SCHEDULE 1SPECIFIED AGGREGATE AMOUNTS OF GENERATING CAPACITY

PART IHYDRO GENERATING STATIONS

1.  Table A below relates to hydro generating stations–

Table A

Name of SupplierPeriod
123456789101112131415161718192021
Eastern Electricity plc0.0000.0000.2040.4480.9201.1341.2141.2141.2141.2141.2141.2141.2141.2141.2141.2141.0090.3940.1690.0780.000
East Midlands Electricity plc0.0000.0000.1340.2940.6040.74507970.7970.7970.7970.7970.7970.7970.7970.7970.7970.6620.2590.1110.0510.000
London Electricity plc0.0000.0000.1490.3270.6720.8280.8860.8860.8860.8860.8860.8860.8860.8860.8860.8860.7360.2880.1230.0570.000
Manweb plc0.0000.0000.0860.1890.3890.4800.5130.5130.5130.5130.5130.5130.5130.5130.5130.5130.4260.1660.0710.0330.000
Midlands Electricity plc0.0000.0000.1440.3170.6510.8030.8590.8590.8590.8590.8590.8590.8590.8590.8590.8590.7140.2790.1190.0550.000
Northern Electric plc0.0000.0000.0780.1730.3550.4380.4690.4690.4690.4690.4690.4690.4690.4690.4690.4690.3900.1520.0650.0300.000
NORWEB plc0.0000.0000.1250.2750.5640.6950.7440.7440.7440.7440.7440.7440.7440.7440.7440.7440.6180.2410.1030.0480.000
SEEBOARD plc0.0000.0000.1230.2710.5570.6870.7350.7350.7350.7350.7350.7350.7350.7350.7350.7350.6110.2380.1020.0470.000
Southern Electric plc0.0000.0000.1840.4060.8331.0261.0981.0981.0981.0981.0981.0981.0981.0981.0981.0980.9130.3570.1530.0710.000
South Wales Electricity plc0.0000.0000.0510.1140.2340.2890.3090.3090.3090.3090.3090.3090.3090.3090.3090.3090.2570.1000.0420.0190.000
South Western Electricity plc0.0000.0000.0840.1860.3820.4710.5040.5040.5040.5040.5040.5040.5040.5040.5040.5040.4190.1630.0700.0320.000
Yorkshire Electricity Group plc0.0000.0000.1220.2680.5500.6780.7260.7260.7260.7260.7260.7260.7260.7260.7260.7260.6030.2360.1010.0470.000

In Table A–

(a)period 1 means 1 December 1998 to 31 March 1999

  • period 2 means 1 April 1999 to 31 March 2000

  • period 3 means 1 April 2000 to 31 March 2001

  • period 4 means 1 April 2001 to 31 March 2002

  • period 5 means 1 April 2002 to 31 March 2003

  • period 6 means 1 April 2003 to 31 March 2004

  • period 7 means 1 April 2004 to 31 March 2005

  • period 8 means 1 April 2005 to 31 March 2006

  • period 9 means 1 April 2006 to 31 March 2014

  • period 10 means 1 April 2007 to 31 March 2008

  • period 11 means 1 April 2008 to 31 March 2009

  • period 12 means 1 April 2009 to 31 March 2010

  • period 13 means 1 April 2010 to 31 March 2011

  • period 14 means 1 April 2011 to 31 March 2012

  • period 15 means 1 April 2012 to 31 March 2013

  • period 16 means 1 April 2013 to 31 March 2014

  • period 17 means 1 April 2014 to 31 March 2015

  • period 18 means 1 April 2015 to 31 March 2016

  • period 19 means 1 April 2016 to 31 March 2017

  • period 20 means 1 April 2017 to 31 March 2018

  • period 21 means 1 April 2018 to 31 November 2018

(b)capacity amounts are expressed in megawatts.

2.  In this Order, “hydro generating stations” means generating stations of less than 5 megawatts declared net capacity which are driven by any form of water power (other than tidal or wave power) provided that if power is used in order that the pressure of the water is artificially increased at the entry point into the turbine, such power must derive from the station itself.

PART IILANDFILL GAS GENERATING STATIONS

1.  Table B below relates to landfill gas generating stations–

Table B

Name of SupplierPeriod
123456789101112131415161718192021
Eastern Electricity plc0.0000.96513.23224.26930.90132.90536.98338.16638.73539.13939.49238.83237.95537.16736.04133.95915.7394.8572.2390.0000.000
East Midlands Electricity plc0.0000.6348.69215.94320.30021.61624.29525.07225.44625.71225.94325.51024.93424.41623.67622.30810.3393.1911.4710.0000.000
London Electricity plc0.0000.7049.65817.71422.55524.01826.99527.85828.27328.56928.82628.34427.70427.12926.30724.78711.4883.5451.6340.0000.000
Manweb plc0.0000.4085.60110.27413.08213.93015.65616.15716.39816.56916.71916.43916.06815.73415.25814.3766.6632.0560.9470.0000.000
Midlands Electricity plc0.0000.6839.36917.18321.87923.29726.18527.02227.42527.71127.96127.49426.87326.31525.51824.04411.1433.4391.5850.0000.000
Northern Electric plc0.0000.3735.1189.38811.95412.72914.30714.76414.98415.14115.27715.02214.68314.37813.94213.1376.0881.8790.8660.0000.000
NORWEB plc0.0000.5918.11314.88018.94620.17522.67523.40023.74923.99724.21423.80923.27222.78822.09820.8219.6502.9781.3730.0000.000
SEEBOARD plc0.0000.5848.01614.70318.72119.93522.40523.12223.46723.71223.92523.52622.99422.51721.83520.5739.5352.9421.3560.0000.000
Southern Electric plc0.0000.87311.97721.96627.96929.78233.47434.54435.05935.42535.74435.14734.35433.64032.62130.73614.2454.3962.0270.0000.000
South Wales Electricity plc0.0000.2463.3806.1997.8948.4069.4479.7509.8959.99810.0889.9209.6969.4949.2078.6754.0201.2400.5710.0000.000
South Western Electricity plc0.0000.4015.50510.09712.85613.69015.38615.87916.11516.28416.43016.15615.79115.46314.99514.1286.5482.0200.9310.0000.000
Yorkshire Electricity Group plc0.0000.5777.92014.52518.49519.69422.13522.84323.18423.42623.63723.24222.71722.24621.57220.3259.4202.9071.3400.0000.000

In Table B–

(a)period 1 means 1 December 1998 to 31 March 1999

  • period 2 means 1 April 1999 to 31 March 2000

  • period 3 means 1 April 2000 to 31 March 2001

  • period 4 means 1 April 2001 to 31 March 2002

  • period 5 means 1 April 2002 to 31 March 2003

  • period 6 means 1 April 2003 to 31 March 2004

  • period 7 means 1 April 2004 to 31 March 2005

  • period 8 means 1 April 2005 to 31 March 2006

  • period 9 means 1 April 2006 to 31 March 2007

  • period 10 means 1 April 2007 to 31 March 2008

  • period 11 means 1 April 2008 to 31 March 2009

  • period 12 means 1 April 2009 to 31 March 2010

  • period 13 means 1 April 2010 to 31 March 2011

  • period 14 means 1 April 2011 to 31 March 2012

  • period 15 means 1 April 2012 to 31 March 2013

  • period 16 means 1 April 2013 to 31 March 2014

  • period 17 means 1 April 2014 to 31 March 2015

  • period 18 means 1 April 2015 to 31 March 2016

  • period 19 means 1 April 2016 to 31 March 2017

  • period 20 means 1 April 2017 to 31 March 2018

  • period 21 means 1 April 2018 to 31 November 2018

(b)capacity amounts are expressed in megawatts.

2.  In this Order, “landfill gas generating stations” means generating stations which are fuelled wholly by gas derived from landfill sites on which, at any time before 25th November 1997, activities were carried on in accordance with a licence issued under section 5 of the Control of Pollution Act 1974(1), or a resolution passed by the relevant disposal authority pursuant to section 11(3)(e) of that Act, or a waste management licence issued under section 36 of the Environmental Protection Act 1990(2).

PART IIIMUNICIPAL AND INDUSTRIAL WASTE WITH COMBINED HEAT AND POWER GENERATING STATIONS

1.  Table C below relates to municipal and industrial waste with combined heat and power generating stations–

Table C

Name of SupplierPeriod
123456789101112131415161718192021
Eastern Electricity plc0.0000.0000.0001.3543.8724.7769.5859.5859.5859.5859.5859.5859.5859.5859.5859.5859.5858.1785.7124.8080.000
East Midlands Electricity plc0.0000.0000.0000.8892.5433.1376.2966.2966.2966.2966.2966.2966.2966.2966.2966.2966.2965.3723.7523.1580.000
London Electricity plc0.0000.0000.0000.9882.8263.4866.9966.9966.9966.9966.9966.9966.9966.9966.9966.9966.9965.9694.1693.5090.000
Manweb plc0.0000.0000.0000.5731.6392.0224.0574.0574.0574.0574.0574.0574.0574.0574.0574.0574.0573.4622.4182.0350.000
Midlands Electricity plc0.0000.0000.0000.9582.7413.3816.7866.7866.7866.7866.7866.7866.7866.7866.7866.7866.7865.7904.0443.4040.000
Northern Electric plc0.0000.0000.0000.5231.4971.8473.7073.7073.7073.7073.7073.7073.7073.7073.7073.7073.7073.1632.2091.8590.000
NORWEB plc0.0000.0000.0000.8302.3742.9285.8775.8775.8775.8775.8775.8775.8775.8775.8775.8775.8775.0143.5022.9470.000
SEEBOARD plc0.0000.0000.0000.8202.3452.8935.8075.8075.8075.8075.8075.8075.8075.8075.8075.8075.8074.9543.4602.9120.000
Southern Electric plc0.0000.0000.0001.2253.5054.3238.6758.6758.6758.6758.6758.6758.6758.6758.6758.6758.6757.4025.1704.3510.000
South Wales Electricity plc0.0000.0000.0000.3450.9881.2192.4482.4482.4482.4482.4482.4482.4482.4482.4482.4482.4482.0891.4591.2280.000
South Western Electricity plc0.0000.0000.0000.5631.6101.9873.9873.9873.9873.9873.9873.9873.9873.9873.9873.9873.9873.4022.3762.0000.000
Yorkshire Electricity Group plc0.0000.0000.0000.8102.3172.8585.7375.7375.7375.7375.7375.7375.7375.7375.7375.7375.7374.8943.4182.8770.000

In Table C–

(a)period 1 means 1 December 1998 to 31 March 1999

  • period 2 means 1 April 1999 to 31 March 2000

  • period 3 means 1 April 2000 to 31 March 2001

  • period 4 means 1 April 2001 to 31 March 2002

  • period 5 means 1 April 2002 to 31 March 2003

  • period 6 means 1 April 2003 to 31 March 2004

  • period 7 means 1 April 2004 to 31 March 2005

  • period 8 means 1 April 2005 to 31 March 2006

  • period 9 means 1 April 2006 to 31 March 2007

  • period 10 means 1 April 2007 to 31 March 2008

  • period 11 means 1 April 2008 to 31 March 2009

  • period 12 means 1 April 2009 to 31 March 2010

  • period 13 means 1 April 2010 to 31 March 2011

  • period 14 means 1 April 2011 to 31 March 2012

  • period 15 means 1 April 2012 to 31 March 2013

  • period 16 means 1 April 2013 to 31 March 2014

  • period 17 means 1 April 2014 to 31 March 2015

  • period 18 means 1 April 2015 to 31 March 2016

  • period 19 means 1 April 2016 to 31 March 2017

  • period 20 means 1 April 2017 to 31 March 2018

  • period 21 means 1 April 2018 to 31 November 2018

(b)capacity amounts are expressed in megawatts.

2.  In this Order, “municipal and industrial waste with combined heat and power generating stations” means generating stations which–

(a)are fuelled wholly or partly by one or more of the following–

(i)municipal waste;

(ii)industrial waste; and

(iii)fuel derived from either or both of the types of waste mentioned in sub-paragraphs (i) and (ii) above;

including stations fuelled partly by sewage matter where, in any period of the Order, such sewage matter used makes up no more than 10 per cent. of the weight of all the above fuel used including the sewage matter (all on a dry-weight basis), but excluding any such station as is partly fuelled by–

(aa)gas derived from a landfill site of any description; or

(bb)gas derived from sewage; or

(cc)sewage matter in excess of the proportion set out above; and

(b)are combined heat and power stations–

(i)which are built with all the equipment, up to and including the meter for measuring heat supplied from the generating station, necessary to maintain and measure a continuous heat output at least equal to 200 per cent. of the declared net capacity of the generating station;

(ii)n respect of which there are, or there are reasonable prospects of obtaining, contracts with third parties to supply heat which would–

(aa)require the station to supply at least the required annual heat output in relevant Period 7; and

(bb)require at least 50 per cent. of the heat actually supplied in each period of the Order to be used within buildings for the purposes of heating space or (other than for industrial purposes) heating water;

(iii)in respect of which there are prospects of the station supplying at least the required annual heat output to a third party in periods of the Order subsequent to relevant Period 7, where at least 50 per cent. of the heat actually supplied would be for the purposes of heating space or (other than for industrial purposes) heating water; and

(iv)which are subject to contractual arrangements in relation to the supply of their electricity which only entitle that electricity to receive a premium price in respect of a period of the Order where, in the previous period of the Order, the station has supplied at least either the required annual heat output or the adjusted annual heat output to a third party and where at least 50 per cent. of the heat actually supplied has been used within buildings for the purposes of heating space or (other than for industrial purposes) heating water;

and for the purpose of this sub-paragraph (b)–

  • “adjusted annual heat output” means the required annual heat output with the following adjustments–

    (aa)

    if in any relevant Period the generating station fails to supply the required annual heat output, then the table (set out in the definition of “required annual heat output”) shall be adjusted so that the value of H for that relevant Period shall also apply to the next relevant Period, and the value of H for all subsequent relevant Periods shall be adjusted in each case to be equal to the value of H (prior to such adjustment) for the relevant Period preceding each such period; and

    (bb)

    if in any relevant Period the generating station fails to supply the adjusted annual heat output, then the table (set out in the definition of “required annual heat output”) shall be further adjusted so that the value of H (as last adjusted) for that relevant Period shall also apply to the next relevant Period, and the value of H for all subsequent relevant Periods shall be further adjusted in each case to be equal to the value of H (as last adjusted) for the relevant Period preceding each such period;

  • “period of the Order” means a period commencing and ending on the dates specified in relation to Table C;

  • particular “relevant Periods” are ascertained by taking the first period of the Order as being relevant Period 1, the next period of the Order as relevant Period 2, and so forth;

  • “required annual heat output” means B kilowatt-hours of heat, where B is ascertained by the application of the formula–

    B = declared net capacity expressed in kilowatts × 8760hours × H

    where–

    • H has the value set out in the table below–

    Relevant PeriodValue of H
    1–60
    70.09
    80.18
    90.27
    100.36
    11 and subsequent periods0.4
  • “third party” means a person who is not a connected person to any person (other than a public electricity supplier contracting in pursuance of an obligation imposed by this Order or his agent) who is party to the contractual arrangements referred to in sub-paragraph (iv) above.

PART IVMUNICIPAL AND INDUSTRIAL WASTE GENERATING STATIONS

1.  Table D below relates to municipal and industrial waste generating stations–

Table D

Name of SupplierPeriod
123456789101112131415161718192021
Eastern Electricity plc0.0000.0000.0000.00011.41123.88250.55650.55656.95656.95656.95656.95656.95656.95656.95656.95656.95656.95635.74815.19911.843
East Midlands Electricity plc0.0000.0000.0000.0007.49615.68933.21233.21237.41637.41637.41637.41637.41637.41637.41637.41637.41637.41623.4849.9857.780
London Electricity plc0.0000.0000.0000.0008.32917.43236.90236.90241.57441.57441.57441.57441.57441.57441.57441.57441.57441.57426.09311.0948.644
Manweb plc0.0000.0000.0000.0004.83010.11021.40321.40324.11224.11224.11224.11224.11224.11224.11224.11224.11224.11215.1346.4345.013
Midlands Electricity plc0.0000.0000.0000.0008.07916.90935.79535.79540.32740.32740.32740.32740.32740.32740.32740.32740.32740.32725.31010.7618.385
Northern Electric plc0.0000.0000.0000.0004.4149.23919.55819.55822.03422.03422.03422.03422.03422.03422.03422.03422.03422.03413.8295.8794.581
NORWEB plc0.0000.0000.0000.0006.99614.64330.99830.99834.92234.92234.92234.92234.92234.92234.92234.92234.92234.92221.9189.3197.261
SEEBOARD plc0.0000.0000.0000.0006.91314.46830.62930.62934.50634.50634.50634.50634.50634.50634.50634.50634.50634.50621.6579.2087.174
Southern Electric plc0.0000.0000.0000.00010.32821.61645.75945.75951.55251.55251.55251.55251.55251.55251.55251.55251.55251.55232.35613.75710.719
South Wales Electricity plc0.0000.0000.0000.0002.9156.10112.91512.91514.55014.55014.55014.55014.55014.55014.55014.55014.55014.5509.1323.8823.025
South Western Electricity plc0.0000.0000.0000.0004.7479.93621.03421.03423.69723.69723.69723.69723.69723.69723.69723.69723.69723.69714.8736.3234.927
Yorkshire Electricity Group plc0.0000.0000.0000.0006.83014.29430.26030.26034.09034.09034.09034.09034.09034.09034.09034.09034.09034.09021.3969.0977.088

In Table D–

(a)period 1 means 1 December 1998 to 31 March 1999

  • period 2 means 1 April 1999 to 31 March 2000

  • period 3 means 1 April 2000 to 31 March 2001

  • period 4 means 1 April 2001 to 31 March 2002

  • period 5 means 1 April 2002 to 31 March 2003

  • period 6 means 1 April 2003 to 31 March 2004

  • period 7 means 1 April 2004 to 31 March 2005

  • period 8 means 1 April 2005 to 31 March 2006

  • period 9 means 1 April 2006 to 31 March 2007

  • period 10 means 1 April 2007 to 31 March 2008

  • period 11 means 1 April 2008 to 31 March 2009

  • period 12 means 1 April 2009 to 31 March 2010

  • period 13 means 1 April 2010 to 31 March 2011

  • period 14 means 1 April 2011 to 31 March 2012

  • period 15 means 1 April 2012 to 31 March 2013

  • period 16 means 1 April 2013 to 31 March 2014

  • period 17 means 1 April 2014 to 31 March 2015

  • period 18 means 1 April 2015 to 31 March 2016

  • period 19 means 1 April 2016 to 31 March 2017

  • period 20 means 1 April 2017 to 31 March 2018

  • period 21 means 1 April 2018 to 31 November 2018

(b)capacity amounts are expressed in megawatts.

2.  In this Order, “municipal and industrial waste generating stations” means generating stations which are fuelled wholly or partly by any one or more of the following–

(a)municipal waste;

(b)industrial waste; and

(c)fuel derived from either or both of the types of waste mentioned in sub-paragraphs (a) and (b) above,

including stations fuelled partly by sewage matter where, in any period of the Order, such sewage matter used makes up no more than 10 per cent. of the weight of all the above fuel used including the sewage matter (all on a dry-weight basis);

but excluding any such station as is partly fuelled by–

(i)gas derived from a landfill site of any description; or

(ii)gas derived from sewage; or

(iii)sewage matter in excess of the proportion set out above.

PART VON-SHORE WIND GENERATING STATIONS

1.  Table E below relates to on-shore wind generating stations exceeding 0.995 MW–

Table E

Name of SupplierPeriod
123456789101112131415161718192021
Eastern Electricity plc0.0000.0000.0004.90832.97546.60146.60146.60146.60146.60146.60146.60146.60146.60146.60146.60146.18540.98713.6250.0000.000
East Midlands Electricity plc0.0000.0000.0003.22421.66230.61430.61430.61430.61430.61430.61430.61430.61430.61430.61430.61430.34026.9258.9500.0000.000
London Electricity plc0.0000.0000.0003.58324.06934.01534.01534.01534.01534.01534.01534.01534.01534.01534.01534.01533.71129.9179.9450.0000.000
Manweb plc0.0000.0000.0002.07713.96019.72819.72819.72819.72819.72819.72819.72819.72819.72819.72819.72819.55217.3525.7680.0000.000
Midlands Electricity plc0.0000.0000.0003.47523.34732.99532.99532.99532.99532.99532.99532.99532.99532.99532.99532.99532.70029.0209.6470.0000.000
Northern Electric plc0.0000.0000.0001.89812.75618.02818.02818.02818.02818.02818.02818.02818.02818.02818.02818.02817.86615.8565.2700.0000.000
NORWEB plc0.0000.0000.0003.00920.21828.57328.57328.57328.57328.57328.57328.57328.57328.57328.57328.57328.31725.1308.3540.0000.000
SEEBOARD plc0.0000.0000.0002.97319.97728.23228.23228.23228.23228.23228.23228.23228.23228.23228.23228.23227.98024.8318.2540.0000.000
Southern Electric plc0.0000.0000.0004.44329.84642.17942.17942.17942.17942.17942.17942.17942.17942.17942.17942.17941.80237.09812.3320.0000.000
South Wales Electricity plc0.0000.0000.0001.2538.42411.90511.90511.90511.90511.90511.90511.90511.90511.90511.90511.90511.79810.4703.4800.0000.000
South Western Electricity plc0.0000.0000.0002.04213.71919.38819.38819.38819.38819.38819.38819.38819.38819.38819.38819.38819.21517.0525.6680.0000.000
Yorkshire Electricity Group plc0.0000.0000.0002.93719.73627.89227.89227.89227.89227.89227.89227.89227.89227.89227.89227.89227.64324.5328.1550.0000.000

In Table E–

(a)period 1 means 1 December 1998 to 31 March 1999

  • period 2 means 1 April 1999 to 31 March 2000

  • period 3 means 1 April 2000 to 31 March 2001

  • period 4 means 1 April 2001 to 31 March 2002

  • period 5 means 1 April 2002 to 31 March 2003

  • period 6 means 1 April 2003 to 31 March 2004

  • period 7 means 1 April 2004 to 31 March 2005

  • period 8 means 1 April 2005 to 31 March 2006

  • period 9 means 1 April 2006 to 31 March 2007

  • period 10 means 1 April 2007 to 31 March 2008

  • period 11 means 1 April 2008 to 31 March 2009

  • period 12 means 1 April 2009 to 31 March 2010

  • period 13 means 1 April 2010 to 31 March 2011

  • period 14 means 1 April 2011 to 31 March 2012

  • period 15 means 1 April 2012 to 31 March 2013

  • period 16 means 1 April 2013 to 31 March 2014

  • period 17 means 1 April 2014 to 31 March 2015

  • period 18 means 1 April 2015 to 31 March 2016

  • period 19 means 1 April 2016 to 31 March 2017

  • period 20 means 1 April 2017 to 31 March 2018

  • period 21 means 1 April 2018 to 31 November 2018

(b)capacity amounts are expressed in megawatts.

2.  Table F below relates to on-shore wind generating stations not exceeding 0.995 MW–

Table F

Name of SupplierPeriod
123456789101112131415161718192021
Eastern Electricity plc0.0000.0000.5273.0913.6673.9273.9273.9273.9273.9273.9273.9273.9273.9273.9273.9273.0530.8350.2590.0000.000
East Midlands Electricity plc0.0000.0000.3462.0302.4092.5802.5802.5802.5802.5802.5802.5802.5802.5802.5802.5802.0050.5480.1700.0000.000
London Electricity plc0.0000.0000.3842.2562.6772.8662.8662.8662.8662.8662.8662.8662.8662.8662.8662.8662.2280.6090.1890.0000.000
Manweb plc0.0000.0000.2231.3081.5521.6621.6621.6621.6621.6621.6621.6621.6621.6621.6621.6621.2920.3530.1090.0000.000
Midlands Electricity plc0.0000.0000.3732.1882.5962.7802.7802.7802.7802.7802.7802.7802.7802.7802.7802.7802.1610.5910.1830.0000.000
Northern Electric plc0.0000.0000.2031.1951.4181.5191.5191.5191.5191.5191.5191.5191.5191.5191.5191.5191.1800.3230.0990.0000.000
NORWEB plc0.0000.0000.3231.8952.2482.4072.4072.4072.4072.4072.4072.4072.4072.4072.40712.4071.8710.5120.1580.0000.000
SEEBOARD plc0.0000.0000.3191.8722.2212.3792.3792.3792.3792.3792.3792.3792.3792.3792.3792.3791.8490.5060.1560.0000.000
Southern Electric plc0.0000.0000.4772.7973.3193.5543.5543.5543.5543.5543.5543.5543.5543.5543.5543.5542.7630.7560.2340.0000.000
South Wales Electricity plc0.0000.0000.1340.7890.9361.0031.0031.0031.0031.0031.0031.0031.0031.0031.0031.0030.7790.2130.0650.0000.000
South Western Electricity plc0.0000.0000.2191.2851.5251.6331.6331.6331.6331.6331.6331.6331.6331.6331.6331.6331.2690.3470.1070.0000.000
Yorkshire Electricity Group plc0.0000.0000.3151.8502.1952.3502.3502.3502.3502.3502.3502.3502.3502.3502.3502.3501.8270.5000.1540.0000.000

In Table F–

(a)period 1 means 1 December 1998 to 31 March 1999

  • period 2 means 1 April 1999 to 31 March 2000

  • period 3 means 1 April 2000 to 31 March 2001

  • period 4 means 1 April 2001 to 31 March 2002

  • period 5 means 1 April 2002 to 31 March 2003

  • period 6 means 1 April 2003 to 31 March 2004

  • period 7 means 1 April 2004 to 31 March 2005

  • period 8 means 1 April 2005 to 31 March 2006

  • period 9 means 1 April 2006 to 31 March 2007

  • period 10 means 1 April 2007 to 31 March 2008

  • period 11 means 1 April 2008 to 31 March 2009

  • period 12 means 1 April 2009 to 31 March 2010

  • period 13 means 1 April 2010 to 31 March 2011

  • period 14 means 1 April 2011 to 31 March 2012

  • period 15 means 1 April 2012 to 31 March 2013

  • period 16 means 1 April 2013 to 31 March 2014

  • period 17 means 1 April 2014 to 31 March 2015

  • period 18 means 1 April 2015 to 31 March 2016

  • period 19 means 1 April 2016 to 31 March 2017

  • period 20 means 1 April 2017 to 31 March 2018

  • period 21 means 1 April 2018 to 31 November 2018

(b)capacity amounts are expressed in megawatts.

3.  In this Order–

  • “declared net capacity”, in the case of an on-shore wind generating station, means the declared net capacity ascertained by the application to such a station of the formula specified in subsection (8A) of section 32 of the Act(3);

  • “on-shore wind generating stations” means generating stations which are driven by wind and are located on land above mean high water level;

  • “on-shore wind generating stations exceeding 0.995 MW” means on-shore wind generating stations each of which has a declared net capacity exceeding 0.995 megawatts; and

  • “on-shore wind generating stations not exceeding 0.995 MW” means on-shore wind generating stations each of which has a declared net capacity of 0.995 megawatts or less.

Article 4(1)

SCHEDULE 2CONDITIONS PRECEDENT

1.  The requirements referred to in article 4(1)(a) are–

(a)that planning permission and all necessary consents (including any necessary wayleave consents), easements and rights to enable any relevant non-fossil fuel generating station to be constructed and operated in accordance with and as contemplated by the terms of the relevant arrangements have been granted;

(b)that planning sion and all necessary consents (including any necessary wayleave consents), easements and rights to enable any public electricity supplier to whose electricity distribution system any relevant non-fossil fuel generating station is to be connected to comply with his obligations as contemplated by the terms of the relevant arrangements have been granted;

(c)that the operator has entered into, and there has come into force, a connection agreement;

(d)that the operator holds a licence or has the benefit of an exemption under Part I of the Act authorising him to generate electricity and to convey electricity from the place at which it is generated to the point of delivery for the purposes of the relevant arrangements;

(e)(to the extent that the arrangements relate to a relevant non-fossil fuel generating station whose operator is so required) that the operator has become a party to the pooling and settlement agreement;

(f)that the commissioning process has been satisfactorily completed.

2.  In this Schedule–

“connection agreement” means an agreement providing for the connection of any relevant non-fossil fuel generating station to a system of electric lines and electrical plant through which generating capacity will be made available to a public electricity supplier.

Article 4(2)

SCHEDULE 3TERMINATION EVENTS

The events referred to in article 4(2)(a) are–

(1) the operator ceasing for any reason to be authorised by a licence or exemption granted under the Act to generate electricity for the purposes of giving a supply to any premises or enabling a supply to be given;

(2) the operator defaulting in the performance of any of his material obligations under the relevant arrangements and in the case of a default which is, in the opinion of the relevant public electricity supplier (acting reasonably), capable of remedy continuing to be unremedied at the expiry of 28 days following the date on which the supplier shall have given notice thereof to the operator;

(3) a binding order being made or an effective resolution being passed for the winding up of the operator (otherwise than for the purposes of reconstruction or amalgamation on terms previously approved in writing by the relevant public electricity supplier (whose approval shall not unreasonably be withheld)) and within 28 days of his appointment the liquidator of the operator not having provided to the supplier a guarantee of performance of the obligations of the operator under the relevant arrangements in such form and amount as the supplier (acting reasonably) may require.

(1)

1974 c. 40; sections 5 and 11 were repealed by the Environmental Protection Act 1990 (c. 43), section 162 and Schedule 16, Part II.

(2)

1990 c. 43; relevant amendments to section 36 have been made by the Environment Act 1995 (c. 25), section 120, Schedule 22, paragraph 68 and Schedule 24.

(3)

Subsection (8A) was inserted by regulation 2 of the Electricity Act 1989 (Modifications of Section 32(5) to (8)) Regulations 1990 (S.I. 1990/264).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources