Regulations 4 and 7(6)
SCHEDULEE+W+SINFORMATION REQUIRED IN AN APPLICATION FOR APPROVAL AND AN APPLICATION FOR RENEWAL OF APPROVAL
1. Name and address of the person submitting the application.E+W+S
Commencement Information
I1Sch. para. 1 in force at 1.8.1998, see reg. 1
2. Name and address of the person by whom the meter was manufactured.E+W+S
Commencement Information
I2Sch. para. 2 in force at 1.8.1998, see reg. 1
3. The type or model number of the meter.E+W+S
Commencement Information
I3Sch. para. 3 in force at 1.8.1998, see reg. 1
4. The voltage and current rating of the meter and the frequency at which it is designed to operate.E+W+S
Commencement Information
I4Sch. para. 4 in force at 1.8.1998, see reg. 1
5. A description of the meter, stating—E+W+S
(1) whether the meter is single or polyphase;
(2) whether it is an induction or electronic meter;
(3) whether it is a prepayment or credit meter; and
(4) if it contains more than one register, the number of registers it contains.
Commencement Information
I5Sch. para. 5 in force at 1.8.1998, see reg. 1
6. Conceptual designs, manufacturing drawings, circuits and schemes of all components.E+W+S
Commencement Information
I6Sch. para. 6 in force at 1.8.1998, see reg. 1
7. A description and explanation of the information in paragraph 6 sufficient to enable a meter examiner to understand the design and operation of the meter.E+W+S
Commencement Information
I7Sch. para. 7 in force at 1.8.1998, see reg. 1
8. The manner in which the meter is to be fixed in position.E+W+S
Commencement Information
I8Sch. para. 8 in force at 1.8.1998, see reg. 1
9. A list of any national, European or international standards with which the meter or any parts of it comply or are believed to comply.E+W+S
Commencement Information
I9Sch. para. 9 in force at 1.8.1998, see reg. 1
10. A report of any examination or test of the meter.E+W+S
Commencement Information
I10Sch. para. 10 in force at 1.8.1998, see reg. 1
11. A statement of the instructions for connection of the meter to the electric line when it is in operation which will be permanently fixed to the meter if a notification of approval is issued (unless the instructions are attached to or impressed on the meters submitted under regulation 4(1)(b)).E+W+S
Commencement Information
I11Sch. para. 11 in force at 1.8.1998, see reg. 1
12. A statement of any other body to which the meter has been submitted for an approval having the same or substantially similar effect to a notification of approval.E+W+S
Commencement Information
I12Sch. para. 12 in force at 1.8.1998, see reg. 1
13. An indication whether the applicant requires approval of the pattern or construction of the meter, or of the manner of its installation, or of both.E+W+S
Commencement Information
I13Sch. para. 13 in force at 1.8.1998, see reg. 1