1. Table C below relates to municipal and industrial waste with combined heat and power generating stations–
Name of Supplier | Period | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | |
Eastern Electricity plc | 0.000 | 0.000 | 0.000 | 1.354 | 3.872 | 4.776 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 9.585 | 8.178 | 5.712 | 4.808 | 0.000 |
East Midlands Electricity plc | 0.000 | 0.000 | 0.000 | 0.889 | 2.543 | 3.137 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 6.296 | 5.372 | 3.752 | 3.158 | 0.000 |
London Electricity plc | 0.000 | 0.000 | 0.000 | 0.988 | 2.826 | 3.486 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 6.996 | 5.969 | 4.169 | 3.509 | 0.000 |
Manweb plc | 0.000 | 0.000 | 0.000 | 0.573 | 1.639 | 2.022 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 4.057 | 3.462 | 2.418 | 2.035 | 0.000 |
Midlands Electricity plc | 0.000 | 0.000 | 0.000 | 0.958 | 2.741 | 3.381 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 6.786 | 5.790 | 4.044 | 3.404 | 0.000 |
Northern Electric plc | 0.000 | 0.000 | 0.000 | 0.523 | 1.497 | 1.847 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.707 | 3.163 | 2.209 | 1.859 | 0.000 |
NORWEB plc | 0.000 | 0.000 | 0.000 | 0.830 | 2.374 | 2.928 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.877 | 5.014 | 3.502 | 2.947 | 0.000 |
SEEBOARD plc | 0.000 | 0.000 | 0.000 | 0.820 | 2.345 | 2.893 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 5.807 | 4.954 | 3.460 | 2.912 | 0.000 |
Southern Electric plc | 0.000 | 0.000 | 0.000 | 1.225 | 3.505 | 4.323 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 8.675 | 7.402 | 5.170 | 4.351 | 0.000 |
South Wales Electricity plc | 0.000 | 0.000 | 0.000 | 0.345 | 0.988 | 1.219 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.448 | 2.089 | 1.459 | 1.228 | 0.000 |
South Western Electricity plc | 0.000 | 0.000 | 0.000 | 0.563 | 1.610 | 1.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.987 | 3.402 | 2.376 | 2.000 | 0.000 |
Yorkshire Electricity Group plc | 0.000 | 0.000 | 0.000 | 0.810 | 2.317 | 2.858 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 5.737 | 4.894 | 3.418 | 2.877 | 0.000 |
In Table C–
(a)period 1 means 1 December 1998 to 31 March 1999
period 2 means 1 April 1999 to 31 March 2000
period 3 means 1 April 2000 to 31 March 2001
period 4 means 1 April 2001 to 31 March 2002
period 5 means 1 April 2002 to 31 March 2003
period 6 means 1 April 2003 to 31 March 2004
period 7 means 1 April 2004 to 31 March 2005
period 8 means 1 April 2005 to 31 March 2006
period 9 means 1 April 2006 to 31 March 2007
period 10 means 1 April 2007 to 31 March 2008
period 11 means 1 April 2008 to 31 March 2009
period 12 means 1 April 2009 to 31 March 2010
period 13 means 1 April 2010 to 31 March 2011
period 14 means 1 April 2011 to 31 March 2012
period 15 means 1 April 2012 to 31 March 2013
period 16 means 1 April 2013 to 31 March 2014
period 17 means 1 April 2014 to 31 March 2015
period 18 means 1 April 2015 to 31 March 2016
period 19 means 1 April 2016 to 31 March 2017
period 20 means 1 April 2017 to 31 March 2018
period 21 means 1 April 2018 to 31 November 2018
(b)capacity amounts are expressed in megawatts.
2. In this Order, “municipal and industrial waste with combined heat and power generating stations” means generating stations which–
(a)are fuelled wholly or partly by one or more of the following–
(i)municipal waste;
(ii)industrial waste; and
(iii)fuel derived from either or both of the types of waste mentioned in sub-paragraphs (i) and (ii) above;
including stations fuelled partly by sewage matter where, in any period of the Order, such sewage matter used makes up no more than 10 per cent. of the weight of all the above fuel used including the sewage matter (all on a dry-weight basis), but excluding any such station as is partly fuelled by–
(aa)gas derived from a landfill site of any description; or
(bb)gas derived from sewage; or
(cc)sewage matter in excess of the proportion set out above; and
(b)are combined heat and power stations–
(i)which are built with all the equipment, up to and including the meter for measuring heat supplied from the generating station, necessary to maintain and measure a continuous heat output at least equal to 200 per cent. of the declared net capacity of the generating station;
(ii)n respect of which there are, or there are reasonable prospects of obtaining, contracts with third parties to supply heat which would–
(aa)require the station to supply at least the required annual heat output in relevant Period 7; and
(bb)require at least 50 per cent. of the heat actually supplied in each period of the Order to be used within buildings for the purposes of heating space or (other than for industrial purposes) heating water;
(iii)in respect of which there are prospects of the station supplying at least the required annual heat output to a third party in periods of the Order subsequent to relevant Period 7, where at least 50 per cent. of the heat actually supplied would be for the purposes of heating space or (other than for industrial purposes) heating water; and
(iv)which are subject to contractual arrangements in relation to the supply of their electricity which only entitle that electricity to receive a premium price in respect of a period of the Order where, in the previous period of the Order, the station has supplied at least either the required annual heat output or the adjusted annual heat output to a third party and where at least 50 per cent. of the heat actually supplied has been used within buildings for the purposes of heating space or (other than for industrial purposes) heating water;
and for the purpose of this sub-paragraph (b)–
“adjusted annual heat output” means the required annual heat output with the following adjustments–
if in any relevant Period the generating station fails to supply the required annual heat output, then the table (set out in the definition of “required annual heat output”) shall be adjusted so that the value of H for that relevant Period shall also apply to the next relevant Period, and the value of H for all subsequent relevant Periods shall be adjusted in each case to be equal to the value of H (prior to such adjustment) for the relevant Period preceding each such period; and
if in any relevant Period the generating station fails to supply the adjusted annual heat output, then the table (set out in the definition of “required annual heat output”) shall be further adjusted so that the value of H (as last adjusted) for that relevant Period shall also apply to the next relevant Period, and the value of H for all subsequent relevant Periods shall be further adjusted in each case to be equal to the value of H (as last adjusted) for the relevant Period preceding each such period;
“period of the Order” means a period commencing and ending on the dates specified in relation to Table C;
particular “relevant Periods” are ascertained by taking the first period of the Order as being relevant Period 1, the next period of the Order as relevant Period 2, and so forth;
“required annual heat output” means B kilowatt-hours of heat, where B is ascertained by the application of the formula–
B = declared net capacity expressed in kilowatts × 8760hours × H
where–
H has the value set out in the table below–
Relevant Period | Value of H |
---|---|
1–6 | 0 |
7 | 0.09 |
8 | 0.18 |
9 | 0.27 |
10 | 0.36 |
11 and subsequent periods | 0.4 |
“third party” means a person who is not a connected person to any person (other than a public electricity supplier contracting in pursuance of an obligation imposed by this Order or his agent) who is party to the contractual arrangements referred to in sub-paragraph (iv) above.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: