There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Aerosol Dispensers Regulations 2009. Those changes will be listed when you open the content using the Table of Contents below. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

  1. Introductory Text

  2. PART 1 GENERAL

    1. 1.Citation and Commencement

    2. 2.Interpretation

    3. 3.Requirements for the marking of aerosol dispensers

    4. 3A.Power to amend Schedule 1A

  3. PART 2 PROHIBITIONS

    1. 4.Prohibition of sale or supply of unmarked relevant aerosol dispensers

    2. 5.Prohibition of sale or supply of non-compliant marked aerosol dispensers

    3. 5A.Obligations which are met by complying with obligations in the Directive

    4. 5B. Qualifying Northern Ireland Goods

  4. PART 3 SUPPLEMENTARY

    1. 6.Contravention of these Regulations

    2. 7.Amendments

    3. 8.Transitional provision

    4. 9.Review

  5. Signature

    1. SCHEDULE

      Revocations and Amendment

      1. 1.Aerosol Dispensers (EEC Requirements) Regulations 1977

      2. 2.Aerosol Dispensers (EEC Requirements) (Amendment) Regulations 1981

      3. 3.Aerosol Dispensers (EEC Requirements) and the Cosmetic Products (Amendment) Regulations 1985

      4. 4.Aerosol Dispensers (EEC Requirements) (Amendment) Regulations 1996

      5. 5.Legislative and Regulatory Reform (Regulatory Functions) Order 2007

    2. SCHEDULE 1A

      (Annex to the Directive)

      1. 1.DEFINITIONS

      2. 1.0.Regulation (EC) No 1272/2008 “ Regulation (EC) No 1272/2008 ”...

      3. 1.1.Pressures

      4. 1.2.Test pressure

      5. 1.3.Bursting pressure

      6. 1.4.Total capacity of the container

      7. 1.5.Net capacity

      8. 1.6.Volume of liquid phase

      9. 1.7.Test conditions

      10. 1.7a.Substance

      11. 1.7b.Mixture

      12. 1.8.Flammable contents

      13. 1.9.Flammable aerosols

      14. 1.9.1.Flammable spray aerosols

      15. 1.9.2.Flammable foam aerosols

      16. 1.10.Chemical Heat of Combustion

      17. 2.GENERAL PROVISIONS

      18. 2.1.Construction and equipment

      19. 2.1.1.The filled aerosol dispenser must be such that, under normal...

      20. 2.1.2.The valve must enable the aerosol dispenser to be virtually...

      21. 2.1.3.There must be no possibility that the mechanical resistance of...

      22. 2.2.Labelling

      23. 2.3.Volume of the liquid phase

      24. 3.SPECIAL PROVISIONS FOR METAL AEROSOL DISPENSERS

      25. 3.1.Capacity

      26. 3.1.1.Test pressure of the container

      27. 3.1.2.The pressure at 50°C in the aerosol dispenser must not...

      28. 4.SPECIAL PROVISIONS FOR GLASS AEROSOL DISPENSERS

      29. 4.1.Plastic coated or permanently protected containers

      30. 4.1.1.Capacity

      31. 4.1.2.Coating

      32. 4.1.3.Test pressure of the container

      33. 4.1.4.Filling

      34. 4.2.Unprotected glass containers

      35. 4.2.1.Capacity

      36. 4.2.2.Test pressure of the container

      37. 4.2.3.Filling

      38. 5.SPECIAL PROVISIONS APPLYING TO PLASTIC AEROSOL DISPENSERS

      39. 5.1.Plastic aerosol dispensers which may splinter on bursting shall be...

      40. 5.2.Plastic aerosol dispensers which cannot splinter on bursting shall be...

      41. 6.TESTS

      42. 6.1.Test requirements to be guaranteed by the person responsible for marketing the aerosol dispenser

      43. 6.1.1..Hydraulic test on empty containers

      44. 6.1.1.1.Metal, glass or plastic aerosol dispensers must be able to...

      45. 6.1.1.2.Metal containers showing assymetrical or major distortions or other similar...

      46. 6.1.2.Bursting test for empty metal containers

      47. 6.1.3.Dropping test for protected glass containers

      48. 6.1.4.Final inspection of filled aerosol dispensers

      49. 6.1.4.1.Aerosol dispensers shall be subject to one of the following...

      50. 6.1.4.2.For aerosol dispensers the contents of which undergo a physical...

      51. 6.1.4.3.In case of test methods according to points 6.1.4.1(b) and...

      52. 6.2.Examples of inspection tests which may be carried out

      53. 6.2.1.Test on unfilled containers

      54. 6.2.2.Tests on filled aerosol dispensers

      55. 6.3.Tests on the flammability of aerosols

      56. 6.3.1.Ignition distance test for spray aerosols

      57. 6.3.1.1.Introduction

      58. 6.3.1.1.1.This test standard describes the method to determine the ignition...

      59. 6.3.1.1.2.This test is applicable to aerosol products with a spray...

      60. 6.3.1.2.Apparatus and material

      61. 6.3.1.2.1.The following apparatus is required: Water bath maintained at 20°C...

      62. 6.3.1.3.Procedure

      63. 6.3.1.3.1.General requirements

      64. 6.3.1.3.1.1.Before testing, each aerosol dispenser shall be conditioned and then...

      65. 6.3.1.3.1.2.The instructions of use shall be strictly followed, including whether...

      66. 6.3.1.3.1.3.The test shall be carried out in a draught-free environment...

      67. 6.3.1.3.1.4.Each aerosol dispenser is to be tested:

      68. 6.3.1.3.1.5.During the test, the can shall be positioned as indicated...

      69. 6.3.1.3.1.6.The following procedure requires testing the spray at intervals of...

      70. 6.3.1.3.2.Test procedure

      71. 6.3.1.3.2.1.All experiments shall be performed in a fume hood in...

      72. 6.3.1.3.2.2.The cans with a 10-12 % nominal fill level shall...

      73. 6.3.1.3.2.3.When the test in the position in which the dispenser...

      74. 6.3.1.4.Method of assessing results

      75. 6.3.1.4.1.All the results shall be recorded. Table 6.3.1.1 below shows...

      76. 6.3.2.Enclosed space ignition test

      77. 6.3.2.1.Introduction

      78. 6.3.2.2.Apparatus and material

      79. 6.3.2.2.1.The following apparatus is required: Chronometer (stopwatch) accurate to ±...

      80. 6.3.2.2.2.Preparation of test apparatus

      81. 6.3.2.2.2.1.A cylindrical vessel approximately 200 dm 3 volume, approximately 600mm...

      82. 6.3.2.2.2.2.Usually, the product leaves the aerosol can at an angle...

      83. 6.3.2.3.Procedure

      84. 6.3.2.3.1.General requirements

      85. 6.3.2.3.1.1.Before testing, each aerosol dispenser shall be conditioned and then...

      86. 6.3.2.3.1.2.The instructions of use shall be strictly followed, including whether...

      87. 6.3.2.3.1.3.The tests shall be carried out in a draught-free environment...

      88. 6.3.2.3.2.Test procedure

      89. 6.3.2.4.Method of assessing results

      90. 6.3.2.4.1.A test report containing the following information shall be drawn...

      91. 6.3.2.4.2.The time equivalent (t eq ) needed to achieve ignition...

      92. 6.3.2.4.3.The deflagration density (D def ) needed to achieve ignition...

      93. 6.3.3.Aerosol foam flammability test

      94. 6.3.3.1.Introduction

      95. 6.3.3.1.1.This test standard describes the method to determine the flammability...

      96. 6.3.3.2.Apparatus and material

      97. 6.3.3.2.1.The following apparatus is required: Graduated scale, support and clamp...

      98. 6.3.3.2.2.The watch-glass is placed on a fire-resistant surface within a...

      99. 6.3.3.2.3.The scale is positioned in such a way that its...

      100. 6.3.3.3.Procedure

      101. 6.3.3.3.1.General requirements

      102. 6.3.3.3.1.1.Before testing, each aerosol dispenser shall be conditioned and then...

      103. 6.3.3.3.1.2.The instructions of use shall be strictly followed, including whether...

      104. 6.3.3.3.1.3.The tests shall be carried out in a draught-free environment...

      105. 6.3.3.3.2.Test procedure

      106. 6.3.3.4.Method of assessing results

      107. 6.3.3.4.1.A test report containing the following information shall be drawn...

  6. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources