Search Legislation

The Birmingham City Council (Selly Oak New Road Tunnel) Scheme 2007 Confirmation Instrument 2007

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2007 No. 2339

HIGHWAYS, ENGLAND

The Birmingham City Council (Selly Oak New Road Tunnel) Scheme 2007 Confirmation Instrument 2007

Made

6th August 2007

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by sections 106(3) and 108(4) of the Highways Act 1980(1) and now vested in her (2):

1.  This Instrument may be cited as “The Birmingham City Council (Selly Oak New Road Tunnel) Scheme 2007 Confirmation Instrument 2007” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2.  The Birmingham City Council (Selly Oak New Road Tunnel) Scheme 2007 (“the Scheme”) is hereby confirmed without modifications.

3.  The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of the Council of Birmingham City Council’s Transportation Strategy, 1 Lancaster Circus Queensway, Birmingham B4 7DQ.

Signed by authority of the Secretary of State for Transport

J. Blackie

Regional Director Government Office for the North East

6th August 2007

THE SCHEDULETHE BIRMINGHAM CITY COUNCIL (SELLY OAK NEW ROAD TUNNEL) SCHEME 2007

Birmingham City Council (hereinafter referred to as “the Council”) make this Scheme in exercise of their powers under section 106(3) and section 108(4) of the Highways Act 1980 and of all other powers enabling them in that behalf—

1.  The Council are authorised to construct under the navigable waters of the Worcester and Birmingham Canal the Tunnel specified in the First Schedule to this Scheme as part of the highway which they are proposing to construct and improve between Harborne Lane/Bristol Lane junction and the Edgbaston Park Road/Bristol Road junction in Selly Oak in the City of Birmingham.

2.  The Council are also authorised in connection with the construction of the said Tunnel to temporarily divert the part of the navigable watercourse and also the towing path adjacent to that part specified in the Second Schedule in the manner shown in that Schedule.

3.  This Scheme may be cited as The Birmingham City Council (Selly Oak New Road Tunnel) Scheme 2007.

THE FIRST SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE SELLY OAK BIRMINGHAM CITY COUNCIL NEW ROAD TUNNEL

Points of Commencement and Termination

From point E as marked on the attached plan numbered 2555—379, 464m north of where the A38 Bristol Road crosses the Worcester and Birmingham Canal.

To point F as marked on the attached plan numbered 2555—379, 538.25m north of where the A38 Bristol Road crosses the Worcester and Birmingham Canal.

Span

A single span of 74.25 metres.

Waterway

A new length of watercourse will be provided after the construction of the Selly Oak New Road Tunnel. This new length of watercourse is the length between the two points described under Article 1 of the Second Schedule. The minimum width of the new length shall be 7.0 metres and its minimum depth shall be 1.6 metres throughout its entire length.

Overall Dimensions

The Tunnel will be 11.6 metres wide overall and will carry a 7 metre wide canal with a 2.3 metre wide towpath on either side.

THE SECOND SCHEDULE TO THE SCHEME

1.  Length of Watercourse to be temporarily diverted

The length of watercourse to be temporarily diverted is the Worcester and Birmingham Canal between point “A”, 575m north of where the A38 Bristol Road crosses the Birmingham and Worcester canal and point “B”, 426m north of where the A38 Bristol Road crosses the Birmingham and Worcester canal as marked on the attached plan numbered 2555—379. This length is shown hatched and is marked “Length of Watercourse to be Temporary Diverted”.

2.  Diversion of Watercourse

During construction of the Selly Oak New Road Tunnel the watercourse will be diverted (the Diversion) to the points referred to in Article 1 above. The diversion is shown on the attached plan numbered 2555—379. The minimum width of the watercourse for the Diversion shall be 3.0 metres and its minimum depth shall be 1.6 metres throughout its entire length.

3.  Length of Towing path to be divertedThe length of towing path to be temporarily diverted during the construction of the tunnel is a length adjacent to and on the west side of the length of watercourse described in Article 1 above. It extends from point “C”, 593m north of where the A38 Bristol Road crosses the Birmingham and Worcester canal, to point “D”, 408m north of where the A38 Bristol Road crosses the Birmingham and Worcester canal as marked on the attached plan numbered 2555—379 and is shown by black zebra hatching. The towpath will be diverted to the west side of the watercourse shown in outline and marked “Temporary Towpath Diversion” on the attached plan numbered 2555—379.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources