The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015

Detailed offshore design parameters

10.  Within Work No. 1A, the HVAC cable crossings must not, in total, exceed—

(a)24 in number;

(b)132,700 cubic metres in volume of cable crossing material;

(c)147,100 square metres in seabed footprint.