Search Legislation

The Town and Country Planning (General Permitted Development) (England) Order 2015

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Cross Heading: Class O – installation etc of flue for combined heat and power on non-domestic premises

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Town and Country Planning (General Permitted Development) (England) Order 2015, Cross Heading: Class O – installation etc of flue for combined heat and power on non-domestic premises. Help about Changes to Legislation

Class O – installation etc of flue for combined heat and power on non-domestic premisesE+W

Permitted developmentE+W

O.  The installation, alteration or replacement of a flue, forming part of a microgeneration combined heat and power system, on a building other than—

(a)a dwellinghouse or a block of flats; or

(b)a building situated within the curtilage of a dwellinghouse or a block of flats.

Development not permittedE+W

O.1  Development is not permitted by Class O if—

(a)the capacity of the system that the flue would serve exceeds 45 kilowatts thermal;

(b)the height of the flue would exceed either—

(i)the highest part of the roof by 1 metre or more, or

(ii)the height of an existing flue which is being replaced,

whichever is the highest;

(c)the installation of the flue would result in the installation on the same building of more than 1 flue forming part of either a biomass heating system or a combined heat and power system;

(d)the flue would be installed on a listed building, within the curtilage of a listed building, or on a site designated as a scheduled monument; or

(e)in the case of a building on article 2(3) land, the flue would be installed on a wall or roof slope which fronts a highway.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?