The Electricity (Non-Fossil Fuel Sources) (England and Wales) Order 1998

  1. Introductory Text

  2. 1.Citation and commencement

  3. 2.Interpretation

  4. 3.Requirement to make arrangements etc.

  5. 4.(1) Where– (a) any relevant arrangements provide that the availability...

  6. Signature

    1. SCHEDULE 1

      SPECIFIED AGGREGATE AMOUNTS OF GENERATING CAPACITY

      1. PART I HYDRO GENERATING STATIONS

        1. 1.Table A below relates to hydro generating stations– Table A...

        2. 2.In this Order, “hydro generating stations” means generating stations of...

      2. PART II LANDFILL GAS GENERATING STATIONS

        1. 1.Table B below relates to landfill gas generating stations– Table...

        2. 2.In this Order, “landfill gas generating stations” means generating stations...

      3. PART III MUNICIPAL AND INDUSTRIAL WASTE WITH COMBINED HEAT AND POWER GENERATING STATIONS

        1. 1.Table C below relates to municipal and industrial waste with...

        2. 2.In this Order, “municipal and industrial waste with combined heat...

      4. PART IV MUNICIPAL AND INDUSTRIAL WASTE GENERATING STATIONS

        1. 1.Table D below relates to municipal and industrial waste generating...

        2. 2.In this Order, “municipal and industrial waste generating stations” means...

      5. PART V ON-SHORE WIND GENERATING STATIONS

        1. 1.Table E below relates to on-shore wind generating stations exceeding...

        2. 2.Table F below relates to on-shore wind generating stations not...

        3. 3.In this Order– “declared net capacity”, in the case of...

    2. SCHEDULE 2

      CONDITIONS PRECEDENT

      1. 1.The requirements referred to in article 4(1)(a) are–

      2. 2.In this Schedule– “connection agreement” means an agreement providing for...

    3. SCHEDULE 3

      TERMINATION EVENTS

  7. Explanatory Note