Work No. 1

A 130 metre single span bridge carrying a pedestrian and cycle route across the River Tyne from a point on the south river wall 440 metres downstream of the Tyne Bridge to a point on the north river wall 450 metres downstream of the Tyne Bridge. The bridge shall rotate about its horizontal axis to allow the passage of maritime traffic through a navigable channel which has a minimum clearance of 25 metres above the level of high water for an unobstructed width of 30 metres.

Work No. 2

A system of fixed piles installed to bedrock and linked by floating booms to demarcate the southern boundary of the navigable channel through the bridge in its open position. The piles and booms shall define a line no more than 15 metres to the south of, and parallel to, the centre line of the River Tyne for distances of 45 metres east and 40 metres west of the horizontal axis of rotation of the bridge together with an angled section, at each end of the line, 40 metres long angled between 30 degrees and 40 degrees away from the centre line of the River Tyne.

Work No. 3

A system of fixed piles installed to bedrock and linked to floating booms to demarcate the northern boundary of the navigable channel through the bridge in its open position. The piles and booms shall define a line no more than 15 metres to the north of, and parallel to, the centre line of the River Tyne for distances of 45 metres east and 40 metres west of the horizontal axis of rotation of the bridge together with an angled section at each end of the line 40 metres long angled between 30 degrees and 40 degrees away from the centre line of the River Tyne.

Article 9

SCHEDULE 2LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1)(2)(3)
Purpose for which temporary possession may be takenLocationLand numbered on deposited plans
Provision of working space and access to the bridge and associated works during constructionCity of Newcastle4

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources