Procedure for requiring a connection.

      3. 17. Exceptions from duty to supply.

      4. 18. Power to recover charges.

      5. 19. Power to recover expenditure.

      6. 20. Power to require security.

      7. 21. Additional terms of supply.

      8. 22. Special agreements with respect to supply.

      9. 23. Determination of disputes.

      10. 24. The public electricity supply code.

    5. Enforcement of preceding provisions

      1. 25. Orders for securing compliance.

      2. 26. Procedural requirements.

      3. 27. Validity and effect of orders.

      4. 27A. Penalties.

      5. 27B.Statement of policy with respect to penalties.

      6. 27C. Time limits on the imposition of financial penalties.

      7. 27D. Interest and payment of instalments.

      8. 27E. Appeals.

      9. 27F. Recovery of penalties.

      10. 28. Power to require information etc.

    6. Provisions with respect to supply generally

      1. 29. Regulations relating to supply and safety.

      2. 30. Electrical inspectors.

      3. 31. Use etc. of meters.

    7. Protection of public interest

      1. 32. Electricity from non-fossil fuel sources.

      2. 32A. Orders under section 32: supplementary.

      3. 32B. Green certificates.

      4. 32C. Payment as alternative to complying with order under section 32.

      5. 33. Fossil fuel levy.

      6. 34. Fuel stocks etc. at generating stations.

      7. 35. Provisions supplementary to section 34.

      8. 36. Consent required for construction etc. of generating stations.

      9. 37. Consent required for overhead lines.

      10. 38. Preservation of amenity and fisheries.

    8. Consumer protection: standards of performance

      1. 39. Electricity supply: performance in individual cases.

      2. 39A. Standards of performance in individual cases: electricity distributors.

      3. 39B. Standards of performance in individual cases: disputes.

      4. 40. Electricity supply: overall performance.

      5. 40A. Overall standards of performance: electricity distributors.

      6. 40B. Procedures for prescribing or determining standards of performance.

      7. 41. Promotion of efficient use of electricity.

      8. 42. Information with respect to levels of performance.

      9. 42A. Information to be given to customers about overall performance.

      10. 42AA. Publication of statistical information about standards of performance.

      11. 42B. Procedures for dealing with complaints.

      12. 42C. Remuneration and service standards.

    9. Consumer protection: miscellaneous

      1. 43. Functions with respect to competition.

      2. 43A. Adjustment of charges to help disadvantaged groups of customers.

      3. 43B. Orders: supplementary.

      4. 44. Fixing of maximum charges for reselling electricity.

    10. Investigation of complaints

      1. 45. Investigation of enforcement matters.

      2. 46. Investigation of certain other matters.

      3. 46A. Power of Council to investigate other matters.

    11. Other functions of Director

      1. 47. General functions.

      2. 48. Publication of information and advice.

      3. 49. Keeping of register.

      4. 49A. Reasons for decisions.

      5. 50. Annual and other reports.

    12. Provisions with respect to committees

      1. 51. General duty of consumers’ committees to advise Director etc.etc.

      2. 52. Periodical and other reports of consumers’ committees.

      3. 53. The National Consumers’ Consultative Committee.

    13. Provisions with respect to Consumers’ etc. Councils

      1. 54. Abolition of Consumers’ etc. Councils.

      2. 55. Compensation for chairmen and officers of abolished Councils.

      3. 56. Continuity of employment of officers of abolished Councils.

    14. Alteration of activities requiring licence

      1. 56A. Power to alter activities requiring licence.

      2. 56B. Application by Authority for order including new activities.

      3. 56C. References to Competition Commission.

      4. 56CA. References under section 56C: time limits

      5. 56CB. References under section 56C: application of Enterprise Act 2002

      6. 56D. Reports on references.

      7. 56E. Application by Authority for order excluding activities.

      8. 56F. Consultation by Secretary of State about order excluding activities.

    15. Miscellaneous

      1. 56G. Service by Authority of certain notices on Council.

      2. 57. General restrictions on disclosure of information.

      3. 58. Directions restricting the use of certain information.

      4. 59. Making of false statements etc.

    16. Supplemental

      1. 60. Powers to make regulations.

      2. 61. Concurrent proceedings.

      3. 62. Public inquiries.

      4. 63. Application to Crown land.

      5. 64. Interpretation etc. of Part I.

  3. PART II REORGANISATION OF THE INDUSTRY

    1. Transfers to successor companies

      1. 65. Transfer of property etc. of Area Boards.

      2. 66. Transfer of property etc. of Generating Board and Electricity Council.

      3. 67. Transfer of property etc. of Scottish Boards.

      4. 68. Transfer schemes under sections 66 and 67.

      5. 69. Functions of Secretary of State in relation to transfer schemes.

      6. 70. Supplementary provisions as to transfers under sections 66 and 67.

    2. Ownership of successor companies

      1. 71. Initial Government holding in the companies.

      2. 72. Government investment in securities of the companies.

      3. 73. Exercise of functions through nominees.

      4. 74. Target investment limit for Government shareholding.

    3. Finances of successor companies

      1. 75. Statutory reserves.

      2. 76. Statutory accounts.

      3. 77. Temporary restrictions on borrowings etc.

      4. 78. Government lending to the companies.

      5. 79. Treasury guarentees for loans made to the companies.

      6. 80. Conversion of certain loans etc. to the Scottish companies.

      7. 81. Financial limits on borrowing etc.

    4. Provisions with respect to floatation

      1. 82. Responsibility for composite listing particulars.

      2. 83. Application of Trustee Investments Act 1961 in relation to investment in operating companies.

    5. Provisions with respect to existing bodies

      1. 84. Dissolution etc. of existing bodies.

      2. 85. Compensation to members and employees of existing bodies.

      3. 86. Discharge of certain advances and loans made to existing bodies.

      4. 87. Expenditure and receipts of Electricity Council.

      5. 88. Grants towards expenditure during transitional period.

    6. Miscellaneous

      1. 89. Payments for the use of tax losses.

      2. 90. Taxation provisions.

      3. 91. Electricity Stock.

      4. 92. Abolition of central guarantee fund.

    7. Supplemental

      1. 93. Parliamentary disqualification.

      2. 94. Construction of references to property, rights and liabilities.

      3. 95. Other interpretation of Part II.

  4. Part III MISCELLANEOUS AND SUPPLEMENTAL

    1. Miscellaneous

      1. 96. Directions for preserving security of electricity supplies etc.

      2. 97. Financial assistance for discharge of nuclear liabilities.

      3. 98. Provision of statistical information.

      4. 99. Promotion of new techniques in national interest.

    2. Amendment of enactments

      1. 100. Competition and restrictive trade practices.

      2. 101. Rights of entry.

      3. 102. Production and supply of heat or electricity etc. by Scottish local authorities.

      4. 103. Stamp duty exemption for certain contracts.

    3. Amendment etc. of pension schemes

      1. 104. Amendment etc. of Electricity Supply Pension Scheme.

      2. 105. Amendment etc. of Scottish Pension Schemes.

    4. Supplemental

      1. 106. Regulations and orders.

      2. 107. Directions.

      3. 108. Offences by bodies corporate.

      4. 109. Service of documents.

      5. 110. Financial provisions.

      6. 111. General interpretation.

      7. 112. Amendments, transitional provisions, savings and repeals.

      8. 113. Short title, commencement and extent.

  5. Electricity Act 1989

    1. SCHEDULE 1

      The Director General of Electricity Supply

      1. Remuneration, pensions etc.

        1. 1.(1) There shall be paid to the Director such remuneration,...

      2. Staff

        1. 2.The Director may, with the approval of the Treasury as...

      3. Expenses of the Director and his staff

        1. 3.There shall be paid out of money provided by Parliament—...

      4. Official seal

        1. 4.The Director shall have an official seal for the authentication...

      5. Performance of functions

        1. 5.(1) Anything authorised or required by or under this Act...

      6. Documentary evidence

        1. 6.The Documentary Evidence Act 1868 shall have effect as if...

      7. The Parliamentary Commissioner

        1. 7.In the Parliamentary Commissioner Act 1967, in Schedule 2 (departments...

      8. Parliamentary disqualification etc.

        1. 8.In the House of Commons Disqualification Act 1975, in Part...

    2. SCHEDULE 2

      Consumers’ Committees

      1. Preliminary

        1. 1.In this Schedule any reference to the committee is a...

      2. Remuneration, pensions etc. of chairman

        1. 2.(1) There shall be paid to the chairman of the...

      3. Allowances for other members

        1. 3.There shall be paid to members of the committee other...

      4. Administration etc.

        1. 4.The Director may make arrangements for the committee to be...

      5. Proceedings

        1. 5.The validity of any proceedings of the committee shall not...

        2. 6.(1) Subject to sub-paragraphs (2) and (3) below, meetings of...

      6. Sub-committees

        1. 7.(1) The committee may, with the approval of the Director—...

      7. Financial provisions

        1. 8.(1) There shall be paid by the Director out of...

      8. Amendment of other Acts

        1. 9.In section 14(1) of the Chronically Sick and Disabled Persons...

        2. 10.In Part III of Schedule 1 to the House of...

    3. SCHEDULE 3

      Compulsory Acquisition of Land etc. by Licence Holders

      1. Part I Powers of Acquisition

        1. 1.(1) Subject to paragraph 2 below, the Secretary of State...

        2. 2.(1) No order shall be made under paragraph 1 above...

        3. 3.(1) This paragraph applies to land which—

        4. 4.Where a licence holder has acquired any land by virtue...

      2. Part II Procedure, Compensation etc. (England and Wales)

        1. Application of Acquisition of Land Act 1981 generally

          1. 5.(1) Subject to sub-paragraph (2) below, the Acquisition of Land...

        2. New rights: general adaptation of Compulsory Purchase Act 1965

          1. 6.The Compulsory Purchase Act 1965 shall have effect with the...

        3. New rights: specific adaptations of Act of 1965

          1. 7.Without prejudice to the generality of paragraph 6 above, Part...

          2. 8.For section 7 of that Act (measure of compensation) there...

          3. 9.For subsection (1) of section 8 of that Act (protection...

          4. 10.The following provisions of that Act (being provisions stating the...

          5. 11.Section 11 of that Act (powers of entry) shall be...

          6. 12.Section 20 of that Act (protection for interests of tenants...

          7. 13.Section 22 of that Act (protection of acquiring authority’s possession...

        4. New rights: compensation

          1. 14.The enactments in force in England and Wales with respect...

      3. Part III Procedure, Compensation etc. (Scotland)

        1. Application of Acquisition of Land (Authorisation Procedure) (Scotland) Act 1947 generally

          1. 15.(1) Subject to sub-paragraph (2) below, the Acquisition of Land...

        2. New rights: general application of Act of 1947 and incorporated enactments

          1. 16.The Acquisition of Land (Authorisation Procedure) (Scotland) Act 1947, and...

        3. New rights: specific adaptations of Act of 1947

          1. 17.Without prejudice to the generality of paragraph 16 above, Part...

          2. 18.In paragraph 9 of that Schedule (compulsory purchase affecting land...

          3. 19.In paragraph 10 of that Schedule (land of statutory undertakers)—...

          4. 20.In paragraph 11 of that Schedule (common or open space),...

          5. 21.In paragraph 12 of that Schedule, for the words “the...

          6. 22.Paragraph 3(1) of the Second Schedule to the Acquisition of...

          7. 23.For paragraph 4 of that Schedule (protection for owner against...

        4. New rights: specific adaptations of Lands Clauses Consolidation (Scotland) Act 1845

          1. 24.Without prejudice to the generality of paragraph 16 above, the...

          2. 25.For section 61 of that Act (estimation of compensation) there...

          3. 26.The following provisions of that Act (being provisions stating the...

          4. 27.Sections 114 (compensation to be made to tenants for a...

          5. 28.Sections 117 (protection of promoter of undertaking where by inadvertence...

        5. New rights: compensation

          1. 29.The enactments in force in Scotland with respect to compensation...

    4. SCHEDULE 4

      Other Powers etc. of Licence Holders

      1. Street works etc. in England and Wales

        1. 1.(1) Subject to the following provisions of this paragraph, for...

      2. Road works etc. in Scotland

        1. 2.(1) Subject to the following provisions of this paragraph, for...

      3. Alteration of works

        1. 3.(1) A licence holder may execute works in pursuance of...

        2. 4.(1) Any of the following who is authorised by or...

      4. Protection from interference

        1. 5.(1) Subject to sub-paragraph (2) below, a licence holder who...

      5. Acquisition of wayleaves

        1. 6.(1) This paragraph applies where— (a) for any purpose connected...

      6. Provisions supplementary to paragraph 6

        1. 7.(1) Where a wayleave is granted to a licence holder...

      7. Temporary continuation of wayleaves

        1. 8.(1) This paragraph applies where at any time such a...

      8. Felling and lopping of trees etc.

        1. 9.(1) This paragraph applies where any tree is or will...

      9. Entry on land for purposes of exploration

        1. 10.(1) Subject to the following provisions of this paragraph and...

      10. Provisions supplementary to paragraphs 9 and 10

        1. 11.(1) Any person who intentionally obstructs a person acting in...

      11. Interpretation

        1. 12.In this Schedule— “moveables” means chattels in relation to England...

    5. SCHEDULE 5

      Water Rights for Hydro-Electric Generating Stations in Scotland

      1. 1.In Scotland, a person who holds a licence under section...

      2. 2.Authorisation under paragraph 1 above shall be by order and...

      3. 3.Where the abstraction, diversion, and use will, in the opinion...

      4. 4.In this Schedule “compensation water” means a flow of water,...

      5. 5.In deciding whether to make the order or in prescribing...

      6. 6.Any question of disputed compensation under paragraph 1 above shall...

      7. 7.An applicant for authorisation under paragraph 1 above shall submit...

      8. 8.Not later than the date on which the said notice...

      9. 9.The applicant shall also publish in the Edinburgh Gazette a...

      10. 10.The applicant shall, at the request of any person interested,...

      11. 11.The Secretary of State may make an order in the...

      12. 12.If before the expiration of the 28 days referred to...

      13. 13.The expenses incurred by the Secretary of State in connection...

      14. 14.In paragraphs 7 and 8 above the expression “area affected...

      15. 15.In paragraphs 1 to 8 above “watercourse” includes all rivers,...

    6. SCHEDULE 6

      The Public Electricity Supply Code

      1. Provisions as to powers of entry

        1. 10.(1) The Rights of Entry (Gas and Electricity Boards) Act...

      2. Electrical plant etc. not to be subject to distress

        1. 11.(1) This paragraph applies to any electric line, electrical plant...

      3. Recovery of electricity charges etc.

        1. 1.(1) Subject to sub-paragraph (2) below, a public electricity supplier...

      4. Restoration of supply by supplier

        1. 2.(1) Where a public electricity supplier has cut off the...

      5. Restoration of supply without consent

        1. 3.(1) Where a supply of electricity to any premises has...

      6. Damage to electrical plant etc.

        1. 4.(1) If any person intentionally or by culpable negligence damages...

      7. Entry during continuance of supply

        1. 5.(1) Any officer authorised by a public electricity supplier may...

      8. Entry on discontinuance of supply

        1. 6.(1) Where a public electricity supplier is authorised by sub-paragraph...

      9. Entry for replacing, repairing or altering lines or plant

        1. 7.(1) Any officer authorised by a public electricity supplier, after...

      10. Provisions as to powers of entry

        1. 8.(1) Where in pursuance of any powers of entry conferred...

      11. Electrical plant etc. not to be subject to distress

        1. 9.Any electrical plant, electric line or electricity meter owned by...

    7. SCHEDULE 7

      Use etc. of Electricity Meters

      1. Consumption to be ascertained by appropriate meter

        1. 1.(1) Where a customer of an electricity supplier is to...

      2. Restrictions on use of meters

        1. 2.(1) No meter shall be used for ascertaining the quantity...

        2. 3.(1) If an electricity supplier supplies electricity through a meter...

      3. Meter examiners

        1. 4.(1) The Director shall appoint competent and impartial persons as...

      4. Certification of meters

        1. 5.(1) Subject to sub-paragraph (2) below, a meter may be...

      5. Apparatus for testing etc. of meters

        1. 6.(1) It shall be the duty of a person to...

      6. Testing etc. of meters

        1. 7.(1) It shall be the duty of a meter examiner,...

        2. 8.(1) This paragraph applies where there is a genuine dispute...

      7. Presumptions and evidence

        1. 9.(1) This paragraph applies to meters used for ascertaining the...

      8. Meters to be kept in proper order

        1. 10.(1) A customer of an electricity supplier shall at all...

      9. Interference with meters

        1. 11.(1) If any person intentionally or by culpable negligence—

      10. Special provision for pre-payment meters

        1. 12.(1) A customer of an electricity supplier who takes his...

      11. Interpretation

        1. 13.In this Schedule— “agreed margins of error” has the meaning...

    8. SCHEDULE 8

      Consents under Sections 36 and 37

      1. Applications for consent

        1. 1.(1) An application for a consent under section 36 or...

      2. Objections by relevant planning authority

        1. 2.(1) Where an application is made to the Secretary of...

      3. Objections by other persons

        1. 3.(1) The Secretary of State may by regulations make provision...

      4. Public inquiries

        1. 4.(1) Where in accordance with paragraph 2(2) or 3(2) above...

      5. Provisions supplementary to paragraphs 2 to 4

        1. 5.(1) Where in accordance with paragraph 2(2) or 3(2) above...

      6. Special provisions as to consents under section 37

        1. 6.(1) Where an application for consent under section 37 of...

      7. Deemed planning permission etc.

        1. 7.(1) On granting a consent under section 36 or 37...

      8. Supplemental

        1. 8.(1) In this Schedule “relevant planning authority” has the meaning...

    9. SCHEDULE 9

      PRESERVATION OF AMENITY AND FISHERIES.

      1. Preservation of amenity: England and Wales

        1. 1.(1) In formulating any relevant proposals, a licence holder or...

        2. 2.(1) A licence holder shall within twelve months from the...

      2. Preservation of amenity and fisheries: Scotland

        1. 3.(1) In formulating any relevant proposals, a licence holder or...

        2. 4.(1) A licence holder shall within twelve months from the...

      3. Fisheries Committee: Scotland

        1. 5.(1) The Fisheries Committee appointed under section 5(2) of the...

    10. SCHEDULE 10

      Transfers under Sections 66 and 67

      1. Allocation of property, rights and liabilities: general

        1. 1.(1) The provisions of this paragraph shall apply where the...

        2. 2.(1) The provisions of this paragraph shall apply where the...

      2. Allocation of rights and liabilities: contracts of employment

        1. 3.(1) The provisions of this paragraph shall apply where—

      3. Variation of transfers by agreement

        1. 4.(1) The provisions of this paragraph shall apply where the...

      4. Right to production of documents of title

        1. 5.(1) The provisions of this paragraph shall apply where the...

      5. Proof of title by certificate

        1. 6.(1) Where two or more transfers are effected in pursuance...

      6. Restrictions on dealing with certain land

        1. 7.(1) Where two or more transfers are effected in pursuance...

      7. Third parties affected by vesting provisions

        1. 8.(1) A transaction of any description which, in pursuance of...

        2. 9.(1) If in consequence of two or more transfers effected...

      8. Interpretation

        1. 10.Any reference in this Schedule to a transfer effected in...

    11. SCHEDULE 11

      TAXATION PROVISIONS

      1. General

        1. 1.(1) Subject to sub-paragraphs (2) and (3) below, the following...

      2. Chargeable gains

        1. 2.(1) This paragraph applies where— (a) by virtue of a...

        2. 2A.In this Schedule “ the 1992 Act ” means the...

      3. Roll-over relief

        1. 3.(1) Where— (a) a held over gain would, but for...

      4. Unallowed capital losses

        1. 4.(1) Any unallowed capital losses of an existing body shall...

      5. Transaction in pursuance of section 68(2)(c)

        1. 5.(1) Sub-paragraph (2) below applies to any disposal (within the...

      6. Transfers in pursuance of Schedule 10

        1. 6.Where any property, rights and liabilities to which a transfer...

      7. Apportionments etc.

        1. 7.(1) This paragraph applies where any apportionment or other matter...

      8. Securities of successor companies

        1. 8.(1) Any share issued by a successor company in pursuance...

      9. Extinguishment of liabilities: restriction of tax losses

        1. 9.(1) Section 400(1) of the 1988 Act (write-off of government...

      10. Income tax exemption for certain interests

        1. 10.The vesting in a successor company by this Act of...

      11. Stamp Duty

        1. 11.(1) No transfer effected by this Act shall give rise...

      12. Stamp duty reserve tax

        1. 12.(1) No agreement made for the purposes of or for...

      13. Interpretation etc.

        1. 13.(1) In this Schedule— “the 1988 Act” means the Income...

    12. SCHEDULE 12

      Nuclear Liabilities: Financial Assistance

      1. Grants by Secretary of State

        1. 1.(1) Subject to paragraph 4 below, the Secretary of State...

      2. Loans by Secretary of State

        1. 2.(1) Subject to paragraph 4 below, the Secretary of State...

      3. Guarantees by Secretary of State

        1. 3.(1) Subject to paragraph 4 below, the Secretary of State...

      4. Financial limits

        1. 4.(1) The aggregate of the following, namely—

      5. Interpretation

        1. 5.In this Schedule “qualifying expenditure” has the meaning given by...

    13. SCHEDULE 13

      Production and Supply of Heat or Electricity etc. by Scottish Local Authorities

      1. In the Local Government (Scotland) Act 1973, the following provisions...

    14. SCHEDULE 14

      The Electricity Supply Pension Scheme

      1. Power to amend scheme

        1. 1.(1) The Secretary of State may make regulations amending the...

      2. Protection for certain persons

        1. 2.(1) The Secretary of State may make regulations for the...

        2. 3.(1) Subject to sub-paragraph (3) below, this sub-paragraph applies to—...

        3. 4.(1) So much of Schedule 13 to the Employment Protection...

      3. Interpretation

        1. 5.(1) In this Schedule— “Consultative Council” means a Consultative Council...

    15. SCHEDULE 15

      The Scottish Pension Schemes

      1. Power to amend schemes

        1. 1.(1) The Secretary of State may make regulations amending the...

      2. Protection for certain persons

        1. 2.(1) The Secretary of State may make regulations for the...

        2. 3.(1) Subject to sub-paragraph (3) below, this sub-paragraph applies to—...

        3. 4.(1) So much of Schedule 13 to the Employment Protection...

      3. Interpretation

        1. 5.(1) In this Schedule— “Consultative Council” means a Consultative Council...

    16. SCHEDULE 16

      Minor and Consequential Amendments

      1. Enactments relating to statutory undertakers etc.

        1. 1.(1) The holder of a licence under section 6(1) of...

        2. 2.(1) A licence holder who is entitled to exercise any...

        3. 3.(1) In the following enactments, namely— (a) the Water Act...

      2. The Civil Defence Act 1939 (c.31)

        1. 4.In section 90 of the Civil Defence Act 1939 (interpretation),...

      3. The Water Act 1945 (c.42)

        1. 5.In Schedule 3 to the Water Act 1945 (incorporated provisions:...

      4. The Wireless Telegraphy Act 1949 (c.54)

        1. 6.In section 19(2) of the Wireless Telegraphy Act 1949 (definition...

      5. The Public Utilities Street Works Act 1950 (c.39)

        1. 7.In section 17(5) of the Public Utilities Street Works Act...

      6. The Rights of Entry (Gas and Electricity Boards) Act 1954 (c.21)

        1. 8.(1) The Rights of Entry (Gas and Electricity Boards) Act...

      7. The Land Powers (Defence) Act 1958 (c.30)

        1. 9.In section 14(2)(b) of the Land Powers (Defence) Act 1958...

      8. The Water Resources Act 1963 (c.38)

        1. 10.In section 19(4)(f) of, and in paragraph 4(h) of Schedule...

      9. The Nuclear Installations Act 1965 (c.57)

        1. 11.For subsection (4) of section 3 of the Nuclear Installations...

      10. The Building Control Act 1966 (c.27)

        1. 12.In section 5(1) of the Building Control Act 1966, after...

      11. The Forestry Act 1967 (c.10)

        1. 13.(1) Section 9 of the Forestry Act 1967 (licences for...

      12. The Transport Act 1968 (c. 73)

        1. 14.In section 109(2) of the Transport Act 1968, for paragraphs...

      13. The Post Office Act 1969 (c.48)

        1. 15.In section 7(1A) of the Post Office Act 1969 (powers...

      14. The Fair Trading Act 1973 (c.41)

        1. 16.(1) The Fair Trading Act 1973 shall be amended as...

      15. The Consumer Credit Act 1974 (c. 39)

        1. 17.(1) The Consumer Credit Act 1974 shall be amended as...

      16. The Control of Pollution Act 1974 (c. 40)

        1. 18.(1) Section 21 of the Control of Pollution Act 1974...

      17. The Restrictive Trade Practices Act 1976 (c. 34)

        1. 19.In section 41(1)(a) of the Restrictive Trade Practices Act 1976...

      18. The Local Government (Miscellaneous Provisions) Act 1976 (c. 57)

        1. 20.(1) Section 11 of the Local Government (Miscellaneous Provisions) Act...

      19. The Land Drainage Act 1976 (c. 70)

        1. 21.In section 112(2)(a) of the Land Drainage Act 1976 (protection...

      20. The Energy Act 1976 (c. 76)

        1. 22.In section 14 of the Energy Act 1976 (fuelling for...

      21. The Land Registration (Scotland) Act 1979 (c. 33)

        1. 23.In section 28(1) of the Land Registration (Scotland) Act 1979...

      22. The Estate Agents Act 1979 (c. 38)

        1. 24.In section 10(3)(a) of the Estate Agents Act 1979 (exceptions...

      23. The Competition Act 1980 (c. 21)

        1. 25.In section 19 of the Competition Act 1980 (exceptions to...

      24. The Water (Scotland) Act 1980 (c. 45)

        1. 26.(1) The Water (Scotland) Act 1980 shall be amended as...

      25. The Highways Act 1980 (c. 66)

        1. 27.In section 181(6) of the Highways Act 1980 (apparatus in...

      26. The Acquisition of Land Act 1981 (c. 67)

        1. 28.In section 28 of the Acquisition of Land Act 1981...

      27. The Telecommunications Act 1984 (c. 12)

        1. 29.(1) The Telecommunications Act 1984 shall be amended as follows....

      28. The Roads (Scotland) Act 1984 (c. 54)

        1. 30.In section 61(4) of the Roads (Scotland) Act 1984 (permission...

      29. The Building Act 1984 (c. 55)

        1. 31.In section 80(3) of the Building Act 1984 (notice to...

      30. The Bankruptcy (Scotland) Act 1985 (c. 66)

        1. 32.In section 70(4)(b) of the Bankruptcy (Scotland) Act 1985 (supplies...

      31. The Airports Act 1986 (c. 31)

        1. 33.In section 74 of the Airports Act 1986 (restrictions on...

      32. The Gas Act 1986 (c. 44)

        1. 34.In section 42 of the Gas Act 1986 (general restrictions...

      33. The Insolvency Act 1986 (c. 45)

        1. 35.(1) The Insolvency Act 1986 shall be amended as follows....

      34. The Consumer Protection Act 1987 (c. 43)

        1. 36.In section 38 of the Consumer Protection Act 1987 (general...

      35. The Water Act 1989 (c. 15)

        1. 37.In section 160 of the Water Act 1989 (protection of...

      36. Interpretation

        1. 38.In this Schedule expressions which are used in Part I...

    17. SCHEDULE 17

      Transitional Provisions and Savings

      1. Part I Provisions and Savings for Part I of Act

        1. 1.(1) In so far as any requisition made under section...

        2. 2.Any tariff fixed under section 37(3) of the Electricity Act...

        3. 3.Any regulations made under section 16 of the Energy Act...

        4. 4.(1) Where any application made under section 2 of the...

        5. 5.(1) Where any application made under section 10(b) of the...

        6. 6.Any maximum charge fixed by an Electricity Board under section...

        7. 7.Where any representation, reference or report made under, or in...

        8. 8.(1) Any land which has been compulsorily acquired under section...

        9. 9.Any consent given under subsection (1) of section 22 of...

        10. 10.Any order made under subsection (3) of section 34 of...

        11. 11.(1) Any meter of a pattern which is approved for...

        12. 12.Any regulations made under section 34(2) of the Electricity Act...

        13. 13.Where— (a) any sum was deposited with an Electricity Board...

        14. 14.(1) Where immediately before the day appointed for the coming...

        15. 15.The repeal by this Act of any provision by virtue...

        16. 16.In this Part of this Schedule “the Electricity Acts” means—...

      2. Part II Provisions and Savings for Part II of Act

        1. 17.Any licence granted under section 6 of this Act to...

        2. 18.Any tariff fixed, or having effect as if fixed, under...

        3. 19.Any consent given under section 36 of this Act to...

        4. 20.Any consent given under section 37 of this Act to...

        5. 21.Any maximum price fixed, or having effect as if fixed,...

        6. 22.A direction given under section 96 of this Act to...

        7. 23.(1) Any land compulsorily acquired by an Electricity Board before...

        8. 24.(1) Where immediately before the transfer date there is in...

        9. 25.(1) Any agreement made, transaction effected or other thing done...

        10. 26.It is hereby declared for the avoidance of doubt that—...

        11. 27.The Transfer of Undertakings (Protection of Employment) Regulations 1981 shall...

        12. 28.Any agreement made under section 53 of the Electricity Act...

        13. 29.(1) It shall be the duty of an Electricity Board...

        14. 30.(1) Notwithstanding the repeal by this Act of section 46...

        15. 31.(1) Notwithstanding the repeal by this Act of section 30...

        16. 32.Notwithstanding the repeal by this Act of sections 10 and...

        17. 33.Where by virtue of anything done before the transfer date,...

        18. 34.Without prejudice to the powers conferred by section 112(2) of...

        19. 35.(1) Nothing in this Act shall affect the validity of...

        20. 36.(1) Where immediately before the transfer date an Electricity Board...

        21. 37.(1) An application or claim by an Electricity Board for...

        22. 38.(1) Where an asset, or the right to receive an...

        23. 39.(1) Where a distribution is proposed to be declared during...

        24. 40.In this Part of this Schedule expressions which are used...

    18. SCHEDULE 18

      Repeals

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources