Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

  1. Introductory Text

  2. PART 1 General

    1. 1.Citation and commencement

    2. 2.Interpretation

  3. PART 2 Control of Building Work

    1. 3.Meaning of building work

    2. 4.Requirements relating to building work

    3. 5.Meaning of material change of use

    4. 6.Requirements relating to material change of use

    5. 7.Materials and workmanship

    6. 8.Limitation on requirements

    7. 9.Exempt buildings and work

    8. 10.Exemption of the Mayor’s Office for Policing and Crime from procedural requirements

    9. 11.Power to dispense with or relax requirements

  4. PART 3 Notices, Plans and Certificates

    1. 12.Giving of a building notice or deposit of plans

    2. 13.Particulars and plans where a building notice is given

    3. 14.Full plans

    4. 15.Consultation with sewerage undertaker

    5. 16.Notice of commencement and completion of certain stages of work

    6. 17.Completion certificates

    7. 17A.Certificate for building occupied before work is completed

    8. 18.Unauthorised building work

  5. PART 4 Supervision of Building Work Otherwise than by Local Authorities

    1. 19.Supervision of building work otherwise than by local authorities

  6. PART 5 Self-certification schemes and third party certification schemes

    1. 20.Provisions applicable to self-certification schemes

    2. 20A.Provisions applicable to third party certification schemes

  7. PART 6 Energy Efficiency Requirements

    1. 21.Application of energy efficiency requirements

    2. 22.Requirements relating to a change to energy status

    3. 23.Requirements for the renovation or replacement of thermal elements

    4. 24.Methodology of calculation and expression of energy performance

    5. 25.Minimum energy performance requirements for new buildings

    6. 25A.Consideration of high-efficiency alternative systems for new buildings

    7. 25B.Nearly zero-energy requirements for new buildings

    8. 25C.New buildings: minimum energy performance requirements

    9. 26.CO2 emission rates for new buildings

    10. 26A.Fabric energy efficiency rates

    11. 26B.Fabric performance values for new dwellings

    12. 27.CO2 emission rate calculations

    13. 27A.Fabric energy efficiency rate calculations

    14. 27B.Fabric performance values calculations

    15. 28.Consequential improvements to energy performance

    16. 29.Energy performance certificates

    17. 29A.Recommendation reports

    18. 30.Energy assessors

    19. 31.Related party disclosures

    20. 32.Duty of care

    21. 33.Right to copy documents

    22. 34.Application of building regulations to educational buildings, buildings of statutory undertakers and Crown Buildings

    23. 35.Interpretation of Part 6

  8. PART 7 Water Efficiency

    1. 36.Water efficiency of new dwellings

    2. 37.Wholesome water consumption calculation

  9. PART 7A Automatic fire suppression systems

    1. 37A.Provision of automatic fire suppression systems

    2. 37B.Requirements of automatic fire suppression systems

  10. PART 8 Information to be Provided by the Person Carrying Out Work

    1. 38.Fire safety information

    2. 39.Information about ventilation

    3. 40.Information about use of fuel and power

  11. PART 9 Testing and Commissioning

    1. 41.Sound insulation testing

    2. 42.Mechanical ventilation air flow rate testing

    3. 43.Pressure testing

    4. 44.Commissioning

  12. PART 9A Physical infrastructure for high speed electronic communications networks

    1. 44A.Application of paragraph R1 of Schedule 1 to educational buildings, buildings of statutory undertakers and Crown buildings

    2. 44B.Exemptions from paragraph R1 of Schedule 1

    3. 44C.Interpretation of Part R of Schedule 1

  13. PART 10 Miscellaneous

    1. 45.Testing of building work

    2. 46.Sampling of material

    3. 47.Contravention of certain regulations not to be an offence

    4. 48.Electronic service of documents

    5. 49.Transitional provisions: interpretation

    6. 50.Transitional provisions: work already started before 1st October

    7. 51.Transitional provisions: work for which notification is not required

    8. 52.Transitional provisions: notice given or plans deposited before 1st October 2010

    9. 53.Transitional and saving provisions: earlier Building Regulations

    10. 54.Revocations and consequential amendments

    11. 55.Review of Part 9A and Part R of Schedule 1

  14. Signature

    1. SCHEDULE 1

      Requirements

    2. SCHEDULE 2

      Exempt Buildings and Work

      1. CLASS 1

        1. 1.Buildings controlled under other legislation

        2. 2.Any building (other than a building containing a dwelling or...

        3. 3.A building included in the schedule of monuments maintained under...

      2. CLASS 2

        1. 1.Buildings not frequented by people

        2. 2.The description of buildings in paragraph 1 does not include...

      3. CLASS 3

        1. 1.Greenhouses and agricultural buildings

        2. 2.A building used, subject to paragraph 3, for agriculture, or...

        3. 3.The descriptions of buildings in paragraphs 1 and 2 do...

        4. 4.In paragraph 2, “agriculture” includes horticulture, fruit growing, the growing...

      4. CLASS 4

        1. Temporary buildings

      5. CLASS 5

        1. 1.Ancillary buildings

        2. 2.A building on the site of construction or civil engineering...

        3. 3.A building, other than a building containing a dwelling or...

      6. CLASS 6

        1. 1.Small detached buildings

        2. 2.A detached building designed and intended to shelter people from...

        3. 3.A detached building, having a floor area which does not...

      7. CLASS 7

        1. Extensions

        2. where the floor area of that extension does not exceed...

    3. SCHEDULE 3

      Self-certification Schemes and Exemptions from Requirement to Give Building Notice or Deposit Full Plans

    4. SCHEDULE 3A

      Third Party Certification Schemes and Exemptions from Requirement to Give Building Notice or Deposit Full Plans

    5. SCHEDULE 4

      Descriptions of Work where no Building Notice or Deposit of Full Plans Required

      1. 1.Work consisting of— (a) replacing any fixed electrical equipment which...

      2. 2.Work which— (a) is not in a kitchen, or a...

      3. 3.Work on— (a) telephone wiring or extra-low voltage wiring for...

      4. 3A.Installation of thermal insulation to suspended timber floors where the...

      5. 4.For the purposes of this Schedule— “ kitchen ” means...

    6. SCHEDULE 4A

      Green deal information

      1. PART 1 Green deal information to be included in energy performance certificates

        1. 1.The information about a green deal plan to be included...

        2. 2.The date on which the energy performance certificate ceases to...

        3. 3.A statement indicating that a new energy performance certificate should...

        4. 4.A statement— (a) indicating that improvements have been installed at...

        5. 5.A statement indicating— (a) that a green deal plan is...

        6. 6.Where the green deal plan is a regulated consumer credit...

        7. 7.Where the green deal plan is not a regulated consumer...

        8. 8.A statement indicating that— (a) the outstanding credit under the...

        9. 9.Where a term has been included in a green deal...

        10. 10.The unique reference number assigned to the green deal plan....

        11. 11.The name of the person (“G”) who is the green...

        12. 12.G’s electronic mail address and telephone number.

        13. 13.The date on which the payment period starts and the...

        14. 14.The amount payable under the green deal plan—

        15. 15.The rate of interest charged under the green deal plan....

        16. 16.A statement indicating whether the interest rate charged under the...

        17. 17.Where, in accordance with regulation 33(b) of the Green Deal...

        18. 18.The estimated first year savings.

        19. 19.Where the green deal property is a domestic property, a...

        20. 20.Where the green deal property is a non-domestic property, a...

        21. 21.In respect of each improvement installed at the green deal...

        22. 22.A statement advising the person receiving the energy performance certificate—...

        23. 23.A statement indicating that— (a) the improvements installed under the...

        24. 24.A statement indicating that further information is contained in the...

        25. 25.Where G knows or has reasonable cause to believe that...

        26. 26.Where G knows or has reasonable cause to believe that...

      2. PART 2 Interpretation

    7. SCHEDULE 5

      Revocation of Regulations

    8. SCHEDULE 6

      Consequential Amendments

      1. 1.In the Building (Local Authority Charges) Regulations 2010 —

      2. 2.In the Energy Performance of Buildings (Certificates and Inspections) (England...

  15. Explanatory Note

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources