Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Statutory Instruments

2011 No. 2860

Energy

The Renewable Heat Incentive Scheme Regulations 2011

Made

27th November 2011

Coming into force in accordance with regulation 1

The Secretary of State makes the following Regulations in exercise of the powers conferred by sections 100 and 104 of the Energy Act 2008 M1.

In accordance with section 105(3) of that Act, a draft of this instrument was laid before Parliament and approved by a resolution of each House of Parliament.

In accordance with section 100(7) of that Act, the Secretary of State has obtained the consent of the Scottish Ministers to the making of these Regulations.

Marginal Citations

M12008 c.32. Section 100 is amended by S.I. 2011/2195, which was made on 5.9.11 and came into force on 6.9.11.

PART 1E+W+SIntroductory provisions

Citation and commencementE+W+S

1.  These Regulations may be cited as the Renewable Heat Incentive Scheme Regulations 2011 and come into force on the day after the day on which they are made.

InterpretationE+W+S

2.  In these Regulations—

accreditation” means accreditation of an eligible installation by the Authority following an application under regulation 22;

accredited RHI installation” means an eligible installation which has been given accreditation;

the Act” means the Energy Act 2008;

[F1“air source heat pump” means a plant which generates heat by absorbing energy stored in the form of heat in the ambient air;]

anaerobic digestion” means the bacterial fermentation of biomass in the absence of oxygen;

[F2“assessment date” means 31st January, 30th April, 31st July or 31st October in any year;]

[F2“average load factor”—

(a)

[F3in respect of a relevant installation which is a large biomass plant, means—

(i)

if the relevant installation uses or is expected to use heat for the same category of eligible purposes as 10 or more relevant installations which are large biomass plants providing metering data, the average of the load factors of all such installations; or

(ii)

if the relevant installation does not use or is not expected to use heat for the same category of eligible purposes as 10 or more relevant installations which are large biomass plants providing metering data, the average of the load factors of all relevant installations which are large biomass plants and are providing metering data;

(aa)

in respect of a relevant installation which is a ground source heat pump with an installation capacity of at least 1MWth (a “large ground source heat pump”), means—

(i)

if the relevant installation uses or is expected to use heat for the same category of eligible purposes as 5 or more relevant installations which are large ground source heat pumps providing metering data, the average of the load factors of all such installations; or

(ii)

if the relevant installation does not use or is not expected to use heat for the same category of eligible purposes as 5 or more relevant installations which are large ground source heat pumps providing metering data, the average of the load factors of all relevant installations which are large ground source heat pumps providing metering data;]

(b)

in respect of a relevant installation (except a relevant installation within paragraph (a) [F4or paragraph (aa)]) which falls or is expected to fall within a tariff category which fewer than 20 accredited RHI installations providing metering data fall within, means the average of the load factors of all accredited RHI installations;

(c)

in respect of a relevant installation [F5(except a relevant installation within paragraphs (a) or (aa))] which falls or is expected to fall within a tariff category which 20 or more accredited RHI installations providing metering data fall within (“sister installations”) means—

(i)

if the relevant installation uses or is expected to use heat for the same eligible purposes as 20 or more of the sister installations (“twin installations”), the average of the load factors of all twin installations;

(ii)

if the relevant installation does not use or is not expected to use heat for the same eligible purposes as 20 or more of the sister installations, the average of the load factors of all sister installations;]

biogas production plant” means a plant which produces biogas by anaerobic digestion, gasification or pyrolysis;

building” means any permanent or long-lasting building or structure of whatever kind and whether fixed or moveable which, except for doors and windows, is wholly enclosed on all sides with a roof or ceiling and walls;

[F1“category of eligible purposes” means any one of the following—

(a)

heating a space;

(b)

heating water;

(c)

heating a space and water;

(d)

any other eligible purpose or combination of eligible purposes;]

CHP” means combined heat and power;

[F1CHP system” means a system which generates power and is (or may be) operated for purposes including the supply to any premises (using liquid or steam) of heat produced in association with that power;]

[F1CHPQA” means, except where otherwise provided, the Combined Heat and Power Quality Assurance Standard, Issue 5, November 2013, as published by the Department of Energy and Climate Change;]

class 2 heat meter” means a heat meter which—

(a)

complies with the relevant requirements set out in Annex 1 to the Measuring Instruments Directive,

(b)

complies with the specific requirements listed in Annex MI-004 to that Directive, and

(c)

falls within accuracy class 2 as defined in Annex MI-004 to that Directive;

coefficient of performance” means the ratio of the amount of heating or cooling in kilowatts provided by a heat pump to the kilowatts of power consumed by the heat pump;

[F1“combustion unit” means—

(a)

where the fuel is solid biomass or solid biomass contained in waste, a boiler;

(b)

where the fuel is biogas, a boiler, turbine or engine;]

commissioned” means, in relation to an eligible installation, the completion of such procedures and tests as constitute, at the time they are undertaken, the usual industry standards and practices for commissioning that type of eligible installation in order to demonstrate that it is capable of operating and delivering heat to the premises or process for which it was installed;

date of accreditation”, in relation to an accredited RHI installation, means the later of—

(a)

the first day falling on or after the date of receipt by the Authority of the application for accreditation on which [F6both the application was properly made and the plant met the eligibility criteria], and

(b)

the day on which the plant was first commissioned;

date of registration”, in relation to a producer of biomethane for injection, means the first day falling on or after the date of receipt by the Authority of the application for registration on which F7... the application was properly made;

[F1“deep geothermal” in relation to energy, means naturally occurring energy located and extracted from at least 500 metres beneath the surface of solid earth, and a “deep geothermal plant” means a plant which generates heat using such energy;]

[F1“design heat load” means, in relation to ground source heat pumps that are capable of heating and cooling, the heat flow required to achieve the planned heating requirements for that plant;]

eligibility criteria” has the meaning given by regulation 4;

eligible installation” means a plant which meets the eligibility criteria;

eligible purpose” means a purpose specified in regulation 3(2);

[F1“energy content” means the energy contained within a substance (whether measured by a calorimeter or determined in some other way) expressed in terms of the substance’s gross calorific value within the meaning of BS 7420:1991 (Guide for the determination of calorific values of solid, liquid and gaseous fuels (including definitions);]

[F8“environmental permit” means a permit issued in accordance with the provisions of the Environmental Permitting (England and Wales) Regulations 2010 or the Pollution Prevention and Control (Scotland) Regulations 2012;]

[F2“estimated energy from biomethane”, [F9in relation to an assessment date and a relevant producer] as expressed in kWh means—

where—

(a)

FR is the flow rate [F10where the relevant producer has received a periodic support payment or the estimated flow rate in any other case]; and

(b)

[F11T is—

(i)

if the relevant producer is a participant or an application for registration has been made by that relevant producer, the number of hours in the year commencing with the assessment date;

(ii)

where paragraph (i) does not apply but an application for preliminary registration has been made by the relevant producer, the number of hours in the period—

(aa)

commencing on the later of the assessment date or the date identified by the applicant as the date on which injection is expected to commence; and

(bb)

ending 12 months after the assessment date;]]

[F1“estimated flow rate”, in relation to an assessment date and a relevant producer, means—

where—

(a)

B is the volume in cubic metres of biomethane that the relevant producer has declared as being the amount which that relevant producer expects will be produced for injection each year once injection has commenced (or if more than one declaration has been given, the volume identified in the latest declaration) or 0 if no such declaration has been given;

(b)

H is the total number of hours in the year commencing with the assessment date;]

[F2 “estimated heat”, in relation to [F12an assessment date and] a relevant installation as expressed in kWhth means—

where—

(a)

LF is—

(i)

if the installation has provided metering data, the load factor; or

(ii)

in any other case, the average load factor applicable in respect of that installation;

(b)

[F13T is—

(i)

if the relevant installation is an accredited RHI installation or an eligible installation for which an application for accreditation has been made, the number of hours in the year commencing with the assessment date;

(ii)

where paragraph (i) does not apply but the relevant installation is a plant for which an application for preliminary accreditation has been made, the number of hours in the period—

(aa)

commencing on the later of the assessment date or the date identified by the applicant as the date the plant is expected to be commissioned; and

(bb)

ending 12 months after the assessment date;]

(c)

C is the installation capacity of that relevant installation;]

[F2“estimated spend”, in relation to—

(a)

a relevant installation [F14(except a relevant installation within paragraph (c))], means the estimated heat in relation to that installation multiplied by the relevant initial tariff or subsequent tariff calculated in accordance with regulations 37 to 37D;

(b)

[F15a relevant producer, means the estimated energy from biomethane in relation to that relevant producer multiplied by the relevant initial tariff or subsequent tariff calculated in accordance with regulations 37 to 37D;]

(c)

[F16a relevant installation which is a large installation for which the owner has given a declaration as to the total heat in kWhth which that installation is expected to generate each year for eligible purposes (or if more than one declaration has been given, the total heat identified in the latest declaration), means that heat expressed in kWhth multiplied by the relevant initial tariff or subsequent tariff calculated in accordance with regulations 37 to 37D;]]

[F2“expenditure forecast statement” means a statement published by the Secretary of State in accordance with regulation 37E;]

[F2“flow rate”, in relation to a participant who is a producer of biomethane for injection, means—

where—

(a)

B is the volume in cubic metres of biomethane injected during all quarterly periods in respect of which the participant has received a periodic support payment; and

(b)

H is the total number of hours in those quarterly periods;]

[F2“forecast for expenditure”—

(a)

in relation to an assessment date and a relevant installation which falls or is expected to fall within any tariff category F17..., means the sum as at that assessment date of the estimated spend for each relevant installation which falls within that tariff category;

(b)

[F18in relation to an assessment date and a relevant producer, means the sum as at that assessment date of the estimated spend for each relevant producer;]]

[F2“forecast for total expenditure”, in relation to an assessment date, means the sum as at that assessment date of—

(a)

the estimated spend for each relevant installation; and

(b)

the estimated spend for each participant who produces biomethane for injection;]

gasification” means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or all of the following: oxides of carbon, methane and hydrogen;

gas transporter” means the holder of a licence granted under section 7 of the Gas Act 1986 M2;

[F1“ground source heat pump” means a plant which generates heat by absorbing energy stored in the form of heat in the ground, including water in the ground, or in surface water, but does not include a plant which is a deep geothermal plant;]

[F8“heat loss calculation” means a calculation of heat lost which is carried out in accordance with the guidance issued by the Chartered Institute of Building Services Engineers and contained in CIBSE Guide C- reference data (2007 edition);]

heat meter” has the same meaning as that given in Annex MI-004 of the Measuring Instruments Directive;

[F19“increase in expenditure forecast” means a figure determined under regulation 37E(2)(d) or 37F(2) as applicable;]

ineligible purpose” means a purpose which is not an eligible purpose;

[F2“initial tariff” has the meaning given in regulation 37(7)(a);]

injection” means the introduction of gas into a pipe-line system operated by a gas transporter;

installation capacity”, in relation to a plant, [F20except where otherwise specified,] means the total installed peak heat output capacity of the plant;

kWh” means kilowatt hours;

kWhth” means kilowatt hours thermal;

kWth” means kilowatt thermal;

[F1“large biomass plant” means a plant which generates heat or heat and power from solid biomass (including solid biomass contained in waste) with an installation capacity of at least 1MWth, and which is not a new solid biomass CHP system;]

[F1“large installation” means—

(a)

a plant which generates heat from biogas with an installation capacity of at least 600kWth; or

(b)

any other plant which has an installation capacity of at least 1MWth;]

[F2“load factor” in respect of an accredited RHI installation means—

where—

(a)

M is the amount of heat in kWhth generated by that installation during all quarterly periods in respect of which it has received a periodic support payment;

(b)

C is the installation capacity of that installation; and

(c)

H is the total number of hours in those quarterly periods;]

[F1“maximum initial capacity” means the volume of biomethane, expressed in cubic metres per quarterly period which a participant is entitled to supply for injection under the Network Entry Agreement applicable to the biomethane in relation to which an application for registration under regulation 25 is made;]

F21...

Measuring Instruments Directive” means Directive 2004/22/EC of the European Parliament and of the Council of 31 March 2004 on measuring instruments M3;

[F1“medium biomass plant” means a plant which generates heat or heat and power from solid biomass including solid biomass contained in waste with an installation capacity of 200kWth or above but less than 1MWth and which is not a new solid biomass CHP system;]

municipal waste” has the same meaning as in section 21 of the Waste and Emissions Trading Act 2003 M4;

MWhth” means megawatt hours thermal;

MWth” means megawatt thermal;

[F8“net heat input” means the means the rate of heat (expressed as the amount of heat over time) which is supplied to the plant by the fuel used, based on the net calorific value of that fuel;]

[F1“Network Entry Agreement” means an agreement between a person who injects biomethane and a gas transporter under which the person who injects biomethane is entitled to inject biomethane into the pipe-line system operated by that gas transporter;]

[F1“new solid biomass CHP system” means a plant which complies with the eligibility requirements in regulation 9A;]

[F8“NOx” means oxides of nitrogen;]

ongoing obligations” means the obligations specified in Part 4;

participant” means—

(a)

the owner of an accredited RHI installation or, where there is more than one such owner, the owner with authority to act on behalf of all owners in accordance with regulation 22(3); or

(b)

a producer of biomethane who has been registered under regulation 25;

“periodic support payments” have the meaning given in regulation 3;

pipe-line system” has the same meaning as in section 5(10) of the Gas Act 1986 M5;

[F8PM” means particulate matter;]

process” means any process other than the generation of electricity;

[F8“properly insulated” means insulated so that the relevant maximum permissible heat losses set in BS 5422: 2009 are not exceeded, where—

(a)

heat losses are calculated in accordance with the equations listed in and following the principles described in BS EN ISO 12241:2008, and

(b)

pursuant to that standard such calculations include, in respect of underground piping, the insulating effect of the soil in which the pipe is buried;]

pyrolysis” means the thermal degradation of a substance in the absence of an oxidising agent (other than that which forms part of the substance itself) to produce char and one or both of gas and liquid;

quarterly period” means, except where otherwise specified, the first, second, third or fourth quarter of any year commencing with, or with the anniversary of, a participant's tariff start date;

[F2“relevant date” means the date of coming into force of the Renewable Heat Incentive Scheme (Amendment) Regulations 2013;]

[F2“relevant installation” means—

(a)

an accredited RHI installation; or]

(b)

[F22a plant for which an application for accreditation or preliminary accreditation has been made, but does not include a plant where—

(i)

the application has been rejected by the Authority;

(ii)

the application has been withdrawn by the applicant; or

(iii)

the Authority requires further information in order to determine whether or not the application should be granted and at least 4 months have passed since the date on which the application was made;]

[F1“relevant producer” means—

(a)

a participant who produces or proposes to produce biomethane for injection; or

(b)

a person who produces or proposes to produce biomethane for injection who has made an application for registration or preliminary registration but does not include a person who has made an application—

(i)

which has been rejected by the Authority;

(ii)

which has been withdrawn by the applicant; or

(iii)

in respect of which the Authority requires further information in order to determine whether or not the application should be granted and at least 4 months have passed since the date on which the application was made;]

retail prices index” means—

(a)

the general index of retail prices (for all items) published by the Office of National Statistics; or

(b)

where the index is not published for a year, any substituted index or figures published by that Office;

[F8“RHI emission certificate” means a document which meets the requirements in regulation 5A;]

“scheme” (except in this regulation) means the incentive scheme established by these Regulations;

[F1“seasonal performance factor” means, in relation to an air source heat pump or a ground source heat pump, the ratio of its heat output to electricity input expressed as an average over a year;]

[F8“second relevant date” means the date of coming into force of the Renewable Heat Incentive Scheme (Amendment) (No. 2) Regulations 2013;]

[F1“small biomass plant” means a plant which generates heat or heat and power from solid biomass including solid biomass contained in waste with an installation capacity of less than 200kWth, and which is not a new solid biomass CHP system;]

solar collector” means a liquid filled flat plate or evacuated tube solar collector;

statement of eligibility” has the meaning given by regulation 22(6)(f);

steam measuring equipment” means all the equipment needed to measure to the Authority's satisfaction the mass flow rate and energy of steam, including at least the following components—

(a)

a flow meter,

(b)

a pressure sensor,

(c)

a temperature sensor, and

(d)

a digital integrator or calculator able to determine the cumulative energy in MWhth which has passed a specific point;

[F2“subsequent tariff” has the meaning given in regulation 37(7)(b);]

tariff” means the payment rate per kWhth in respect of an accredited RHI installation and per kWh in respect of biomethane injection;

[F23“tariff category” means—

(a)

for the purposes of any forecast for expenditure published before the third relevant date and the determination of any periodic support payment for a tariff period commencing earlier than 1st October 2014, a category of plant which is described in the second and third columns of Schedule 3 and identified by a tariff name in the first column of that Schedule;

(b)

for any other purpose, one of the following categories—

(i)

small biomass plants;

(ii)

medium biomass plants;

(iii)

large biomass plants;

(iv)

ground source heat pumps;

(v)

plants which use solar collectors;

(vi)

plants which generate heat from biogas;

(vii)

producers of biomethane for injection;

(viii)

new solid biomass CHP systems;

(ix)

deep geothermal plants;

(x)

air source heat pumps;]

tariff end date” means the last day of the tariff lifetime;

tariff lifetime” means—

(a)

in relation to an accredited RHI installation, the period for which periodic support payments are payable for that installation, or

(b)

in relation to a participant who is a producer of biomethane, the period for which that person is eligible to receive periodic support payments;

[F2“tariff period” is a three month period commencing with 1st January, 1st April, 1st July or 1st October in any year;]

[F24“tariff start date” means, except where otherwise specified,—

(a)

in relation to an eligible installation, the date of accreditation of that eligible installation;

(b)

in relation to additional RHI capacity, the date of accreditation of that additional RHI capacity; or

(c)

in relation to a producer of biomethane—

(i)

in relation to the maximum initial capacity, the date of registration in relation to that capacity, and

(ii)

in relation to any maximum additional capacity, the date of registration in relation to that capacity;]

[F1“third relevant date” means the date of coming into force of the Renewable Heat Incentive Scheme (Amendment) Regulations 2014;]

[F8“testing laboratory” means an organisation which carries out the testing of emissions from a plant either at permanent laboratory premises or away from those premises;]

[F8“type-testing range” means a range of plants which have the same construction and design so that the testing of one or more plants in that range gives results capable of applying to all plants in the range, provided that—

(a)

where the installation capacity of the smallest of the plants in the range is less than or equal to 500 kWth, the ratio of the installation capacity of the smallest plant to that of the largest plant in the type-testing range for which tests are carried out is no more than 1: 2, or

(b)

where the installation capacity of the smallest of the plants is greater than 500 kWth, then the difference in installation capacity between the smallest and largest of the plants within the type-testing range for which tests are carried out is no more than 500 kWth.]

[F1“waste” has the meaning given to it in section 75(2) of the Environmental Protection Act 1990.]

[F2“working day” means any day other than—

(a)

a Saturday, Sunday, Good Friday, or Christmas Day; or

(b)

a day which is a bank holiday in England, Wales or Scotland under the Banking and Financial Dealings Act 1971. ]

Textual Amendments

Marginal Citations

M21986 c.44; section 7 was amended by the Utilities Act 2000 (c.27), section 3(2), section 76, section 108, Schedule 6, Part I, paragraphs 1 and 4 and Schedule 8 and the Energy Act 2004 (c.20), section 149, subsections (1) and (5), section 197(9) and Schedule 23, Part I.

M3OJ L 135, 30.4.2004, p. 1, amended by Commission Directive 2009/137/EC (OJ L 294, 11.11.2009, p. 7).

M5Section 5(6) to (10) was inserted by section 149(1) and (3) of the Energy Act 2004 (c.20).

Renewable heat incentive schemeE+W+S

3.—(1) These Regulations establish an incentive scheme to facilitate and encourage the renewable generation of heat and make provision regarding its administration.

[F25(2) Subject to Part 7 and regulations 24 and 24A, the Authority must make, to participants who are owners of accredited RHI installations, payments (referred to in these Regulations as “periodic support payments”) for generating heat that is—

(a)used in a building for any of the following purposes—

(i)heating a space,

(ii)heating water,

(iii)carrying out a process; or

(b)used otherwise than in a building for either of the following purposes carried out on a commercial basis—

(i)cleaning,

(ii)drying.]

(3) Subject to Part 7, the Authority must pay participants who are producers of biomethane for injection periodic support payments.

PART 2E+W+SEligibility and matters relating to eligibility

CHAPTER 1E+W+SEligible installations

Eligible installationsE+W+S

4.—(1) A plant meets the criteria for being an eligible installation (“the eligibility criteria”) if—

[F26(a)regulation 5, 6, 7, 8, 8A, 9, 9A, 10 or 11 applies;]

(b)the plant satisfies the requirements set out in regulation 12(1);

(c)regulation 15 does not apply; and

(d)the plant satisfies the requirements set out in Chapter 3.

(2) But this regulation is subject to regulation 14.

Textual Amendments

CHAPTER 2E+W+SEligibility criteria for technologies

Eligible installations generating heat from solid biomassE+W+S

[F275.(1) This regulation applies if the plant complies with all of the following requirements—

(a)it generates heat from solid biomass;

(b)the heat from the solid biomass is generated using equipment specifically designed and installed to use solid biomass as its only primary fuel source;

(c)in the case of a plant with an installation capacity of 45 kWth or less, [F28the plant meets the requirements in regulation 13];

(d)in the case of a plant for which an application for accreditation is made on or after the second relevant date—

(i)an environmental permit subsists in relation to that plant, or

(ii)an RHI emission certificate which complies with the requirements in regulation 5A applies to that plant.

(2) Paragraph (1)(d) does not apply to plants in respect of which preliminary accreditation has been granted before the second relevant date (and such preliminary accreditation has not been withdrawn).

(3) For the purposes of this regulation, an RHI emission certificate applies to a plant (A) if the information in that certificate is based on testing—

(a)A;

(b)a plant of the same make, model and installation capacity as A; or

(c)any other plant in the same type-testing range as A.]

[F29RHI emission certificatesE+W+S

5A.(1) An RHI emission certificate must be issued by a testing laboratory.

(2) Where the information contained in an RHI emission certificate is based on testing carried out on or after the second relevant date, the testing laboratory must be accredited to BS EN ISO/IEC 17025:2005 at the time of testing.

(3) An RHI emission certificate must contain the information set out in Schedule A1.]

Eligible installations generating heat from solid biomass contained in F30... wasteE+W+S

6.  This regulation applies if the plant generates heat from solid biomass contained in F31... waste.

Eligible installations generating heat using solar collectorsE+W+S

7.  This regulation applies if the plant complies with all of the following requirements—

(a)it generates heat using a solar collector;

(b)it has an installation capacity of less than 200kWth;

(c)in the case of a plant with an installation capacity of 45kWth or less, [F32the plant meets the requirements in regulation 13].

Eligible installations generating heat using ground source heat pumpsE+W+S

[F338.(1) This regulation applies if the plant complies with all of the following requirements—

(a)it is a ground source heat pump;

(b)it generates heat using naturally occurring energy;

(c)in the case of a plant with an installation capacity of 45kWth or less, the plant meets the requirements in regulation 13;

(d)it has a coefficient of performance of at least 2.9; and

(e)in the case of a plant in respect of which an application for accreditation is made on or after the third relevant date—

(i)the plant is designed and installed to operate with a seasonal performance factor of at least 2.5; and

(ii)where the plant is capable of heating and cooling, a design heat load for the plant has been calculated in accordance with BS EN 12831:2003.

(2) Paragraph (3) applies where—

(a)an application for accreditation in respect of the plant is made on or after the third relevant date; and

(b)the plant was first commissioned on or after 4th December 2013.

(3) Where this paragraph applies, the requirement in paragraph (1)(b) is deemed to be satisfied where, in addition to using naturally occurring energy in the form of heat, the plant uses—

(a)solar energy which has been gathered by any means (other than by a solar collector which is an accredited RHI installation) and is stored in the ground in the form of heat;

(b)heat from space cooling or process cooling; or

(c)heat from processes other than the generation of heat.]

[F34Eligible installations generating heat using air source heat pumpsE+W+S

8A.  This regulation applies if the plant complies with all of the following requirements—

(a)it is an air source heat pump;

(b)in the case of a plant with an installation capacity of 45kWth or less, the plant meets the requirements in regulation 13;

(c)it has a coefficient of performance of at least 2.9;

(d)it has been designed and installed to operate with a seasonal performance factor of at least 2.5;

(e)it is not designed to provide cooling; and

(f)it is not designed to use heat in air which has been expelled—

(i)from a building; or

(ii)directly from a process which generates heat.]

Eligible installations which are CHP systemsE+W+S

[F359.(1) This regulation applies if the plant is a CHP system which complies with the requirements in paragraphs (2) and (3).

(2) The requirements in this paragraph are that the CHP system generates heat and power from—

(a)one of the sources of energy set out in paragraph (5) alone, or

(b)solid biomass, solid biomass contained in waste or biogas, in combination with each other or with any other source of energy provided that—

(i)the combustion unit in which that solid biomass, solid biomass contained in waste or biogas is burned was first commissioned as part of a CHP system on or after 4th December 2013;

(ii)the combustion unit was new at the time of installation;

(iii)(except in relation to the use of solid biomass contaminated with fossil fuel) the combustion unit in which that solid biomass, solid biomass contained in waste or biogas is burned is a separate combustion unit from that in which any other fuel is burned.

(3) Where energy is supplied to the CHP system from a combustion unit in which solid biomass (excluding solid biomass contained in waste) is burned, the requirements in this paragraph are that—

(a)the combustion unit is specifically designed and installed to use solid biomass as its only primary fuel source, and

(b)where an application for accreditation relating to the combustion unit is made on or after the second relevant date, that combustion unit complies with the requirements in regulation 5(1)(d)(i) and (ii).

(4) The requirements in paragraph (2)(b)(i) and (ii) are deemed to be satisfied where the combustion unit was previously supplying energy for the generation of power only and the plant to which it supplies energy is first commissioned as a CHP system on or after 4th December 2013.

(5) The sources of energy referred to in paragraph (2)(a) are—

(a)solid biomass (excluding solid biomass contained in waste);

(b)solid biomass contained in waste;

(c)biogas, provided that the combustion unit in which the biogas is burned does not generate heat from solid biomass;

(d)deep geothermal energy.]

[F36Eligible installations which are new solid biomass CHP systemsE+W+S

9A.(1) This regulation applies if the plant is a CHP system which complies with the requirements in paragraphs (2) and (3).

(2) The requirement in this paragraph is that the CHP system is certified under CHPQA.

(3) The requirements in this paragraph are that the CHP system generates heat and power from solid biomass (excluding solid biomass contained in waste) alone or in combination with any other source of energy provided that the combustion unit in which that solid biomass is burned—

(a)was first commissioned as part of a CHP system on or after 4th December 2013;

(b)was new at the time of installation;

(c)(except in relation to the use of solid biomass contaminated with fossil fuel), is a separate combustion unit from that in which any other fuel is burned;

(d)is specifically designed and installed to use solid biomass as its only primary fuel source, and

(e)complies with the requirements in regulation 5(1)(d)(i) and (ii).

(4) The requirements in paragraph (3)(a) and (b) are deemed to be satisfied where the combustion unit was previously supplying energy for the generation of power only and the plant to which it supplies energy is first commissioned as a CHP system on or after 4th December 2013.]

Eligible installations generating heat using geothermal sourcesE+W+S

10.  This regulation applies if the plant generates heat using naturally occurring energy located and extracted from at least 500 metres beneath the surface of solid earth.

Eligible installations generating heat using biogasE+W+S

11.  This regulation applies if the plant complies with all of the following requirements—

(a)it generates heat from biogas;

F37(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c)it does not generate heat from solid biomass.

Other eligibility requirements for technologiesE+W+S

12.—(1) The requirements referred to in regulation 4(b) are—

[F38(a)except where regulation 9(2)(b) or 9A applies—

(i)in the case of a plant generating heat using biogas combustion with an installation capacity of 200 kWth or above or an air source heat pump, the plant was first commissioned on or after 4th December 2013;

(ii)in all other cases, installation of the plant was completed and the plant was first commissioned on or after 15th July 2009;]

(b)the plant was new at the time of installation;

(c)the plant uses liquid or steam as a medium for delivering heat to the space, water or process [F39or to any of the purposes in regulation 3(2)(b)];

(d)heat generated by the plant is used for an eligible purpose.

(2) The requirements of paragraph (1)(a) and (b) are deemed to be satisfied where the plant was previously generating electricity only, using solid biomass or biogas, and was first commissioned as a CHP system on or after 15th July 2009.

(3) But the requirements of paragraph (1)(a) and (b) are not satisfied where the plant was previously generating heat only and was first commissioned as a CHP system on or after 15th July 2009.

Certification for installation of Microgeneration heating equipmentE+W+S

[F4013.(1) A plant meets the requirements set out in this regulation if it is certified under—

(a)the Microgeneration Certification Scheme as installed in accordance with the relevant installation standard in that scheme; or

(b)a scheme accredited under European Standards EN 45011 or EN ISO/IEC 17065:2012 as installed in accordance with the installation requirements applicable to the plant which apply under that scheme where—

(i)that scheme is equivalent to the Microgeneration Certification Scheme; and

(ii)the installation requirements are those which apply on the plant’s first commissioning date and which are equivalent to the relevant installation standard.

(2) In paragraph (1), “relevant installation standard” means, if the first commissioning date for the plant is—

(a)on or after the third relevant date—

(i)where the plant generates heat from solid biomass, version 4.0 of the document entitled “Microgeneration Installation Standard: MIS 3004 requirements for contractors undertaking the supply, design, installation, set to work, commissioning and handover of solid biofuel heating systems” published on 16th December 2013;

(ii)where the plant is a ground source heat pump or air source heat pump, version 4.0 of the document entitled “Microgeneration Installation Standard: MIS 3005 requirements for contractors undertaking the supply, design, installation, set to work, commissioning and handover of microgeneration heat pump systems” published on 16th December 2013; or

(iii)where the plant generates heat using a solar collector, version 4.0 of the document entitled “Microgeneration Installation Standard: MIS 3001 requirements for contractors undertaking the supply, design, installation, set to work, commissioning and handover of solar heating microgeneration systems” published on 16th December 2013; or

(b)earlier than the third relevant date, any installation requirements applicable to the plant under the Microgeneration Certification Scheme on the plant’s first commissioning date.]

Plants comprised of more than one plantE+W+S

14.—(1) Subject to paragraph (2), and without prejudice to regulation 43(5)(b), the eligibility criteria are not met if the plant is comprised of more than one plant.

(2) Where two or more plants—

(a)use the same source of energy and technology,

(b)form part of the same heating system, and

(c)are not accredited RHI installations,

those plants (the “component plants”) are to be regarded as a single plant for the purposes of paragraph (1) provided that paragraph (3) applies.

(3) This paragraph applies where each component plant meets the eligibility criteria; and for that purpose a component plant can be taken to meet the eligibility criteria notwithstanding that regulation 13 does not apply.

Excluded plantsE+W+S

15.—(1) This regulation applies where the plant—

(a)is generating heat solely for the use of one domestic premises;

(b)is, in the Authority's opinion, generating heat solely for an ineligible purpose; or

(c)is a plant which—

(i)is additional RHI capacity within the meaning of regulation 43(2) and was first commissioned more than 12 months after the original installation was first commissioned;

[F41(ii)generates heat using a solar collector or in the case of additional RHI capacity commissioned before 4th December 2013, using biogas;]

(iii)has an installation capacity which, together with the installation capacities of all related plants, is 200kWth or above.

(2) For the purposes of this regulation—

domestic premises” means single, self contained premises used wholly or mainly as a private residential dwelling where the fabric of the building has not been significantly adapted for non-residential use;

related plant” means any plant for which an application for accreditation has been made (whether or not it has been accredited) which uses the same source of energy and technology and forms part of the same heating system as the plant referred to in paragraph (1)(c).

CHAPTER 3E+W+SEligibility criteria in relation to metering and steam measuring

Metering of plants in simple systemsE+W+S

16.—(1) [F42Subject to paragraph (3), this regulation applies] where—

(a)the plant is generating and supplying heat solely for one or more eligible purposes within one building;

(b)no heat generated by the plant is delivered by steam; and

(c)the plant is not a CHP system.

(2) Where this regulation applies, a class 2 heat meter must be installed to measure the heat in kWhth generated by the plant.

[F43(3) This regulation does not apply to any plant in respect of which an application for accreditation is made on or after the second relevant date.]

Metering of plants in complex systemsE+W+S

17.—(1) [F44Subject to paragraph (4), this regulation applies] where regulation 16(1) does not apply.

(2) Subject to regulation 19—

(a)where heat generated by the plant is delivered by liquid, class 2 heat meters must be installed to measure both the kWhth of heat generated by that plant and the kWhth of heat used for eligible purposes by the heating system of which that plant forms part; and

(b)where heat generated by the plant is delivered by steam, the following must be installed—

(i)steam measuring equipment to measure both the heat generated in the form of steam by the plant and the heat in the form of steam used for eligible purposes; and

(ii)a class 2 heat meter or steam measuring equipment to measure any condensate or steam which returns to the plant.

(3) Where this regulation applies, and more than one plant is supplying heat to the heating system supplied by the plant, steam measuring equipment or class 2 heat meters must be installed, as appropriate, to measure the heat generated in kWhth by all plants supplying heat to that heating system.

[F45(4) This regulation does not apply to any plant in respect of which an application for accreditation is made on or after the second relevant date.]

[F46Metering in respect of new applications for accreditationE+W+S

17A.(1) This regulation applies to any plant in respect of which an application for accreditation is made on or after the second relevant date.

(2) Subject to paragraph (3) and regulation 19—

(a)where heat generated by the plant is delivered by liquid—

(i)one class 2 heat meter, and

(ii)such other class 2 heat meters as may be necessary,

must be installed so as to enable the kWhth of heat generated by that plant which is used for eligible purposes to be determined;

(b)where heat generated by the plant is delivered by steam—

(i)such steam measuring equipment as may be necessary, and

(ii)such class 2 heat meters to measure any condensate returning to the plant as may be necessary,

must be installed so as to enable the kWhth of heat generated by that plant which is used for eligible purposes to be determined.

(3) For the purposes of determining the heat generated by a plant which is used for eligible purposes it is not necessary to measure heat loss—

(a)which may be disregarded in accordance with regulation 42A(2), or

(b)for which a heat loss calculation may be provided in accordance with regulation 42A(4) or (5).]

[F47Metering in respect of new applications for accreditation in respect of ground source or air source heat pumpsE+W+S

17B.(1) This regulation applies to any ground source heat pump or air source heat pump in respect of which an application for accreditation is made on or after the third relevant date.

(2) Where this regulation applies, the following meters must be installed—

(a)such electricity meters as will enable the seasonal performance factor of the heat pump to be determined to the satisfaction of the Authority;

(b)in the case of a ground source heat pump, where that heat pump is capable of simultaneous heating and cooling, such metering as will enable the heat drawn from the ground, including water in the ground, or from surface water, to be measured.]

Shared metersE+W+S

18.—(1) Subject to paragraph (2), the heat generated by the plant must be individually metered.

(2) Subject to regulation 43(8), the heat generated by two or more plants may be metered using one meter provided that—

(a)the plants use the same source of energy and technology;

(b)the plants will, once given accreditation, be eligible to receive the same tariff;

(c)the plants will then share the same tariff start date and tariff end date; and

(d)it is the Authority's opinion that a single meter is capable of metering the heat generated by all of those plants.

Metering of CHP systems generating electricity only before 15th July 2009E+W+S

19.—(1) This regulation applies where the plant is a CHP system and the requirements of regulation 12(1)(a) and (b) are deemed to be satisfied in accordance with regulation 12(2).

(2) Where this regulation applies, any existing heat meter or steam measuring equipment installed before the date of commencement of these Regulations may continue to be used by a participant to measure the heat generated by the CHP system and used for eligible purposes, provided that the CHP system was registered under the CHPQA before that date.

(3) For the purpose of this regulation, “the CHPQA” means the Combined Heat and Power Quality Assurance Standard, Issue 3, January 2009, as published by the Department of Energy and Climate Change M6.

Marginal Citations

M6A copy is available on www.chpqa.decc.gov.uk.

Matters relating to all heat meters and steam measuring equipmentE+W+S

20.—(1) All heat meters installed or used in accordance with these Regulations must, where applicable—

(a)be calibrated prior to use;

(b)be calibrated correctly for any water/ethylene glycol mixture; F48...

(c)be (or have been) properly installed in accordance with manufacturer's instructions[F49; and

(d)be positioned to provide accurate measurements.]

(2) All steam measuring equipment installed or used in accordance with these Regulations must be—

(a)calibrated prior to use;

(b)capable of displaying measured steam pressure and temperature;

(c)capable of displaying the current steam mass flow rate and the cumulative mass of steam which has passed through it since it was installed; F50...

(d)properly installed in accordance with manufacturer's instructions[F51; and

(e)positioned to provide accurate measurements.]

Additional metering requirements for plants generating heat from biogasE+W+S

21.—(1) This regulation sets out additional requirements in relation to metering where a plant is generating heat from biogas.

(2) In that case—

(a)a class 2 heat meter must be installed to meter any heat directed from the plant combusting the biogas to the biogas production plant; and

(b)a class 2 heat meter must be installed to meter any heat supplied to the biogas production plant from any source other than—

(i)the plant combusting the biogas; and

(ii)where the biogas has been produced by anaerobic digestion, the feedstock from which it was produced.

PART 3E+W+SAccreditation and registration

Applications for accreditationE+W+S

22.—(1) [F52An owner] of an eligible installation may apply for that installation to be accredited.

(2) All applications for accreditation must be made in writing to the Authority and must be supported by—

(a)such of the information specified in Schedule 1 as the Authority may require;

(b)a declaration that the information provided by the applicant is accurate to the best of the applicant's knowledge and belief;

(c)a declaration that the applicant is the owner, or one of the owners, of the eligible installation for which accreditation is being sought [F53and,

(d)if the eligible installation is a large installation, a declaration as to the total heat in kWhth which the applicant expects the eligible installation to generate each year for eligible purposes.]

(3) The Authority may, where an eligible installation is owned by more than one person, require that—

(a)an application submitted under this regulation is made by only one of those owners;

(b)the applicant has the authority from all other owners to be the participant for the purposes of the scheme; and

(c)the applicant provides to the Authority, in such manner and form as the Authority may request, evidence of that authority.

(4) Before accrediting an eligible installation, the Authority may arrange for a site inspection to be carried out in order to satisfy itself that a plant should be accredited.

(5) The Authority may, in granting accreditation, attach such conditions as it considers to be appropriate.

(6) Where an application for accreditation has, in the Authority's opinion, been properly made in accordance with paragraphs (2) and (3) and the Authority is satisfied that the plant is an eligible installation the Authority must (subject to regulation 23 and regulation 47(3))—

(a)accredit the eligible installation;

(b)notify the applicant in writing that the application has been successful;

(c)enter on a central register maintained by the Authority the applicant's name and such other information as the Authority considers necessary for the proper administration of the scheme;

(d)notify the applicant of any conditions attached to the accreditation;

(e)in relation to an applicant who is or will be generating heat from solid biomass, having regard to the information provided by the applicant, specify by notice to the applicant which of regulation 28, 29 or 30 applies;

(f)provide the applicant with a written statement (“statement of eligibility”) including the following information—

(i)the date of accreditation;

(ii)the applicable tariff;

(iii)the process and timing for providing meter readings;

(iv)details of the frequency and timetable for payments; and

(v)the tariff lifetime and tariff end date.

(7) Where the Authority does not accredit a plant it must notify the applicant in writing that the application for accreditation has been rejected, giving reasons.

(8) Once a specification made in accordance with paragraph (6)(e) has been notified to an applicant, it cannot be changed except where the Authority considers that an error has been made or on the receipt of new information by the Authority which demonstrates that the specification should be changed.

[F54(9) The Authority must not accredit an eligible installation if it has not been commissioned.]

[F54(10) The Authority may refuse to accredit an eligible installation if its owner has indicated that one of the applicable ongoing obligations will not be complied with.]

[F54(11) The Authority may refuse to accredit a plant which is a component plant within the meaning of regulation 14(2).]

[F54(12) The Authority must not accredit a plant if—

(a)it is, or at any time has been, an accredited domestic plant within the meaning given by regulation 2 of the Domestic Renewable Heat Incentive Scheme Regulations 2014;

(b)an application for accreditation of the plant has been made under those Regulations and that application has not been withdrawn by the applicant or rejected by the Authority;

(c)it provides heat to the same property as an accredited domestic plant or a plant for which an application for accreditation under those Regulations has been made which has not been withdrawn or rejected.]

Treatment of grants from public fundsE+W+S

[F5523.(1) Subject to paragraphs (2) to (5), the Authority must not accredit an eligible installation or register a producer of biomethane unless the applicant has given notice (which the Authority has no reason to believe is incorrect) that, as applicable—

(a)no grant from public funds has been paid or will be paid in respect of any of the costs of purchasing or installing the eligible installation or any of the equipment used to produce the biomethane for which the applicant is intending to claim periodic support payments; or

(b)such a grant was paid and has been repaid to the person or authority who made it.

(2) Where some or all of the purchase or installation costs of the eligible installation or the equipment used to produce biomethane were funded by any grant from public funds and—

(a)the applicant demonstrates to the satisfaction of the Authority that the person or authority who made the grant has—

(i)refused to accept repayment of the grant, or

(ii)ceased to exist; or

(b)paragraph (3) applies,

the Authority may accredit the eligible installation or register the producer of biomethane (as the case may be), but a grant funding deduction must be deducted from each quarterly periodic support payment in accordance with paragraphs (4) to (6).

(3) This paragraph applies where—

(a)a grant originates from funds raised by the National Lottery; and

(b)on or after 15th July 2009 but not later than 6 months after the third relevant date—

(i)installation of the plant was completed and the plant was first commissioned; or

(ii)installation of the equipment used to produce biomethane was completed and injection of biomethane produced by that applicant has commenced.

(4) A grant funding deduction for each quarterly period is calculated in accordance with the following formula—

where A is calculated in accordance with paragraph (5).

(5) For the purposes of paragraph (4), A is—

(a)for the quarterly period commencing on the tariff start date, the figure that the Authority believes, based on all relevant information available to the Authority at the time, represents the total value of any grants from public funds to which paragraph (2) refers;

(b)for any subsequent quarterly period that does not include 1st April of any year, the value of A in the previous quarterly period;

(c)for any subsequent quarterly period that includes 1st April of any year, the value of A in the previous quarterly period adjusted by the percentage increase or decrease in the retail prices index for the previous calendar year (the resulting figure being stated to two decimal places and rounded to the nearest hundredth of a penny).

(6) Where a grant funding shortfall arises, the Authority must deduct from the periodic support payments (“P”) payable in the subsequent quarterly period and any quarterly period thereafter, the grant funding deduction for that period together with such part of the grant funding shortfall as remains outstanding provided that the total amount so deducted does not exceed P.

(7) Where an eligible installation is accredited or a producer of biomethane is registered and paragraph (2) applies, the tariff start date shall be the date of accreditation or registration, or the third relevant date, whichever is the later.

(8) In this regulation—

“grant from public funds” means a grant made by a public authority or by any person distributing funds on behalf of a public authority;

“grant funding shortfall” means the amount by which the grant funding deduction exceeds the periodic support payment in any quarterly period;

“National Lottery” means the National Lottery as referred to in the National Lottery Act 1993.]

Changes in ownershipE+W+S

24.—(1) This regulation applies where ownership of all or part of an accredited RHI installation is transferred to another person.

(2) No periodic support payment may be made to a new owner until—

(a)that owner has notified the Authority of the change in ownership; and

(b)the steps set out in paragraph (3) have been completed.

(3) On receipt of a notification under paragraph (2), the Authority—

(a)may require the new owner to provide such of the information specified in Schedule 1 as the Authority considers necessary for the proper administration of the scheme;

(b)may review the accreditation of the accredited RHI installation to ensure that it continues to meet the eligibility criteria and should remain an accredited RHI installation.

(4) Where the Authority has received the information required under paragraph (3)(a) and is satisfied as to the matters specified in paragraph (3)(b) it must—

(a)update the central register referred to in regulation 22(6)(c);

(b)where the new owner is the participant, send the new owner a statement of eligibility setting out the information specified in regulation 22(6)(f); and

(c)where applicable, send the new owner (if the new owner is the participant) a notice in accordance with regulation 22(6)(e).

(5) If, within a period of 12 months from the transfer of ownership of the accredited RHI installation, no notification is made in accordance with paragraph (2) or paragraph (4) does not apply, the installation will on the expiry of that period cease to be accredited and accordingly no further periodic support payments will be paid in respect of the heat it generates.

(6) The period specified in paragraph (5) may be extended by the Authority where the Authority considers it is just and equitable to do so.

(7) Subject to paragraph (8), following the successful completion of the steps required under paragraphs (3) and (4), the new owner of an accredited RHI installation will receive periodic support payments calculated from the date of completion of those steps for the remainder of the tariff lifetime of that accredited RHI installation.

(8) Where a transfer of ownership of all or part of an accredited RHI installation takes place and results in that accredited RHI installation being owned by more than one person, the Authority may require that only one of those owners is the participant for the purposes of the scheme and require that owner to comply with sub-paragraphs (b) and (c) of regulation 22(3).

[F56Changes in location of accredited RHI installationsE+W+S

24A.(1) This regulation applies where an accredited RHI installation is moved to a new location during its tariff lifetime.

(2) No periodic support payment may be made in respect of the accredited RHI installation after the date on which it is moved to a new location until—

(a)the owner has notified the Authority of the change in location; and

(b)the Authority has concluded that the accredited RHI installation should continue to be accredited.

(3) On receipt of a notification under paragraph (2) the Authority—

(a)may require the owner to provide such of the information specified in Schedule 1 as the Authority considers necessary for the proper administration of the scheme; and

(b)must review the accreditation of the accredited RHI installation to determine whether it continues to meet the eligibility criteria in the new location (except the requirement in regulation 12(1)(b)) and accordingly whether it should continue to be accredited.

(4) Where the Authority concludes that the accredited RHI installation should continue to be accredited it must update the central register referred to in regulation 22(6)(c) if appropriate.

(5) Where the Authority concludes that the accredited RHI installation should continue to be accredited, periodic support payments calculated from the date of that decision and for the remainder of the tariff lifetime of that accredited RHI installation shall be payable.]

Producers of biomethaneE+W+S

25.—(1) [F57A producer] of biomethane for injection may apply to the Authority to be registered as a participant.

(2) Applications for registration must be in writing and supported by—

(a)such of the information specified in Schedule 1 as the Authority may require;

(b)a declaration that the information provided by the applicant is accurate to the best of the applicant's knowledge and belief;

(c)details of the process by which the applicant proposes to produce biomethane and arrange for its injection; F58...

(d)a notice given in accordance with paragraph (6) [F59and

(e)in relation to applications for registration made after the third relevant date, a declaration as to the volume in cubic metres of biomethane which the applicant expects to produce for injection each year;]

[F60(2A) Before registering a producer of biomethane as a participant, the Authority may arrange to carry out an inspection of any equipment which is being used to produce the biomethane for which the applicant is intending to claim periodic support payments (including equipment used to produce the biogas from which that biomethane is made) in order to satisfy itself that the applicant should be registered.]

[F60(2B) Where an application for registration is made after the third relevant date, and the applicant is not also the person producing the biogas used to make the biomethane in respect of which that application is made, the Authority may require—

(a)that the applicant has the authority from all persons who produce the biogas from which the biomethane is made to be the participant; and

(b)that the applicant provides to the Authority, in such manner and form as the Authority may request, evidence of that authority.]

(3) The Authority may in registering an applicant attach such conditions as it considers appropriate.

[F61(3A) In relation to applicants who are registered after the third relevant date, the Authority must specify the maximum initial capacity in respect of which the participant is registered.]

(4) Where the application for registration is properly made in accordance with paragraph (2), the Authority must (subject to [F62regulation 23 and] paragraphs [F63(5) to (8)])—

(a)notify the applicant in writing that registration has been successfully completed and the applicant is a participant;

(b)enter on a central register maintained by the Authority the date of registration and the applicant's name;

(c)notify the applicant of any conditions attached to their registration as a participant; and

(d)send the applicant a statement of eligibility including such of the information specified in regulation 22(6)(f) as the Authority considers applicable.

(5) The Authority may refuse to register an applicant if the applicant has indicated that one or more of the applicable ongoing obligations will not be complied with.

F64(6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(7) The Authority must not register an applicant if it would result in periodic support payments being made to more than one participant for the same biomethane.

[F65(8) Where an application for registration is made after the [F6631st July 2012], the Authority must not register an applicant unless at the time of making the application, injection of biomethane produced by that applicant has commenced.]

F67(9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F67(10) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Preliminary accreditationE+W+S

26.—(1) [F68The Authority] may, upon the application by a person who proposes to construct or operate an eligible installation which has not yet been commissioned, grant preliminary accreditation in respect of that eligible installation provided—

(a)any necessary planning permission has been granted; or

(b)such planning permission is not required and appropriate evidence of this is provided to the Authority from the relevant planning authority.

(2) The Authority must not grant preliminary accreditation to any plant under this regulation if, in its opinion, that plant is unlikely to generate heat for which periodic support payments may be paid.

(3) An application for preliminary accreditation must be in writing and supported by such of the information specified in Schedule 1 as the Authority may require [F69and declarations as to—

(a)the date on which the applicant expects the plant to be commissioned;

(b)the total heat in kWhth which the applicant expects the plant to generate each year for eligible purposes once the plant has been commissioned; and

(c)the installation capacity of the plant.]

(4) The Authority may attach such conditions as it considers appropriate in granting preliminary accreditation under this regulation.

(5) Where a plant has been granted preliminary accreditation (and such preliminary accreditation has not been withdrawn) and an application for accreditation is made under this Part, the Authority must, subject to regulation 23, grant that application unless it is satisfied that—

(a)there has been a material change in circumstances since the preliminary accreditation was granted such that, had the application for preliminary accreditation been made after the change, it would have been refused;

(b)any condition attached to the preliminary accreditation has not been complied with;

(c)the information on which the decision to grant the preliminary accreditation was based was incorrect in a material particular such that, had the Authority known the true position when the application for preliminary accreditation was made, it would have been refused; or

(d)there has been a change in applicable legislation since the preliminary accreditation was granted such that, had the application for preliminary accreditation been made after the change, it would have been refused.

(6) Where any of the circumstances mentioned in paragraph (7) apply in relation to a preliminary accreditation which the Authority has granted and having regard to those circumstances the Authority considers it appropriate to do so, the Authority may—

(a)withdraw the preliminary accreditation;

(b)amend the conditions attached to the preliminary accreditation;

(c)attach conditions to the preliminary accreditation.

(7) The circumstances referred to in paragraph (6) are as follows—

(a)in the Authority's view there has been a material change in circumstances since the preliminary accreditation was granted;

(b)any condition attached to the preliminary accreditation has not been complied with;

(c)the Authority considers that the information on which the decision to grant the preliminary accreditation was based was incorrect in a material particular;

(d)there has been change in the applicable legislation since the preliminary accreditation was granted such that, had the application for preliminary accreditation been made after the change, it would have been refused.

(8) The Authority must send the applicant a notice setting out—

(a)its decision on an application for preliminary accreditation of a plant or on the withdrawal of any preliminary accreditation;

(b)any condition attached to the preliminary accreditation or any amendment to those conditions.

(9) The notice sent pursuant to paragraph (8) must specify the date on which the grant or withdrawal of preliminary accreditation is to take effect and, where applicable, the date on which any conditions (or amendments to those conditions) attached to the preliminary accreditation are to take effect.

(10) In paragraph (1), the reference to the person who proposes to construct an eligible installation includes a person who arranges for the construction of the eligible installation.

(11) This regulation does not apply to a plant which will generate heat using—

(a)a solar collector;

[F70(b)a ground source heat pump or an air source heat pump; or]

(c)solid biomass, provided that the plant will have an installation capacity below 200kWth.

[F71(12) In this regulation, “change in applicable legislation” does not include the introduction of the requirement in regulation 5(1)(d) by the Renewable Heat Incentive Scheme (Amendment) (No. 2) Regulations 2013.]

[F72Preliminary registration of biomethane producersE+W+S

26A.(1) The Authority may grant preliminary registration to a person who—

(a)proposes to produce biomethane for injection; and

(b)has not yet started production.

(2) An application for preliminary registration must be in writing and supported by such of the information specified in Schedule 1 as the Authority may require and declarations as to—

(a)the date on which the applicant expects that injection will commence;

(b)the volume in cubic metres of biomethane which the applicant expects to produce for injection each year once injection has commenced; and

(c)the expected maximum initial capacity.

(3) The Authority may attach such conditions as it considers appropriate in granting preliminary registration under this regulation.

(4) The Authority must not grant preliminary registration unless it is satisfied that a Connection Agreement in relation to the proposed production of biomethane has been entered into.

(5) Where a person has been granted preliminary registration (and such preliminary registration has not been withdrawn) and an application for registration is made under this Part, the Authority must, subject to regulations 23 and 25(5), (7) and (8), grant that application unless it is satisfied that—

(a)there has been a material change in circumstances since the preliminary registration was granted such that, had the application for preliminary registration been made after the change, it would have been refused;

(b)any condition attached to the preliminary registration has not been complied with;

(c)the information on which the decision to grant the preliminary registration was based was incorrect in a material particular such that, had the Authority known the true position when the application for preliminary registration was made, it would have been refused;

(d)there has been a change in applicable legislation since the preliminary registration was granted such that, had the application for preliminary registration been made after the change, it would have been refused.

(6) Where any of the circumstances mentioned in paragraph (7) apply in relation to the preliminary registration which the Authority has granted, and having regard to those circumstances the Authority considers it appropriate to do so, the Authority may—

(a)withdraw the preliminary registration;

(b)amend the conditions attached to the preliminary registration;

(c)attach conditions to the preliminary registration.

(7) The circumstances referred to in paragraph (6) are—

(a)in the Authority’s view there has been a material change in circumstances since the preliminary registration was granted;

(b)any condition attached to the preliminary registration has not been complied with;

(c)the Authority considers that the information on which the decision to grant the preliminary registration was based was incorrect in a material particular;

(d)there has been a change in the applicable legislation since the preliminary registration was granted such that, had the application for preliminary registration been made after the change, it would have been refused.

(8) The Authority must send the applicant a notice setting out—

(a)its decision on an application for preliminary registration or on the withdrawal of any preliminary registration;

(b)any condition attached to the preliminary registration or any amendment to those conditions.

(9) In this regulation a “Connection Agreement” means an agreement between a person who proposes to inject biomethane into a pipe-line system and the operator of the pipe-line system which provides for the design and construction of a connection whereby the biomethane may be injected into the pipe-line system.]

PART 4E+W+SOngoing obligations for participants

CHAPTER 1E+W+SOngoing obligations relating to the use of solid biomass to generate heat

InterpretationE+W+S

27.  In this Part—

allocating authority” has the same meaning as in section 24 of the Waste and Emissions Trading Act 2003 M7;

F73...

landfill gas” means gas formed by the digestion of material in a landfill;

standby generation” means the generation of electricity by equipment which is not used frequently or regularly to generate electricity and where all the electricity generated by that equipment is used by the accredited RHI installation;

F73...

waste collection authority” has the same meaning as in section 30(3) of the Environmental Protection Act 1990 M8;

waste disposal authority” has the same meaning as in section 30(2) of the Environmental Protection Act 1990 M9.

Textual Amendments

Marginal Citations

M72003 c.33. Section 24 was amended by section 209(1)(a) and (b) of the Local Government and Public Involvement in Heath Act 2007 (c.28).

M8Section 30(3) was amended by the Local Government (Wales) Act 1994 (c.19), section 66(8), paragraph 17(3) of Schedule 9 and Schedule 18 and subsection (3)(c) was substituted by section 180(1) of and paragraph 167(3) of Schedule 13 to the Local Government etc (Scotland) Act 1994 (c.39).

M9Paragraph (f) of section 30(2) was substituted by paragraph 17(2) of Schedule 9 to the Local Government (Wales) Act 1994 (c.19) and paragraph (g) was amended by section 180(1) of and paragraph 167(3) of Schedule 13 to the Local Government etc (Scotland) Act 1994 (c.39).

Participants using solid biomass contained in F74... wasteE+W+S

28.—(1) This regulation applies to participants generating heat in an accredited RHI installation from solid biomass contained in F75... waste.

(2) The proportion of solid biomass contained in the F75... waste must be a minimum of [F7610 per cent].

(3) For the purposes of paragraph (2)—

(a)the proportion of solid biomass contained in the F75... waste is to be determined by the Authority for every quarterly period;

(b)it is for the participant to provide, in such form as the Authority may require, evidence to demonstrate to the Authority's satisfaction the proportion of the energy content of the F75... waste used in any quarterly period which is composed of fossil fuel, to enable the Authority to determine the proportion of solid biomass in accordance with sub-paragraph (c);

(c)the proportion of solid biomass is the energy content of the F75...waste used in any quarterly period to generate heat less the energy content of any fossil fuel of which that F75... waste is in part composed, expressed as a percentage of the energy content of that F75... waste.

(4) The participant may use fossil fuel (other than fossil fuel mentioned in paragraph (3)(c)) in an accredited RHI installation for the following permitted ancillary purposes only—

(a)cleansing other fuels from the accredited RHI installation's combustion system prior to using fossil fuel to heat the combustion system to its normal temperature;

(b)the heating of the accredited RHI installation's combustion system to its normal operating temperature or the maintenance of that temperature;

(c)the ignition of fuels of low or variable calorific value;

(d)emission control;

(e)in relation to accredited RHI installations which are CHP systems, standby generation or the testing of standby generation capacity.

(5) The energy content of the fossil fuel used during any quarterly period for the permitted ancillary purposes specified in paragraph (4) must not exceed 10 per cent of the energy content of all the fuel used by that accredited RHI installation [F77or where the installation is a CHP system, by a combustion unit which supplies energy to that installation from solid biomass contained in waste,] to generate heat during that quarterly period.

(6) Without prejudice to paragraph (3)(b), when determining the proportion of solid biomass contained in F78... waste, the Authority may have regard to any information (whether or not produced to it by the participant) if, in its opinion, that information indicates what proportion of the energy content of the F78... waste is composed of fossil fuel.

(7) Subject to paragraph (8), where the participant produces to the Authority—

(a)data published by an allocating authority, a waste disposal authority or a waste collection authority, demonstrating that the proportion of municipal waste used by that participant which is composed of fossil fuel is unlikely to exceed 50 per cent, and

(b)evidence that the municipal waste used has not been subject to any process before being used that is likely to have materially increased that proportion,

the Authority may accept this as sufficient evidence for the purposes of paragraph (3)(b) of the fact that the proportion of the municipal waste used which is composed of fossil fuel is no more than 50 per cent.

(8) Where the Authority so requests, the participant must arrange for samples of theF79... waste used (or to be used) in the accredited RHI installation, or of any gas or other substance produced as the result of the use of such F79... waste, to be taken by a person (and analysed in a manner) specified by the Authority, and for the results of that analysis to be made available to the Authority in such form as the Authority may require.

F80(9) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Participants using solid biomass in accredited RHI installations with an installation capacity of 1MWth or aboveE+W+S

29.—(1) This regulation applies to participants generating heat from solid biomass, not being solid biomass contained in F81... waste, in an accredited RHI installation with an installation capacity of 1MWth or above.

(2) The participant may use solid biomass contaminated with fossil fuel only where the proportion of fossil fuel contamination does not exceed 10 per cent.

(3) Such contaminated biomass may not be used unless the fossil fuel is present because—

(a)the solid biomass has been subject to a process, the undertaking of which has caused the fossil fuel to be present in, on or with the biomass even though that was not the object of the process; or

(b)the fossil fuel is waste and was not added to the solid biomass with a view to its being used as a fuel.

(4) For the purposes of paragraph (2)—

(a)the proportion of fossil fuel contamination is to be determined by the Authority for every quarterly period;

(b)it is for the participant to provide, in such form as the Authority may require, evidence to demonstrate to the Authority's satisfaction the proportion of fossil fuel contamination; and

(c)the proportion of fossil fuel contamination is the energy content of the fossil fuel with which the solid biomass used in any quarterly period is contaminated expressed as a percentage of the energy content of all solid biomass (contaminated or otherwise) used in that quarterly period to generate heat other than fossil fuel used in accordance with paragraphs (5) and (6).

(5) The participant may use fossil fuel (other than fossil fuel mentioned in paragraph (2) in an accredited RHI installation for the following permitted ancillary purposes only—

(a)cleansing other fuels from the accredited RHI installation's combustion system prior to using fossil fuel to heat the combustion system to its normal temperature;

(b)the heating of the accredited RHI installation's combustion system to its normal operating temperature or the maintenance of that temperature;

(c)the ignition of fuels of low or variable calorific value;

(d)emission control;

(e)in relation to accredited RHI installations which are CHP systems, standby generation or the testing of standby generation capacity.

(6) The energy content of the fossil fuel used during a quarterly period for the permitted ancillary purposes specified in paragraph (5) must not exceed 10 per cent of the energy content of all the fuel used by that accredited RHI installation [F82or where the installation is a CHP system, by a combustion unit which supplies energy to that installation from solid biomass,] to generate heat during that quarterly period.

(7) Without prejudice to paragraph (4)(b), in determining the proportion of solid biomass composed of fossil fuel the Authority may have regard to any information (whether or not produced to it by the participant) if, in its opinion, that information indicates what proportion of the contaminated solid biomass is composed of fossil fuel.

(8) Where the Authority so requests, the participant must arrange for samples of the fuel used (or to be used) in the accredited RHI installation, or of any gas or other substance produced as the result of the use of such fuel, to be taken by a person (and analysed in a manner) specified by the Authority, and for the results of that analysis to be made available to the Authority in such form as the Authority may require.

(9) The participant must provide sustainability information in accordance with Schedule 2.

Participants using solid biomass in accredited RHI installations with an installation capacity of between 45kWth and 1MWthE+W+S

30.—(1) This regulation applies to participants generating heat from solid biomass, not being solid biomass contained in F83...waste, in an accredited RHI installation with an installation capacity of between 45kWth and 1MWth.

(2) The participant may use solid biomass contaminated with fossil fuel provided the participant complies with paragraphs (2), (3) (5) and (6) of regulation 29 as well as the requirements of this regulation.

(3) Where solid biomass contaminated with fossil fuel is used in an accredited RHI installation, the participant must keep and provide upon request written evidence including invoices, receipts and such other documentation as the Authority may specify relating to fuel use and fossil fuel used for the permitted ancillary purposes specified in regulation 29(5) and provide this information upon request to the Authority, in such form as the Authority may require, to demonstrate compliance with this regulation.

(4) Without prejudice to paragraph (3), the Authority may have regard to any information (whether or not produced to it by the participant) if, in its opinion, that information indicates what proportion of the contaminated solid biomass is composed of fossil fuel.

(5) Where—

(a)the Authority is not satisfied that the proportion of fossil fuel contamination (within the meaning of regulation 29(4)(c)) does not exceed 10 per cent; or

(b)the Authority is not satisfied as to the matters specified in paragraphs (5) and (6) of regulation 29,

the Authority may require the participant to arrange for samples of the fuel used (or to be used) in the accredited RHI installation, or of any gas or other substance produced as the result of the use of such fuel, to be taken by a person (and analysed in a manner) specified by the Authority, and for the results of that analysis to be made available to the Authority in such form as the Authority may require.

CHAPTER 2E+W+SOngoing obligations relating to the use of biogas to generate heat and the production of biomethane for injection

Biogas produced from gasification or pyrolysisE+W+S

31.—(1) This regulation applies to participants producing biogas using gasification or pyrolysis and generating heat from that biogas in an accredited RHI installation.

(2) The participant may only use solid biomass or F84... waste as feedstock to produce the biogas.

(3) Where the participant usesF84... waste as feedstock—

(a)paragraphs (2), (3), (6) and (7) of regulation 28 apply to the proportion of solid biomass contained in the F84... waste used for feedstock in the same way as for the proportion of solid biomass contained in F84...waste used to generate heat; and

(b)paragraphs (4) and (5) of regulation 28 apply.

(4) Where the participant uses solid biomass (not being solid biomass contained in F84...waste) as feedstock—

(a)paragraphs (2), (3), (4) and (7) of regulation 29 apply to the contamination of solid biomass used for feedstock in the same way as for solid biomass contaminated with fossil fuel used to generate heat; and

(b)paragraphs (5) and (6) of regulation 29 apply.

(5) Where the Authority so requests, the participant must arrange for samples of the F84...waste or solid biomass used (or to be used) as feedstock in the biogas production plant, or of any gas or other substance produced as a result of the use of such F84... waste or solid biomass, to be taken by a person (and analysed in a manner) specified by the Authority, and for the results of that analysis to be made available to the Authority in such form as the Authority may require.

Textual Amendments

Participants generating heat from biogasE+W+S

32.—(1) This regulation applies to participants generating heat from biogas in an accredited RHI installation where regulation 31 does not apply.

(2) A participant using biogas produced by anaerobic digestion may only use biogas which—

(a)was produced from one or more of the following feedstocks—

(i)solid biomass,

(ii)solid waste,

(iii)liquid waste; and

(b)is not landfill gas.

(3) The participant may use fossil fuel in the accredited RHI installation only in accordance with paragraphs (5) and (6) of regulation 29.

Biomethane producersE+W+S

33.—(1) This regulation applies to participants producing biomethane for injection.

(2) A participant producing biomethane for injection from biogas made by gasification or pyrolysis may only use biogas made using solid biomass or F85...waste as feedstock.

(3) Where F85... waste is used as feedstock, paragraphs (2) and (3)(c) of regulation 28 apply to the proportion of solid biomass contained in F85... waste used as feedstock in the same way as for the proportion of solid biomass contained in F85... waste used to generate heat.

(4) Where solid biomass is used as feedstock, paragraphs (2), (3), and (4)(c) of regulation 29 apply to the contamination of solid biomass used for feedstock in the same way as for solid biomass contaminated with fossil fuel used by participants to generate heat.

(5) A participant producing biomethane for injection from biogas made by anaerobic digestion must comply with regulation 32(2).

(6) The participant must provide measurements in such format as the Authority may request which satisfies the Authority of all of the following—

(a)the gross calorific value and volume of biomethane injected;

(b)the gross calorific value and volume of any propane contained in the biomethane;

(c)the kWh of biomethane injected together with supporting meter readings and calculations;

(d)the kWhth of heat supplied to the biogas production plant (other than heat contained in feedstock to produce biogas by anaerobic digestion) which made the biogas used in any quarterly period to produce biomethane for injection;

(e)any heat supplied to the biomethane production process.

(7) The participant must keep and provide upon request copies or details of agreements with third parties with whom the participant contracts to carry out any of the processes undertaken to turn the biogas into biomethane and to arrange for its injection.

(8) The participant must keep and provide upon request written evidence including invoices, receipts, contracts and such other information as the Authority may specify in relation to biogas purchased and feedstock used in the production of the biogas used to produce biomethane.

(9) The participant must provide sustainability information in accordance with Schedule 2.

Textual Amendments

CHAPTER 3E+W+SOngoing obligations relating to other matters

Ongoing obligations: generalE+W+S

34.  Participants must comply with the following ongoing obligations, as applicable—

(a)they must keep and provide upon request by the Authority records of type of fuel used and fuel purchased for the duration of their participation in the scheme;

(b)they must keep and provide upon request by the Authority written records of fossil fuel used for the permitted ancillary purposes specified in Chapters 1 and 2;

(c)they must submit an annual declaration as requested by the Authority confirming, as appropriate, that they are using their accredited RHI installations in accordance with the eligibility criteria and are complying with the relevant ongoing obligations;

(d)they must notify the Authority if any of the information provided in support of their application for accreditation or registration was incorrect;

(e)they must ensure that their accredited RHI installation continues to meet the eligibility criteria;

(f)they must comply with any condition attached to their accreditation or registration;

(g)they must keep their accredited RHI installation maintained to the Authority's satisfaction and keep evidence of this including service and maintenance documents;

(h)participants combusting biogas must not deliver heat by air from their accredited RHI installation to the biogas production plant producing the biogas used for combustion;

(i)they must allow the Authority or its authorised agent reasonable access in accordance with Part 9;

(j)participants generating heat from solid biomass must comply with the regulation specified by the Authority in accordance with regulation 22(6)(e);

(k)they must notify the Authority within 28 days where they have ceased to comply with an ongoing obligation or have become aware that they will not be able so to comply, or where there has been any change in circumstances which may affect their eligibility to receive periodic support payments;

(l)they must notify the Authority within 28 days of the addition or removal of a plant supplying heat to a heating system of which their accredited RHI installation forms part;

(m)they must notify the Authority within 28 days of a change in ownership of all or part of their accredited RHI installation;

(n)they must repay any overpayment in accordance with any notice served under regulation 48;

(o)they must, if requested, provide evidence that the heat for which periodic support payments are made is used for an eligible purpose;

(p)they must not generate heat for the predominant purpose of increasing their periodic support payments;

[F86(pa)where a heat loss calculation is used they must notify the Authority within 28 days where there are any changes in circumstances which may affect the basis of that calculation;]

[F86(pb)they must notify the Authority within 28 days where the accredited RHI installation is moved to a new location;]

(q)they must comply with such other administrative requirements that the Authority may specify in relation to the effective administration of the scheme.

[F87(r)participants generating heat and power in a CHP system to which regulation 9A applies, must notify the Authority within 28 days where CHPQA certification ceases to apply;]

[F87(s)participants generating heat and power in a CHP system from more than one source of energy—

(i)(except in relation to solid biomass contaminated with fossil fuel), must only burn one of the sources of energy at any time in any combustion unit which supplies energy for the production of heat;

(ii)must keep and provide upon request to the Authority a separate record of the fuel burned in each combustion unit which supplies energy for the production of heat in respect of which periodic support payments are paid;]

[F87(t)participants generating heat using a ground source heat pump for which an application for accreditation is made on or after the third relevant date and which is capable of heating and cooling, must keep and provide upon request to the Authority, details of the calculation of the design heat load.]

[F88Ongoing obligations: emissions from biomassE+W+S

34A.  Participants generating heat from solid biomass in an accredited RHI installation in respect of which an RHI emission certificate is required must—

(a)use fuel of a type specified in the RHI emission certificate;

(b)use fuel with a moisture content which is no greater than the maximum moisture content specified in the RHI emission certificate; and

(c)operate the accredited RHI installation in accordance with the manufacturer’s instructions for that plant in relation to the control of emissions of PM and NOx.]

Ongoing obligations in relation to meteringE+W+S

35.—(1) Participants must keep all meters and steam measuring equipment required to be used in accordance with these Regulations—

(a)continuously operating,

(b)properly maintained and periodically checked for errors, F89...

(c)re-calibrated every 10 years or within such period of time as may be specified in accordance with manufacturers' instructions where available, whichever is the sooner, [F90and

(d)located in accordance with any conditions attached to their accreditation,]

and must retain evidence of this, including service and maintenance invoices, receipts or certificates for the duration of their participation in the scheme.

(2) The Authority may, by the date (if any) specified by it, or at such regular intervals as it may require to enable it to carry out its functions under these Regulations, require participants to provide the following information—

(a)meter readings and other data collected in accordance with these Regulations from all steam measuring equipment, class 2 heat meters[F91, and any other meters] used in accordance with these Regulations in such format as the Authority may reasonably require;

(b)in relation to participants using steam measuring equipment, a kWhth figure of both the heat generated and the heat used for eligible purposes together with supporting data and calculations; and

(c)the evidence and service and maintenance documentation specified in paragraph (1).

(3) Participants using heat pumps to provide both heating and cooling must ensure that their meters for those pumps enable them to—

(a)measure heat used for eligible purposes only, and

(b)where appropriate, measure (in order to discount) any cooling generated by the reverse operation of the heat pump,

and must provide upon request an explanation of how their metering arrangements have enabled the cooling in sub-paragraph (b) to be discounted.

(4) The data referred to in paragraph (2)(a) and (b) may be estimated in exceptional circumstances if the Authority has agreed in writing to an estimate being provided and to the way in which those estimates are to be calculated.

(5) Nothing in this regulation prevents the Authority from accepting further data from a participant, if the Authority considers it appropriate to do so.

Ongoing obligations in relation to the provision of informationE+W+S

36.—(1) A participant must provide to the Authority on request any information which the participant holds and which the Authority requires in order to discharge its functions under these Regulations.

(2) Participants must retain the information referred to in Schedule 1, including such information as may reasonably be required by the Authority under paragraph 1(2)(e), (f), (h), (k), (n), (v) or (w) and whether or not copies of that documentation have been supplied to the Authority, for the duration of their participation in the scheme.

(3) Information requested under paragraph (1) must be provided within 7 days of the request or such later date as the Authority may specify.

(4) Information provided to the Authority under these Regulations must be accurate to the best of the participant's knowledge and belief.

(5) Sub-paragraphs (3) and (4) of paragraph 1 of Schedule 1 have effect.

PART 5E+W+SPeriodic support payments

Payment of periodic support payments to participantsE+W+S

[F9237.(1) Subject to regulation 43 and 43A, periodic support payments shall accrue from the tariff start date and shall be payable for 20 years.

(2) Periodic support payments shall be calculated and paid by the Authority.

(3) Subject to paragraphs (7), (15), (16) and (19) of this regulation and regulation 43(4) to (6), the tariff for an accredited RHI installation shall be fixed when that installation is accredited.

(4) Subject to paragraph (7), the tariff for a participant who is a producer of biomethane is the tariff relevant to biomethane set out in Schedule 3.

(5) Subject to paragraphs (6), (7), (15), (16) and (19), the tariff for an accredited RHI installation is the tariff set out in Schedule 3 in relation to its source of energy or technology and installation capacity.

(6) Subject to regulation 43, for the purposes of paragraphs (5) and (10), where the accredited RHI installation is one of a number of plants forming part of the same heating system, its installation capacity is to be taken to be the sum of the installation capacities of that accredited RHI installation and all plants for which an application for accreditation has been made (whether or not they have been accredited) which—

(a)use the same source of energy and technology as that accredited RHI installation, and

(b)form part of the same heating system as that accredited RHI installation.

(7) The tariff for an accredited RHI installation or a participant who is a producer of biomethane—

(a)for the period commencing with the tariff start date and ending with the following 31st March (“the initial period”) is the tariff specified in paragraph (8), (9) or (10) (“the initial tariff”);

(b)for each year following the initial period commencing with 1st April and ending with the following 31st March (“a subsequent year”) is the tariff specified in paragraph (11) or (12) for the relevant subsequent year (“the subsequent tariff”).

(8) For the purposes of paragraph (7)(a), the initial tariff is—

(a)if the tariff start date is later than 27th November 2011 but earlier than 1st April 2012, the tariff set out in Schedule 3;

(b)if the tariff start date is later than 31st March 2012 but earlier than 1st April 2013, the tariff set out in Schedule 3 adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending on 31st December 2011 (the resulting figure being rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards);

(c)if the tariff start date is later than 31st March 2013 but earlier than 30th April 2013, the tariff set out in Schedule 3—

(i)adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending on 31st December 2011 (the resulting figure being rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards); and

(ii)further adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending on 31st December 2012 (the resulting figure being rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards);

(d)subject to paragraphs (9) and (10), if the tariff start date is on or after 30th April 2013, the tariff calculated in accordance with regulations 37A to 37D.

(9) The initial tariff for an accredited RHI installation which has a tariff start date on or after 1st April 2014 but earlier than 1st October 2014 and which uses a solar collector, is a ground source heat pump or is a large biomass plant is—

(a)for any part of the initial period which is earlier than the third relevant date, the tariff calculated in accordance with regulations 37A to 37D; and

(b)for the period commencing with the third relevant date and ending with 31st March 2015, the tariff set out in Schedule 3A in relation to its source of energy or technology.

(10) Subject to paragraph (19), the initial tariff for an accredited RHI installation which has a tariff start date on or after the third relevant date but earlier than 1st October 2014 and is—

(a)a new solid biomass CHP system;

(b)an air source heat pump;

(c)a plant which generates heat from biogas (but not from solid biomass) with a capacity of at least 200 kWth; or

(d)a deep geothermal plant which is first commissioned on or after 4th December 2013,

is the tariff set out in Schedule 3B in relation to its source of energy or technology and installation capacity.

(11) Subject to paragraph (12), for the purposes of paragraph (7)(b), the subsequent tariff for a particular subsequent year is the tariff applicable to the installation or participant on the 31st March immediately preceding the commencement of the subsequent year, adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending on the 31st December immediately preceding the commencement of that subsequent year, the resulting figure being stated to—

(a)one decimal place and rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards, if the subsequent year commences on a date which is earlier than 1st April 2015; or

(b)two decimal places and rounded to the nearest hundredth of a penny, with any two hundredth of a penny being rounded upwards, if the subsequent year commences on or after 1st April 2015.

(12) The subsequent tariff for the subsequent year commencing with 1st April 2014 for an accredited RHI installation with a tariff start date on or after 21st January 2013 and which uses a solar collector, is a ground source heat pump or is a large biomass plant is—

(a)for the period commencing with 1st April 2014 and ending with the date immediately preceding the third relevant date, the tariff applicable to the installation on 31st March 2014, adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending on 31st December 2013, the resulting figure being stated to one decimal place and rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards;

(b)for the period commencing with the third relevant date and ending with 31st March 2015, the tariff set out in Schedule 3A in relation to its source of energy or technology.

(13) The Authority must calculate the subsequent tariffs each year in accordance with paragraphs (7), (11) and (12) and publish on or before 1st April each year a table of tariffs for the period commencing 1st April of that year and ending with 31st March of the following year.

(14) The Authority must by 15th March, 15th June, 15th September and 15th December in each year (“the tariff publication date”) publish in a table on its website the initial tariffs applicable where a tariff start date falls within the tariff period immediately following the tariff publication date.

(15) For the purposes of paragraphs (5) and (8), and regulation 37B, where an accredited RHI installation fits within the tariff category “small biomass” or “medium biomass” a reference to the tariff set out in Schedule 3 is—

(a)in relation to the initial heat generated by the installation in any 12 month period commencing with, or with the anniversary of, the date of accreditation, a reference to the relevant tier 1 tariff specified in Schedule 3; and

(b)in relation to all further heat generated in that same 12 month period, a reference to the relevant tier 2 tariff so specified.

(16) For the purposes of paragraphs (9)(b) and (12)(b), where an accredited RHI installation is a ground source heat pump, a reference to the tariff set out in Schedule 3A is—

(a)in relation to the initial heat generated by the installation in any 12 month period commencing with, or with the anniversary of, the date of accreditation, a reference to the relevant tier 1 tariff specified in Schedule 3A;

(b)in relation to all further heat generated in that same 12 month period, a reference to the relevant tier 2 tariff so specified.

(17) For the purposes of paragraphs (15) and (16), “the initial heat” means the heat in kWhth generated by an accredited RHI installation running at its installation capacity for 1,314 hours.

(18) In the case of ground source heat pumps which are capable of both heating and cooling, and in respect of which an application for accreditation is made on or after the third relevant date, “installation capacity” for the purposes of paragraph (17) means the design heat load.

(19) Where an accredited RHI installation which is a new solid biomass CHP system ceases to be certified under CHPQA, the tariff during any period in which it is not so certified shall be the tariff that would have been applicable if the plant had never been so certified.]

[F93Calculation of initial tariffs on or after the relevant dateE+W+S

37A.(1) [F94Subject to regulation 37(9) and (10)] this regulation applies for the purposes of calculating the initial tariff if the tariff start date is on or after the relevant date.

(2) Where this regulation applies, the initial tariff is calculated in accordance with the formula—

where—

(a)

A is calculated in accordance with regulation 37B;

(b)

B is calculated in accordance with regulation 37C; and

(c)

C is calculated in accordance with regulation 37D.]

[F93Calculation of AE+W+S

37B.(1) For the purposes of regulation 37A, A is calculated as follows.

(2) If the tariff start date falls within the period commencing with the relevant date and ending with 30th June 2013, A is the tariff set out in Schedule 3—

(a)adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending 31st December 2011 (the resulting figure being rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards);

(b)further adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending 31st December 2012 (the resulting figure being rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards).

(3) If the tariff start date falls within any subsequent tariff period commencing with 1st July, 1st October or 1st January, A is the tariff that would have been applicable if the tariff start date had fallen on the day immediately preceding the commencement of that subsequent tariff period (“the previous tariff”).

(4) If the tariff start date is within any subsequent tariff period commencing with 1st April, A is the previous tariff adjusted by the percentage increase or decrease in the retail prices index for the calendar year ending on the 31st December immediately preceding the commencement of that subsequent tariff period, the resulting figure being] [F95stated to—

(a)one decimal place and rounded to the nearest tenth of a penny, with any twentieth of a penny being rounded upwards, if the subsequent tariff period commences on a date which is earlier than 1st April 2015; or

(b)two decimal places and rounded to the nearest hundredth of a penny, with any two hundredth of a penny being rounded upwards, if the subsequent tariff period commences on or after 1st April 2015.]

[F93Calculation of BE+W+S

37C.(1) For the purposes of regulation 37A, B is calculated as follows.

(2) For the purposes of this regulation—

(a)the first test is met in relation to an assessment date if the forecast for total expenditure as at that date exceeds the figure specified for that assessment date in the second column of the table in Schedule 4;

(b)the second test is met in relation to an assessment date if, as at that assessment date, the forecast for expenditure applicable to the accredited RHI installation or participant who produces biomethane for injection exceeds the figure specified in relation to that date in the second column of [F96the table applicable to the installation in the relevant Part of Schedule 5].

(3) B is 0 if—

(a)the tariff start date falls within the period commencing with the relevant date and ending with 30th June 2013;

(b)the first test is not met in relation to the assessment date immediately preceding the commencement of the tariff period in which the tariff start date falls (“the relevant assessment date”); or

(c)the second test is not met in relation to the relevant assessment date.

[F97(3A) B is 0 if—

(a)the application for accreditation was made in the period—

(i)commencing with 24th September 2013, and

(ii)ending with the day before the date on which the Renewable Heat Incentive Scheme (Amendment) (No. 3) Regulations 2013 come into force or 1st January 2014, whichever is the earlier;

(b)compliance with regulation 5(1)(d)(ii) is one of the eligibility criteria in relation to that installation;

(c)except in relation to compliance with regulation 5(1)(d)(ii), before 1st January 2014—

(i)the application was properly made, and

(ii)the eligibility criteria were met;

(d)the plant has an installation capacity of 500 kWth or less;

(e)the plant is commissioned before 1st January 2014; and

(f)the tariff start date falls on or after 1st January 2014.]

(4) [F98Except where paragraph (3A) applies,] B is 0.05 if—

(a)the tariff start date is later than 30th June 2013;

(b)the first test is met in relation to the relevant assessment date; and

(c)the second test is met in relation to relevant assessment date.]

[F93Calculation of CE+W+S

37D.(1) For the purposes of regulation 37A, C is calculated as follows.

(2) For the purposes of this regulation—

(a)the first test is met in relation to an assessment date if the forecast for total expenditure as at that date exceeds the figure specified for that assessment date in the third column of the table in Schedule 4;

(b)the second test is met in relation to an assessment date if, as at that assessment date, the forecast for expenditure applicable to the accredited RHI installation or participant who produces biomethane for injection exceeds the figure specified in relation to that date in the third column of [F99the table applicable to the installation in the relevant Part of Schedule 5];

[F100(c)the third test is met in relation to an assessment date if, as at that assessment date, the increase in expenditure forecast applicable to the installation or participant is less than 50% of the figure specified in relation to that date in the fourth column of [F101the table applicable to the installation in the relevant Part of Schedule 5] (“the anticipated increase figure”);]

[F100(d)the fourth test is met in relation to an assessment date if, as at that assessment date, the increase in expenditure forecast applicable to the installation or participant is at least 50% of, but less than 150% of, the anticipated increase figure;]

[F100(e)the fifth test is met in relation to an assessment date if, as at that assessment date, the increase in expenditure forecast applicable to the installation or participant is at least 150% of the anticipated increase figure.]

(3) C is 0 if—

(a)the tariff start date falls within the period commencing with the relevant date and ending with 30th June 2013;

(b)the first test is not met in relation to the assessment date immediately preceding the commencement of the tariff period in which the tariff start date falls (“the relevant assessment date”);

(c)the second test is not met in relation to the relevant assessment date; or

(d)the second test is met in relation to the relevant assessment date but—

(i)during the tariff period that immediately preceded the tariff period in which the tariff start date falls the value of C in relation to the applicable source of energy or technology and installation capacity, or in relation to the production of biomethane, was greater than 0; and

(ii)the third test is met.

[F102(3A) C is 0 if—

(a)the application for accreditation was made in the period—

(i)commencing with 24th September 2013, and

(ii)ending with the day before the date on which the Renewable Heat Incentive Scheme (Amendment) (No. 3) Regulations 2013 come into force or 1st January 2014, whichever is the earlier;

(b)compliance with regulation 5(1)(d)(ii) is one of the eligibility criteria in relation to that installation;

(c)except in relation to compliance with regulation 5(1)(d)(ii), before 1st January 2014—

(i)the application was properly made, and

(ii)the eligibility criteria were met;

(d)the plant has an installation capacity of 500 kWth or less;

(e)the plant is commissioned before 1st January 2014; and

(f)the tariff start date falls on or after 1st January 2014.]

(4) [F103Except where paragraph (3A) applies,] C is 0.05 if—

(a)the first test is met in relation to the relevant assessment date;

(b)the second test is met in relation to the relevant assessment date; and

(c) the third test is met in relation to an assessment date if, as at that assessment date, the increase in expenditure forecast applicable to the installation or participant is less than 50% of the figure specified in relation to that date in the fourth column of the table in the relevant Part of Schedule 5 (“the anticipated increase figure”);

(5) [F104Except where paragraph (3A) applies,] C is 0.10 if—

(a)the first test is met in relation to the relevant assessment date;

(b)the second test is met in relation to the relevant assessment date;

(c)during the tariff period that immediately preceded the tariff period in which the tariff start date falls the value of C in relation to the applicable source of energy or technology and installation capacity, or in relation to the production of biomethane, was 0.05; and

(d)the fifth test is met.

(6) [F105Except where paragraph (3A) applies,] C is 0.20 if—

(a)the first test is met in relation to the relevant assessment date;

(b)the second test is met in relation to the relevant assessment date;

(c)during the tariff period that immediately preceded the tariff period in which the tariff start date falls the value of C in relation to the applicable source of energy or technology and installation capacity, or in relation to the production of biomethane, was more than 0.05; and

(d)the fifth test is met.]

[F93Expenditure forecast statement and tariff change noticeE+W+S

37E.(1) The Secretary of State must publish on the GOV.UK website an expenditure forecast statement in accordance with this regulation.

(2) For that purpose the Secretary of State must determine—

(a)the forecast for total expenditure;

(b)for each tariff category F106...the forecast for expenditure in relation to the relevant installations that fall within that tariff category;

[F107(c)the forecast for expenditure in relation to relevant producers;]

(d)[F108except where regulation 37F applies] in relation to each of the forecasts for expenditure referred to in sub-paragraphs (b) and (c) the increase in expenditure forecast for that tariff category, that is to say the difference between—

(i)the forecast for expenditure as at the assessment date immediately preceding the date on which the expenditure forecast is published (“the latest assessment date”); and

(ii)the forecast for expenditure as at the assessment date three months before the latest assessment date.

(3) An expenditure forecast statement must set out, as at the latest assessment date—

(a)the forecast for total expenditure;

(b)each of the forecasts for expenditure referred to in [F109paragraph (2)(b)] and (c); and

(c)each of the increase in expenditure forecasts referred to in [F110paragraph (2)(d) or, if applicable, regulation 37F].

(4) If, as a result of the forecast and by virtue of paragraphs (7) and [F111(8)] of regulation 37, the new initial tariff will be different from the former initial tariff, the Secretary of State must also—

(a)calculate the new initial tariff in accordance with those paragraphs; and

(b)publish with the expenditure forecast statement a notice (“the tariff change notice”) setting out the new initial tariff and the date on which it will take effect.

(5) For the purposes of paragraph (4)—

(a)“new initial tariff” means the initial tariff for an accredited RHI installation or a producer of biomethane for injection having a start date which falls within the next tariff period;

(b)“former initial tariff” means the initial tariff that would have been applicable to the installation or producer if the tariff start date had fallen on the day immediately preceding the commencement of that tariff period.

(6) The expenditure forecast statement and, if applicable, the tariff change notice must be published by 1st June 2013, 1st September 2013, 1st December 2013 and subsequently by 1st March, 1st June, 1st September and 1st December in each year.]

[F112Determination of increase in expenditure forecasts for 1st September 2014 expenditure forecast statementE+W+S

37F.(1) This regulation applies when the Secretary of State prepares to publish the expenditure forecast statement which, by virtue of regulation 37E(6), must be published by 1st September 2014.

(2) Where this regulation applies, the Secretary of State must determine the increase in expenditure forecast for each tariff category in accordance with paragraph (3).

(3) For the purposes of paragraph (2)—

(a)the increase in expenditure forecast for a tariff category specified in the first column of table 1 is the difference between—

(i)the forecast for expenditure as at 31st July 2014 for that tariff category; and

(ii)the forecast for expenditure as at 30th April 2014 for the corresponding former tariff category in the second column of table 1, or where more than one former tariff category is specified, the sum of the forecast for expenditure for those former tariff categories;

(b)the increase in expenditure forecast for any other tariff category is 0.

(3) In this regulation “former tariff category” means the category of plant which is described in the second and third columns of Schedule 3 and identified by a tariff name in the first column of that Schedule.

Table 1

Tariff categoryFormer tariff category
Small biomass plantsSmall commercial biomass
Medium biomass plantsMedium commercial biomass
Large biomass plantsLarge commercial biomass
Ground source heat pumpsSmall commercial heat pumps and large commercial heat pumps
Plants which use solar collectorsAll solar collectors
Producers of biomethane for injectionBiomethane and small biogas combustion]

Periodic support payments for accredited RHI installations in simple systemsE+W+S

38.—(1) [F113Subject to paragraph (3), this regulation applies] to participants who own an accredited RHI installation (“the installation”) which—

(a)is generating and supplying heat solely for one or more eligible purposes used in one building;

(b)does not deliver heat by steam; and

(c)is not a CHP system.

(2) Subject to regulations 40 and 41, participants shall be paid a periodic support payment for the installation in respect of each quarterly period calculated in accordance with one of the following formulae, as applicable—

(a)A x B; or

(b)where the installation is generating heat from the combustion of biogas, A x (B – C),

where— A is the tariff for the installation [F114determined in accordance with regulations 37 to 37D]; B is the heat in kWhth generated by the installation during the relevant quarterly period; and C is the heat in kWhth directed from the installation or delivered by any other source to the biogas production plant which produced the biogas combusted in the relevant quarterly period (other than heat contained in feedstock used to produce biogas by anaerobic digestion).

[F115(3) This regulation does not apply to an accredited RHI installation in respect of which an application for accreditation is made on or after the second relevant date.]

Periodic support payments accredited RHI installations for complex systemsE+W+S

39.—(1) [F116Subject to paragraph (3), this regulation applies] to participants who own an accredited RHI installation (“the installation”) which does not fall within regulation 38.

(2) Subject to regulations [F11739C,] 40 and 41, participants shall be paid a periodic support payment for the installation in respect of each quarterly period calculated in accordance with one of the following formulae, as applicable—

(a)A x B x

(b)where the accredited RHI installation is generating heat from the combustion of biogas,

A x (B - C) x

where— A is the tariff for the installation [F118determined in accordance with regulations 37 to 37D]; B is the heat in kWhth used by the heating system of which the installation forms part during the relevant quarterly period for eligible purposes; C is the heat in kWhth directed from the installation or delivered from any other source to the biogas production plant which produced the biogas combusted in the relevant quarterly period (other than heat contained in feedstock to produce biogas by anaerobic digestion) or, where there is no such heat, zero; D is the heat in kWhth generated by the installation during the relevant quarterly period; and E is the heat in kWhth generated by all plants supplying heat to the same heating system of which the installation forms part in the relevant quarterly period.

[F119(3) This regulation does not apply to an accredited RHI installation in respect of which an application for accreditation is made on or after the second relevant date.]

[F120Periodic support payments for new accredited RHI installationsE+W+S

39A.(1) This regulation applies to participants who own an accredited RHI installation for which an application for accreditation was made on or after the second relevant date.

(2) Subject to regulations [F12123(2) and 39C,] 40 and 41, participants shall be paid a periodic support payment for the installation in respect of each quarterly period calculated in accordance with one of the following formulae, as applicable—

(a); or

(b)where the accredited RHI installation is generating heat from the combustion of biogas, ,

where—

(i)

A is the tariff for the installation determined in accordance with regulations 37 to 37D;

(ii)

B is the kWhth of heat generated by that plant which is used for eligible purposes, determined in accordance with regulations 17A and 42A; and

(iii)

C is the heat in kWhth directed from the installation or delivered from any other source to the biogas production plant which produced the biogas combusted in the relevant quarterly period (other than heat contained in feedstock to produce biogas by anaerobic digestion) or, where there is no such heat, zero..]

[F122Periodic support payments for CHP systems using biomass or biogas in combination with other sources of energyE+W+S

39B.(1) This regulation applies to participants who own an accredited RHI installation which is a CHP system using solid biomass or biogas in combination with other sources of energy.

(2) Subject to regulation 23(2) and 39C, where this regulation applies, participants shall be paid periodic support payments for the installation in respect of each quarterly period calculated in accordance with the following formula—

where—

(a)

A is the tariff in respect of any heat generated by the installation using solid biomass determined in accordance with regulations 37 to 37D;

(b)

B is the kWhth of heat generated by the installation from solid biomass burned in a combustion unit to which regulation 9(2)(b) or 9A applies or solid biomass contained in waste burned in a combustion unit to which regulation 9(2)(b) applies, calculated in accordance with paragraph (3), and which is used for eligible purposes;

(c)

C is the tariff in respect of any heat generated using biogas determined in accordance with regulations 37 to 37D;

(d)

D is the kWhth of heat generated by the installation from biogas, calculated in accordance with paragraph (4), and which is used for eligible purposes;

(e)

E is the heat in kWhth directed from the installation or delivered from any other source to the biogas production plant which produced the biogas combusted in the relevant quarterly period (other than heat contained in feedstock to produce biogas by anaerobic digestion) or, where there is no such heat, 0.

(3) B shall be calculated in accordance with the following equation—

where—

(a)

HCHP is the total heat in kWhth generated by the installation in the relevant quarterly period which is used for eligible purposes;

(b)

FIB is the energy content of the solid biomass (excluding the energy content of any fossil fuel contamination in such biomass) to which regulation 9(2)(b) or 9A applies or solid biomass contained in waste burned in a combustion unit to which regulation 9(2)(b) applies and used in the installation to generate heat and power during the relevant quarterly period;

(c)

FIother is the energy content of all other fuel used in the installation in the relevant quarterly period, including the energy content of any fossil fuel contamination or fossil fuel used in the CHP system for permitted ancillary purposes in accordance with regulation 28 or 29.

(4) D shall be calculated in accordance with the following equation—

where—

(a)

HCHPis the total heat in kWhth generated by the installation during the relevant quarterly period which is used for eligible purposes;

(b)

FID is the energy content of the biogas used in the installation during the relevant quarterly period;

(c)

FIother is the energy content of all other fuel used in the installation during the relevant quarterly period, including the energy content of any fossil fuel used in the CHP system for permitted ancillary purposes in accordance with regulation 28 or 29.]

[F122CHP systems accredited in relation to the Renewables ObligationE+W+S

39C.(1) No periodic support payments may be made in relation any heat generated by any capacity of a CHP system to which paragraph (2) or (3) applies.

(2) This paragraph applies to capacity which generated heat and electricity before 1st April 2013 and which—

(a)uses solid biomass or solid biomass contained in waste to generate heat and electricity, and

(b)forms part of a generating station which—

(i)is accredited under the Renewables Obligation Order 2009 or the Renewables Obligation (Scotland) Order 2009, and

(ii)is or at any time since it was so accredited, has been a qualifying combined heat and power generating station within the meaning of article 2 of either of those Orders.

(3) This paragraph applies to capacity which first generates heat and electricity on or after 1st April 2013 and—

(a)which—

(i)uses solid biomass to generate heat and electricity;

(ii)forms part of a generating station which is accredited under the Renewables Obligation Order 2009 or the Renewables Obligation (Scotland) Order 2009, and

(iii)is capacity in respect of which a declaration under article 28(7) of either of those Orders has been made; or

(b)which—

(i)uses solid biomass contained in waste to generate heat and electricity;

(ii)forms part of a generating station which is accredited under the Renewables Obligation Order 2009 or the Renewables Obligation (Scotland) Order 2009; and

(iii)forms part of a generating station which is or at any time since it was so accredited, has been a qualifying combined heat and power generating station within the meaning of article 2 of either of those Orders.]

Fossil fuel contamination of solid biomass and fossil fuel used for permitted ancillary purposesE+W+S

40.—(1) This regulation applies to participants generating heat in an accredited RHI installation—

(a)where the heat is generated from solid biomass contained in F123... waste (“Case A”); or

(b)where the heat is generated from solid biomass, not being solid biomass contained in F123...waste, and the capacity of the installation is 1MWth or above (“Case B”).

(2) In Case A, the periodic support payment calculated in accordance with regulation 38[F124, 39 or 39A] shall be reduced pro rata to reflect the proportion of the energy content of the F123...waste used in the relevant quarterly period which was composed of fossil fuel and, where fossil fuel has been used for permitted ancillary purposes in accordance with regulation 28, to reflect the proportion of fossil fuel so used which resulted in the generation of heat.

(3) In Case B, the periodic support payment calculated in accordance with regulation 38[F125, 39 or 39A] shall be reduced pro rata to reflect the proportion of fossil fuel contamination in the relevant quarterly period determined in accordance with regulation 29 and, where fossil fuel has been used for permitted ancillary purposes during the relevant quarterly period in accordance with regulation 29, to reflect the proportion of fossil fuel so used which resulted in the generation of heat.

Fossil fuel contamination adjustment to periodic support payments for producers and combusters of biogas produced from gasification and pyrolysisE+W+S

41.—(1) This regulation applies to participants producing biogas from gasification or pyrolysis and generating heat from that biogas in an accredited RHI installation.

(2) Where, in accordance with regulation 31, a participant uses feedstock contaminated with fossil fuel, the periodic support payment calculated in accordance with regulation 38, [F12639 or 39A] shall be reduced pro rata to reflect the proportion of fossil fuel contamination in the feedstock used by the participant in the relevant quarterly period.

Textual Amendments

Periodic support payments to producers of biomethaneE+W+S

42.  [F127Subject to regulation 23(2),] Participants producing biomethane for injection shall be paid a periodic support payment in respect of each quarterly period calculated in accordance with the following formula—

A x (B – (C + D + E)) x F,

where— A is the [F128tariff relevant to biomethane injection] [F129determined in accordance with regulations 37 to 37D]; B is the kWh of biomethane injected in any quarterly period[F130(or the sum of the maximum initial capacity together with any maximum additional capacity which has been specified under regulation 43A, if lower)]; C is the kWh of propane contained in B; D is the kWhth of heat supplied to the biogas production plant (other than heat contained in feedstock to produce biogas by anaerobic digestion) which produced the biogas from which the biomethane was made, from any heat source other than heat generated from the combustion of that biogas; [F131E is the kWhth of heat supplied to the biomethane production process in that quarterly period from any heat source other than heat generated from the combustion of biogas by the plant which supplies that process; and] F applies only in relation to biomethane made using biogas produced from gasification or pyrolysis, and is the proportion of biomass contained in the feedstock used in the relevant quarterly period to produce the biogas.

[F132Calculation of heat loss in certain circumstancesE+W+S

42A.(1) This regulation applies to participants who own an accredited RHI installation for which an application for accreditation was made on or after the second relevant date.

(2) Where the Authority is satisfied that relevant piping complies with the requirements in paragraph (3)(a), (b) or (c), the heat lost through that piping may be disregarded when determining the kWhth of heat generated by the plant which is used for eligible purposes.

(3) The requirements in this paragraph are that—

(a)each length of piping which is 10 metres or less and situated outside a building is properly insulated;

(b)each length of piping which is greater than 10 metres and situated outside a building is—

(i)properly insulated, and

(ii)the average annual heat lost from all such piping based on a heat loss calculation is less than 3% of the projected annual heat output of the plant; or

(c)the piping is situated inside a building.

(4) Where relevant piping which is properly insulated is—

(a)situated outside a building;

(b)each length of such piping is greater than 10 metres; and

(c)the average annual heat lost from all such piping is more than 3% of the projected annual heat output of the plant,

a heat loss calculation may be used to establish the heat lost from such piping when determining the kWhth of heat generated by the plant which is used for eligible purposes.

(5) A heat loss calculation may be used to establish heat lost when determining the heat generated by the plant which is used for eligible purposes where in the opinion of the Authority—

(a)physical constraints, reasons of safety or environmental conditions mean that it is not reasonably practicable to install a class 2 heat meter or steam measuring equipment;

(b)a class 2 heat meter or steam measuring equipment would provide less accurate results than a heat loss calculation;

(c)the cost of installing a class 2 heat meter or steam measuring equipment would be disproportionate when compared with the total installation cost of the plant; or

(d)the administrative cost to the Authority of processing information from a class 2 heat meter or steam measuring equipment would be disproportionate when compared with the amount of heat which may be measured.

(6) Where in addition to heat supplied by the plant—

(a)heat generated solely by gas or electricity is supplied to the same heating system of which the plant forms part; and

(b)one or more meters are installed which measure the total amount of gas or electricity used to generate that heat,

the quantity of that gas or electricity expressed in kWh may be converted into kWhth provided such a calculation is based on an assumption that 100% of the fuel is converted into heat.

(7) In this regulation, “relevant piping” means piping which conveys heat for, or returns heat following its use for, a purpose for which heat is supplied by the heating system of which the plant forms part.]

PART 6E+W+SAdditional RHI capacity

[F133Additional RHI capacityE+W+S

43.(1) Paragraphs (4) to (7) apply where the Authority accredits additional RHI capacity which is first commissioned less than 12 months after the date on which the original installation was first commissioned.

(2) Paragraph (8) applies where the Authority accredits additional RHI capacity which is first commissioned 12 months or more after the date on which the original installation was first commissioned.

(3) In this regulation “additional RHI capacity” means a plant which is—

(a)first commissioned after the date on which an accredited RHI installation (“the original installation”) was first commissioned;

(b)uses the same source of energy and technology as the original installation; and

(c)supplies heat to the same heating system as that of which the original installation forms part.

(4) Subject to paragraphs (5) and (6), from the date of accreditation of additional RHI capacity to which this paragraph applies, the tariff for both the original installation and the additional RHI capacity is the applicable tariff for the source of energy and technology based on the sum of the installation capacity of the original installation and the additional RHI capacity, and—

(a)in respect of heat generated by the original installation, calculated in accordance with regulations 37 to 37D as at the tariff start date of that original installation; and

(b)in respect of heat generated by the additional RHI capacity, calculated in accordance with regulations 37 to 37D as at the tariff start date of that additional capacity.

(5) Where the original installation generates heat using solid biomass and—

(a)the tariff start date of the original installation is before 21st January 2013;

(b)the additional RHI capacity is accredited on or after 21st January 2013,

(c)the installation capacity of the original installation is below 1MWth; and

(d)the sum of the installation capacity of the original installation and the additional RHI capacity is 1MWth or above,

from the third relevant date, the tariff for both the original installation and that additional RHI capacity shall be the tariff applicable to large biomass plants in Schedule 3A, calculated in accordance with regulations 37 to 37D.

(6) Where the accreditation is in respect of an installation which generates heat from biogas combustion and—

(a)the tariff start date of the original installation is before 4th December 2013;

(b)the additional RHI capacity is first commissioned on or after 4th December 2013; and

(c)the sum of the installation capacity of the original installation and the additional RHI capacity is 200kWth or above,

from the third relevant date, the tariff for both the original installation and that additional RHI capacity shall be the applicable tariff in Schedule 3B based on the sum of the installation capacity of the original installation and the additional RHI capacity, calculated in accordance with regulation 37 to 37D.

(7) Where the date of accreditation of the original installation is before the relevant date, periodic support payments in respect of both the original installation and the additional RHI capacity shall terminate with the tariff end date of the original installation.

(8) Where this paragraph applies—

(a)the tariff for the original installation shall continue to be the applicable tariff for the source of energy or technology and installation capacity of that original installation;

(b)that tariff shall be calculated in accordance with regulation 37 to 37D as at the tariff start date of that original installation;

(c)the tariff for the additional RHI capacity shall be the applicable tariff for the source of energy or technology based on the sum of the installation capacity of the original installation and the additional RHI capacity; and

(d)that tariff shall be calculated in accordance with regulation 37 to 37D as at the tariff start date of that additional RHI capacity.

(9) All additional RHI capacity must be metered so as to enable the heat generated by such additional capacity and used for eligible purposes to be distinguished from the heat so generated by the original installation.

(10) Where an application for accreditation of additional RHI capacity is made on or after the second relevant date, the eligibility requirements in regulations 5(1)(d) and 17A will apply to that additional RHI capacity.]

[F134Additional capacity for biomethane productionE+W+S

43A.(1) A participant who is—

(a)a producer of biomethane;

(b)whose original application for registration was made on or after the third relevant date; and

(c)who is producing additional biomethane for injection,

may apply to the Authority to be registered in respect of that additional biomethane.

(2) Regulation 23 and paragraphs (2) to (3) and (4) to (8) of regulation 25 apply to an application for registration in respect of additional biomethane as they do to an application for registration under that regulation.

(3) Where a participant is registered in respect of additional biomethane, the Authority must specify the maximum additional capacity in relation to which the participant is being registered.

(4) Periodic support payments for additional biomethane may not be made beyond the tariff end date notified in accordance with regulation 25(4)(d) when the participant was originally registered as a producer of biomethane.

(5) For the purposes of this regulation,

(a)“additional biomethane” means any biomethane—

(i)which exceeds the sum of the maximum initial capacity, together with any maximum additional capacity previously specified under this regulation; and

(ii)is being supplied by the participant for injection at the same injection point as the biomethane in respect of which that participant was first registered.

(b)“maximum additional capacity” means the volume of biomethane expressed in cubic metres per quarterly period which—

(i)is additional biomethane; and

(ii)is the maximum volume which a participant is entitled to supply for injection under the Network Entry Agreement applicable to that additional biomethane.]

PART 7E+W+SEnforcement

Power to temporarily withhold periodic support payments to investigate alleged non-complianceE+W+S

44.—(1) Where the Authority has reasonable grounds to suspect that a participant has failed or is failing to comply with an ongoing obligation and the Authority requires time to investigate, it may temporarily withhold all or part of that participant's periodic support payments.

(2) Within 21 days of a decision to withhold periodic support payments, the Authority must send a notice to the participant specifying—

(a)the respect in which the Authority suspects the participant has failed or is failing so to comply;

(b)the reason why periodic support payments are being withheld;

(c)the date from which periodic support payments will be withheld;

(d)the next steps in the investigation; and

(e)details of the participant's right of review including any relevant time-limits.

(3) The Authority's investigation must be commenced and completed as soon as is reasonably practicable.

(4) The Authority may withhold a participant's periodic support payments for a maximum period of 6 months commencing with the date specified in accordance with the notice required by paragraph (2)(c).

(5) The Authority must review its decision to withhold a participant's periodic support payments every 30 days commencing 30 days after the date of the notice required by paragraph (2).

(6) Following a review pursuant to paragraph (5), the Authority must send a notice to the participant providing an update on—

(a)the progress of any investigation to date; and

(b)whether the Authority intends to continue to withhold periodic support payments.

(7) For the purposes of calculating the time-limit specified in paragraph (4), no account is to be taken of any period attributable to the participant's delay in providing any information reasonably requested by the Authority.

(8) For the purposes of paragraph (7), a participant is not to be deemed to have delayed in providing information if that participant responds within 2 weeks of a request from the Authority.

(9) On expiry of the period referred to in paragraph (4) or, if earlier, the conclusion of the investigation, the Authority must—

(a)send the participant a notice specifying the outcome of the investigation or, where the investigation is not concluded, inform the participant accordingly; and

(b)pay within 28 days of the date of that notice all periodic support payments temporarily withheld under this regulation, subject to any permanent withholding or reduction of any such payments under regulation 46.

(10) If, on conclusion of the investigation, the Authority is satisfied that a participant is failing or has failed to comply with an ongoing obligation it may impose one or more of the other sanctions set out in this Part.

Power to suspend periodic support payments where ongoing failure to complyE+W+S

45.—(1) Where the Authority is satisfied that a participant is failing to comply with an ongoing obligation it may suspend that participant's periodic support payments.

(2) Within 21 days of a decision to suspend periodic support payments the Authority must send a notice to the participant specifying—

(a)the respect in which the Authority is satisfied that the participant is failing so to comply;

(b)the reason why periodic support payments are being suspended;

(c)the date from which the suspension is effective;

(d)the steps that the participant must take to satisfy the Authority that it is complying with the ongoing obligation;

(e)the consequences of the participant failing to take the steps required pursuant to sub-paragraph (d) including potential sanctions; and

(f)details of the participant's right of review including any relevant time-limits.

(3) Within 21 days of being satisfied that the participant is complying with the ongoing obligation the Authority must remove the suspension.

(4) If, within 6 months, the Authority is satisfied that the participant has taken the steps specified by notice under paragraph (2), the Authority may pay within 28 days of being so satisfied all periodic support payments withheld under this regulation.

(5) The maximum period for which the Authority may suspend a participant's periodic support payments is 1 year.

(6) Subject to paragraph (4), a participant may not recover any periodic support payments suspended in accordance with this regulation.

Power to permanently withhold or reduce a participant's periodic support paymentsE+W+S

46.—(1) Where the Authority is satisfied that there has been a material or repeated failure by a participant to comply with an ongoing obligation during any quarterly period and the periodic support payment for that quarterly period has not been paid, the Authority may take one or more of the following actions—

(a)permanently withhold a proportion of the participant's periodic support payment which corresponds to the proportion of that quarterly period during which the participant failed so to comply;

(b)reduce a participant's periodic support payment for that quarterly period or for the quarterly period immediately following.

(2) Within 21 days of a decision to permanently withhold or to reduce a periodic support payment, the Authority must send a notice to the participant specifying, as applicable—

(a)the respect in which the participant has failed so to comply;

(b)the reason why a periodic support payment is being withheld or reduced;

(c)the period in respect of which any periodic support payment is to be withheld or reduced;

(d)the level of any reduction; and

(e)details of the participant's right of review including any relevant time-limits.

(3) Where reducing a periodic support payment in accordance with paragraph (1)(b), the Authority may determine the level of the reduction (taking into consideration all factors which it considers relevant) up to a maximum reduction of 10 per cent of the periodic support payment in question.

Revocation of accreditation or registrationE+W+S

47.—(1) Where the Authority is satisfied that there has been a material or repeated failure by a participant to comply with an ongoing obligation it may take one or more of the following actions—

(a)revoke accreditation for the accredited RHI installation in respect of which there has been a material or repeated failure;

(b)revoke accreditation for any other accredited RHI installations owned by that participant; or

(c)in relation to a participant who is a producer of biomethane for injection, revoke that participant's registration.

[F135(1A) Where the Authority is satisfied, in relation to an accredited RHI installation which generates heat from solid biomass, that—

(a)an RHI emission certificate is required in relation to that plant, and

(b)that the plant has been accredited as a result of the provision of information in the RHI certificate which is incorrect in a material particular,

the Authority may revoke that accreditation.]

(2) Within 21 days of a decision to revoke accreditation or registration the Authority must send a notice to the participant specifying—

(a)the reason for the revocation of accreditation or registration including, where applicable, details of the respect in which the participant has failed so to comply [F136or of the information which is incorrect in a material particular];

(b)an explanation of the effect of the revocation; and

(c)details of the participant's right of review including any relevant time limits.

(3) Where accreditation of an accredited RHI installation has been revoked, or a participant's registration has been revoked, the Authority may refuse to accredit any eligible installations owned by the same person or refuse to register that person as a producer of biomethane for injection at any future date.

Overpayment notices and offsettingE+W+S

48.—(1) Where the Authority is satisfied that a participant has received a periodic support payment which exceeds that participant's entitlement or has received a periodic support payment whilst failing to comply with an ongoing obligation [F137or in circumstances where regulation 47 (1A) applies,] it may—

(a)require the participant to repay the periodic support payment as a civil debt owed to the Authority; or

(b)offset the periodic support payment against any future periodic support payments.

(2) Within 21 days of a decision to offset or require the participant to repay any periodic support payment the Authority must send the participant a notice specifying—

(a)the periodic support payment which the Authority believes has been overpaid and the sum which it is seeking to recover from the participant;

(b)whether the sum specified in sub-paragraph (a) will be recovered in accordance with paragraph (1)(a) or (1)(b);

(c)where applicable, a date by which the sum specified in sub-paragraph (a) must be repaid;

(d)the consequences of failing to make any repayments requested including potential sanctions or civil action; and

(e)details of the participant's right of review including any relevant time limits.

PART 8E+W+SRevocation of sanctions

Revocation of Part 7 sanctionsE+W+S

49.—(1) The Authority may at any time revoke a sanction imposed in accordance with Part 7 if it is satisfied that—

(a)there was an error involved in the original imposition of the sanction; or

(b)it is just and equitable in the particular circumstances of the case to do so.

(2) Within 21 days of a decision to revoke a sanction, the Authority must send a notice to the participant specifying—

(a)the sanction which has been revoked;

(b)the reason for the revocation;

(c)what action if any the Authority proposes to take in relation to any loss incurred by the participant as a result of the imposition of the sanction including the time within which any action will be taken; and

(d)details of someone within the Authority whom the participant may contact if they are not satisfied with the proposals made by the Authority under sub-paragraph (c).

PART 9E+W+SInspection

Power to inspect accredited RHI installations [F138and equipment used to produce biomethane] E+W+S

50.—(1) The Authority or its authorised agent may request entry at any reasonable hour to inspect an accredited RHI installation [F139and equipment used to produce biomethane] and its associated infrastructure to undertake any one or more of the following—

(a)verify that the participant is complying with all applicable ongoing obligations;

(b)verify meter readings;

(c)take samples and remove them from the premises for analysis;

(d)take photographs, measurements or video or audio recordings;

(e)ensure that there is no other contravention of these Regulations.

(2) Within 21 days of a request made under paragraph (1) being (in its opinion) unreasonably refused the Authority must send a notice to the participant specifying—

(a)the reason why the Authority considers the refusal to be unreasonable;

(b)the consequences of the refusal, including potential sanctions for failing to comply with the ongoing obligation imposed by regulation 34(i); and

(c)details of the participant's right of review including any relevant time-limits.

PART 10E+W+SReviews

Right of reviewE+W+S

51.—(1) Any prospective, current or former participant affected by a decision made by the Authority in exercise of its functions under these Regulations (other than a decision made in accordance with this regulation) may have that decision reviewed by the Authority.

(2) An application for review must be made by notice in such format as the Authority may require and must—

(a)be received by the Authority within 28 days of the date of receipt of notification of the decision being reviewed;

(b)specify the decision which that person wishes to be reviewed;

(c)specify the grounds upon which the application is made; and

(d)be signed by or on behalf of the person making the application.

(3) A person who has made an application in accordance with paragraph (2) must provide the Authority with such information and such declarations as the Authority may reasonably request in order to discharge its functions under this regulation, provided any information requested is in that person's possession.

(4) On review the Authority may—

(a)revoke or vary its decision;

(b)confirm its decision;

(c)vary any sanction or condition it has imposed; or

(d)replace any sanction or condition it has imposed with one or more alternative sanctions or conditions.

(5) Within 21 days of the Authority's decision on a review, it must send the applicant and any other person who is in the Authority's opinion affected by its decision a notice setting out its decision with reasons.

[F140PART 10AE+W+SRestriction of entry to the scheme

Circumstances in which entry to the scheme is restrictedE+W+S

F14151A.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

InterpretationE+W+S

F14151B.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ]

Textual Amendments

PART 11E+W+SAdministrative Functions of the Authority and notices

Publication of guidance and tariffsE+W+S

52.  The Authority must publish procedural guidance to participants and prospective participants in connection with the administration of the scheme.

Reporting obligationsE+W+S

53.—(1) The Authority must provide to the Secretary of State monthly reports in such manner and form as the Secretary of State may request containing the following information, as applicable—

(a)in respect of each accredited RHI installation accredited during the period covered by the report—

(i)such of the information specified in Schedule 1 as the Authority may hold and the Secretary of State may require regarding the accredited RHI installation,

(ii)details of the plant it has replaced, if any,

(iii)the total amount of periodic support payments made in respect of the accredited RHI installation during the period covered by the report,

(iv)the total amount of heat in kWhth for which periodic support payments were made and the eligible purposes and the industry sector for which it was used,

(v)sustainability information provided in accordance with Schedule 2;

(b)in respect of each participant registered as a producer of biomethane during the period covered by the report—

(i)the total amount of periodic support payments made to each participant,

(ii)the volume of biomethane produced for injection by each participant, and

(iii)sustainability information provided in accordance with Schedule 2;

(c)such other information as the Authority may hold in relation to its functions under these Regulations as the Secretary of State may require.

(2) The first monthly report must cover the period from the commencement of these Regulations and ending with 31st December 2011 and each subsequent monthly report must cover each subsequent month and must be sent to the Secretary of State within [F1427 working days] of the end of that month.

(3) The Authority must provide to the Secretary of State quarterly and annual reports in such manner and form as the Secretary of State may request containing the information specified in paragraph (1) in aggregate form both for the period covered by the report and since the date of commencement of the scheme.

(4) The first annual report must be published by 31st July 2013 and must cover the period from the commencement of these Regulations and ending with 31st March 2013, and in each subsequent year the annual report must be published by 31st July in respect of the 12 month period ending with 31st March of that year.

(5) The first quarterly report must be published by 30th April 2012 and must cover the period from the commencement of these Regulations and ending with 31st March 2012, and each subsequent quarterly report must cover each quarterly period and must be published within one month of the end of the relevant quarterly period.

(6) The Authority must publish the following information on its website—

(a)the quarterly and annual reports provided in accordance with this regulation;

(b)current information in aggregate form as to—

(i)the number of accredited RHI installations,

(ii)their technology and installation capacity,

(iii)the amount of heat they have generated,

(iv)the total amount of periodic support payments made under each tariff; and

(c)current information in aggregate form as to—

(i)the number of participants who are producers of biomethane,

(ii)the volume of biomethane produced for injection by those participants, and

(iii)the total amount of periodic support payments made in respect of that biomethane.

(7) For the purposes of this regulation “quarterly period” means the first, second, third or fourth quarter of any year commencing on 1st January.

(8) For the purposes of this regulation “current information” means information which is no more than five days out of date.

Additional informationE+W+S

54.  On request from the Secretary of State, the Authority must provide to the Secretary of State in such manner and form and by such date as the Secretary of State may request such additional information as the Authority may hold in relation to the performance of its functions under these Regulations.

NoticesE+W+S

55.  A notice under these Regulations—

(a)must be in writing; and

(b)may be transmitted by electronic means.

Gregory Barker

Minister of State

Department of Energy and Climate Change

SCHEDULES

Regulation 5A(3)

[F143SCHEDULE A1E+W+SContent of RHI emission certificates

1.  The name and address of the testing laboratory by which tests have been carried out.E+W+S

2.  The name and signature of the person authorised by the testing laboratory to issue the certificate.E+W+S

3.  The date of issue of the certificate together with a certificate reference number.E+W+S

4.  Where the testing laboratory is accredited to [F144BS EN ISO/IEC 17025:2005]E+W+S

(a)the date of that accreditation; and

(b)the accreditation number.

Textual Amendments

5.  The name, model, manufacturer and installation capacity of the plant tested.E+W+S

6.  The date of the testing.E+W+S

[F1457.  Confirmation that emissions of NOx and PM have been tested on the same occasion in accordance with the requirements specified in paragraph 8 or 9.]E+W+S

[F1458.  The requirements of this paragraph are that testing is carried out in accordance with the provisions relevant to emissions of PM and NOx in either BS EN 303-5:1999 or BS EN 303-5:2012, whichever standard is current at the time of testing.]E+W+S

[F1459.  The requirements of this paragraph are that—E+W+S

(a)testing is carried out in accordance with—

(i)BS EN 14792:2005 in respect of NOx emissions, and

(ii)BS EN 13284-1:2002 or BSISO 9096:2003 in respect of PM emissions;

(b)the emissions of PM represent the average of at least three measurements of emissions of PM, each of at least 30 minutes duration; and

(c)the value for NOx emissions is derived from the average of measurements made throughout the PM emission tests.]

10.  Confirmation that the test was carried out at no less than 85% of the installation capacity of the plant.E+W+S

11.  Confirmation that when tested as specified in paragraphs 7 to 10—E+W+S

(a)emissions of PM from the plant did not exceed 30 grams of PM per gigajoule net heat input; and

(b)emissions of NOx did not exceed 150 grams of NOx per gigajoule net heat input.

12.  The actual emissions of PM and NOx measured when the plant was tested as specified in paragraphs 7 to 10.E+W+S

13.  A list of—E+W+S

(a)the types of fuel used during the testing; and

(b)the types of fuel which can be used so as to ensure that the emission limits referred to in paragraph 11 are not exceeded.

14.  The moisture content of the fuel used during testing and the maximum moisture content which can be used so as to ensure that the emission limits referred to in paragraph 11 are not exceeded.E+W+S

15.  A statement indicating whether or not the plant tested was a manually stoked natural draught plant.E+W+S

16.  A list of plants, other than the plant tested, in the type-testing range of plants to which the certificate applies, if any.]E+W+S

Regulations 22, 24, 25, 26 and 36

SCHEDULE 1E+W+SInformation required for accreditation and registration

1.—(1) This Schedule specifies the information that may be required of a prospective participant in the scheme.E+W+S

(2) The information is, as applicable to the prospective participant—

(a)name, home address, e-mail address and telephone number;

(b)any company registration number and registered office;

(c)any trading or other name by which the prospective participant is commonly known;

(d)details of a bank account in the prospective participant's name which accepts pound sterling deposits in the United Kingdom;

(e)information to enable the Authority to satisfy itself as to the identity of the individual completing the application;

(f)where an individual is making an application on behalf of a company, evidence which satisfies the Authority, that the individual has authority from the company to make the application on its behalf;

(g)details of the eligible installation owned by the prospective participant including its cost;

(h)evidence, which satisfies the Authority, as to the ownership of the eligible installation;

(i)evidence that the eligible installation was new at the time of installation;

(j)where an eligible installation has replaced a plant, details of the plant replaced;

(k)evidence which demonstrates to the Authority's satisfaction the installation capacity of the eligible installation;

[F146(ka)in the case of a plant which is a CHP system, evidence which demonstrates to the Authority’s satisfaction any capacity to which paragraphs (2) and (3) of regulation 39C apply;]

(l)details of the fuel which the prospective participant is proposing to use;

(m)in relation to prospective participants generating heat from biomass, notification as to whether the prospective participant is proposing to use solid biomass contained inF147...waste and, if so, whether or not the prospective participant is regulated under the Environmental Permitting (England and Wales) Regulations 2010 M10 or [F148the Pollution Prevention and Control (Scotland) Regulations 2012];

[F149(n)where the plant is a ground source heat pump or air source heat pump, evidence which demonstrates to the Authority’s satisfaction—

(i)that the heat pump meets a coefficient of performance of at least 2.9;

(ii)in relation to an application for accreditation after the third relevant date, evidence that the heat pump has been designed to operate with a minimum seasonal performance factor of at least 2.5;]

[F149(na)in the case of a ground source heat pump in respect of which accreditation is granted on or after the third relevant date a declaration from the installer that the size of the heat pump has been determined appropriately for the planned heat use;]

[F149(nb)in the case of a ground source heat pump in respect of which accreditation is granted on or after the third relevant date and which is capable of heating and cooling, a declaration from the installer—

(i)as to the design heat load;

(ii)that the design heat load has been calculated according to BS EN 12831:2003; and

(iii)as to the outdoor temperatures used in the calculation of the design heat load;]

(o)in respect of a producer of biogas or biomethane, details of the feedstock which the producer is proposing to use;

(p)details of what the heat generated will be used for and an estimate of how much heat will be used[F150, together with an estimate of the number of hours of operation per week in which heat will be generated for an eligible purpose];

(q)details of the building in which the heat will be used;

(r)the industry sector for which the heat will be used;

(s)details of the size and annual turnover of the prospective participant's organisation;

(t)details of other plants generating heat which form part of the same heating system as the eligible installation to which the application relates;

(u)where regulation 13 applies, evidence from the installer that the requirements specified in that regulation are met;

(v)such information as the Authority may specify to enable it to satisfy itself that the requirements of Chapter 3 of Part 2 have been met including—

(i)evidence that a class 2 heat meter, other heat meter or steam measuring equipment has been installed;

(ii)evidence that the class 2 heat meter, other heat meter or steam measuring equipment was calibrated prior to use;

(iii)in relation to all heat meters, details of the meter's manufacturer, model, meter serial number;

(iv)a schematic diagram showing details of the heating system of which the eligible installation forms part, including all plants generating and supplying heat to that heating system, all purposes for which heat supplied by that heating system is used, the location of meters and associated components and such other details as may be specified by the Authority;

(v)where—

(aa)an eligible installation has an installation capacity of 1MWth or above, or

(bb)regulation 17 [F151or 17A] applies,

if so requested by the Authority, an independent report by a competent person verifying that such of those requirements as the Authority may specify have been met;

(w)such other information as the Authority may require to enable it to consider the prospective participant's application for accreditation or registration.

[F152(x)in relation to plant generating heat from solid biomass, either—

(i)evidence which demonstrates to the satisfaction of the Authority that an RHI emission certificate has been issued in relation to that plant; or

(ii)evidence which demonstrates to the satisfaction of the Authority that an environmental permit subsists in relation to that plant.]

(3) Information specified in this Schedule must be provided in such manner and form as the Authority may reasonably request.

(4) The costs of providing the information specified in this Schedule are to be borne by the applicant.

[F153(5) For the purposes of sub-paragraph (n)(ii)—

(a)where the heat pump has an installation capacity of 45kWth or below, a declaration from the installer that the seasonal performance factor was calculated in line with the methodology used in version 1.0 of the MCS 021 heat emitter guide for domestic heat pumps published by the Microgeneration Certification Scheme on 16th December 2013 may be accepted as evidence that the heat pump was designed to operate with a minimum seasonal performance factor of 2.5;

(b)where the heat pump has an installation capacity of more than 45kWth, a declaration by the installer that the heat pump has been designed to operate with a seasonal performance factor of at least 2.5 may be accepted as evidence of that fact, provided that the installation design and supporting calculations are retained by the participant and can be provided the Authority on request;]

Regulations 29 and 33

SCHEDULE 2E+W+SProvision of information in relation to the use of biomass in certain circumstances

Information to be provided to the Authority where biomass is used for combustion or production of biomethaneE+W+S

1.  This Schedule specifies the information that a participant is required to provide under regulation 29(9) and 33(9).

2.  The information is information identifying to the best of the participant's knowledge and belief, in such manner and form as the Authority may require—E+W+S

(a)the material from which the solid biomass was composed;

(b)the form of the solid biomass;

(c)its mass;

(d)whether the solid biomass was a by-product of a process;

(e)whether the solid biomass was derived from waste;

(f)where the solid biomass was plant matter or derived from plant matter, the country where the plant matter was grown;

(g)where the information specified in paragraph (vi) is not known or the solid biomass was not plant matter or derived from plant matter, the country from which the operator obtained the solid biomass;

(h)whether any of the solid biomass used was an energy crop or derived from an energy crop and if so—

(i)the proportion of the consignment which was or was derived from the energy crop, and

(ii)the type of energy crop in question;

(i)whether the solid biomass or any matter from which it was derived was certified under an environmental quality assurance scheme and, if so, the name of the scheme;

(j)where the solid biomass was plant matter or derived from plant matter, the use to which the land on which the plant matter was grown has been put since 30th November 2005.

3.  The information specified in paragraph 2 must be collated by reference to the following places of origin—E+W+S

(a)United States of America or Canada;

(b)the European Union;

(c)other.

4.  The information specified in paragraph 2 must be provided for every quarterly period.E+W+S

5.  For the purpose of this Schedule—E+W+S

energy crop” means a plant crop planted after 31st December 1989 which is grown primarily for the purpose of being used as fuel or which is one of the following—

(a)

miscanthus giganteus (a perennial grass),

(b)

salix (also known as short rotation coppice willow),

(c)

populus (also known as short rotation coppice poplar);

and

environmental quality assurance scheme” means a voluntary scheme which establishes environmental or social standards in relation to the production of biomass or matter from which a biomass is derived.

Regulation 37

SCHEDULE 3E+W+STariffs

Table 1

Tariff nameSources of energy or technologyInstallation capacityTariff(pence/kWh)
Small commercial biomassSolid biomass including solid biomass contained in F154...waste and [F155CHP systems generating heat and power from solid biomass including solid biomass contained in waste]Less than 200kWth

Tier 1: 7.9

Tier 2: 2.0

Medium commercial BiomassAs above200kWth and above up to but not including 1MWth

Tier 1: 4.9

Tier 2: 2.0

Large commercial biomassAs above1MWth and above1.0

Small commercial

heat pumps

Ground source heat pump,F156... deep geothermalLess than 100kWth4.5
Large commercial heat pumpsAs above100kWth and above3.2
All Solar collectorsSolar collectorsBelow 200kWth8.5
Biomethane and [F157small biogas combustion]Biomethane injection and biogas combustion [F158including CHP systems generating heat and power from biogas] [F159biogas combustion below 200kWth and all biomethane injection]6.8

Regulation 37(9)

[F160SCHEDULE 3AE+W+SNew tariffs for plants generating heat from solid biomass with a capacity of 1 MWth or above, ground source heat pumps and solar collectors

Tariff nameSource of energy or technologyInstallation capacityTariff (pence/kWh)
New large biomassSolid biomass including solid biomass contained in waste, including CHP systems generating heat and power from solid biomass1MWth and above2.0
New ground source heat pumpsGround source heat pumpsAll capacities

Tier 1: 8.7

Tier 2: 2.6

New solar collectorsSolar collectorsLess than 200kWth10.0]

Regulation 37(10)

[F160SCHEDULE 3BE+W+SNew tariffs for new solid biomass CHP systems, deep geothermal energy, biogas combustion with a capacity of 200kWth and above and air source heat pumps

Tariff nameSource of energy or technologyInstallation capacityTariff (pence/kWh)
New solid biomass CHP systemsSolid biomass (excluding solid biomass contained in waste) used in CHP systems which comply with the requirements in regulation 9AAll capacities4.1
New deep geothermalDeep geothermal energy, including CHP systems generating heat and power from such energyAll capacities5
Medium biogasBiogas combustion200kWth and above up to but not including 600kWth5.9
Large biogasBiogas combustion600kWth and above2.2
Air source heat pumpsAir source heat pumpsAll capacities2.5]

Regulations 37C and 37D

[F161SCHEDULE 4E+W+STotal expenditure

Assessment dateTotal expenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37A
30th April 2013£ 97.2 million£ 48.6 million
31st July 2013£ 120.2 million£ 60.1 million
31st October 2013£ 143.3 million£ 71.6 million
31st January 2014£ 166.3 million£ 83.2 million
30th April 2014£ 192.8 million£ 96.4 million
31st July 2014£ 184.1 million£ 92.1 million
31st October 2014£ 207.2 million£ 103.6 million
31st January 2015£ 230.3 million£ 115.1 million
30th April 2015£ 260.9 million£ 130.4 million
31st July 2015£ 306.2 million£ 153.1 million
31st October 2015£ 351.5 million£ 175.7 million
Any date after 30th January 2016£ 396.8 million]

Regulations 37C and 37D

[F162SCHEDULE 5E+W+SExpenditure in relation to individual technologies

PART 1E+W+SSmall biomass plants

Table 1

Small biomass plants

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 14.8 million£ 22.2 million-
31st July 2013£ 16.7 million£ 25.1 million£ 2.9 million
31st October 2013£ 18.7 million£ 28.0 million£ 2.9 million
31st January 2014£ 20.6 million£ 30.9 million£ 2.9 million
30th April 2014£ 22.6 million£ 34.0 million£ 3.1 million
31st July 2014£ 48.8 million£ 58.6 million£ 8.7 million
31st October 2014£ 56.0 million£ 67.2 million£ 8.7 million
31st January 2015£ 63.2 million£ 75.9 million£ 8.7 million
30th April 2015£ 71.1 million£ 85.3 million£ 9.5 million
31st July 2015£ 80.3 million£ 96.4 million£ 11.0 million
31st October 2015£ 89.5 million£ 107.4 million£ 11.0 million
Any date after 30th January 2016£ 98.7 million£ 118.5 million£ 11.0 million

PART 2E+W+SMedium biomass plants

Table 2

Medium biomass plants

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 13.4 million£ 20.1 million-
31st July 2013£ 15.5 million£ 23.2 million£ 3.1 million
31st October 2013£ 17.6 million£ 26.3 million£ 3.1 million
31st January 2014£ 19.6 million£ 29.4 million£ 3.1 million
30th April 2014£ 21.8 million£ 32.7 million£ 3.3 million
31st July 2014£ 43.7 million£ 52.5 million£ 6.3 million
31st October 2014£ 49.0 million£ 58.8 million£ 6.3 million
31st January 2015£ 54.2 million£ 65.1 million£ 6.3 million
30th April 2015£ 59.9 million£ 71.8 million£ 6.7 million
31st July 2015£ 66.2 million£ 79.4 million£ 7.6 million
31st October 2015£ 72.5 million£ 87.0 million£ 7.6 million
Any date after 30th January 2016£ 78.8 million£ 94.5 million£ 7.6 million

PART 3E+W+SLarge biomass plants

Table 3

Large biomass plants

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 23.1 million£ 34.7 million-
31st July 2013£ 27.6 million£ 41.3 million£ 6.6 million
31st October 2013£ 32 million£ 48 million£ 6.7 million
31st January 2014£ 36.4 million£ 54.6 million£ 6.6 million
30th April 2014£ 41.2 million£ 61.8 million£ 7.2 million
31st July 2014£ 10.9 million£ 16.3 million£ 2.2 million
31st October 2014£ 12.4 million£ 18.5 million£ 2.2 million
31st January 2015£ 13.9 million£ 20.8 million£ 2.2 million
30th April 2015£ 15.8 million£ 23.8 million£ 3.0 million
31st July 2015£ 18.8 million£ 28.2 million£ 4.5 million
31st October 2015£ 21.8 million£ 32.7 million£ 4.5 million
Any date after 30th January 2016£ 24.8 million£ 37.2 million£ 4.5 million

PART 4E+W+SHeat pumps (except air source heat pumps)

Table 4

Heat pumps (except air source heat pumps) with an installation capacity of less than 100 kWth

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 28.9 million£ 43.4 million-
31st July 2013£ 36.3 million£ 54.4 million£ 11 million
31st October 2013£ 43.6 million£ 65.5 million£ 11.1 million
31st January 2014£ 51 million£ 76.5 million£ 11 million
30th April 2014£ 59.7 million£ 89.5 million£ 13 million

Table 5

Heat pumps (except air source heat pumps) with an installation capacity of 100 kWth and above

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 4.9 million£ 4.9 million-
31st July 2013£ 6 million£ 6 million£ 1.1 million
31st October 2013£ 7.2 million£ 7.2 million£ 1.2 million
31st January 2014£ 8.3 million£ 8.3 million£ 1.1 million
30th April 2014£ 9.6 million£ 9.6 million£ 1.3 million

Table 6

Ground source heat pumps

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
31st July 2014£ 7.4 million£ 11.1 million£ 2.3 million
31st October 2014£ 8.9 million£ 13.3 million£ 2.3 million
31st January 2015£ 10.4 million£ 15.6 million£ 2.3 million
30th April 2015£ 12.6 million£ 18.9 million£ 3.3 million
31st July 2015£ 16.2 million£ 24.2 million£ 5.4 million
31st October 2015£ 19.7 million£ 29.6 million£ 5.4 million
Any date after 30th January 2016£ 23.3 million£ 35.0 million£ 5.4 million

PART 5E+W+SPlants using solar collectors

Table 7

Plants using solar collectors

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 4.9 million£ 4.9 million-
31st July 2013£ 6 million£ 6 million£ 1.1 million
31st October 2013£ 7.2 million£ 7.2 million£ 1.2 million
31st January 2014£ 8.3 million£ 8.3 million£ 1.1 million
30th April 2014£ 9.6 million£ 9.6 million£ 1.3 million
31st July 2014£ 3.9 million£ 3.9 million£ 0.8 million
31st October 2014£ 4.7 million£ 4.7 million£ 0.8 million
31st January 2015£ 5.5 million£ 5.5 million£ 0.8 million
30th April 2015£ 6.5 million£ 6.5 million£ 0.9 million
31st July 2015£ 7.5 million£ 7.5 million£ 1.1 million
31st October 2015£ 8.6 million£ 8.6 million£ 1.1 million
Any date after 30th January 2016£ 9.8 million£ 9.8 million£ 1.1 million

PART 6E+W+SProducers of biomethane for injection and plants which generate heat from biogas

Table 8

Producers of biomethane for injection and plants which generate heat from biogas

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
30th April 2013£ 12 million£ 18 million-
31st July 2013£ 18.1 million£ 27.2 million£ 9.2 million
31st October 2013£ 24.2 million£ 36.3 million£ 9.1 million
31st January 2014£ 30.3 million£ 45.5 million£ 9.2 million
30th April 2014£ 37 million£ 55.5 million£ 10 million

Table 9

Plants which generate heat from biogas

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
31st July 2014£ 3.9 million£ 3.9 million£ 0.8 million
31st October 2014£ 4.7 million£ 4.7 million£ 0.8 million
31st January 2015£ 5.5 million£ 5.5 million£ 0.8 million
30th April 2015£ 6.5 million£ 6.5 million£ 0.9 million
31st July 2015£ 7.5 million£ 7.5 million£ 1.1 million
31st October 2015£ 8.6 million£ 8.6 million£ 1.1 million
Any date after 30th January 2016£ 9.8 million£ 9.8 million£ 1.1 million

Table 10

Producers of biomethane for injection

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
31st July 2014£ 41.5 million£ 49.8 million£ 5.1 million
31st October 2014£ 45.9 million£ 55.1 million£ 5.3 million
31st January 2015£ 50.3 million£ 60.4 million£ 5.3 million
30th April 2015£ 57.5 million£ 69.0 million£ 8.6 million
31st July 2015£ 70.2 million£ 84.2 million£ 15.2 million
31st October 2015£ 82.8 million£ 99.4 million£ 15.2 million
Any date after 30th January 2016£ 95.5 million£ 114.6 million£ 15.2 million

PART 7E+W+SNew biomass CHP systems

Table 11

New solid biomass CHP systems

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
31st July 2014£ 17.9 million£ 26.9 million-
31st October 2014£ 18.8 million£ 28.2 million£ 1.4 million
31st January 2015£ 19.7 million£ 29.6 million£ 1.4 million
30th April 2015£ 22.8 million£ 34.2 million£ 4.7 million
31st July 2015£ 30.3 million£ 45.5 million£ 11.2 million
31st October 2015£ 37.8 million£ 56.7 million£ 11.2 million
Any date after 30th January 2016£ 45.3 million£ 68.0 million£ 11.2 million

PART 8E+W+SDeep geothermal plants

Table 12

Deep geothermal plants

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
31st July 2014£ 3.9 million£ 3.9 million-
31st October 2014£ 4.7 million£ 4.7 million£ 0.8 million
31st January 2015£ 5.5 million£ 5.5 million£ 0.8 million
30th April 2015£ 6.5 million£ 6.5 million£ 0.9 million
31st July 2015£ 7.5 million£ 7.5 million£ 1.1 million
31st October 2015£ 8.6 million£ 8.6 million£ 1.1 million
Any date after 30th January 2016£ 9.8 million£ 9.8 million£ 1.1 million

PART 9E+W+SAir source heat pumps

Table 13

Air source heat pumps

Assessment dateExpenditure anticipated for subsequent yearExpenditure threshold when calculating C for the purposes of regulation 37AAnticipated increase in expenditure since previous assessment date
31st July 2014£ 12.2 million£ 18.3 million-
31st October 2014£ 14.0 million£ 21.0 million£ 2.7 million
31st January 2015£ 15.8 million£ 23.7 million£ 2.7 million
30th April 2015£ 17.9 million£ 26.8 million£ 3.2 million
31st July 2015£ 20.7 million£ 31.0 million£ 4.2 million
31st October 2015£ 23.4 million£ 35.1 million£ 4.2 million
Any date after 30th January 2016£ 26.2 million£ 39.3 million£ 4.2 million]

Explanatory Note

(This note is not part of the Regulations)

These Regulations, which apply to Great Britain, establish a renewable heat incentive scheme (“the scheme”) under which owners of plants which generate heat from specified renewable sources and meet specified criteria may receive payments at prescribed tariffs for the heat used for eligible purposes. Payments may also be made to biomethane producers who produce biomethane for injection. The Regulations confer functions on the Gas and Electricity Markets Authority (“the Authority”) in connection with the administration of the scheme.

Regulation 3 confers on the Authority the function of making payments to participants in the scheme and specifies the eligible purposes for which heat will receive payment.

Chapter 1 of Part 2 (regulation 4) defines criteria (“eligibility criteria”) that must be satisfied for a plant to be eligible to participate in the scheme.

Chapter 2 of Part 2 (regulations 5 to 15) specifies the eligibility criteria other than those in relation to metering.

Chapter 3 of Part 2 (regulations 16 to 21) specifies the eligibility criteria in relation to metering, setting out the types of meters which may be used, the requirements with which they must comply and what must be measured.

Part 3 (regulations 22 to 26) sets out the procedures for accreditation, registration, change of ownership and preliminary accreditation. Regulation 22 confers on the Authority the function of accrediting eligible installations (which upon accreditation are known as accredited RHI installations) and specifies the process by which applicants apply to the Authority for accreditation.

Regulation 23 specifies the circumstances in which the Authority may not accredit a plant. These include matters relating to the receipt of grants from public funds; where a plant has not been commissioned; where an applicant has indicated that applicable ongoing obligations will not be complied with and where the plant is one of a number of plants which would together form one eligible installation in accordance with Part 2.

Regulation 24 specifies the procedure for notifying the Authority where there has been a transfer in ownership of all or part of an accredited RHI installation and sets out the process by which the new owner may receive payments under the scheme.

Regulation 25 confers on the Authority the function of registering producers of biomethane who are producing biomethane for injection. It specifies the process by which applicants apply to the Authority for registration and specifies the circumstances in which an application for registration can be refused.

Regulation 26 sets out the process by which a person may apply for and the Authority may grant preliminary accreditation in respect of a plant.

Chapter 1 of Part 4 (regulations 27 to 30) sets out ongoing obligations with which participants generating heat from biomass must comply.

Regulation 28 applies to participants generating heat from solid biomass contained in municipal waste. It specifies the minimum proportion of solid biomass which must be contained in the municipal waste used, sets out how the proportion of solid biomass is determined and specifies the permitted uses of fossil fuel in accredited RHI installations.

Regulations 29 and 30 apply to participants generating heat from solid biomass, not being solid biomass contained in municipal waste. They specify the permitted levels of and reasons for fossil fuel contamination, set out how the proportion of fossil fuel contamination is determined and specify the permitted uses of fossil fuel in accredited RHI installations. Regulation 29 also imposes a sustainability reporting requirements for participants generating heat using accredited RHI installations with an installation capacity of 1MWth or above.

Chapter 2 of Part 4 (regulations 31 to 33) sets out ongoing obligations for participants who are generating heat from biogas and producing biomethane for injection.

Regulation 31 applies to participants producing biogas using gasification and pyrolysis and generating heat from that biogas. It stipulates composition requirements for the feedstock used by participants and specifies the permitted uses of fossil fuel in accredited RHI installations.

Regulation 32 applies to participants generating heat from biogas to whom regulation 31 does not apply. It stipulates feedstock requirements for participants using biogas produced from anaerobic digestion and specifies permitted uses of fossil fuel in accredited RHI installations.

Regulation 33 applies to biomethane producers who produce biomethane for injection. It specifies composition requirements for feedstocks used to produce the biogas from which the biomethane is made and sets out the ongoing obligations relating to administration with which participants must comply. It also imposes a sustainability reporting requirement.

Chapter 3 of Part 4 (regulations 34 to 36) sets out the ongoing obligations for participants which are not specific to those participants generating heat from biomass or biogas or producing biomethane for injection.

Regulation 34 specifies general ongoing obligations relating to administrative and other matters with which participants must comply.

Regulation 35 specifies the ongoing obligations in relation to metering. It imposes requirements on participants in relation to their heat meters and steam measuring equipment; requires participants to provide data when requested by the Authority; and specifies the metering arrangements for participants using heat pumps for both heating and cooling. This regulation also permits the data to be estimated in exceptional circumstances.

Regulation 36 specifies ongoing obligations in relation to the provision of information and gives effect to Schedule 1.

Part 5 (regulations 37 to 42) confers on the Authority the function of calculating and paying periodic support payments to participants. These regulations specify the method by which tariffs are assigned; confer a function on the Authority to calculate and publish a table of tariffs each year based on the tariffs set out in Schedule 3 adjusted in line with the retail price index and specifies the method by which periodic support payments are calculated.

Part 6 (regulation 43) specifies how a plant using the same source of energy and technology as an accredited RHI installations and supplying heat to the same heating system (known as additional RHI capacity) is to be treated under the scheme.

Part 7 (regulations 44 to 48) sets out the provisions in relation to enforcement. Regulations 44 to 47 confer on the Authority a wide range of powers to temporarily or permanently withhold a participant's periodic support payments or reduce a periodic support payment.

Regulation 47 confers a power on the Authority to revoke accreditation or registration in certain circumstances.

Regulation 48 confers a power on the Authority to recover overpayments.

Part 8 (regulation 49) confers on the Authority a power to revoke any sanction imposed under Part 7 and specifies the circumstances and manner in which the Authority may exercise this power.

Part 9 (regulation 50) confers on the Authority or its authorised agent the power to inspect an accredited RHI installation and its associated infrastructure and specifies the manner and circumstances in which this power may be exercised and the consequences of refusal.

Part 10 (regulation 51) confers a right of review on any prospective, current or former participant affected by a decision made by the Authority under these Regulations, sets out the process by which a person may request a review of such decisions and specifies the Authority's powers on review.

Part 11 (regulations 52 to 55) confers additional administrative functions on the Authority. Under regulation 52 the Authority must publish procedural guidance in connection with the administration of the scheme.

Regulation 53 requires the Authority to provide information to the Secretary of State including annual, quarterly and monthly reports and to publish certain information on its website.

Regulation 54 requires the Authority to provide certain additional information as the Secretary of State may request.

Regulation 55 describes the form of notices under these Regulations.

A draft of these Regulations was notified to the European Commission in accordance with Directive 98/34/EC of the European Parliament and of the Council laying down a procedure for the provision of information in the field of technical standards and regulations (OJ L 204, 21.7.1998, p. 37) as amended by Directive 98/48/EC (OJ L 217, 5.8.1998, p. 18).

A full impact assessment of the effect that this instrument will have on the costs of business and the voluntary sector is available from the Department of Energy and Climate Change at 3 Whitehall Place, London, SW1A 2AW and is published with the Explanatory Memorandum alongside the instrument on www.legislation.gov.uk.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources