Articles 2 and 5

SCHEDULE 1SCHEDULED WORKS

In the County of Oxfordshire, District of Cherwell—

  • Work No. 1– A double track railway (1,197 metres in length) commencing by a junction with the course of the railway from London Marylebone to Birmingham Moor Street at a point 40 metres west of the northern face of Charbridge Lane overbridge and terminating by a junction with the commencement of Work No.2 on the course of the Bletchley to Oxford Railway at a point 70 metres south-west of Tubbs Lane crossing. Work No.1 includes a culvert extension and the construction of an embankment.

In the County of Oxfordshire, District of Cherwell and the City of Oxford—

  • Work No. 2– A double track railway (17,600 metres in length) commencing in the county of Oxfordshire, district of Cherwell by a junction with the termination of Work No.1 and terminating in the city of Oxford by a junction with the commencement of Work No.3 at a point 370 metres north of Aristotle Lane Crossing. Work No.2 includes the reconstruction of Bicester Town and Islip Stations; construction of a station at Water Eaton; extensions to bridges OXD37, OXD38, OXD39 and OXD40; remedial works to bridges OXD42, OXD44, OXD46 and OXD49; demolition of bridge OXD47; lowering of track through Wolvercot Tunnel and the provision of a signalling power supply point at the proposed Elm Tree Farm Langford Lane overbridge (Work No.11).

In the City of Oxford—

  • Work No. 3– A railway (1,939 metres in length) commencing by a junction with the termination of Work No.2 and terminating in Oxford Station at a point 190 metres south of Bridge DCL26. Work No.3 includes the extension of the Aristotle Lane accommodation crossing, remedial works to Bridge OXD53, the extension of DCL26 and the demolition of the parcel bay platforms and construction of platforms and other facilities at Oxford Station.

  • Work No. 3A– A railway (234 metres in length) forming a spur off Work No.3 commencing by a junction with that work at a point 35 metres north of Bridge DCL26 and terminating in Oxford Station at a point 190 metres south of that bridge.

In the County of Oxfordshire, District of Cherwell—

  • Work No. 4– A railway (704 metres in length) forming a spur off Work No.2 commencing at a point 276 metres north-east of Bridge OXD38A carrying the A41 road over the railway, and terminating by a junction with Work No.2 at a point 120 metres south-west of Bridge OXD39.

  • Work No. 4A– A railway (91 metres in length) forming a spur off Work No.4 commencing by a junction with Work No.4 at a point 25 metres south-west of Bridge OXD39 and terminating by a junction with Exchange Sidings at a point 110 metres south-east of that bridge.

  • Work No. 5– A railway (245 metres in length) forming a spur off Work No.2 commencing by a junction with Exchange Sidings at a point 350 metres north-east of Bridge OXD40 and terminating by a junction with Work No.2 at a point 120 metres north-east of that bridge.

  • Work No. 6– A railway (527 metres in length) forming a siding commencing at a point 275 metres north-east of Gosford and Water Eaton Number 4 Crossing and terminating by a junction with Work No. 2 at a point 230 metres south-west of that crossing.

  • Work No. 7– A railway (200 metres in length) forming a connection between the Bletchley to Oxford Railway and the Oxford to Birmingham Railway commencing by a junction with the termination of Work No.2 at a point on the Bletchley to Oxford Railway 370 metres north of Aristotle Lane Crossing and terminating on the Oxford to Birmingham Railway at a point 185 metres north of that crossing.

  • Work No. 8– A footbridge (80 metres in length) over Work No.1 commencing on footpath FP129/3 at a point 45 metres south of Bridge NAJ3/27 and terminating on that footpath at a point 82 metres south of that bridge.

  • Work No. 9– A footbridge (96 metres in length) with stairs and ramps over Work No.1 commencing on footpath FP129/3 at a point 45 metres north-west of Tubbs Lane crossing and terminating on the Path at a point 20 metres south of that crossing.

  • Work No. 10– A reconstruction of Bridge OXD38A carrying the A41 road over the Bletchley to Oxford Railway commencing at a point 28 metres south-east of that bridge and terminating at a point 20 metres north-west of that bridge. Work No.10 includes the construction of two temporary bridges.

  • Work No.11– A road (2060 metres in length) including an overbridge over Work No.2 commencing in Langford Lane at a point 115 metres south-west of Akeman Street level crossing and terminating in Wendlebury Road at a point 200 metres north-east of North End, Wendlebury.

  • Work No. 12– A footbridge (81 metres in length) over Work No.2 commencing on footpath FP398/3 at a point 240 metres north-east of Bridge OXD40C carrying the M40 motorway over Work No.2 and terminating on that footpath at a point 244 metres north-east of that bridge.

  • Work No.13– An accommodation road and bridleway (735 metres in length) including an overbridge over Work No.2 commencing at Mansmoor Road at a point 340 metres south-east of Holts Farm Crossing and terminating at a point 450 metres south-west of that crossing.

  • Work No. 14– A road (553 metres in length) including an overbridge over Work No.2 commencing in Oddington Road at a point 330 metres south-east of Oddington Crossing and terminating on that road at a point 210 metres north of that crossing.

  • Work No. 15– A footbridge (76 metres in length) over Work No.2 commencing on footpath at FP318/5 at a point 23 metres north of Oddington Number 5 Crossing and terminating at a point 25 metres south of that crossing.

  • Work No. 16– A bridleway (360 metres in length) including an overbridge over Work No.2 commencing at a point 36 metres south-east of Mill Lane crossing on Mill Lane and terminating at a point 315 metres north-west of Mill Lane crossing on Mill Lane.

  • Work No. 17– A road (610 metres in length) including an overbridge over Work No.2 commencing on bridleway BW229/5 at a point 290 metres north of Water Eaton Number 5 Crossing and terminating on that bridleway at a point 340 metres south-east of that crossing.

  • Work No. 18– A footbridge (82 metres in length) over Work No.2 commencing on footpath FP229/10 at a point 10 metres east of Gosford and Water Eaton Number 10 Crossing and terminating on that footpath at a point 15 metres west of that crossing.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources