The Chiltern Railways (Bicester to Oxford Improvements) Order 2012

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

SCHEDULES

Articles 2 and 5

SCHEDULE 1SCHEDULED WORKS

In the County of Oxfordshire, District of Cherwell—

  • Work No. 1– A double track railway (1,197 metres in length) commencing by a junction with the course of the railway from London Marylebone to Birmingham Moor Street at a point 40 metres west of the northern face of Charbridge Lane overbridge and terminating by a junction with the commencement of Work No.2 on the course of the Bletchley to Oxford Railway at a point 70 metres south-west of Tubbs Lane crossing. Work No.1 includes a culvert extension and the construction of an embankment.

In the County of Oxfordshire, District of Cherwell and the City of Oxford—

  • Work No. 2– A double track railway (17,600 metres in length) commencing in the county of Oxfordshire, district of Cherwell by a junction with the termination of Work No.1 and terminating in the city of Oxford by a junction with the commencement of Work No.3 at a point 370 metres north of Aristotle Lane Crossing. Work No.2 includes the reconstruction of Bicester Town and Islip Stations; construction of a station at Water Eaton; extensions to bridges OXD37, OXD38, OXD39 and OXD40; remedial works to bridges OXD42, OXD44, OXD46 and OXD49; demolition of bridge OXD47; lowering of track through Wolvercot Tunnel and the provision of a signalling power supply point at the proposed Elm Tree Farm Langford Lane overbridge (Work No.11).

In the City of Oxford—

  • Work No. 3– A railway (1,939 metres in length) commencing by a junction with the termination of Work No.2 and terminating in Oxford Station at a point 190 metres south of Bridge DCL26. Work No.3 includes the extension of the Aristotle Lane accommodation crossing, remedial works to Bridge OXD53, the extension of DCL26 and the demolition of the parcel bay platforms and construction of platforms and other facilities at Oxford Station.

  • Work No. 3A– A railway (234 metres in length) forming a spur off Work No.3 commencing by a junction with that work at a point 35 metres north of Bridge DCL26 and terminating in Oxford Station at a point 190 metres south of that bridge.

In the County of Oxfordshire, District of Cherwell—

  • Work No. 4– A railway (704 metres in length) forming a spur off Work No.2 commencing at a point 276 metres north-east of Bridge OXD38A carrying the A41 road over the railway, and terminating by a junction with Work No.2 at a point 120 metres south-west of Bridge OXD39.

  • Work No. 4A– A railway (91 metres in length) forming a spur off Work No.4 commencing by a junction with Work No.4 at a point 25 metres south-west of Bridge OXD39 and terminating by a junction with Exchange Sidings at a point 110 metres south-east of that bridge.

  • Work No. 5– A railway (245 metres in length) forming a spur off Work No.2 commencing by a junction with Exchange Sidings at a point 350 metres north-east of Bridge OXD40 and terminating by a junction with Work No.2 at a point 120 metres north-east of that bridge.

  • Work No. 6– A railway (527 metres in length) forming a siding commencing at a point 275 metres north-east of Gosford and Water Eaton Number 4 Crossing and terminating by a junction with Work No. 2 at a point 230 metres south-west of that crossing.

  • Work No. 7– A railway (200 metres in length) forming a connection between the Bletchley to Oxford Railway and the Oxford to Birmingham Railway commencing by a junction with the termination of Work No.2 at a point on the Bletchley to Oxford Railway 370 metres north of Aristotle Lane Crossing and terminating on the Oxford to Birmingham Railway at a point 185 metres north of that crossing.

  • Work No. 8– A footbridge (80 metres in length) over Work No.1 commencing on footpath FP129/3 at a point 45 metres south of Bridge NAJ3/27 and terminating on that footpath at a point 82 metres south of that bridge.

  • Work No. 9– A footbridge (96 metres in length) with stairs and ramps over Work No.1 commencing on footpath FP129/3 at a point 45 metres north-west of Tubbs Lane crossing and terminating on the Path at a point 20 metres south of that crossing.

  • Work No. 10– A reconstruction of Bridge OXD38A carrying the A41 road over the Bletchley to Oxford Railway commencing at a point 28 metres south-east of that bridge and terminating at a point 20 metres north-west of that bridge. Work No.10 includes the construction of two temporary bridges.

  • Work No.11– A road (2060 metres in length) including an overbridge over Work No.2 commencing in Langford Lane at a point 115 metres south-west of Akeman Street level crossing and terminating in Wendlebury Road at a point 200 metres north-east of North End, Wendlebury.

  • Work No. 12– A footbridge (81 metres in length) over Work No.2 commencing on footpath FP398/3 at a point 240 metres north-east of Bridge OXD40C carrying the M40 motorway over Work No.2 and terminating on that footpath at a point 244 metres north-east of that bridge.

  • Work No.13– An accommodation road and bridleway (735 metres in length) including an overbridge over Work No.2 commencing at Mansmoor Road at a point 340 metres south-east of Holts Farm Crossing and terminating at a point 450 metres south-west of that crossing.

  • Work No. 14– A road (553 metres in length) including an overbridge over Work No.2 commencing in Oddington Road at a point 330 metres south-east of Oddington Crossing and terminating on that road at a point 210 metres north of that crossing.

  • Work No. 15– A footbridge (76 metres in length) over Work No.2 commencing on footpath at FP318/5 at a point 23 metres north of Oddington Number 5 Crossing and terminating at a point 25 metres south of that crossing.

  • Work No. 16– A bridleway (360 metres in length) including an overbridge over Work No.2 commencing at a point 36 metres south-east of Mill Lane crossing on Mill Lane and terminating at a point 315 metres north-west of Mill Lane crossing on Mill Lane.

  • Work No. 17– A road (610 metres in length) including an overbridge over Work No.2 commencing on bridleway BW229/5 at a point 290 metres north of Water Eaton Number 5 Crossing and terminating on that bridleway at a point 340 metres south-east of that crossing.

  • Work No. 18– A footbridge (82 metres in length) over Work No.2 commencing on footpath FP229/10 at a point 10 metres east of Gosford and Water Eaton Number 10 Crossing and terminating on that footpath at a point 15 metres west of that crossing.

Articles 5 and 22

SCHEDULE 2ACQUISITION OF CERTAIN LANDS FOR ANCILLARY WORKS

(1)

Area

(2)

Number of land shown on deposited plan

(3)

Purpose for which land may be acquired

County of Oxfordshire, District of Cherwell01003, 01004, 01005, 01008, 01009, 03004, 03006, 04032, 04a003, 04a004Provision of maintenance access
02001, 02a001, 02a002, 02a003, 02a004, 02a005Provision of signalling works
04004, 04006, 04007, 04008, 04009, 04010, 04011, 04012, 04013, 04014, 04015, 04016, 04017, 04018, 04019, 04020, 04021, 04022, 04023, 04024, 04026, 04027, 04028, 04029, 04061Reconstruction of Bicester Town Station, provision of footbridge and car parking and alterations to road and pedestrian access
05009, 05010Environmental mitigation including permanent earth works
05017, 05018Embankment strengthening and provision of maintenance access
07002, 07003, 07004, 07006, 07007, 07008Provision of vehicular turning areas
08003Diversion of overhead electric cables and temporary working site
08a004, 13012, 13013, 14005, 15034, 16029, 16b001, 22013, 22014Provision of footpath
09024, 09025, 15023, 17012, 19005Environmental mitigation including permanent earth works
10036, 10a001, 10a002, 10a003, 10a004, 10a009, 10b001, 10b002Provision of maintenance and accommodation access, and temporary access
15011, 15012Provision of accommodation access and working site
11005, 16a001, 16a002, 16a003, 16a008, 16a009, 17a001Provision of accommodation access
12004, 12a003, 12b001, 21b004, 21b005, 21b006, 21b007Provision of accommodation access and temporary access
14007, 14009Provision of footpath and accommodation access
11008, 11009, 12002, 12003Provision of accommodation works, access and temporary access
12c002, 12c003, 12c004, 12c005Provision of bridleway and accommodation access
14016Provision of footpath and accommodation access and temporary working site
15021, 15024, 15032, 16005Provision of maintenance access and temporary access
18009Provision of disabled parking
19004Provision of vehicular turning area and temporary access
20023, 20024, 21003, 21a001Provision of accommodation access and temporary access and working site
23005, 23006, 23007, 23008, 23009, 23010, 23011, 23012, 23013, 23014, 23015, 23a001, 23a002, 23a003, 23a004, 23a005, 23a006, 23a007, 23a008Construction of a station at Water Eaton, provision of footbridge and car park, road and pedestrian access and access road to rail aggregates terminal
23016, 23017, 23a009, 23a010Provision of bus stop and road junction improvements
23023Provision of footpath and road improvements
23024Provision of footpath and temporary working site
City of Oxford24002, 24004, 24015, 24017, 24018, 25002Provision of maintenance access
29003, 29004Provision of accommodation access and temporary access and working site

Article 8

SCHEDULE 3STREETS SUBJECT TO STREET WORKS

(1)

Area

(2)

Street subject to street works

County of Oxfordshire

District of Cherwell

Charbridge Lane

London Road
Gavray Drive
Launton Road
A41
Langford Lane
Road to Langford Lane
Wendlebury Road
Oddington Road
Bletchingdon Road
Mill Lane
Unclassified Road at Water Eaton
Oxford Road (A4165)
City of OxfordFirst Turn

Article 9

SCHEDULE 4STREETS TO BE STOPPED UP

PART 1STREET FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Street to be stopped up

(3)

Extent of stopping up

(4)

New street to be substituted

County of Oxfordshire District of CherwellFootpath FP 129/3Between points F1 and F2Footpath between point F1, Work No. 8 and point F2

PART 2STREETS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Street to be stopped up

(3)

Extent of stopping up

County of Oxfordshire

District of Cherwell

Gavray Drive

Unclassified road at Water Eaton

Within the Order limits

Within the Order limits

Article 10

SCHEDULE 5STREETS TO BE TEMPORARILY STOPPED UP

(1)

Area

(2)

Street to be temporarily stopped up

(3)

Extent of temporary stopping up

County of Oxfordshire

District of Cherwell

Charbridge Lane

Within the Order limits

Footpath FP129/3Within the Order limits
PathWithin the Order limits
Launton RoadWithin the Order limits
London RoadWithin the Order limits
Station ApproachWithin the Order limits
A41Within the Order limits
Langford LaneWithin the Order limits
Footpath FP398/6Within the Order limits
Road to Langford LaneWithin the Order limits
Wendlebury RoadWithin the Order limits
Footpath FP398/2Within the Order limits
Footpath FP398/3Within the Order limits
Merton RoadWithin the Order limits
Bridleway BW398/4Within the Order limits
Bridleway BW157/4Within the Order limits
Oddington RoadWithin the Order limits
Footpath FP318/7Within the Order limits
Footpath FP318/2Within the Order limits
Footpath FP318/5Within the Order limits
Footpath FP318/8Within the Order limits
Footpath FP318/6Within the Order limits
Bletchingdon RoadWithin the Order limits
Bridleway BW229/5Within the Order limits
Footpath FP260/4Within the Order limits
Mill LaneWithin the Order limits
Footpath FP229/4Within the Order limits
Oxford RoadWithin the Order limits
Footpath FP229/10Within the Order limits
City of OxfordFirst TurnWithin the Order limits
Fairlawn EndWithin the Order limits
Woodstock RoadWithin the Order limits
Bridleway BW320/10Within the Order limits

Article 11

SCHEDULE 6ACCESS TO WORKS

(1)

Area

(2)

Description of access

County of Oxfordshire

District of Cherwell

Charbridge Lane

Gavray Drive
Launton Road
London Road
Langford Lane
Road to Langford Lane
Wendlebury Road
Oddington Road
Mill Lane
Oxford Road (A4165)

Article 15

SCHEDULE 7REPLACEMENT AND CLOSURE OF ROAD LEVEL CROSSINGS

(1)

Area

(2)

Level crossing to be discontinued

(3)

Street to be stopped up

(4)

Accommodation works

County of Oxfordshire District of CherwellLangford Lane Level CrossingLangford Lane between points S1 and S2Work No. 11 (Road)
Oddington Road Level CrossingOddington Road between points S3 and S4Work No. 14 (Road)
Islip Road Level CrossingMill Lane between points S5 and S6Work No. 16 (Bridleway)

Article 16

SCHEDULE 8REPLACEMENT AND CLOSURE OF FOOTPATH LEVEL CROSSINGS

(1)

Area

(2)

Footpath level crossing to be discontinued

(3)

Footpath to be stopped up

(4)

New footpath to be substituted

County of Oxfordshire District of CherwellTubbs Lane Level CrossingFootpath FP129/3 between points F3, F4, F5 and F6Footpath between point F3, Work No. 9 and point F6
Elm Tree Farm No. 1 Level CrossingFootpath FP398/6 between points F7 and F8Footpath between points F7, F9, Work No. 11 and points F10 and F8
Merton Foot Level CrossingFootpath FP398/3 between points F10 and F11Footpath between point F10, Work No. 12 and point F11
Wendlebury Foot Level CrossingFootpath FP398/2 between points F12 and F13Footpath between points F12, F11, Work No. 12 and point F13
Beebont Level CrossingBridleway BW398/4 and Bridleway BW157/4 between points B1 and B2Bridleway between points B1, B3, B4, B5, Work No. 13 and point B2
Oddington Foot Level CrossingFootpath FP318/6 between points F19 and F20Footpath between points F19, F21, F22, Work No 14 and point F23
Yew Tree Farm Level CrossingFootpath FP318/2 between points F21 and F24Footpath between points F21, F22, Work No. 14 and point F23
Islip Foot Level CrossingFootpath FP318/7 between points F25 and F26Footpath between points F25 and F27, F28 and F29 and between points F37, F36 and F35
Oddington No. 5 Level Crossing.Footpath FP318/5 between points F30 and F31Footpath between point F30, Work No. 15 and point F31
Islip No. 4 Level CrossingFootpath FP260/4 between points F32 and F33 and Footpath FP318/8 between points F33 and F34Footpath between points F32, F29, F30, Work No. 15, and points F31, F37, F36, F35 and F34
Water Eaton No. 5 Level CrossingBridleway BW229/5 between points B3 and B4Bridleway between point B3, Work No. 17 and point B4
Gosford and Water Eaton No. 4 Level CrossingFootpath FP229/4 between points F38 and F39Footpath between points F38, F40, the A4165 and points F41 and F39
Gosford and Water Eaton No. 10 Level CrossingFootpath FP229/10 between points F42 and F43Footpath between point F42, Work No. 18 and point F43

Article 17

SCHEDULE 9ACCOMMODATION CROSSINGS

PART 1ACCOMMODATION CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Accommodation facility to be discontinued

(3)

Private right of way to be extinguished

(4)

Accommodation facility to be substituted

County of Oxfordshire District of CherwellElm Tree Farm No. 1 CrossingWithin the limits of deviationWork No. 11
Elm Tree Farm No. 2 CrossingWithin the limits of deviationAccommodation access and Work No. 11
College Farm No. 2 CrossingWithin the limits of deviationAccommodation access from Merton Road
Manor Farm CrossingWithin the limits of deviationAccommodation access from Merton Road
Home Farm CrossingWithin the limits of deviationAccommodation access from Merton Road
Beebont CrossingWithin the limits of deviationAccommodation access and Work No. 13
Holts Farm CrossingWithin the limits of deviationAccommodation access and Work No. 13
Oddington Grange CrossingWithin the limits of deviationAccommodation access and Work No. 14
Brookfurlong Farm CrossingWithin the limits of deviationAccommodation access from Bletchingdon Road
Northfield Farm Bridge CrossingWithin the limits of deviationAccommodation access and Work No. 16
Water Eaton No. 5 CrossingWithin the limits of deviationWork No. 16

PART 2ACCOMMODATION CROSSINGS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Accommodation facility to be discontinued

(3)

Private right of way to be extinguished

County of Oxfordshire

District of Cherwell

Taylors Number 1 CrossingWithin the limits of deviation
Wendlebury CrossingWithin the limits of deviation
Farm CrossingWithin the limits of deviation
Bonners CrossingWithin the limits of deviation
Lane CrossingWithin the limits of deviation
Footbridge CrossingWithin the limits of deviation
Islip Foot CrossingWithin the limits of deviation
Crossing CrossingWithin the limits of deviation
Mill Farm CrossingWithin the limits of deviation
Coults CrossingWithin the limits of deviation
Nesbitts CrossingWithin the limits of deviation
St Edwards CrossingWithin the limits of deviation

Article 25

SCHEDULE 10MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS OR IMPOSITION OF RESTRICTIVE COVENANTS

Compensation enactments

1.  The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply with the necessary modifications as respects compensation in the case of a compulsory acquisition under this Order of a right by the creation of a new right, and in the case of the imposition of a restrictive covenant, as they apply as respects compensation on the compulsory purchase of land and interests in land.

2.—(1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973(1) has effect subject to the modifications set out in sub-paragraphs (2) and (3).

(2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 4—

(a)for the words “land is acquired or taken from” there are substituted the words “a right or restrictive covenant over land is purchased from or imposed on”; and

(b)for the words “acquired or taken from him” there are substituted the words “over which the right is exercisable or the restrictive covenant enforceable”.

(3) In section 58(1) (determination of material detriment where part of house etc. proposed for compulsory acquisition), as it applies to determinations under section 8 of the 1965 Act as substituted by paragraph 5—

(a)for the word “part” in paragraphs (a) and (b) there are substituted the words “a right over or restrictive covenant affecting land consisting”;

(b)for the word “severance” there are substituted the words “right or restrictive covenant over or affecting the whole of the house, building or manufactory or of the house and the park or garden”;

(c)for the words “part proposed” there are substituted the words “right or restrictive covenant proposed”; and

(d)for the words “part is” there are substituted the words “right or restrictive covenant is”.

Application of the 1965 Act

3.—(1) The 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land are to be read (according to the requirements of the particular context) as referring to, or as including references to—

(a)the right acquired or to be acquired or the restrictive covenant imposed or to be imposed; or

(b)the land over which the right is or is to be exercisable or the restrictive covenant is or is to be enforceable.

(2) Without limitation on the scope of sub-paragraph (1), Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or in relation to the imposition of a restrictive covenant, with the modifications specified in the following provisions of this Schedule.

4.  For section 7 of the 1965 Act (measure of compensation in case of severance) there is substituted the following section—

7.  In assessing the compensation to be paid by the acquiring authority under this Act regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act..

5.  For section 8 of the 1965 Act (other provisions as to divided land) there is substituted the following—

8.(1) Where in consequence of the service on a person under section 5 of this Act of a notice to treat in respect of a right over, or a restrictive covenant affecting, land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”)—

(a)a question of disputed compensation in respect of the purchase of the right or the imposition of the restrictive covenant would apart from this section fall to be determined by the Upper Tribunal (“the tribunal”); and

(b)before the tribunal has determined that question, the tribunal is satisfied that the person has an interest in the whole of the relevant land and is able and willing to sell that interest, and—

(i)where that land consists of a house, building or manufactory, that the right cannot be purchased or the restrictive covenant imposed without material detriment to that land; or

(ii)where that land consists of such a park or garden, that the right cannot be purchased or the restrictive covenant imposed without seriously affecting the amenity or convenience of the house to which that land belongs,

the Chiltern Railways (Bicester to Oxford Improvements) Order 2012(2) (“the Order”), in relation to that person, ceases to authorise the purchase of the right and is deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice is deemed to have been served in respect of that interest on such date as the tribunal directs.

(2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section is to be determined by the tribunal.

(3) Where in consequence of a determination of the tribunal that it is satisfied as mentioned in subsection (1) of this section the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of 6 weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice..

6.  The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

(a)section 9(4) (failure by owners to convey);

(b)paragraph 10(3) of Schedule 1 (owners under incapacity);

(c)paragraph 2(3) of Schedule 2 (absent and untraced owners); and

(d)paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

7.  Section 11 of the 1965 Act (powers of entry) is modified so as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.

8.  Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

9.  Section 22 of the 1965 Act (interest omitted from purchase) is modified so as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or to enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.

Articles 5, 22 and 29

SCHEDULE 11LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1)

Area

(2)

Number of land shown on deposited plans

(3)

Purpose for which temporary possession may be taken

(4)

Authorised work

County of Oxfordshire

District of Cherwell

01010Working site and accessWork No. 1
02004, 02008Working site and accessWork Nos. 1 and 8
03003Working siteWork No. 1
03010, 03011, 03012Working site, access and footpath diversionWork No. 9
03013, 03014, 03017, 03019, 03020, 03021, 03022Working site and accessWork No. 9
04003, 04005Working siteWork No. 2
04036, 04037, 04038AccessWork Nos. 2, 4 and 10
04039, 04041, 04042, 04043, 04044, 04045, 04046, 04047, 04048, 04049, 04050, 04051, 04056, 04057, 04a001, 04a002, 05001, 05005, 05021, 05022Working site and accessWork Nos. 2, 4 and 10
05007, 05008, 05015, 05016Working site and accessWork Nos. 2 and 4
05009, 05010Environmental mitigation including permanent earth worksWork No. 2
08005, 08009AccessWork Nos. 2 and 11
08b004Working site and accommodation accessWork No. 11
09001, 09005, 09006, 09008, 09012, 09014, 09017, 09021, 10001, 10009, 10010, 10011, 10015, 12013, 13001, 13006, 13007, 13011, 13018, 13019 14003, 14010, 15017, 15020, 15028, 15029, 15a001, 16016, 16017, 16018, 16020, 16021, 16022, 16023, 16024, 16025, 16026, 16027, 17002, 17003, 17004, 17006, 17007, 17009, 19006, 19010, 19015, 19016, 20003, 20004, 20005, 20006, 20007, 20008, 20011, 20012, 20015, 20016, 20020, 20022, 21018Working site and accessWork No. 2
09024, 09025, 15023, 17012, 19005Environmental mitigation including permanent earth worksWork No. 2
10016, 10021, 10027, 10028, 10033, 10034Working site and accessWork Nos. 2 and 12
10a005, 10a006, 10a007, 10a008Working siteWork Nos. 2 and 12
16a004, 16a005, 16a006, 16a007Working siteWork No. 2
12005Working site and accessWork Nos. 2 and 13
14012, 15013Working site and accessWork Nos. 2 and 14
15005Working siteWork No. 14
15006, 15007, 15008, 15010Working siteWork Nos. 2 and 14
16001, 16006, 16010, 16011, 16013Working site and accessWork Nos. 2 and 15
18004, 18010Remedial works to Bridge OXD42 and road junction improvementsWork No. 2
19008, 19009, 21b001AccessWork No. 2
24006, 24009, 24011Working site and accessWork Nos. 2 and 18
City of Oxford25003, 25004, 25005Working site and accessWork No. 2
26004, 26008, 26009, 26010Remedial works to Bridge OXD49, working site and accessWork No. 2
29005AccessWork No. 3
31006, 31007, 31008, 31009, 31010, 31011, 31012, 31016, 31017, 31018, 31019, 31020, 31021Working site and accessWork Nos. 3 and 3A
31027, 31028, 31029AccessWork Nos. 3 and 3A

Article 37

SCHEDULE 12TRAFFIC REGULATION

(1)

Area

(2)

Street subject to traffic regulation

(3)

Extent of traffic regulation

County of Oxfordshire

District of Cherwell

Charbridge Lane

Within the Order limits

Launton RoadWithin the Order limits
London RoadWithin the Order limits
Station ApproachWithin the Order limits
Langford LaneWithin the Order limits
Road to Langford LaneWithin the Order limits
Wendlebury RoadWithin the Order limits
Oddington RoadWithin the Order limits
Bletchingdon RoadWithin the Order limits
Mill LaneWithin the Order limits
Oxford RoadWithin the Order limits
City of OxfordFirst TurnWithin the Order limits
Fairlawn EndWithin the Order limits

Articles 8, 9, 15, 16, 35 and 49

SCHEDULE 13PROVISIONS RELATING TO STATUTORY UNDERTAKERS ETC.

Apparatus of statutory undertakers etc. on land acquired

1.—(1) Sections 271 to 274 of the 1990 Act (power to extinguish rights of statutory undertakers etc. and power of statutory undertakers etc. to remove or re-site apparatus) apply in relation to any land acquired or appropriated by the Company under this Order subject to the following provisions of this paragraph: and all such other provisions of that Act as apply for the purposes of those provisions (including sections 275 to 278, which contain provisions consequential on the extinguishment of any rights under sections 271 and 272, and sections 279(2) to (4), 280 and 282, which provide for the payment of compensation) have effect accordingly.

(2) In the provisions of the 1990 Act, as applied by sub-paragraph (1), references to the appropriate Minister are references to the Secretary of State.

(3) Where any apparatus of public utility undertakers or of a public communications provider is removed in pursuance of a notice or order given or made under section 271, 272 or 273 of the 1990 Act, as applied by sub-paragraph (1), any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the Company compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

(4) Sub-paragraph (3) does not apply in the case of the removal of a public sewer but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that paragraph, any person who is—

(a)the owner or occupier of premises the drains of which communicated with that sewer; or

(b)the owner of a private sewer which communicated with that sewer,

is entitled to recover from the Company compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

(5) The provisions of the 1990 Act mentioned in sub-paragraph (1), as applied by that sub-paragraph, do not have effect in relation to apparatus as respects which paragraph 2 or Part 3 of the 1991 Act applies.

(6) In this paragraph—

“public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003(3); and

“public utility undertakers” has the same meaning as in the Highways Act 1980(4).

Apparatus of statutory undertakers etc. in stopped up streets

2.—(1) Where a street is stopped up under this Order any statutory utility whose apparatus is under, in, upon, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this paragraph, as if this Order had not been made.

(2) Where a street is stopped up under this Order any statutory utility whose apparatus is under, in, upon, over, along or across the street may, and if reasonably requested to do so by the Company must—

(a)remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the utility may reasonably determine and have power to place it; or

(b)provide other apparatus in substitution for the existing apparatus and place it in that other position.

(3) Subject to the following provisions of this paragraph, the Company must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—

(a)the execution of the relocation works required in consequence of the stopping up of the street; and

(b)the doing of any other work or thing rendered necessary by the execution of the relocation works.

(4) If in the course of the execution of relocation works under sub-paragraph (2)—

(a)apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the Company, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the statutory utility by virtue of sub-paragraph (3) is to be reduced by the amount of that excess.

(5) For the purposes of sub-paragraph (4)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(6) An amount which apart from this sub-paragraph would be payable to a statutory utility in respect of works by virtue of sub-paragraph (3) (and having regard, where relevant, to sub-paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

(7) Sub-paragraphs (3) to (6) do not apply where the authorised works constitute major transport works for the purposes of Part 3 of the 1991 Act, but instead—

(a)the allowable costs of the relocation works are to be determined in accordance with section 85 of that Act (sharing of cost of necessary measures) and any regulations for the time being having effect under that section; and

(b)the allowable costs are to be borne by the Company and the statutory utility in such proportions as may be prescribed by any such regulations.

(8) In this paragraph—

“apparatus” has the same meaning as in Part 3 of the 1991 Act;

“relocation works” means work executed, or apparatus provided, under sub-paragraph (2); and

“statutory utility” means a statutory undertaker for the purposes of the Highways Act 1980 or a public communications provider as defined in paragraph 1(6).

Railway and navigation undertakings

3.—(1) Subject to the following provisions of this paragraph, the powers under article 8 (power to execute street works) to break up or open a street are not exercisable where the street, not being a highway maintainable at public expense (within the meaning of the Highways Act 1980)—

(a)is under the control or management of, or is maintainable by, railway or tramway undertakers or a navigation authority; or

(b)forms part of a level crossing belonging to any such undertakers or to such an authority or to any other person,

except with the consent of the undertakers or authority or, as the case may be, of the person to whom the level crossing belongs.

(2) Sub-paragraph (1) does not apply to the carrying out under this Order of emergency works, within the meaning of Part 3 of the 1991 Act.

(3) A consent given for the purpose of sub-paragraph (1) may be made subject to such reasonable conditions as may be specified by the person giving it but must not be unreasonably withheld.

(4) In this paragraph “navigation authority” means any person who has a duty or power under any enactment to work, maintain, conserve, improve or control any canal or other inland navigation, navigable river, estuary, harbour or dock.

Article 50

SCHEDULE 14FOR THE PROTECTION OF SPECIFIED UNDERTAKERS

1.—(1) For the protection of the undertakers referred to in this Schedule the following provisions have effect unless otherwise agreed in writing between the Company and the undertakers concerned.

(2) The provisions of Schedule 13 (provisions relating to statutory undertakers etc.), in so far as they relate to the removal of apparatus, do not apply in relation to apparatus to which this Schedule applies.

2.  In this Schedule—

“alternative apparatus” means alternative apparatus adequate to enable the undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;

“apparatus” means—

(a)

in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989(5)) belonging to or maintained by that undertaker;

(b)

in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply;

(c)

in the case of a water undertaker—

(i)

mains, pipes or other apparatus belonging to, or maintained by, the undertaker for the purposes of water supply; and

(ii)

any water mains or service pipes (or part of a water main or service pipe) that is the subject of an agreement to adopt made under section 51A of the Water Industry Act 1991(6);

(d)

in the case of a sewerage undertaker—

(i)

any drain or works vested in the undertaker under the Water Industry Act 1991; and

(ii)

any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act,

and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works,

and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;

“functions” includes powers and duties;

“in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and

“undertaker” means—

(e)

any licence holder within the meaning of Part 1 of the Electricity Act 1989;

(f)

a gas transporter within the meaning of Part 1 of the Gas Act 1986(7);

(g)

a water undertaker within the meaning of the Water Industry Act 1991; and

(h)

a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,

for the area of the authorised works, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.

3.  This Schedule does not apply to apparatus in respect of which the relations between the Company and the undertaker are regulated by the provisions of Part 3 of the 1991 Act.

4.—(1) Where any street is stopped up under article 9 (stopping up of streets), any undertaker whose apparatus is in the street has the same powers and rights in respect of that apparatus as it enjoyed immediately before the stopping up, but nothing in this paragraph affects any right of the Company or of the undertaker to require the removal of that apparatus under paragraph 6(2) or the power of the Company to carry out works under paragraph 8.

(2) the Company must give not less than 28 days’ notice in writing of its intention to stop up any street under article 9 to any undertaker whose apparatus is in that street.

5.  Regardless of any provision in this Order or anything shown on the deposited plans the Company must not acquire any apparatus other than by agreement.

6.—(1) If, in the exercise of the powers conferred by this Order, the Company acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Schedule and any right of an undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the undertaker in question.

(2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the Company requires the removal of any apparatus placed in that land, it must give to the undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus) the Company must, subject to sub-paragraph (3), afford to the undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the Company and for the subsequent maintenance of that apparatus.

(3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the Company, or the Company is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker in question must, on receipt of a written notice to that effect from the Company, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.

(4) Any alternative apparatus to be constructed in land of the Company under this Schedule must be constructed in such manner and in such line or situation as may be agreed between the undertaker in question and the Company or in default of agreement settled by arbitration in accordance with article 57 (arbitration).

(5) The undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 57, and after the grant to the undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the Company to be removed under the provisions of this Schedule.

(6) Regardless of anything in sub-paragraph (5), if the Company gives notice in writing to the undertaker in question that it desires itself to execute any work to which this sub-paragraph applies, that work, instead of being executed by the undertaker, must be executed by the Company without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the undertaker.

(7) Sub-paragraph (6) applies to any part of any work necessary in connection with construction of alternative apparatus, or the removal of apparatus required to be removed, as will take place in any land of the Company.

(8) Nothing in sub-paragraph (6) authorises the Company to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

7.—(1) Where, in accordance with the provisions of this Schedule, the Company affords to an undertaker facilities and rights for the construction and maintenance in land of the Company of alternative apparatus in substitution for apparatus to be removed, those facilities and rights may be granted upon such terms and conditions as may be agreed between the Company and the undertaker in question or in default of agreement settled by arbitration in accordance with article 57 (arbitration).

(2) In settling those terms and conditions in respect of the alternative apparatus to be constructed in or along any railway, the arbitrator must—

(a)give effect to all reasonable requirements of the Company for ensuring the safety and efficient operation of the railway and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the Company or the traffic on the railway; and

(b)so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or along the railway for which the alternative apparatus is to be substituted.

(3) If the facilities and rights to be afforded by the Company in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the Company to that undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

8.—(1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 6(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the Company under paragraph 6(2), the Company must submit to the undertaker in question a plan, section and description of the works to be executed.

(2) Those works are to be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and an officer of the undertaker is entitled to watch and inspect the execution of those works.

(3) Any requirements made by the undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.

(4) If an undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the Company, reasonably requires the removal of any apparatus and gives written notice to the Company of that requirement, paragraphs 6 and 7 apply as if the removal of the apparatus had been required by the Company under paragraph 6(2).

(5) Nothing in this paragraph precludes the Company from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.

(6) The Company is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

9.—(1) If in consequence of the exercise of the powers conferred by this Order the access to any apparatus is materially obstructed the Company must provide such alternative means of access to such apparatus as will enable the undertaker to maintain or use the apparatus no less effectively than was possible before such obstruction.

(2) Subject to the following provisions of this paragraph, the Company must repay to an undertaker the reasonable expenses incurred by that undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 6(2).

(3) The value of any apparatus removed under the provisions of this Schedule is to be deducted from any sum payable under sub-paragraph (2), that value being calculated after removal.

(4) If in accordance with the provisions of this Schedule—

(a)apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the Company or, in default of agreement, is not determined by arbitration in accordance with article 57 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the undertaker in question by virtue of sub-paragraph (2), is to be reduced by the amount of that excess.

(5) For the purposes of sub-paragraph (4)—

(a)an extension of apparatus to a length greater than the length of existing apparatus must not be treated as placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.

(6) An amount which apart from this sub-paragraph would be payable to an undertaker in respect of works by virtue of sub-paragraph (2) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

10.—(1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 6(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of an undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any undertaker, the Company must—

(a)bear and pay the cost reasonably incurred by that undertaker in making good such damage or restoring the supply; and

(b)make reasonable compensation to that undertaker for any other expenses, loss, damages, penalty or costs incurred by the undertaker,

by reason or in consequence of any such damage or interruption.

(2) Nothing in sub-paragraph (1) imposes any liability on the Company with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an undertaker, its officers, servants, contractors or agents.

(3) An undertaker must give the Company reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the Company, which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

Article 51

SCHEDULE 15FOR THE PROTECTION OF THE ENVIRONMENT AGENCY

1.—(1) For the protection of the Agency, the following provisions have effect unless otherwise agreed in writing between the Company and the Agency.

(2) In this Schedule—

“the Agency” means the Environment Agency;

“construction” includes execution, placing, altering, replacing, relaying and removal and “construct” and “constructed” are to be construed accordingly;

“drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;

“the fishery” means any waters containing fish and the spawn, habitat or food of such fish;

“plans” includes sections, drawings, specifications and method statements;

“specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to—

(a)

affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work;

(b)

affect the flow, purity or quality of water in any watercourse or other surface waters or ground water;

(c)

cause obstruction to the free passage of fish or damage to any fishery; or

(d)

affect the conservation, distribution or use of water resources.

2.—(1) Before beginning to construct any specified work, the Company must submit to the Agency plans of the specified work and such further particulars available to it as the Agency may within 28 days of the submission of the plans reasonably require.

(2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the Agency, or determined under paragraph 13.

(3) Any approval of the Agency required under this paragraph—

(a)must not be unreasonably withheld or delayed;

(b)is deemed to have been given if it is neither given nor refused within 2 months of the submission of the plans for approval and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and

(c)may be given subject to such reasonable requirements as the Agency may make for the protection of any drainage work or the fishery or for the protection of water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.

(4) The Agency must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).

3.  Without limitation on the scope of paragraph 2, the requirements which the Agency may make under that paragraph include conditions requiring the Company at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—

(a)to safeguard any drainage work against damage; or

(b)to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,

by reason of any specified work.

4.—(1) Subject to sub-paragraph (2), any specified work, and all protective works required by the Agency under paragraph 3, must be constructed—

(a)without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Schedule; and

(b)to the reasonable satisfaction of the Agency,

and an officer of the Agency is entitled to watch and inspect the construction of such works.

(2) The Company must give to the Agency not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is brought into use.

(3) If any part of a specified work or any protective work required by the Agency is constructed otherwise than in accordance with the requirements of this Schedule, the Agency may by notice in writing require the Company at the Company’s own expense to comply with the requirements of this Schedule or (if the Company so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the Agency reasonably requires.

(4) Subject to sub-paragraph (5) and paragraph 8, if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon the Company, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the Agency may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from the Company.

(5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.

5.—(1) Subject to the provisions of this Schedule and except to the extent that the Agency or another person is liable to maintain any such work and is not precluded by the exercise of the powers conferred by this Order from so doing, the Company must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation or on land held by the Company for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.

(2) If any such drainage work which the Company is liable to maintain is not maintained to the reasonable satisfaction of the Agency, the Agency may by notice in writing require the Company to repair and restore the work, or any part of such work, or (if the Company so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the Agency reasonably requires.

(3) Subject to paragraph 8, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the Company, the Company has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the Company.

(4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2) , the Agency must not except in a case of emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.

6.  Subject to paragraph 8, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by the Company to the reasonable satisfaction of the Agency and if the Company fails to do so, the Agency may make good the same and recover from the Company the expense reasonably incurred by it in so doing.

7.—(1) The Company must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.

(2) If by reason of—

(a)the construction of any specified work; or

(b)the failure of any such work,

damage to the fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the Company requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.

(3) Subject to paragraph 8, if within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, the Company fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and may recover from the Company the expense reasonably incurred by it in doing so.

(4) Subject to paragraph 8, in any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from the Company the reasonable cost of so doing provided that notice specifying those steps is served on the Company as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.

8.  Nothing in paragraphs 4(4), 5(3), 6, 7(3) and (4) authorises the Agency to execute works on or affecting an operational railway without the prior consent in writing of the Company, such consent not to be unreasonably withheld or delayed.

9.  The Company must indemnify the Agency in respect of all costs, charges and expenses which the Agency may reasonably incur or have to pay or which it may sustain—

(a)in the examination or approval of plans under this Schedule; and

(b)in the inspection of the construction of the specified works or any protective works required by the Agency under this Schedule.

10.—(1) Without prejudice to the other provisions of this Schedule, the Company must indemnify the Agency from all claims, demands, proceedings, costs, damages, expenses or loss, which may be made or taken against, recovered from, or incurred by, the Agency by reason of—

(a)any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;

(b)any damage to the fishery;

(c)any raising or lowering of the water table in land adjoining the authorised works or any sewers, drains and watercourses;

(d)any flooding or increased flooding of any such lands; or

(e)inadequate water quality in any watercourse or other surface waters or in any groundwater,

which is caused by the construction of any of the specified works or any act or omission of the Company, its contractors, agents or employees whilst engaged upon the work.

(2) The Agency must give to the Company reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of the Company which agreement must not be unreasonably withheld or delayed.

11.  The fact that any work or thing has been executed or done by the Company in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve the Company from any liability under the provisions of this Schedule.

12.  For the purposes of Chapter 2 of Part 2 of the Water Resources Act 1991(8) (abstraction and impounding of water) and section 109 of that Act (as to structures in, over or under watercourses) as applying to the construction of any specified work, any consent or approval given or deemed to be given by the Agency under this Schedule with respect to such construction is deemed also to constitute a licence under that Chapter to obstruct or impede the flow of inland waters at that point by means of impounding works or, as the case may be, a consent or approval under section 109.

13.  Any dispute arising between the Company and the Agency under this Schedule, if the parties agree, is to be determined by arbitration under article 57 (arbitration), but otherwise is to be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly on a reference to them by the Company or the Agency, after notice in writing by one to the other.

Article 52

SCHEDULE 16FOR THE PROTECTION OF NETWORK RAIL

1.  For the protection of Network Rail, the following provisions have effect unless otherwise agreed in writing between the Company and Network Rail and in the case of paragraph 13, any other person on whom rights or obligations are conferred by that paragraph.

2.  In this Schedule—

“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;

“the engineer” means an engineer appointed by Network Rail for the purposes of this Order;

“network licence” means the network licence, as amended from time to time, granted to Network Rail by the Secretary of State in exercise of powers under section 8 of the Railways Act 1993(9)

“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;

“railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station or depot lease;

“railway property” means any railway belonging to Network Rail and—

(a)

any station, land, works, apparatus and equipment belonging to Network Rail or connected with any such railway; and

(b)

any easement or other property interest held by or used for the benefit of Network Rail for the purposes of such railway or works, apparatus or equipment; and

“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.

3.—(1) Where under this Schedule Network Rail is required to give its consent or approval in respect of any matter, that consent or approval must not be unreasonably withheld or delayed but may be subject to reasonable conditions (while recognising that the engineer has sole discretion in matters relating to safety) and is subject to the condition that Network Rail complies with any relevant railway operational procedures and any obligations under its network licence or under statute.

(2) In so far as any specified work or the acquisition or use of railway property is or may be subject to railway operational procedures, Network Rail must—

(a)co-operate with the Company with a view to avoiding undue delay and securing conformity as between any plans approved by the engineer and requirements emanating from those procedures; and

(b)use its reasonable endeavours to avoid any conflict arising between the application of those procedures and the proper implementation of the authorised works under this Order.

4.—(1) The Company must not exercise the powers conferred by article 21 (power to survey and investigate land, etc.) or the powers conferred by section 11(3) of the 1965 Act as applied by this Order in respect of any railway property unless the exercise of such powers is with the consent of Network Rail.

(2) The Company must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Network Rail.

(3) The Company must not exercise the powers conferred by sections 271 or 272 of the 1990 Act, as applied by Schedule 13 (provisions relating to statutory undertakers, etc.), in relation to any right of access of Network Rail to railway property, but such right of access may be diverted with the consent of Network Rail.

(4) The Company must not under the powers conferred by this Order acquire or use or acquire new rights over any railway property except with the consent of Network Rail.

5.—(1) The Company must before commencing construction of any specified work supply to Network Rail proper and sufficient plans of that work for the reasonable approval of the engineer and the specified work must not be commenced except in accordance with such plans as have been approved in writing by the engineer or settled by arbitration.

(2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld or delayed, and if by the end of the period of 28 days beginning with the date on which such plans have been supplied to Network Rail the engineer has not intimated disapproval of those plans and the grounds of disapproval the undertaker may serve upon the engineer written notice requiring the engineer to intimate approval or disapproval within a further period of 28 days beginning with the date upon which the engineer receives written notice from the undertaker. If by expiry of the further period of 28 days the engineer has not intimated approval or disapproval, the engineer is deemed to have approved the plans as submitted.

(3) If by the end of the period of 56 days beginning with the date on which such plans have been supplied to Network Rail, Network Rail gives notice to the Company that Network Rail desires itself to construct any part of a specified work which in the opinion of the engineer will or may affect the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the Company desires such part of the specified work to be constructed, Network Rail must construct it on behalf of and to the reasonable satisfaction of the Company in accordance with the plans approved or deemed to be approved or settled under this paragraph.

(4) When signifying approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in the engineer’s opinion should be carried out before the commencement of the construction of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of the railways of Network Rail or the services of operators using the same (including any relocation of works, apparatus and equipment necessitated by a specified work and the comfort and safety of passengers who may be affected by the specified works), and such protective works as may be reasonably necessary for those purposes are to be constructed by Network Rail but at the expense of the Company, or if Network Rail so desires such protective works must be carried out by the Company at its own expense without unnecessary delay, and the Company must not commence the construction of the specified works until the engineer has notified the Company that the protective works have been completed to the engineer’s reasonable satisfaction.

6.—(1) Any specified work and any protective works to be constructed by virtue of paragraph 5(4) must, when commenced, be constructed without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under paragraph 5—

(a)under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer;

(b)in such manner as to cause as little damage as is possible to railway property; and

(c)so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway of Network Rail or the traffic on it and the use by passengers of railway property.

(2) If any damage to railway property or any such interference or obstruction is caused by the carrying out of, or in consequence of the construction of, a specified work, the Company must, regardless of any approval described in paragraph 6(1), make good such damage and pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.

(3) Nothing in this Schedule imposes—

(a)any liability on the Company with respect to any damage, costs, expenses or loss attributable to the negligence of Network Rail or its servants, contractors or agents; or

(b)any liability on Network Rail with respect to any damage, costs, expenses or loss attributable to the negligence of the Company or its servants, contractors or agents.

7.  The Company must—

(a)at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and

(b)supply the engineer with all such information as the engineer may reasonably require with regard to a specified work or the method of constructing it.

8.  Network Rail must at all times afford reasonable facilities to the Company and its agents for access to any works carried out by Network Rail under this Schedule during their construction and must supply the Company with such information as it may reasonably require with regard to such works or the method of constructing them.

9.—(1) If any permanent or temporary alterations or additions to railway property, or any protective works under paragraph 5(4), are reasonably necessary during the construction of a specified work, or during a period of 12 months after the opening for public use of any authorised work that includes a specified work, in consequence of the construction of that specified work, such alterations and additions may be carried out by Network Rail and if Network Rail gives to the Company reasonable notice of its intention to carry out such alterations or additions, the Company must pay to Network Rail all costs reasonably and properly incurred in constructing those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations or additions.

(2) If during the construction of a specified work by the Company, Network Rail gives notice to the Company that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the Company desires that part of the specified work to be constructed, Network Rail must assume construction of that part of the specified work and the Company must, regardless of any such approval of a specified work under paragraph 5(1), pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work.

(3) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against-any sum payable by the Company to Network Rail under this paragraph.

10.  The Company must repay to Network Rail all fees, costs, charges and expenses reasonably and properly incurred by Network Rail—

(a)in constructing any part of a specified work on behalf of the Company as provided by paragraph 5(3) or in constructing any protective works under the provisions of paragraph 5(4) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;

(b)in respect of the approval by the engineer of plans submitted by the Company and the supervision by the engineer of the construction of a specified work and otherwise in connection with the implementation of the provisions of this Schedule;

(c)in respect of the employment or procurement of the services of any inspectors and other persons whom it is reasonably necessary to appoint for inspecting, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work;

(d)in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or consequence of the construction or failure of a specified work; and

(e)in respect of any special traffic working resulting from any speed restrictions which may, in the opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of a specified work or from the substitution or diversion of services which may be reasonably necessary for the same reason.

11.  If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the Company informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the Company must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.

12.  Any additional expenses which Network Rail may reasonably incur in altering, reconstructing, working or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction, working or maintenance has been given to the Company, are to be repaid by the Company to Network Rail.

13.—(1) The Company must pay to Network Rail all costs, charges, damages and expenses not otherwise provided for in this Schedule (but subject to article 56 (no double recovery)) which may be occasioned to or reasonably and properly incurred by Network Rail—

(a)by reason of the construction, working or maintenance of a specified work or the failure of such a work; or

(b)by reason of any act or omission of the Company or of any person in its employ or of its contractors or others whilst engaged upon a specified work;

and the Company must indemnify Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission; and the fact that any act or thing may have been done by Network Rail on behalf of the Company or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision will not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the Company from any liability under the provisions of this sub-paragraph.

(2) Network Rail must give the Company reasonable notice of any such claim or demand and must make no settlement or compromise of such a claim or demand without the prior consent of the Company.

(3) The sums payable by the Company under sub-paragraph (1) may include a sum equivalent to the relevant costs.

(4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail Infrastructure Limited must promptly pay to each train operator the amount of any sums which Network Rail Infrastructure Limited receives under sub-paragraph (1) which relates to the relevant costs of that train operator.

(5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs will, in the event of default, be enforceable directly by any train operator concerned to the extent that the relevant costs would be payable to that operator under sub-paragraph (4).

(6) In this paragraph—

“the relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in sub-paragraph (1); and

“train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 of the Railways Act 1993.

14.  Network Rail must, on receipt of a request from the Company, from time to time provide the Company free of charge with written estimates of the costs, charges, expenses and other liabilities for which the Company is or will become liable under this Schedule (including the amount of the relevant costs mentioned in paragraph 13) and with such information as may reasonably enable the Company to assess the reasonableness of any such estimate or claim made or to be made under this Schedule (including any claim relating to those relevant costs).

15.  In the assessment of any sums payable to Network Rail under this Schedule there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the Company under this Schedule or increasing the sums so payable.

16.  The Company must no later than 28 days from the date that the plans submitted to and certified by the Secretary of State in accordance with article 54 (certification of plans etc.) are certified by the Secretary of State, provide a set of those plans to Network Rail in the form of a computer disc with read only memory.

Article 53

SCHEDULE 17FOR THE PROTECTION OF THE CANAL & RIVER TRUST

1.—(1) For the protection of the Canal & River Trust, the following provisions, have effect unless otherwise agreed in writing between the Company and the Trust.

(2) In this Schedule—

“the canal” means any canal or waterway owned or managed by the Trust, and includes any works connected with any such canal or waterway for the maintenance of which the Trust is responsible and any lands held or used by the Trust for the purposes of the canal;

“canal work” means so much of any specified work or any other work of which the Company is in possession under the powers conferred by this Order as is in or over the canal;

“construction” includes execution, placing, altering, replacing and relaying and includes removal;

“detriment” means any damage to the canal or any other property of the Trust and, without limitation on the scope of the meaning, includes—

(a)

the erosion of the bed or banks of the canal, or the impairment of the stability of any works, lands or premises forming part of the canal;

(b)

the silting of the canal or the deposit of materials in it so as to materially damage the canal;

(c)

the pollution of the canal;

(d)

any material alteration of the water level of the canal, or material interference with the supply of water to the canal, or drainage of water from the canal; and

(e)

any material harm to the ecology of the canal (including any material adverse impact on any site of special scientific interest comprised in the canal);

“non-canal work” means so much of any specified work or any other work of which the Company is in possession under the powers conferred by this Order as is not in or over the canal;

“plans” includes sections, drawings, specifications and method statements;

“specified work” means so much of any permanent or temporary work authorised by this Order as is in, across, under, or within 15 metres of, or may in any way affect, the canal but does not include painting;

“stoppage season” means a period of 5 calendar months running consecutively from 1 November until 31 March inclusive; and

“the Trust” means the Canal & River Trust.

2.  The Company must not under the powers conferred by article 22 (power to acquire land) acquire compulsorily any land of the Trust without the consent of the Trust.

3.—(1) Subject to sub-paragraph (2), the Company must not under the powers conferred by article 22 (power to acquire land) acquire compulsorily any easement or other right over any land of the Trust other than such easements or other rights over any such land, as are reasonably necessary for, or in connection with, the construction, maintenance or operation of the authorised works.

(2) The Company must not acquire any such easement or other right that would impede navigation (such that minimum clear headroom is reduced to below 3 metres above water level or the navigable width of the canal is reduced below that existing on the date on which this Order is made) at any point along the length of the canal.

4.  Before beginning to construct any specified work, the Company must submit to the Trust plans of the work and such further particulars available to it as the Trust may within 14 days of the submission of the plans reasonably require.

5.  Any specified work must not be constructed except in accordance with such plans as may be approved in writing by the Trust or determined under article 57 (arbitration).

6.  Any approval of the Trust required under paragraph 5 must not be unreasonably withheld and—

(a)is deemed to have been given if it is neither given nor refused (with an indication of the grounds for refusal) within 28 days of the submission of the plans for approval or where further particulars are submitted under paragraph 4, within 28 days of the submission of those particulars; and

(b)may be given subject to such reasonable requirements as the Trust may make for the purpose of ensuring the safety or stability of the canal, including requirements as to the construction of protective works.

7.  Any specified work, and any protective works required by the Trust under paragraph 6(b), must be constructed without unnecessary delay to the reasonable satisfaction of the Trust, and in such manner as to cause as little damage to the canal as may be reasonably practicable and as little interference as may be reasonably practicable with the passage of vessels using the canal, and an officer of the Trust is entitled at all reasonable times, on giving such notice as may be reasonable in the circumstances, to inspect the construction of such work or works.

8.  The Company must give to the Trust not less than 56 days’ notice in writing of its intention to commence construction of any specified work or any protective works and also, except in emergency (when the Company must give such notice as may be reasonably practicable), of its intention to carry out any works for the repair or maintenance of any specified work in so far as such works of repair or maintenance affect or interfere with the canal.

9.  The Company must not—

(a)temporarily close the canal; or

(b)temporarily obstruct navigation along the canal;

other than during the stoppage season and must give to the Trust notice in writing of its intention to close temporarily or obstruct temporarily the canal by 1 May immediately prior to the relevant stoppage season.

10.  The Company must not exercise the maintenance powers conferred by articles 5 (power to construct and maintain works) and 30 (temporary use of land for maintenance of works) in relation to the canal unless such exercise is with the consent of the Trust.

11.  The Company must bear the reasonable costs of the carrying out, by a qualified surveyor or engineer (“the surveyor”) to be appointed by the Trust and Company, of surveys of so much of the canal as will or may be affected by the specified works—

(a)before commencement of the initial construction of any part of the specified works; and

(b)following completion of the specified works,

and if the Trust and the Company do not agree on the appointment of the surveyor under this paragraph an arbitrator is to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.

12.  For the purposes of the surveys the Company—

(a)on being given reasonable notice (save in the case of emergency, when immediate access must be afforded) must afford reasonable access to the site of the specified works and to any land and existing works of the Company which may provide support for the canal as will or may be affected by the specified works; and

(b)as soon as reasonably practicable must supply the surveyor with all such information as the surveyor may reasonably require with regard to such land and existing works of the Company and to the specified works or the method of construction of the specified works.

13.  The surveyor must provide copies of a report of the surveys to both the Trust and the Company without unnecessary delay.

14.  Where, in the reasonable opinion of the Trust, the surveys show that the specified works are likely to cause detriment to the canal then, at the request of the Trust and at its own expense, the Company must take steps to remedy such detriment to the reasonable satisfaction of the Trust.

15.  The Company must not deposit any polluting material on, in or over the canal and must not without the consent of the Trust—

(a)deposit any other materials on, in or over the canal (other than materials comprised in a specified work); or

(b)regardless of anything in article 19 (discharge of water), discharge any water directly or indirectly into the canal.

16.  Any consent of the Trust required under paragraph 15 must not be unreasonably withheld and—

(a)is deemed to have been given if it is neither given nor refused within 28 days of the submission of the request for it; and

(b)may be given subject to such reasonable requirements as the Trust may make—

(i)in the case of a deposit, so as to ensure that the use of the canal is not obstructed or rendered less safe, and

(ii)in the case of a discharge, concerning the reimbursement by the Company of expenses incurred by the Trust in disposing of the water so discharged, being expenses which the Trust would not have incurred but for the discharge.

17.  In its application to the discharge of water into the canal, article 19(6) (discharge of water) has effect subject to the terms of any requirements attached to the consent under paragraph 16 and, where such discharge includes a deposit to which consent has been given under paragraph 15, to any requirements attached to that consent.

18.  If any canal work is abandoned, the Trust may by notice in writing require the Company to take such reasonable steps as may be specified in the notice to remove the work and (to such extent as the Trust reasonably requires) to restore the site to its former condition.

19.  If any canal work is in such condition that it is, or is likely to become, a danger to or to interfere with navigation, the Trust may by notice in writing require the Company to take such reasonable steps as may be specified in the notice—

(a)to repair and restore the work or part of it; or

(b)if the Company so elects, to remove the work and (to such extent as the Trust reasonably requires) to restore the site to its former condition.

20.  If—

(a)a work which consists of a canal work and a non-canal work is abandoned or falls into decay; and

(b)the non-canal work is in such a condition as to interfere with the right of navigation in the relevant canal or as to interfere with the rights of access or use of land adjacent to the relevant canal;

the Trust may include the non-canal work, or any part of it, in any notice under paragraph 19.

21.  If after such reasonable period as may be specified in a notice under paragraph 19 the Company has failed to begin taking steps to comply with the requirements of the notice or after beginning has failed to make reasonably expeditious progress towards their implementation, the Trust may carry out the works specified in the notice and any expenditure reasonably incurred by it in so doing is recoverable from the Company.

22.  The Company must indemnify the Trust from all claims, demands, proceedings or damages, which may be made or given against, or recovered from the Trust by reason of any damage to the canal which is caused by the construction of any specified work or protective work or any act or omission of the Company, its contractors, agents or employees whilst engaged upon the work and from any costs reasonably incurred in making good such damage.

23.  The Trust must give to the Company reasonable notice of any such claim or demand and no settlement or compromise of any such claim or demand is to be made without the consent of the Company which, if it notifies the Trust that it desires to do so, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

24.  Nothing in paragraph 22 imposes any liability on the Company with respect to any damage to the extent that it is attributable to the act, neglect or default of the Trust, its officers, servants, contractors or agents but the fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by the Trust, or to its satisfaction, or in accordance with a determination in accordance with the article 57 (arbitration), does not (in the absence of negligence on the part of the Trust, its officers, servants, contractors or agents) relieve the Company from any liability under the provisions of this Schedule.

(7)

1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000 (c. 27).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources