Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Article 2(1)
Textual Amendments
1. An eligible installation is an MCS-certified installation if it is certified under—E+W+S
(a)the MCS and installed in accordance with the relevant installation standard in the scheme; or
(b)a scheme where—
(i)installers are certified to that scheme’s standards by an organisation accredited to EN 45011(2) or EN ISO/IEC 17065:2012(3);
(ii)the plant is installed in accordance with the installation standards applicable to the plant under that scheme on the plant’s first commissioning date and which are equivalent to a relevant installation standard; and
(iii)that scheme is equivalent to the Microgeneration Certification Scheme.
2. In paragraph 1, “relevant installation standard” means—E+W+S
(a)if the commissioning date for the installation is on or after 15th January 2016, if the installation is—
(i)a solar photovoltaic installation, version 3.3 of the document entitled Microgeneration Installation Standard: MIS 3002 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of solar-photovoltaic (PV) microgeneration systems,
(ii)a wind installation, version 3.4 of the document entitled Microgeneration Installation Standard: MIS 3003 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of micro and small wind turbine systems,
(iii)a heat-led combined heat and power installation, version 3.2 of the document entitled Microgeneration Installation Standard: MIS 3007 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing and micro-cogeneration package; or
(iv)an electricity-led combined heat and power installation, version 2.3 of the document entitled Microgeneration Installation Standard: MIS 3007-2 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a domestic hot water system combining an electricity led micro-cogeneration package; or
(b)if the commissioning date for the installation is before the 15th January 2016, any installation requirements applicable to the installation under the MCS on the installation’s commissioning date.
3. When exercising any functions under this Order, the Authority may treat the certification of an eligible installation in accordance with this Schedule as evidence that the installation is installed in accordance with a relevant installation standard or a standard which is equivalent to a relevant installation standard.E+W+S
4. In this Schedule, “MCS” means the Microgeneration Certification Scheme. ]E+W+S
Article 21
1.—(1) The central FIT register must contain sufficient information to identify each accredited FIT installation.E+W+S
(2) Information under paragraph (1) must include, in respect of each accredited FIT installation—
(a)the tariff code assigned under article 13;
(b)the unique identifier assigned under article 14;
(c)the site of the installation determined under article 15;
(d)the confirmation date;
(e)whether or not the installation has been extended;
(f)whether or not the installation has been modified (other than by way of an extension which falls within Part 4);
(g)if applicable, the number of the MCS certificate;
(h)the eligible low carbon energy source used;
(i)the total installed capacity;
(j)details of the FIT generator and, if applicable, details of the FIT generator's nominated recipient;
(k)whether or not an export payment is paid and how that export payment is determined;
(l)the date of the statement of FIT terms;
(m)details of the generation and, if applicable, export meters which apply to the accredited FIT installation, including meter point administration numbers.
2. The central FIT register must contain sufficient information to identify, in respect of each accredited FIT installation—E+W+S
(a)the FIT licensee responsible for making FIT payments;
(b)the FIT generator and any nominated recipient to which the FIT licensee makes FIT payments.
Article 8B
Textual Amendments
8th February to 31st March 2016 | 1st April to 30th June 2016 | 1st July to 30th September 2016 | 1st October to 31st December 2016 | 1st January to 31st March 2017 | 1st April to 30th June 2017 | 1st July to 30th September 2017 | 1st October to 31st December 2017 | 1st January to 31st March 2018 | 1st April to 30th June 2018 | 1st July to 30th September 2018 | 1st October to 31st December 2018 | 1st January to 31st March 2019 | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Anaerobic digestion installations | 5.8 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 |
Hydro generating stations with total installed capacity of 100 kW or less | 1.1 | 1.1 | 1.2 | 1.2 | 1.2 | 1.3 | 1.3 | 1.3 | 1.3 | 1.3 | 1.4 | 1.4 | 1.4 |
Hydro generating stations with total installed capacity greater than 100 kW | 6.1 | 6.2 | 6.3 | 6.3 | 6.4 | 6.4 | 6.4 | 6.4 | 6.4 | 6.4 | 6.4 | 6.3 | 6.3 |
Solar photovoltaic (other than stand-alone) with total installed capacity of 10 kW or less | 48.4 | 49.6 | 50.6 | 51.7 | 52.8 | 53.8 | 54.2 | 55.9 | 57.0 | 58.0 | 59.1 | 60.1 | 61.1 |
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 10 kW but not exceeding 50 kW | 16.5 | 17.0 | 17.4 | 17.8 | 18.2 | 18.6 | 18.7 | 19.4 | 19.8 | 20.3 | 20.7 | 21.1 | 21.5 |
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 50 kW | 14.1 | 14.5 | 14.9 | 15.4 | 15.8 | 16.2 | 16.4 | 17.1 | 17.6 | 18.0 | 18.5 | 19.0 | 19.4 |
Stand-alone solar photovoltaic | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 |
Wind with total installed capacity of 50 kW or less | 5.6 | 5.6 | 5.5 | 5.5 | 5.6 | 5.5 | 5.5 | 5.4 | 5.5 | 5.4 | 5.4 | 5.3 | 5.4 |
Wind with total installed capacity greater than 50 kW but not exceeding 100 kW | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 | 0.3 |
Wind with total installed capacity greater than 100 kW but not exceeding 1500 kW | 6.8 | 6.7 | 6.6 | 6.5 | 6.4 | 6.3 | 6.2 | 6.1 | 6.1 | 5.9 | 5.8 | 5.7 | 5.7 |
Wind with total installed capacity greater than 1500 kW | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 | 5.0] |
Article 36
Textual Amendments
1. Within the first 5 working days of each tariff period, the Authority must determine and publish the data set out in paragraphs 2 to 4.E+W+S
2. The data referred to in paragraph 1, in respect of installations not able to be granted preliminary accreditation are—E+W+S
(a)the aggregate total installed capacities of solar photovoltaic (other than stand-alone), with total installed capacity of 10 kilowatts or less, which were registered on the MCS database in the deployment period;
(b)the aggregate total installed capacities of solar photovoltaic (other than stand-alone), with total installed capacity greater than 10 kilowatts but not exceeding 50 kilowatts, which were registered on the MCS database in that period; and
(c)the aggregate total installed capacities of wind installations, with total installed capacity of 50 kilowatts or less, which were registered on the MCS database in that period.
3. The data referred to in paragraph 1, in respect of installations to which the Authority may grant preliminary accreditation, are—E+W+S
(a)the aggregate total installed capacities of anaerobic digestion installations, with total installed capacity of 500 kilowatts or less, applied for within that deployment period;
(b)the aggregate total installed capacities of anaerobic digestion installations, with total installed capacity greater than 500 kilowatts, applied for within that period;
(c)the aggregate total installed capacities of hydro generating stations applied for within that period;
(d)the aggregate total installed capacities of solar photovoltaic installations (other than stand-alone), with total installed capacity greater than 50 kilowatts applied for within that period;
(e)the aggregate total installed capacity of wind installations, with total installed capacity greater than 50 kilowatts, applied for within that deployment period.
4. The data referred to in paragraph 1, in respect of stand-alone solar photovoltaic installations, are the aggregate total installed capacities of stand-alone solar photovoltaic installations applied for within that deployment period (including those which were registered on the MCS database in that period).E+W+S
5. In this Schedule—E+W+S
“applied for” refers to an application for accreditation or preliminary accreditation being received as defined in article 8B(4)(a);
“deployment period” means the period of three months immediately preceding the tariff period; and
“MCS database” means the database maintained by the Microgeneration Certification Scheme that records the details of MCS-certified installations.]
Article 40
Orders revoked | References |
---|---|
The Feed-in Tariffs (Specified Maximum Capacity and Functions) Order 2010 | S.I. 2010/678 |
The Feed-in Tariffs (Specified Maximum Capacity and Functions) (Amendment) Order 2011 | S.I. 2011/1181 |
The Feed-in Tariffs (Specified Maximum Capacity and Functions) (Amendment No. 2) Order 2011 | S.I. 2011/1655 |
The Feed-in Tariffs (Specified Maximum Capacity and Functions) (Amendment No. 3) Order 2011 | S.I. 2011/2364 |
The Feed-in Tariffs (Specified Maximum Capacity and Functions) (Amendment) Order 2012 | S.I. 2012/671 |
The Feed-in Tariffs (Specified Maximum Capacity and Functions) (Amendment No. 2) Order 2012 | S.I. 2012/1393 |
The Feed-in Tariffs (Specified Maximum Capacity and Functions) (Amendment No. 3) Order 2012 | S.I. 2012/2268 |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: