The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015

Detailed offshore design parameters

9.  Within Work No. 1A, the HVAC cables must not, in total,—

(a)exceed 1,270 kilometres in length;

(b)have cable protection (excluding cable crossings) exceeding 660,000 square metres in area;

(c)have cable protection (excluding cable crossings) exceeding 413,000 cubic metres in volume.