- Latest available (Revised)
- Point in Time (06/04/2018)
- Original (As made)
Version Superseded: 24/06/2024
Point in time view as at 06/04/2018.
There are currently no known outstanding effects for the The Energy Performance of Buildings (England and Wales) Regulations 2012, SCHEDULEB1.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Regulation 30A
Textual Amendments
1. In this Schedule, “residential building” means premises in England or Wales consisting of a single dwelling, including ancillary land.E+W
2. For data from which an energy performance certificate for a residential building may be produced, the data items specified are—E+W
(a)the address (including the postcode),
(b)the energy rating,
(c)the potential energy rating,
(d)the building type and built form,
(e)the inspection date,
(f)the local authority area,
(g)the constituency and county where the building is located,
(h)the date the data were entered onto the register,
(i)the transaction type,
(j)the current environmental impact rating,
(k)the potential environmental impact rating,
[F2(l)the current primary energy use of the building,]
[F3(m)the potential primary energy use of the building,]
(n)the current CO2 emissions,
(o)the current CO2 emissions per floor area,
(p)the potential CO2 emissions,
(q)the current lighting cost,
(r)the potential lighting cost,
(s)the current heating cost,
(t)the potential heating cost,
(u)the current hot water cost,
(v)the potential hot water cost,
(w)the total floor area,
(x)the energy tariff,
(y)whether the building is connected to the gas network,
(z)the floor level,
(aa)whether the building is on the top floor (for flats),
(bb)if the building is a flat not on the top floor the storey count for the building,
F4(cc). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(dd)the proportion of the windows which are multi-glazed,
(ee)the types of glazing and the area glazed,
(ff)the number of extensions to the building,
(gg)the number of habitable rooms,
(hh)the number of heated rooms,
(ii)the floor height,
(jj)the main fuel type,
(kk)the number of open fireplaces,
(ll)any recommended improvements included in the latest recommendation report under regulation 9(1)(d),
(mm)the hot water heating source,
(nn)the energy efficiency of the hot water heating source,
(oo)the environmental efficiency of the hot water heating source,
(pp)the description of the main heating system,
(qq)the energy efficiency of the main heating system,
(rr)the environmental efficiency of the main heating system,
(ss)the description of the main heating controls,
(tt)the energy efficiency of the main heating controls,
(uu)the environmental efficiency of the main heating controls,
(vv)the description of the secondary heating system,
(ww)the energy efficiency of the secondary heating system,
(xx)the environmental efficiency of the secondary heating system,
(yy)the description of the floor,
(zz)the energy efficiency of the floor,
(aaa)the environmental efficiency of the floor,
(bbb)the description of the windows,
(ccc)the energy efficiency of the windows,
(ddd)the environmental efficiency of the windows,
(eee)the description of the walls,
(fff)the energy efficiency of the walls,
(ggg)the environmental efficiency of the walls,
(hhh)the description of the roof,
(iii)the energy efficiency of the roof,
(jjj)the environmental efficiency of the roof,
(kkk)the description of the lighting,
(lll)the energy efficiency of the lighting,
(mmm)the environmental efficiency of the lighting,
(nnn)the proportion of low energy lighting,
(ooo)the number of wind turbines,
(ppp)whether there is a heat loss corridor,
(qqq)the length of any unheated corridor,
(rrr)the description of any photovoltaic supply,
(sss)the description of any mechanical ventilation system,
(ttt)whether solar water heating is present, F5...
(uuu)the unique property reference number assigned to the building.
[F6(vvv)the construction age band for the building,
(www)the time stamp to show when the data were entered into the register,
(xxx)the date on which the energy assessor completed the report,
(yyy)the tenure type,
(zzz)the indicative cost, typical saving per year and energy efficiency rating and environmental efficiency ratings associated with recommended improvements,
(aaaa)whether a pressure test has been carried out or an assumed value has been used for air permeability,
(bbbb)the results of any air permeability test,
(cccc)the size of the living area,
(dddd)the orientation of the front of the building,
(eeee)the type of any conservatory,
(ffff)the description of the main building part,
(gggg)the amount of over-shading for the main building part,
(hhhh)the number of open flues in the building,
(iiii)the number of extract fans in the building,
(jjjj)the number of pressure safety valves in the building,
(kkkk)the number of flueless gas fires in the building,
(llll)the number of sheltered sides of the building,
(mmmm)the type of ventilation,
(nnnn)the source of any mechanical ventilation data,
(oooo)the product index number of any mechanical ventilation system,
(pppp)the number of fans located in the kitchen,
(qqqq)the number of ducts located in the kitchen,
(rrrr)the number of fans in rooms other than the kitchen,
(ssss)the number of ducts in rooms other than the kitchen,
(tttt)the proportion of the total floor area served by the main heating system,
(uuuu)the main heating data source,
(vvvv)the boiler index number,
(wwww)the age of the central heating pump,
(xxxx)the type of heat emitter,
(yyyy)the main heating flue type,
(zzzz)whether there is a boiler interlock system,
(aaaaa)whether the heating system has a delayed start thermostat,
(bbbbb)whether the heating system has a load or weather compensator,
(ccccc)the compensating controller index number,
(ddddd)the type of water heating present in the building,
(eeeee)the type of fuel used to heat water,
(fffff)the type of insulation surrounding the hot water cylinder,
(ggggg)the average thickness of the insulation surrounding the hot water cylinder,
(hhhhh)the size of the hot water cylinder,
(iiiii)whether the hot water cylinder has a thermostat,
(jjjjj)the description of any hot water thermal store,
(kkkkk)the type of terrain where any wind turbine is located,
(lllll)the total number of fixed lighting outlets,
(mmmmm)the total number of low energy fixed lighting outlets,
(nnnnn)the details of any solar water heating collector and solar storage,
(ooooo)the product index number of the flue gas heat recovery system where recorded,
(ppppp)the product index number of the waste water heat recovery system where recorded][F7,
(qqqqq)the accreditation scheme that lodged the data items specified in this paragraph].
Textual Amendments
F2Sch. B1 para. 2 item (l) substituted (1.10.2016) by The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(a)(i)
F3Sch. B1 para. 2 item (m) substituted (1.10.2016) by The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(a)(ii)
F4Sch. B1 para. 2 item (cc) omitted (1.10.2016) by virtue of The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(a)(iii)
F5Word in Sch. B1 para. 2 omitted (6.4.2017) by virtue of The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2017 (S.I. 2017/368), regs. 1(2), 4(a)(i)
F6Words in Sch. B1 para. 2 inserted (6.4.2017) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2017 (S.I. 2017/368), regs. 1(2), 4(a)(ii)
F7Sch. B1 para. 2 item (qqqqq) and comma inserted (6.4.2018) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2018 (S.I. 2018/362), regs. 1(2), 6(a)
3. For data from which an energy performance certificate for a building other than a residential building may be produced, the data items specified are—E+W
(a)the address (including the postcode),
(b)the energy rating,
F8(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(d)the building type,
(e)the inspection date,
(f)the local authority area,
(g)the constituency and county where the building is located,
(h)the date the data were entered onto the register,
(i)the transaction type,
(j)the benchmark against other new build or existing properties as appropriate,
(k)whether the building is a level 3, 4 or 5 building,
(l)the main heating fuel,
(m)the description of any other fuel,
(n)whether the building is air-conditioned,
(o)whether an air-conditioning system inspection has been requested,
(p)the estimated and actual rated output of the air-conditioning system,
F9(q). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
[F10(r)the primary energy use of the building,]
(s)the floor area,
(t)the current CO2 emissions per floor area,
(u)the unique property reference number assigned to the building,
(v)the standard emission rate of the building,
(w)the typical emission rate of the building,
(x)the target emission rate of the building,
[F11(xa)the building emission rate of the building,]
(y)any recommended improvements included in the latest recommendation report under regulation 9(1)(d), F12...
(z)the description of the building environment.
[F13(aa)the time stamp to show when the data were entered onto the register][F14,
(bb)the accreditation scheme that lodged the data items specified in this paragraph].
Textual Amendments
F8Sch. B1 para. 3 item (c) omitted (1.10.2016) by virtue of The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(b)(i)(aa)
F9Sch. B1 para. 3 item (q) omitted (1.10.2016) by virtue of The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(b)(i)(bb)
F10Sch. B1 para. 3 item (r) substituted (1.10.2016) by The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(b)(ii)
F11Sch. B1 para. 3 item (xa) inserted (1.10.2016) by The Energy Performance of Buildings (England and Wales) (Amendment) (No. 2) Regulations 2016 (S.I. 2016/888), regs. 1(2), 2(6)(b)(iii)
F12Word in Sch. B1 para. 3 omitted (6.4.2017) by virtue of The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2017 (S.I. 2017/368), regs. 1(2), 4(b)(i)
F13Words in Sch. B1 para. 3 added (6.4.2017) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2017 (S.I. 2017/368), regs. 1(2), 4(b)(ii)
F14Sch. B1 para. 3 item (bb) and comma inserted (6.4.2018) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2018 (S.I. 2018/362), regs. 1(2), 6(b)
4. For data from which a display energy certificate may be produced, the data items specified are—E+W
(a)the address (including the postcode),
(b)the current energy rating,
(c)the energy rating for any previous years,
(d)the building type,
(e)the inspection date,
(f)the local authority area,
(g)the constituency and county where the building is located,
(h)the date the data were entered onto the register,
(i)the unique property reference number assigned to the building,
(j)the benchmark category,
(k)the lodged code for the type of building,
(l)the main heating fuel,
(m)the description of any other fuel,
(n)whether the building is air-conditioned,
(o)whether an air-conditioning system inspection has been requested,
(p)the estimated and actual rated output of the air-conditioning system,
(q)whether the building has specialised energy requirements,
(r)the energy from renewable sources (if any) used in the building,
(s)the floor area,
(t)the description of the building environment,
(u)the proportion of CO2 emissions attributable to electricity used in the building,
(v)the proportion of CO2 emissions from energy used to heat the building,
(w)the proportion of CO2 emissions from energy from renewable sources (if any) used in the building,
(x)the annual thermal fuel usage of the building,
(y)the typical thermal fuel usage of the building,
(z)the annual electricity fuel usage of the building,
(aa)the typical electricity fuel usage of the building,
(bb)the proportion of thermal fuel from renewable sources (if any) for the building,
(cc)the proportion of electricity from renewable sources (if any) for the building, F15...
(dd)the CO2 emissions in previous years from electricity use, heating and renewable sources (if any) for the building.
[F16(ee)the time stamp to show when the data were entered onto the register,
(ff)the nominated date for the assessment] [F17,
(gg)assessment end date,
(hh)occupancy level,
(ii)the accreditation scheme that lodged the data items specified in this paragraph].
Textual Amendments
F15Word in Sch. B1 para. 4 omitted (6.4.2017) by virtue of The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2017 (S.I. 2017/368), regs. 1(2), 4(c)(i)
F16Words in Sch. B1 para. 4 added (6.4.2017) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2017 (S.I. 2017/368), regs. 1(2), 4(c)(ii)
F17Sch. B1 para. 4 item (gg)-(ii) and comma inserted (6.4.2018) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2018 (S.I. 2018/362), regs. 1(2), 6(c)
5. For data from which an inspection report may be produced, the data items specified are—E+W
(a)the address (including the postcode),
(b)the building type,
(c)the inspection date,
(d)the local authority area,
(e)the constituency and county where the building is located,
(f)the date the data were entered onto the register,
(g)the unique property reference number assigned to the building,
(h)the complexity level of the building,
(i)whether an F-Gas compliant report has been provided,
(j)the total effective rated output of the air-conditioning system,
(k)the treated floor area of the air-conditioning system,
(l)the total estimated refrigerant charge of the air-conditioning system,
(m)whether the inspection has been undertaken using a sample of components of larger air-conditioning systems,
(n)whether the air-conditioning system is sub-metered,
(o)the description of any sub-systems inspected,
(p)the description of any refrigerant types, and
(q)the age of the main components of the system.]
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: