Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
3.—(1) In these Regulations–
“the 1998 Act" means the Petroleum Act 1998 M1;
[F1“the 2008 Act” means the Energy Act 2008;]
“application" means, except in regulations 16 and 17 (applications to court), an application in writing;
[F2“appropriate particulars” means the name and address of the undertaker and a description of the relevant project which—
includes—
the physical characteristics of the whole project, and where relevant, of demolition works;
the location of the project with particular regard to the environmental sensitivity of the geographical areas likely to be affected by the project;
the aspects of the environment likely to be significantly affected by the project;
any likely significant effects, to the extent of the information available on such effects, of the project on the environment resulting from—
the expected residues and emissions and the production of waste, where relevant; and
the use of natural resources, in particular soil, land, water and biodiversity;
takes into account the matters set out in Schedule 1 (matters to be taken into account in deciding whether relevant project likely to have a significant effect on the environment) and, where relevant, the results of other assessments of the effects on the environment carried out pursuant to [F3retained EU law other than any law that implemented] the Directive; and
may also include any features of the project or measures envisaged to avoid or prevent what might otherwise have been significant adverse effects on the environment;]
“approval" means an approval of the kind referred to in regulation 11(1) below (approval of proposals for the carrying out of relevant project);
“authorisation" means a pipe-line works authorisation required by section 14 of the Petroleum Act 1998 (construction and use of pipe-lines);
“business day" means any day except a Saturday, a Sunday, Christmas Day, Good Friday or a bank holiday in any part of the United Kingdom by virtue of the Banking and Financial Dealings Act 1971 M2;
[F4“combustible gas” means gas within the meaning of section 2(4) of the 2008 Act;]
“consent" means, except in regulation 4 below (requirements as to contents of licences; requirement as to consent for use of floating installations in connection with a development etc.),–
in relation to any relevant project comprising the drilling of an exploration well, any consent required by or under a licence to the commencement or re-commencement of the drilling of that well;
in relation to a relevant project comprising a development–
any consent required by or under a licence in respect of the erection of any structure;
any consent required by or under a licence to the getting of more than 500 tonnes of oil per day or 500,000 cubic metres of gas per day otherwise than as a by-product of the drilling or the testing of any well;
any consent required by virtue of regulation 4(4)(a) below (consent to use of floating installation);
any consent required by or under a licence in respect of the commencement or re-commencement of the drilling of any well used for the purposes of, or in connection with, the development; F5...
any authorisation for the execution of works for the construction of a pipe-line for the conveyance of petroleum [F6carbon dioxide or combustible gas], being a pipe-line which is to form an integral part of the development; [F7or
any consent required by or under a licence to the carrying on of a storage or unloading activity;]
in relation to any relevant project comprising a pipe-line for the conveyance of petroleum [F8, carbon dioxide or combustible gas] other than a pipe-line which is to form an integral part of a development, any authorisation for the execution of works for the construction of that pipe-line; or
[F9in relation to any relevant project comprising the use of a mobile installation for—
the extraction of petroleum where the principle purpose of the extraction is the testing of any well; or
the purpose of carrying out test injections of carbon dioxide or combustible gas,
any consent required under regulation 4(4)(b) or (c),]
but does not in any case include any consent required pursuant to a licence in respect of anything done or to be done wholly outside the relevant area or any approval;
[F10“development” means—
any project which has as its main object the getting of petroleum as opposed to the establishment of its existence, the appraisal of its quantity, characteristics or quality or the characteristics or extent of any reservoir in which it occurs; or
any project which has as its main object a storage or unloading activity;]
[F11“the Directive” means Directive 2011/92/EU of the European Parliament and of the Council on the assessment of the effects of certain public and private projects on the environment;]
[F12“EEA State” means a member State, Norway, Iceland or Liechtenstein;]
“effect" includes, except where the context otherwise requires, any direct, indirect, secondary, cumulative, short, medium or long-term, permanent or temporary, or positive or negative effect;
[F13“electronic communication” means a communication transmitted (whether from one person to another, from one device to another or from a person to a device or vice versa) while in an electronic form;]
“environmental authority" means any person on whom environmental responsibilities are conferred by or under any enactment other than these Regulations;
[F14“environmental impact assessment” shall be interpreted in accordance with regulation 3A;]
[F14“environmental statement” has the meaning set out in regulation 3B (environmental statement);]
“exploration well" means any well other than a well drilled for the purposes of, or in connection with, a development;
“floating installation" means any floating construction or device maintained on a station by whatever means but does not include a structure;
“gas", except in the [F15definitions of “combustible gas” and “petroleum”], means natural gas existing in its natural condition in strata;
“the Gazettes" means the London, Edinburgh and Belfast Gazettes;
[F16“licence” means—
a licence granted or having effect as if granted under section 3 of the 1998 Act (licences to search and bore for and get petroleum); or
a licence granted under section 4 or section 18 of the 2008 Act;
and “licensee” shall be construed accordingly.;]
“notice" means notice in writing;
[F17“the OGA” means the Oil and Gas Authority;]
“oil", except in the definition of “petroleum" below, includes any mineral oil or relative hydrocarbon existing in its natural condition in strata, but does not include coal or bituminous shales or other stratified deposits from which oil can be extracted by destructive distillation;
“petroleum" includes any mineral oil or relative hydrocarbon and natural gas existing in its natural condition in strata, but does not include coal or bituminous shales or other stratified deposits from which oil can be extracted by destructive distillation;
[F18“public website” means a website accessible to the public where the public can view and download information placed upon it;]
“the relevant area" means that area comprising–
tidal waters and parts of the sea adjacent to the United Kingdom from the low water mark up to the seaward limits of territorial waters;
waters in any area for the time being designated under section 1(7) of the Continental Shelf Act 1964 M3 (designation of areas of continental shelf); and
the seabed and subsoil under the waters referred to in paragraphs (a) and (b) above;
“relevant project" means a project comprising–
the drilling of an exploration well;
a development;
the construction of a pipe-line for the conveyance of petroleum [F19, carbon dioxide or combustible gas] other than one which is to form an integral part of any development, F20...
the use of a mobile installation for the extraction of petroleum where the principal purpose of the extraction is the testing of any well [F21; or
the use of a mobile installation for the purposes of carrying out test injections of carbon dioxide or combustible gas,]
wholly or partly within the relevant area;
“relevant requirement" means any requirement, imposed under a licence, of the kind referred to in regulation 11(4) below (powers of [F22OGA] to require carrying out of relevant project);
[F23“storage or unloading activity” means any activity within—
section 2(3)(a) to (d) of the 2008 Act; or
section 17(2)(a) or (b) of the 2008 Act;]
[F24“structure” means any structure which is intended to be permanent and is not designed to be moved from place to place without major dismantling and is used for, or, as the case may be, to be used for the purpose of—
getting petroleum or conveying petroleum to land (including any structure for the storage of petroleum) but is not to be used only for searching for petroleum; or
a storage or unloading activity, or for conveying carbon dioxide or combustible gas to or from land;]
[F25“transboundary area” means the area comprising the relevant area but excluding—
the tidal waters and parts of the sea adjacent to Scotland from the low water mark to the seaward limits of the territorial sea; and
the seabed and subsoil under the waters referred to in paragraph (a) above;]
“undertaker" means any person who carries out, or may reasonably be taken to propose the carrying out of, a relevant project; and
[F26“well” means any well or borehole drilled for the purposes of, or in connection with—
the getting of petroleum, the exploration for petroleum or the establishment of the existence of, or appraisal of, the quantity, characteristics or quality of, petroleum in a particular location; or
activities within section 2(3) or section 17(2) of the 2008 Act,
but does not include any well drilled to a depth of 350 metres or less below the surface of the seabed for the purpose of obtaining geological information about strata or any drilling operation, the main purpose of which is the testing of the stability of the seabed.]
(2) References in these Regulations to a project being in a particular area include, unless the context otherwise requires, references to a project proposed to be carried out in that area, a project which is in the course of being carried out in that area and a project which has been carried out in that area.
Textual Amendments
F1Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(a) (with reg. 23)
F2Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(b) (with reg. 23)
F3Words in reg. 3 substituted (31.12.2020) by The Pipe-lines, Petroleum, Electricity Works and Oil Stocking (Miscellaneous Amendments) (EU Exit) Regulations 2018 (S.I. 2018/1325), regs. 1(1), 3(2); 2020 c. 1, Sch. 5 para. 1(1)
F4Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(c) (with reg. 23)
F5Word in reg. 3(1) omitted (16.5.2017) by virtue of The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(d)(i) (with reg. 23)
F6Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(d)(ii) (with reg. 23)
F7Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(d)(iii) (with reg. 23)
F8Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(d)(iv) (with reg. 23)
F9Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(d)(v) (with reg. 23)
F10Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(e) (with reg. 23)
F11Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(f) (with reg. 23)
F12Words in reg. 3(1) substituted (16.4.2007) by The Offshore Petroleum Production and Pipe-lines (Assessment of Environmental Effects) (Amendment) Regulations 2007 (S.I. 2007/933), regs. 1, 4(b) (with reg. 14)
F13Words in reg. 3(1) inserted (16.4.2007) by The Offshore Petroleum Production and Pipe-lines (Assessment of Environmental Effects) (Amendment) Regulations 2007 (S.I. 2007/933), regs. 1, 4(c) (with reg. 14)
F14Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(g) (with reg. 23)
F15Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(h) (with reg. 23)
F16Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(i) (with reg. 23)
F17Words in reg. 3(1) inserted (1.10.2016) by The Energy (Transfer of Functions, Consequential Amendments and Revocation) Regulations 2016 (S.I. 2016/912), regs. 1(1), 7(2)(a)
F18Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(j) (with reg. 23)
F19Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(k)(i) (with reg. 23)
F20Word in reg. 3(1) omitted (16.5.2017) by virtue of The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(k)(ii) (with reg. 23)
F21Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(k)(ii) (with reg. 23)
F22Word in reg. 3(1) substituted (1.10.2016) by The Energy (Transfer of Functions, Consequential Amendments and Revocation) Regulations 2016 (S.I. 2016/912), regs. 1(1), 7(2)(b)
F23Words in reg. 3(1) inserted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(l) (with reg. 23)
F24Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(m) (with reg. 23)
F25Words in reg. 3(1) inserted (16.4.2007) by The Offshore Petroleum Production and Pipe-lines (Assessment of Environmental Effects) (Amendment) Regulations 2007 (S.I. 2007/933), regs. 1, 4(e) (with reg. 14)
F26Words in reg. 3(1) substituted (16.5.2017) by The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (S.I. 2017/582), regs. 1, 4(n) (with reg. 23)
Marginal Citations
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: