PART 1Preliminary

Citation and commencement

1.  This Order may be cited as the Network Rail (Norton Bridge Area Improvements) Order 2014 and comes into force on 21st April 2014.

Interpretation

2.—(1) In this Order—

“the 1961 Act” means the Land Compensation Act 1961(1);

“the 1965 Act” means the Compulsory Purchase Act 1965(2);

“the 1973 Act” means the Land Compensation Act 1973(3);

“the 1980 Act” means the Highways Act 1980(4);

“the 1984 Act” means the Road Traffic Regulation Act 1984(5);

“the 1990 Act” means the Town and Country Planning Act 1990(6);

“the 1991 Act” means the New Roads and Street Works Act 1991(7);

“the 2003 Act” means the Communications Act 2003(8);

“the 2008 Act” means the Planning Act 2008;

“address” includes any number or address used for the purposes of electronic transmission;

“associated development” has the same meaning as in section 115(2) of the 2008 Act;

“authorised development” means the development and associated development described in Schedule 1 (authorised development) and any other development authorised by this Order, which is development within the meaning of section 32 of the 2008 Act;

“the book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;

“building” includes any structure or erection or any part of a building, structure or erection;

“carriageway” has the same meaning as in the 1980 Act;

“compulsory acquisition notice” means a notice served in accordance with section 134 of the 2008 Act;

“cycle track” has the same meaning as in the 1980 Act;

“defects period” means, in relation to any highway work, the period of 12 months referred to in article 10(5) (construction and maintenance of new or altered streets) during which Network Rail must remedy defects in a street;

“design brief” means the Design Brief for Landscape Proposals and Mitigation and Restoration of the Wider Landscape (revised September 2013) as certified by the Secretary of State for the purposes of this Order;

“the design drawings” means the drawings listed in Part 1 of Schedule 11 (plans and drawings) and certified as the design drawings by the Secretary of State for the purposes of this Order;

“electronic transmission” means a communication transmitted—

(a)

by means of an electronic communications network; or

(b)

by other means but while in electronic form;

“the Environmental Statement” means the document certified as the environmental statement by the Secretary of State for the purposes of this Order;

“footpath” and “footway” have the same meaning as in the 1980 Act;

“highway” and “highway authority” have the same meaning as in the 1980 Act;

“highway work” means any work that involves the construction of a new street or permanent change to an existing street, including changes to road layout, kerbs, signs and markings, lighting, signalling, drainage, landscaping and installation of roadside equipment;

“the land plans” means the plans listed in Part 2 of Schedule 11 and certified as the land plans by the Secretary of State for the purposes of this Order;

“limits of deviation” means the limits of deviation referred to in article 6 (limits of deviation);

“maintain” includes to inspect, test, repair, adjust, alter, remove, renew, reconstruct, replace, render unusable, protect or strengthen and any derivative of “maintain” is to be construed accordingly;

“National Grid” means National Grid Gas plc, company number 2006000, registered at 1-3 Strand, London WC2N 5EH;

“Network Rail” means Network Rail Infrastructure Limited, company number 02904587, registered at Kings Place, 90 York Way, London N1 9AG;

“Order land” means the land shown on the land plans which is within the limits of land to be acquired or used and described in the book of reference;

“Order limits” means the limits of deviation shown on the works plans and the limits of land to be acquired or used shown on the land plans;

“owner”, in relation to land, has the same meaning as in section 7 of the Acquisition of Land Act 1981(9);

“relevant planning authority” means Stafford Borough Council;

“the sections” means the sections forming part of the works plans certified by the Secretary of State for the purposes of this Order;

“statutory undertaker” means any statutory undertaker for the purposes of section 127(8) of the 2008 Act and for the purpose of, or in connection with, Work No. 20, includes UKOP;

“street” means a street within the meaning of section 48 of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;

“street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;

“the street plans” means the plans listed in Part 3 of Schedule 11 and certified as the street plans by the Secretary of State for the purposes of the Order;

“the traffic regulation order plans” means the plans listed in Part 5 of Schedule 11 and certified as the traffic regulation order plans by the Secretary of State for the purposes of the Order;

“the tribunal” means the Lands Chamber of the Upper Tribunal;

“UKOP” means United Kingdom Oil Pipelines Limited, company number 00746708, registered at 5-7 Alexandra Road, Hemel Hempstead, Hertfordshire, HP2 5BS;

“watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain; and

“the works plans” means the plans listed in Part 4 of Schedule 11 and certified as the works plans by the Secretary of State for the purposes of this Order.

(2) References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or is otherwise comprised in Network Rail’s railway undertaking.

(3) All distances, directions and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.

(4) All areas described in the book of reference are approximate.

(5) References in this Order to points identified by letters, with or without numbers, are to be construed as references to points so lettered on the works plans.

(6) References in this Order to numbered works are references to the works as numbered in Schedule 1 (authorised development).

Incorporation of the Railways Clauses Acts

3.—(1) The following provisions of the Railways Clauses Consolidation Act 1845(10) are incorporated in this Order—

  • section 46 (crossing of roads—level crossings), subject to paragraph (4) and article 17 (level crossing);

  • section 58 (company to repair roads used by them), except for the words from “and if any question” to the end;

  • section 61 (company to make sufficient approaches and fences to highways crossing on the level);

  • section 68 (accommodation works by company);

  • section 71 (additional accommodation works by owners), except for the words “or directed by such justices to be made by the company” and “or, in case of difference, as shall be authorised by two justices”;

  • sections 72 and 73 (supplementary provisions relating to accommodation works);

  • section 77 (presumption that minerals excepted from acquisition of land);

  • sections 78 to 83, 85 to 85E and Schedules 1 to 3 (minerals under railways), as respectively substituted and inserted by section 15 of the Mines (Working Facilities and Support) Act 1923(11); and

  • section 105 (carriage of dangerous goods on railway), except for the words from “and if any person” to “for every such offence”.

(2) The following provisions of the Railways Clauses Act 1863(12) are incorporated in this Order—

  • sections 5 and 7 (level crossings); and

  • section 12 (signals, watchmen etc.).

(3) In those provisions, as incorporated in this Order—

“the company” means Network Rail;

“goods” includes any thing conveyed on the railway authorised to be constructed by this Order;

“lease” includes an agreement for a lease;

“prescribed”, in relation to any such provision, means prescribed by this Order for the purposes of that provision;

“the railway” means any railway authorised to be constructed by this Order and any other authorised development; and

“the special Act” means this Order.

(4) In section 46 of the Railways Clauses Consolidation Act 1845, as incorporated in this Order, for the proviso substitute—

Provided always that, with the consent of the highway authority and subject to such conditions as the authority may reasonably impose, the railway may be carried across a highway on the level..

PART 2Principal Powers

Development consent etc. granted by the Order

4.—(1) Subject to the provisions of this Order including the requirements in Schedule 2 (requirements)—

(a)Network Rail is granted development consent for the authorised development; and

(b)National Grid is granted development consent for Work Nos. 17, 18, 19A and 19B and any further associated development in connection with those works,

but, in relation to Work No. 19A and Work No. 19B, only one of them (not both) may be carried out.

(2) Subject to article 6 (limits of deviation) the authorised development is to be constructed in the lines and situations shown on the works plans and at the levels shown on the sections.

Maintenance of authorised development

5.—(1) Network Rail may at any time maintain the authorised development except to the extent that this Order, or an agreement made under this Order, provides otherwise.

(2) National Grid may at any time maintain Work Nos. 17, 18 and either 19A or 19B and any associated development in connection with those works except to the extent that this Order, or an agreement made under this Order, provides otherwise.

Limits of deviation

6.  In carrying out the authorised development for which they are granted development consent by article 4(1) (development consent etc. granted by the Order), Network Rail and National Grid may—

(a)deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; and

(b)deviate vertically from the levels of the authorised development shown on the sections—

(i)to any extent not exceeding 3 metres upwards; or

(ii)to any extent downwards as may be found to be necessary or convenient.

Benefit of Order

7.—(1) Subject to paragraphs (2) to (4), and paragraph (5) of article 22 (compulsory acquisition of rights)—

(a)the following provisions have effect for the benefit of Network Rail and National Grid—

(i)the development consent granted by article 4(1)(b) (development consent etc. granted by the Order); and

(ii)subject to sub-paragraph (b), any other provisions of this Order in so far as they are applicable to, or are exercisable for the purpose of, or in connection with, the carrying out or maintenance of Work Nos. 17, 18, 19A and 19B and of any associated development in connection with those works,

and references in any of those provisions to Network Rail, where applicable, with respect to those works, are to be construed as referring also to National Grid;

(b)the following provisions have effect for the benefit of National Grid only—

(i)article 22(3) and Part 2 of Schedule 7 (land in which only new rights etc. may be acquired); and

(ii)article 29 (temporary use of land by National Grid) and Part 2 of Schedule 9 (land of which temporary possession may be taken); and

(c)the remainder of the provisions of this Order have effect for the benefit of Network Rail only.

(2) Paragraph (1) does not apply to the benefit of the consent granted by this Order for works for the benefit of owners and occupiers of land, statutory undertakers and other persons affected by the authorised development.

(3) National Grid may not exercise the powers referred to in sub-paragraphs (1)(a) or (1)(b) without the written consent of, and upon such terms as may be agreed by, Network Rail.

(4) The exercise by National Grid of any benefits or rights conferred on it by this Order is subject to the same restrictions, liabilities and obligations as would apply under this Order if those benefits or rights were exercised by Network Rail.

PART 3Streets

Power to alter layout etc. of streets

8.—(1) Network Rail may for the purposes of the authorised development alter the layout of or carry out any works in each street specified in column (1) of Schedule 3 (streets subject to alteration of layout) in the manner specified in relation to that street in column (2).

(2) Without limitation on the scope of the specific powers conferred by paragraph (1) but subject to paragraph (3), Network Rail may, within the Order limits and for the purposes of constructing and maintaining the authorised development, alter the layout of any street and the layout of any street having a junction with such a street; and, without limitation on the scope of this paragraph, Network Rail may—

(a)increase the width of the carriageway of the street by reducing the width of any kerb, footpath, footway, cycle track or verge within the street;

(b)alter the level or increase the width of any such kerb, footpath, footway, cycle track or verge;

(c)reduce the width of the carriageway of the street; and

(d)make and maintain passing places.

(3) Network Rail must restore to the reasonable satisfaction of the street authority any street that has been temporarily altered under this article.

(4) The powers conferred by paragraph (2) are not to be exercised without the consent of the street authority, but such consent must not be unreasonably withheld.

Street works

9.—(1) Network Rail may, for the purposes of the authorised development, enter on so much of any of the streets specified in Schedule 4 (streets subject to street works) as is within the Order limits and may—

(a)break up or open the street, or any sewer, drain or tunnel under it;

(b)tunnel or bore under the street;

(c)place temporary apparatus in the street;

(d)maintain temporary apparatus in the street and permanent apparatus under the street and, in either case, change its position; and

(e)execute any works required for or incidental to any works referred to in sub-paragraphs (a), (b), (c) and (d).

(2) In this article “apparatus” has the same meaning as in Part 3 of the 1991 Act and “in” as referring to apparatus in the street means under, over, across, along or upon the street.

Construction and maintenance of new or altered streets

10.—(1) Any highway work constructed under this Order must be completed to the reasonable satisfaction of the highway authority.

(2) When Network Rail considers that a highway work has been completed, except for any minor item not affecting safety, it must apply to the highway authority in accordance with the provisions of article 44 (procedure in relation to certain approvals etc. other than under Schedule 2) for its approval of the standard to which the work has been carried out.

(3) In the case of a new street, Network Rail must, within 28 days of receiving the approval or deemed approval of the highway authority under article 44, vest the street in the highway authority.

(4) Upon the vesting of the new street in the highway authority, the highway authority must adopt it as a highway maintainable at the public expense.

(5) In the case of a new street, regardless of its adoption by the highway authority, Network Rail must, for a period of 12 months beginning with the date of the highway authority’s approval or deemed approval under article 44 of the standard to which a highway work has been carried out under this Order, and unless otherwise agreed with the highway authority, remedy any defect in the street resulting from the carrying out of the work.

(6) Any work by Network Rail to remedy a defect in a street under this article must be carried out to the reasonable satisfaction of the highway authority.

(7) Network Rail must apply to the highway authority for its approval of the standard to which any remedial work under this article has been carried out.

(8) Network Rail will continue to be liable for the maintenance of the structure of any bridge or tunnel carrying a street over or under any railway of Network Rail regardless of the adoption of the highway by the highway authority or the expiry of any defects period applicable to the street under this article.

(9) In any action against Network Rail in respect of loss or damage resulting from any failure by it to remedy a defect under this article, it is a defence (without prejudice to any other defence or the application of the law relating to contributory negligence) to prove that Network Rail had taken such care as in all the circumstances was reasonably required to secure that the part of the street to which the action relates was not dangerous to traffic.

(10) For the purpose of a defence under paragraph (9), the court must in particular have regard to the following matters—

(a)the character of the street and the traffic which was reasonably to be expected to use it;

(b)the standard of maintenance appropriate for a street of that character and used by such traffic;

(c)the state of repair in which a reasonable person would have expected to find the street;

(d)whether Network Rail knew, or could reasonably have been expected to know, that the condition of the part of the street to which the action relates was likely to cause danger to users of the street; and

(e)where Network Rail could not reasonably have been expected to repair that part of the street before the cause of action arose, what warning notices of its condition had been displayed;

but for the purposes of such a defence it is not relevant to prove that Network Rail had arranged for a competent person to carry out or supervise the remedial work to the part of the street to which the action relates unless it is also proved that Network Rail had given the competent person proper instructions with regard to the remedial work to the street and that the competent person had carried out those instructions.

(11) Nothing in this article—

(a)prejudices the operation of section 87 of the 1991 Act (prospectively maintainable highways); and Network Rail is not, by reason of any duty under this article to remedy a defect in a street, to be taken to be a street authority in relation to that street for the purposes of Part 3 of that Act; or

(b)has effect in relation to the street works with regard to which the provisions of Part 3 of the 1991 Act apply.

Stopping up of streets

11.—(1) Subject to the provisions of this article, Network Rail may, in connection with the carrying out of the authorised development, stop up each of the streets specified in columns (1) and (2) of Schedule 5 (streets to be stopped up) to the extent specified, by reference to the letters and numbers shown on the street plans, in column (3) of that Schedule.

(2) No street specified in columns (1) and (2) of Schedule 5 is to be wholly or partly stopped up under this article unless—

(a)the new street to be constructed and substituted for it, which is specified in column (4) of that Schedule, has been constructed and completed to the reasonable satisfaction of the street authority and is open for use; or

(b)a temporary alternative route for the passage of such traffic as could have used the street to be stopped up is first provided and subsequently maintained by Network Rail, to the reasonable satisfaction of the street authority, between the commencement and termination points for the stopping up of the street until the completion and opening of the new street in accordance with sub-paragraph (a).

(3) Where a street has been stopped up under this article—

(a)all rights of way over or along the street so stopped up are extinguished; and

(b)Network Rail may appropriate and use for the purposes of the authorised development so much of the site of the street as is bounded on both sides by land owned by Network Rail.

(4) Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

(5) This article is subject to article 32 (apparatus and rights of statutory undertakers in stopped up streets).

(6) When a street has been stopped up under the provisions of this article, Network Rail must provide to the street authority within 28 days of the stopping up a plan to a scale of not less than 1:500 showing the extent of the stopping up.

Application of the 1991 Act

12.—(1) Works carried out under this Order in relation to a highway which consists of or includes a carriageway are to be treated for the purposes of Part 3 of the 1991 Act (street works in England and Wales) as major transport works if—

(a)they are of a description mentioned in any of paragraphs (a), (c) to (e), (g) and (h) of section 86(3) of that Act (which defines what highway authority works are major highway works); or

(b)they are works which, had they been carried out by the highway authority, might have been carried out in exercise of the powers conferred by section 64 of the 1980 Act (dual carriageways and roundabouts).

(2) The following provisions of the 1991 Act do not apply in relation to any works carried out under the powers conferred by this Order—

  • section 56 (directions as to timing);

  • section 56A (power to give directions as to placing of apparatus);

  • section 58 (restriction on works following substantial road works);

  • section 58A (restriction on works following substantial street works);

  • section 73A (power to require undertaker to re-surface street);

  • section 73B (power to specify timing etc. of re-surfacing);

  • section 73C (materials, workmanship and standard of re-surfacing);

  • section 78A (contributions to costs of re-surfacing by undertaker); and

  • Schedule 3A (restriction on works following substantial street works).

(3) The provisions of the 1991 Act mentioned in paragraph (4) (which, together with other provisions of that Act, apply in relation to the carrying out of street works) and any regulations made or code of practice issued or approved under those provisions apply (with the necessary modifications) in relation to the temporary stopping up, temporary alteration or temporary diversion of a street by Network Rail under the powers conferred by article 13 (temporary stopping up of streets) and the carrying out of works under article 9 (street works) whether or not the stopping up, alteration or diversion, or the carrying out of such works, constitutes street works within the meaning of that Act.

(4) The provisions of the 1991 Act referred to in paragraph (3) are—

  • section 54 (advance notice of certain works), subject to paragraph (5);

  • section 55 (notice of starting date of works), subject to paragraph (5);

  • section 57 (notice of emergency works);

  • section 59 (general duty of street authority to co-ordinate works);

  • section 60 (general duty of undertakers to co-operate);

  • section 68 (facilities to be afforded to street authority);

  • section 69 (works likely to affect other apparatus in the street);

  • section 76 (liability for cost of temporary traffic regulation); and

  • section 77 (liability for cost of use of alternative route),

and all such other provisions as apply for the purposes of the provisions mentioned above.

(5) Sections 54 and 55 of the 1991 Act as applied by paragraph (3) have effect as if references in section 57 of that Act to emergency works included a reference to a stopping up, alteration or diversion (as the case may be) required in a case of emergency.

Temporary stopping up of streets

13.—(1) Network Rail, during and for the purposes of carrying out the authorised development, may temporarily stop up, alter or divert any street and may for any reasonable time—

(a)divert the traffic from the street; and

(b)subject to paragraph (3), prevent all persons from passing along the street.

(2) Without limitation on the scope of paragraph (1), Network Rail may use any street stopped up under the powers conferred by this article within the Order limits as a temporary working site.

(3) Network Rail must provide reasonable access for pedestrians going to or from premises abutting a street affected by the temporary stopping up, alteration or diversion of a street under this article if there would otherwise be no such access.

(4) Network Rail must not temporarily stop up, alter or divert or use as a temporary working site any street without the consent of the street authority which may attach reasonable conditions to any consent, but such consent must not be unreasonably withheld.

(5) Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

Access to works

14.  Network Rail may, for the purposes of the authorised development and with the approval of the relevant planning authority after consultation with the highway authority, form and lay out such other means of access or improve existing means of access, at such locations within the Order limits as Network Rail reasonably requires for the purposes of the authorised development.

Agreements with street authorities

15.—(1) A street authority and Network Rail may enter into agreements with respect to—

(a)the construction of any new street, including any structure carrying the street over or under a railway authorised by the Order;

(b)the strengthening, improvement, repair or reconstruction of any street under the powers conferred by this Order;

(c)the maintenance of the structure of any bridge or tunnel carrying a street over or under any railway authorised by this Order;

(d)any stopping up, alteration or diversion of a street under the powers conferred by this Order; or

(e)the carrying out in the street of any of the works referred to in article 9(1) (street works).

(2) Such agreements may, without limitation on the scope of paragraph (1)—

(a)make provision for the street authority to carry out any function under this Order which relates to the street in question;

(b)include an agreement between Network Rail and the street authority specifying a reasonable time for the completion of the works; and

(c)contain such terms as to payment and otherwise as the parties consider appropriate.

Construction of bridges and tunnels

16.  Any bridge or tunnel to be constructed under this Order for carrying a highway over or under a railway or a watercourse must be constructed in accordance with the plans and specifications approved by the highway authority.

Level crossing

17.—(1) Subject to paragraph (3), the level crossing specified in columns (1) and (2) of Schedule 6 (replacement and closure of level crossing) is stopped up and discontinued.

(2) Subject to paragraph (3), upon the stopping up and discontinuance of the level crossing referred to in paragraph (1), any right of way over it is extinguished.

(3) Paragraphs (1) and (2) do not take effect with respect to the level crossing specified in Schedule 6 until the new way to be substituted for it, which is specified in column (4) of that Schedule, has been constructed and completed to the reasonable satisfaction of the highway authority, such approval not to be unreasonably withheld, and is open for use.

(4) Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

PART 4Supplemental powers

Discharge of water

18.—(1) Network Rail may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out or maintenance of the authorised development and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain.

(2) Any dispute arising from the making of connections to or the use of a public sewer or drain by Network Rail under paragraph (1) is to be determined as if it were a dispute under section 106 of the Water Industry Act 1991(13) (right to communicate with public sewers).

(3) Network Rail must not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld.

(4) Network Rail must not make any opening into any public sewer or drain except—

(a)in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and

(b)where that person has been given the opportunity to supervise the making of the opening.

(5) Network Rail must not, in carrying out or maintaining works under this article, damage or interfere with the bed or banks of any watercourse forming part of a main river.

(6) Network Rail must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.

(7) Nothing in this article overrides the requirement for an environmental permit under regulation 12(1)(b) of the Environmental Permitting (England and Wales) Regulations 2010(14).

(8) In this article—

(a)“public sewer or drain” means a sewer or drain which belongs to a sewerage undertaker, the Environment Agency, an internal drainage board, or a local authority; and

(b)other expressions, excluding watercourse, used both in this article and in the Water Resources Act 1991(15) have the same meaning as in that Act.

Authority to survey and investigate the land

19.—(1) Network Rail may for the purposes of this Order enter on any land shown within the Order limits and—

(a)survey or investigate the land;

(b)without limitation on the scope of sub-paragraph (a), make trial holes in such positions on the land as Network Rail thinks fit to investigate the nature of the surface layer and subsoil and remove soil samples;

(c)without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land; and

(d)place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes.

(2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least 14 days’ notice has been served on every owner and occupier of the land.

(3) Any person entering land under this article on behalf of Network Rail—

(a)must, if so required, produce written evidence of their authority to do so; and

(b)may take with them such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes.

(4) No trial holes are to be made under this article—

(a)in land located within the highway boundary without the consent of the highway authority; or

(b)in a private street without the consent of the street authority,

but such consent must not be unreasonably withheld.

(5) Network Rail must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the authority conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act (determination of questions of disputed compensation).

PART 5Powers of acquisition

Compulsory acquisition of land

20.—(1) Network Rail may acquire compulsorily so much of the Order land as is required for the authorised development or to facilitate, or is incidental to, it.

(2) This article is subject to paragraph (2) of article 22 (compulsory acquisition of rights) and paragraph (8) of article 28 (temporary use of land by Network Rail).

Time limit for exercise of authority to acquire land compulsorily

21.—(1) After the end of the period of 5 years beginning on the day on which the Order is made—

(a)no notice to treat is to be served under Part 1 of the 1965 Act; and

(b)no declaration is to be executed under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981(16) as applied by article 24 (application of the Compulsory Purchase (Vesting Declarations) Act 1981).

(2) The authority conferred by article 28 (temporary use of land by Network Rail) and article 29 (temporary use of land by National Grid) ceases at the end of the period referred to in paragraph (1), except that nothing in this paragraph prevents Network Rail or National Grid remaining in possession of land after the end of that period, if the land was entered and possession was taken before the end of that period.

Compulsory acquisition of rights

22.—(1) Subject to paragraphs (2) and (8) Network Rail may acquire compulsorily such rights over the Order land, or impose restrictive covenants affecting the land, as may be required for any purpose for which land may be acquired under article 20 (compulsory acquisition of land), by creating them as well as by acquiring rights already in existence.

(2) In the case of the Order land specified in column (1) of Part 1 of Schedule 7 (land in which only new rights etc. may be acquired) Network Rail’s powers of compulsory acquisition are limited to the acquisition of such new rights as may be required for the purpose specified in relation to that land in column (2) of that Part.

(3) In the case of the Order land specified in column (1) of Part 2 of Schedule 7, National Grid may acquire compulsorily such new rights or impose such restrictive covenants as may be required for the purpose specified in relation to that land in column (2) of that Part.

(4) Subject to section 8 of the 1965 Act (as substituted by paragraph 5 of Schedule 8 (modification of compensation and compulsory purchase enactments for creation of new rights)) where Network Rail or National Grid acquires a right over land or the benefit of a restrictive covenant under paragraphs (1) to (3) Network Rail or National Grid is not required to acquire a greater interest in that land.

(5) Schedule 8 has effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article of a right over land by the creation of a new right or the imposition of a restrictive covenant.

(6) In any case where the acquisition of new rights or the imposition of restrictive covenants under paragraph (1) is required for the purpose of diverting, replacing or protecting apparatus of a statutory undertaker or of UKOP, Network Rail may, with the consent of the Secretary of State, transfer the power to acquire such rights or impose such covenants to the statutory undertaker in question or to UKOP.

(7) The exercise by a statutory undertaker or by UKOP of any power in accordance with a transfer under paragraph (6) is subject to the same restrictions, liabilities and obligations as would apply under this Order if that power were exercised by Network Rail.

(8) The power to impose restrictive covenants under paragraph (1) is exercisable only in respect of Order land specified in column (1) of Part 2 of Schedule 7.

Private rights

23.—(1) Subject to the provisions of this article, all private rights over land subject to compulsory acquisition under this Order are extinguished—

(a)as from the date of acquisition of the land by Network Rail, whether compulsorily or by agreement; or

(b)on the date of entry on the land by Network Rail under section 11(1) of the 1965 Act (power of entry),

whichever is the earlier.

(2) Subject to the provisions of this article, all private rights over land subject to the compulsory acquisition of rights or the imposition of restrictive covenants under this Order are extinguished in so far as their continuance would be inconsistent with the exercise of the right or the burden of the restrictive covenant—

(a)as from the date of the acquisition of the right or the benefit of the restrictive covenant by Network Rail, whether compulsorily or by agreement; or

(b)on the date of entry on the land by Network Rail under section 11(1) of the 1965 Act in pursuance of the right,

whichever is the earlier.

(3) Subject to the provisions of this article, all private rights over land owned by Network Rail which, being within the limits of land which may be acquired or used shown on the land plans, are required for the purposes of this Order are extinguished on the appropriation of the land by Network Rail for any of those purposes.

(4) Subject to the provisions of this article, all private rights over land of which Network Rail takes temporary possession under this Order are suspended and unenforceable for as long as Network Rail remains in lawful possession of the land.

(5) Any person who suffers loss by the extinguishment or suspension of any private right under this article is entitled to compensation in accordance with the terms of section 152 of the 2008 Act to be determined, in case of dispute, under Part 1 of the 1961 Act.

(6) This article does not apply in relation to any right to which section 138 of the 2008 Act (extinguishment of rights, and removal of apparatus, of statutory undertakers etc.) or article 31 (statutory undertakers) applies.

(7) Paragraphs (1) to (3) have effect subject to—

(a)any notice given by Network Rail before—

(i)the completion of the acquisition of the land or the acquisition of rights or the imposition of restrictive covenants over or affecting the land;

(ii)Network Rail’s appropriation of it;

(iii)Network Rail’s entry onto it; or

(iv)Network Rail’s taking temporary possession of it,

that any or all of those paragraphs do not apply to any right specified in the notice; and

(b)any agreement made at any time between Network Rail and the person in or to whom the right in question is vested or belongs.

(8) If any such agreement as is referred to in paragraph (7)(b)—

(a)is made with a person in or to whom the right is vested or belongs; and

(b)is expressed to have effect also for the benefit of those deriving title from or under that person,

it is effective in respect of the persons so deriving title, whether the title was derived before or after the making of the agreement.

(9) Reference in this article to private rights over land includes reference to any trusts or incidents to which the land is subject.

Application of the Compulsory Purchase (Vesting Declarations) Act 1981

24.—(1) The Compulsory Purchase (Vesting Declarations) Act 1981 applies as if this Order were a compulsory purchase order.

(2) The Compulsory Purchase (Vesting Declarations) Act 1981, as so applied, has effect with the following modifications.

(3) In section 3 (preliminary notices) for subsection (1) there is substituted—

(1) Before making a declaration under section 4 with respect to any land which is subject to a compulsory purchase order the acquiring authority must include the particulars specified in subsection (3) in a notice which is—

(a)given to every person with a relevant interest in the land with respect to which the declaration is to be made (other than a mortgagee who is not in possession); and

(b)published in a local newspaper circulating in the area in which the land is   situated..

(4) In that section, in subsection (2), for “(1)(b)” there is substituted “(1)” and after “given” there is inserted “and published”.

(5) In that section, for subsections (5) and (6) there is substituted—

(5) For the purposes of this section, a person has a relevant interest in land if—

(a)that person is for the time being entitled to dispose of the fee simple of the land, whether in possession or in reversion; or

(b)that person holds, or is entitled to the rents and profits of, the land under a lease or agreement, the unexpired term of which exceeds one month..

(6) In section 5 (earliest date for execution of declaration)—

(a)in subsection (1), after “publication” there is inserted “in a local newspaper circulating in the area in which the land is situated”; and

(b)subsection (2) is omitted.

(7) In section 7 (constructive notice to treat), in subsection (1)(a), the words “(as modified by section 4 of the Acquisition of Land Act 1981)” are omitted.

(8) References to the 1965 Act in the Compulsory Purchase (Vesting Declarations) Act 1981 are construed as references to that Act as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act to the compulsory acquisition of land under this Order.

Acquisition of subsoil or airspace only

25.—(1) Network Rail may acquire compulsorily so much of, or such rights in, the subsoil of or the airspace over the land referred to in article 20(1) (compulsory acquisition of land) as may be required for any purpose for which that land may be acquired under that provision instead of acquiring the whole of the land.

(2) Where Network Rail acquires any part of, or rights in, the subsoil of or the airspace over land under paragraph (1), Network Rail is not required to acquire an interest in any other part of the land.

(3) Paragraph (2) does not prevent article 26 (acquisition of part of certain properties) from applying where Network Rail acquires a cellar, vault, arch or other construction forming part of a house, building or manufactory.

Acquisition of part of certain properties

26.—(1) This article applies instead of section 8(1) of the 1965 Act (other provisions as to divided land) (as applied by section 125 of the 2008 Act) where—

(a)a notice to treat is served on a person (“the owner”) under the 1965 Act (as so applied) in respect of land forming only part of a house, building or manufactory or of land consisting of a house with a park or garden (“the land subject to the notice to treat”); and

(b)a copy of this article is served on the owner with the notice to treat.

(2) In such a case, the owner may, within the period of 21 days beginning with the day on which the notice was served, serve on Network Rail a counter-notice objecting to the sale of the land subject to the notice to treat which states that the owner is willing and able to sell the whole (“the land subject to the counter-notice”).

(3) If no such counter-notice is served within that period, the owner must sell the land subject to the notice to treat.

(4) If such a counter-notice is served within that period, the question whether the owner is required to sell only the land subject to the notice to treat must, unless Network Rail agrees to take the land subject to the counter-notice, be referred to the tribunal.

(5) If on such a reference the tribunal determines that the land subject to the notice to treat can be taken—

(a)without material detriment to the remainder of the land subject to the counter-notice; or

(b)where the land subject to the notice to treat consists of a house with a park or garden, without material detriment to the remainder of the land subject to the counter-notice and without seriously affecting the amenity and convenience of the house,

the owner must sell the land subject to the notice to treat.

(6) If on such a reference the tribunal determines that only part of the land subject to the notice to treat can be taken—

(a)without material detriment to the remainder of the land subject to the counter-notice; or

(b)where the land subject to the notice to treat consists of a house with a park or garden, without material detriment to the remainder of the land subject to the counter-notice and without seriously affecting the amenity and convenience of the house,

the notice to treat is deemed to be a notice to treat for that part.

(7) If on such a reference the tribunal determines that—

(a)the land subject to the notice to treat cannot be taken without material detriment to the remainder of the land subject to the counter-notice; but

(b)the material detriment is confined to a part of the land subject to the counter-notice,

the notice to treat is deemed to be a notice to treat for the land to which the material detriment is confined in addition to the land already subject to the notice, whether or not the additional land is land which Network Rail is authorised to acquire compulsorily under this Order.

(8) If Network Rail agrees to take the land subject to the counter-notice, or if the tribunal determines that—

(a)none of the land subject to the notice to treat can be taken without material detriment to the remainder of the land subject to the counter-notice or, as the case may be, without material detriment to the remainder of the land subject to the counter-notice and without seriously affecting the amenity and convenience of the house; and

(b)the material detriment is not confined to a part of the land subject to the counter-notice,

the notice to treat is deemed to be a notice to treat for the land subject to the counter-notice whether or not the whole of that land is land which Network Rail is authorised to acquire compulsorily under this Order.

(9) Where by reason of a determination by the tribunal under this article a notice to treat is deemed to be a notice to treat for less land or more land than that specified in the notice, Network Rail may, within the period of 6 weeks beginning with the day on which the determination is made, withdraw the notice to treat; and, in that event, must pay the owner compensation for any loss or expense occasioned to the owner by the giving and withdrawal of the notice, to be determined in case of dispute by the tribunal.

(10) Where the owner is required under this article to sell only part of a house, building or manufactory or of land consisting of a house with a park or garden, Network Rail must pay the owner compensation for any loss sustained by the owner due to the severance of that part in addition to the value of the interest acquired.

Rights under or over streets

27.—(1) Network Rail may enter upon and appropriate so much of the subsoil of, or airspace over, any street within the Order limits as may be required for the purposes of the authorised development and may use the subsoil or airspace for those purposes or any other purpose ancillary to the authorised development.

(2) Subject to paragraph (3), Network Rail may exercise any power conferred by paragraph (1) in relation to a street without Network Rail being required to acquire any part of the street or any easement or right in the street.

(3) Paragraph (2) does not apply in relation to—

(a)any subway or underground building; or

(b)any cellar, vault, arch or other construction in, on or under a street which forms part of a building fronting onto the street.

(4) Network Rail must repair and make good at its own expense and to the reasonable satisfaction of the highway authority any damage caused to a street or to any highway apparatus, highway structure or street furniture in the street belonging to the highway authority by virtue of its occupation and appropriation of the subsoil of, or airspace over, the street under this article.

(5) Subject to paragraph (6), any person who is an owner or occupier of land in respect of which the power of appropriation conferred by paragraph (1) is exercised without Network Rail acquiring any part of that person’s interest in the land, and who suffers loss by the exercise of that power, is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

(6) Compensation is not payable under paragraph (5) to any person who is an undertaker to whom section 85 of the 1991 Act applies in respect of measures of which the allowable costs are to be borne in accordance with that section.

Temporary use of land by Network Rail

28.—(1) Network Rail may, in connection with the carrying out of the authorised development—

(a)enter on and take temporary possession of—

(i)the land specified in column (1) of Part 1 of Schedule 9 (land of which temporary possession may be taken) for the purpose specified in relation to that land in column (2) of Part 1 of that Schedule relating to the part of the authorised development specified in column (3) of Part 1 of that Schedule;

(ii)any other Order land in respect of which no notice of entry has been served under section 11 of the 1965 Act (other than in connection with the acquisition of rights only) and no declaration has been made under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981;

(b)remove any buildings and vegetation from that land;

(c)construct temporary works (including, subject to the provisions of article 14 (access to works), the provision of means of access) and buildings on that land; and

(d)construct any works specified in relation to that land in column (2) of Part 1 of Schedule 9, or any other mitigation works.

(2) Not less than 28 days before entering on and taking temporary possession of land under this article Network Rail must serve notice of the intended entry on the owners and occupiers of the land.

(3) Network Rail may not, without the agreement of the owners of the land, remain in possession of any land under this article—

(a)in the case of land specified in paragraph (1)(a)(i) after the end of the period of 3 years beginning with the date of completion of the part of the authorised development specified in relation to that land in column (3) of Part 1 of Schedule 9; or

(b)in the case of land referred to in paragraph (1)(a)(ii), after the end of the period of 3 years beginning with the date of completion of the work for which temporary possession of this land was taken unless Network Rail has, before the end of that period, served a notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the Compulsory Purchase (Vesting Declaration) Act 1981.

(4) Before giving up possession of land of which temporary possession has been taken under this article, Network Rail must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but Network Rail is not required to—

(a)replace a building removed under this article;

(b)restore the land on which any works have been constructed under paragraph (1)(d) in so far as the element of works shown in column (4) of Part 1 of Schedule 9 is concerned; or

(c)remove any ground strengthening works which have been placed in that land to facilitate construction of the authorised development.

(5) Network Rail must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.

(6) Any dispute as to a person’s entitlement to compensation under paragraph (5), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.

(7) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (5).

(8) Network Rail may not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(i) except that Network Rail is not precluded from—

(a)acquiring new rights or imposing restrictive covenants over any part of that land under article 22 (compulsory acquisition of rights); or

(b)acquiring any part of the subsoil of or airspace over (or rights in the subsoil of or airspace over) that land under article 25 (acquisition of subsoil or airspace only).

(9) Where Network Rail takes possession of land under this article, Network Rail is not required to acquire the land or any interest in it.

(10) Section 13 of the 1965 Act (refusal to give possession to acquiring authority) applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 of the 2008 Act (application of compulsory acquisition provisions).

Temporary use of land by National Grid

29.—(1) National Grid may, in connection with the carrying out of Work Nos. 17, 18, 19A and 19B and any associated development in connection with those works—

(a)enter on and take temporary possession of the land specified in column (1) of Part 2 of Schedule 9 (land of which temporary possession may be taken) for the purpose specified in relation to that land in column (2) of Part 2 of that Schedule relating to the part of the authorised development specified in column (3) of Part 2 of that Schedule;

(b)remove any buildings and vegetation from that land;

(c)construct temporary works (including, subject to the provisions of article 14 (access to works), the provision of means of access) and buildings on that land; and

(d)construct any works specified in relation to that land in column (2) of Part 2 of Schedule 9.

(2) Not less than 28 days before entering on and taking temporary possession of land under this article National Grid must serve notice of the intended entry on the owners and occupiers of the land.

(3) National Grid may not, without the agreement of the owners of the land, remain in possession of any land under this article after the end of the period of one year beginning with the date of completion of the part of the authorised development specified in relation to that land in column (3) of Part 2 of Schedule 9.

(4) Before giving up possession of land of which temporary possession has been taken under this article, National Grid must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but National Grid is not required to—

(a)replace a building removed under this article;

(b)remove any pipe-line constructed in that land; or

(c)remove any ground strengthening works which have been placed in that land to facilitate construction of the authorised development.

(5) National Grid must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.

(6) Any dispute as to a person’s entitlement to compensation under paragraph (5), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.

(7) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (5).

(8) National Grid is not precluded from acquiring new rights or imposing restrictive covenants over any part of the land shown numbered 30, 30a, 33, 34, 37, 38, 56, 58, 59, 61, 65 and 67 on the land plans.

(9) Where National Grid takes possession of land under this article, National Grid is not required to acquire the land or any interest in it.

(10) Section 13 of the 1965 Act (refusal to give possession to acquiring authority) applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 of the 2008 Act (application of compulsory acquisition provisions).

Temporary use of land for maintaining authorised development

30.—(1) Subject to paragraph (2), at any time during the maintenance period relating to any of the authorised development, Network Rail may—

(a)enter upon and take temporary possession of any Order land if such possession is reasonably required for the purpose of maintaining the authorised development; and

(b)construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.

(2) Paragraph (1) does not authorise Network Rail to take temporary possession of—

(a)any house or garden belonging to a house; or

(b)any building (other than a house) if it is for the time being occupied.

(3) Not less than 28 days before entering upon and taking temporary possession of land under this article Network Rail must serve notice of the intended entry on the owners and occupiers or the land.

(4) Network Rail may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.

(5) Before giving up possession of land of which temporary possession has been taken under this article, Network Rail must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.

(6) Network Rail must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.

(7) Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.

(8) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under paragraph (6).

(9) Where Network Rail takes possession of land under this article, it is not required to acquire the land or any interest in it.

(10) Section 13 of the 1965 Act (refusal to give possession to the acquiring authority) applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 of the 2008 Act (application of compulsory acquisition provisions).

(11) In this article “the maintenance period” in relation to any part of the authorised development means the period of 5 years beginning with the date on which that part of the authorised development is first opened for use.

Statutory undertakers

31.  Subject to the provisions of Schedule 10 (protective provisions), Network Rail may—

(a)acquire compulsorily, or acquire new rights or impose restrictive covenants over, the land belonging to statutory undertakers shown on the land plans within the limits of the land to be acquired or used and described in the book of reference;

(b)extinguish the rights of, remove or reposition the apparatus belonging to statutory undertakers over or within the Order land.

Apparatus and rights of statutory undertakers in stopped up streets

32.—(1) Where a street is stopped up under article 11 (stopping up of streets) or article 17 (level crossing) any statutory utility whose apparatus is under, in, on, over, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this article, as if this Order had not been made.

(2) Where a street is stopped up under articles 11 or 17 any statutory utility whose apparatus is under, in, on, over, along or across the street may, and if reasonably requested to do so by Network Rail must—

(a)remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the utility may reasonably determine and have power to place it; or

(b)provide other apparatus in substitution for the existing apparatus and place it in such position as described in sub-paragraph (a).

(3) Subject to the following provisions of this article, Network Rail must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—

(a)the execution of the relocation works required in consequence of the stopping up of the street; and

(b)the doing of any other work or thing rendered necessary by the execution of the relocation works.

(4) If in the execution of the relocation works under paragraph (2)—

(a)apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by Network Rail, or, in default of agreement, is not determined by arbitration in accordance with article 43 (arbitration) to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which, apart from this paragraph, would be payable to the statutory utility under paragraph (3) is to be reduced by the amount of that excess.

(5) For the purposes of paragraph (4)—

(a)an extension of apparatus to a length greater than the length of the existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(6) An amount which, apart from this paragraph, would be payable to a statutory utility in respect of works under paragraph (3) (and having regard, where relevant, to paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

(7) Paragraphs (3) to (6) do not apply where the authorised development constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 of the 1991 Act, but instead—

(a)the allowable costs of the relocation works are to be determined in accordance with section 85 of that Act (sharing of cost of necessary measures) and any regulations for the time being having effect under that section; and

(b)the allowable costs are to be borne by Network Rail and the statutory utility in such proportions as may be prescribed by any such regulations.

(8) In this article—

“apparatus” has the same meaning as in Part 3 of the 1991 Act;

“relocation works” means works carried out, or apparatus provided, under paragraph (2); and

“statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in section 151(1) of the 2003 Act.

Recovery of costs of new connections

33.—(1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 31 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

(2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 31, any person who is—

(a)the owner or occupier of premises the drains of which communicated with that sewer; or

(b)the owner of a private sewer which communicated with that sewer,

is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

(3) In this article—

“public communications provider” has the same meaning as in section 151(1) of the 2003 Act; and

“public utility undertaker” has the same meaning as in the 1980 Act.

PART 6Operations

Operation and use of railways

34.—(1) Network Rail may operate and use the railways and any other elements of the authorised development as a system, or part of a system, of transport for the carriage of passengers and goods.

(2) Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part 1 of the Railways Act 1993(17) (the provision of railway services).

Felling or lopping of trees

35.—(1) Network Rail may fell or lop any tree or shrub within or overhanging land within the Order limits, or cut back its roots, if it reasonably believes it to be necessary to do so to prevent the tree or shrub—

(a)from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or

(b)from constituting a danger to passengers or other persons using the authorised development.

(2) In carrying out any activity authorised by paragraph (1), Network Rail must not cause unnecessary damage to any tree or shrub and must pay compensation to any person for any loss or damage arising from such activity.

(3) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined under Part 1 of the 1961 Act.

PART 7Miscellaneous and general

Operational land for purposes of the 1990 Act

36.  Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) of the 1990 Act (cases in which land is to be treated as operational land for the purposes of that Act).

Defence to proceedings in respect of statutory nuisance

37.—(1) Where proceedings are brought under section 82(1) of the Environmental Protection Act 1990(18) (summary proceedings by person aggrieved by statutory nuisance) in relation to a nuisance falling within paragraph (g) of section 79(1) of that Act (noise emitted from premises so as to be prejudicial to health or a nuisance) no order is to be made, and no fine may be imposed, under section 82(2) of that Act if—

(a)the defendant shows that the nuisance—

(i)relates to premises used by Network Rail for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction site), or a consent given under section 61 (prior consent for work on construction site) or section 65 (noise exceeding registered level), of the Control of Pollution Act 1974(19); or

(ii)is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or

(b)the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot reasonably be avoided.

(2) Section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 and section 65(8) of that Act (corresponding provision in relation to consent for registered noise level to be exceeded), does not apply where the consent relates to the use of premises by Network Rail for the purposes of or in connection with the construction or maintenance of the authorised development.

Traffic regulation

38.—(1) Subject to the provisions of this article, and the consent of the traffic authority in whose area the road concerned is situated, Network Rail may at any time, in the interests of safety and for the purposes of, or in connection with, the construction of the authorised development, regulate vehicular speed indefinitely or temporarily in the manner specified in Schedule 12 (traffic regulation) on the roads specified in column (1) by imposing the speed limit corresponding to those roads in column (2) to the extent described in column (3) of that Schedule.

(2) Without limitation on the scope of the specific powers conferred by paragraph (1) but subject to the provisions of this article and the consent of the traffic authority in whose area the road concerned is situated, Network Rail may, in so far as may be expedient or necessary for the purposes of or in connection with the construction of the authorised development, at any time prior to the opening of the authorised development for use—

(a)revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act;

(b)permit, prohibit or restrict the stopping, parking, waiting, loading or unloading of vehicles on any road;

(c)authorise the use as a parking place of any road;

(d)make provision as to the maximum speed, direction or priority of vehicular traffic on any road; and

(e)permit or prohibit vehicular access to any road,

either at all times, or on days or during such periods as may be specified by Network Rail .

(3) Network Rail must not exercise the powers conferred by paragraphs (1) and (2) unless it has—

(a)given not less than 4 weeks’ notice in writing of its intention so to do to the chief officer of police and to the traffic authority in whose area the road is situated; and

(b)advertised its intention in such manner as the traffic authority may specify in writing within 7 days of its receipt of notice of Network Rail’s intention in the case of sub-paragraph (a).

(4) Any prohibition, restriction or other provision made by Network Rail under paragraph (1) or (2)—

(a)has effect as if duly made by, as the case may be—

(i)the traffic authority in whose area the road is situated as a traffic regulation order under the 1984 Act; or

(ii)the local authority in whose area the road is situated as an order under section 32 of the 1984 Act,

and the instrument by which it is effected may specify savings and exemptions (in addition to those mentioned in Schedule 12 (traffic regulation) to which the prohibition, restriction or other provision is subject; and

(b)is deemed to be a traffic order for the purposes of Schedule 7 to the Traffic Management Act 2004(20) (road traffic contraventions subject to civil enforcement).

(5) Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by Network Rail from time to time by subsequent exercise of the powers conferred by paragraph (2) at any time prior to the opening of the authorised development for use.

(6) Before complying with the provisions of paragraph (3), Network Rail must consult the chief officer of police and the traffic authority in whose area the road is situated.

(7) Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.

Protections of interests

39.  Schedule 10 (protective provisions) has effect.

Application of the 1973 Act

40.—(1) Any regulations made by the Secretary of State under section 20 (sound proofing of buildings affected by public works) and 20A (power to make payments in respect of caravans and other structures affected by noise of public works) of the 1973 Act which apply to a railway provided or used in the exercise of statutory powers apply to the railway comprised in the authorised development as if that railway was provided or used in the exercise of statutory powers.

(2) Section 28 (power to pay expenses) of the 1973 Act has effect as if any works comprised in the authorised development were public works for the purposes of that section.

Certification of plans etc.

41.—(1) Network Rail must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—

(a)the book of reference;

(b)the land plans;

(c)the works plans;

(d)the street plans;

(e)the traffic regulation order plans;

(f)the sections;

(g)the design brief;

(h)the design drawings; and

(i)the environmental statement,

for certification that they are true copies of the documents referred to in this Order.

(2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Service of notices

42.—(1) A notice or other document required or authorised to be served for the purposes of this Order may be served—

(a)by post;

(b)by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or

(c)with the consent of the recipient and subject to paragraphs (6) to (8) by electronic transmission.

(2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.

(3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978(21) as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—

(a)in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and

(b)in any other case, the last known address of that person at the time of service.

(4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—

(a)addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and

(b)either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.

(5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is taken to be fulfilled only where—

(a)the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;

(b)the notice or document is capable of being accessed by the recipient;

(c)the notice or document is legible in all material respects; and

(d)in a form sufficiently permanent to be used for subsequent reference.

(6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.

(7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).

(8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—

(a)that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and

(b)such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.

(9) This article does not exclude the employment of any method of service not expressly provided for by it.

(10) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.

Arbitration

43.  Except where otherwise expressly provided for in this Order and unless otherwise agreed between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after notice in writing to the other) by the President of the Institution of Civil Engineers.

Procedure in relation to certain approvals etc. other than under Schedule 2

44.—(1) In this article “plans” includes sections, drawings, specifications and particulars (including descriptions of methods of construction).

(2) Where an application is made to the relevant planning authority, a highway authority, a street authority, a traffic authority or the owner of a sewer for any consent, agreement or approval required under any of the provisions of this Order other than under Schedule 2 (requirements), such application must, where appropriate, be accompanied (if not already provided) by proper and sufficient plans of the proposal and such consent, agreement or approval must, if given, be in writing and may be given subject to such reasonable terms and conditions as the authority or owner may require and must not be unreasonably withheld.

(3) If, within 28 days after the application has been submitted to the authority or owner, it has not intimated its disapproval and the grounds of disapproval, it is deemed to have approved the application.

(4) In the event of any refusal or disapproval by the authority or owner, Network Rail may resubmit a revised application, or revised plans in support of the original application, and, in that event, if the authority or owner has not intimated its refusal or disapproval and the grounds of refusal or disapproval within 28 days of the revised application or of revised plans being submitted, it is deemed to have given its consent or agreement to, or its approval of, them.

(5) Network Rail must not carry out the proposal until such plans have been approved or are deemed to have been approved or have been settled by arbitration in accordance with article 43 (arbitration).

Further provision as to approvals etc. under Schedule 2

45.—(1) Where the application is for a consent, agreement or approval required by a requirement under Schedule 2 (requirements), the following provisions apply, so far as they relate to a consent, agreement or approval of a local planning authority required by a condition imposed on a grant of planning permission, as if the requirement was a condition imposed on the grant of a planning permission—

(a)sections 78 (other than paragraph (a) of subsection (2)) and 79 of the 1990 Act (right of appeal in relation to planning decisions); and

(b)any orders, rules or regulations which make provision in relation to a consent, agreement or approval of a local planning authority required by a condition imposed on the grant of planning permission.

(2) For the purposes of paragraph (1), a provision relates to a consent, agreement or approval of a local planning authority required by a condition imposed on a grant of planning permission in so far as it makes provision in relation to an application for such a consent, agreement or approval, or the grant or refusal of such an application, or a failure to give notice of a decision on such an application.

Signed by authority of the Secretary of State for Transport

Martin Woods

Head of the Transport and Works Act Orders Unit

Department for Transport

31st March 2014

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources