- Latest available (Revised)
- Point in Time (15/04/2015)
- Original (As made)
Version Superseded: 21/12/2023
Point in time view as at 15/04/2015.
There are currently no known outstanding effects for the The Town and Country Planning (General Permitted Development) (England) Order 2015, Cross Heading: Class O – installation etc of flue for combined heat and power on non-domestic premises.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
O. The installation, alteration or replacement of a flue, forming part of a microgeneration combined heat and power system, on a building other than—
(a) a dwellinghouse or a block of flats; or
(b) a building situated within the curtilage of a dwellinghouse or a block of flats.
O.1 Development is not permitted by Class O if—
(a)the capacity of the system that the flue would serve exceeds 45 kilowatts thermal;
(b)the height of the flue would exceed either—
(i)the highest part of the roof by 1 metre or more, or
(ii)the height of an existing flue which is being replaced,
whichever is the highest;
(c)the installation of the flue would result in the installation on the same building of more than 1 flue forming part of either a biomass heating system or a combined heat and power system;
(d)the flue would be installed on a listed building, within the curtilage of a listed building, or on a site designated as a scheduled monument; or
(e)in the case of a building on article 2(3) land, the flue would be installed on a wall or roof slope which fronts a highway.
P. For the purposes of Part 14—
“aerodrome”—
means any area of land or water designed, equipped, set apart, or commonly used for affording facilities for the landing and departure of aircraft; and
includes any area or space, whether on the ground, on the roof of a building or elsewhere, which is designed, equipped or set apart for affording facilities for the landing and departure of aircraft capable of descending or climbing vertically; but
does not include any area the use of which for affording facilities for the landing and departure of aircraft has been abandoned and has not been resumed;
“air traffic services licence holder” means a person who holds a licence under Chapter 1 of Part 1 of the Transport Act 2000 M1;
“block of flats” means a building which consists wholly of flats;
“detached dwellinghouse” or “detached building” means a dwellinghouse or building, as the case may be, which does not share a party wall with a neighbouring building;
“MCS Planning Standards” means the standards specified in the Microgeneration Certification Scheme for air source heat pumps (being MCS 007 M2) and for small and micro wind turbines (being MCS 006 M3);
“microgeneration” has the same meaning as in section 82(6) of the Energy Act 2004 M4;
“safeguarded land” means land which—
is necessary to be safeguarded for aviation or defence purposes; and
has been notified as such, in writing, to the Secretary of State by an aerodrome operator, an air traffic services licence holder or the Secretary of State for Defence for the purposes of this Part;
“solar PV” means solar photovoltaics;
“stand-alone solar” means solar PV or solar thermal equipment which is not installed on a building;
“stand-alone wind turbine” means a wind turbine which is not fixed to a building; and
“water source heat pump” means a heat pump where the collecting medium is water.
Marginal Citations
M12000 c. 38. See in particular sections 5 to 7 and 40 (section 5 was amended by S.I. 2009/1941 and 2011/205).
M2Version 2.4 dated 16th December 2013, an electronic copy of which can be found here: http://www.microgenerationcertification.org/mcs-standards/product-standards/10-mcs-standards/126-product-standards-2 and a copy of the MCS Planning Standards may be inspected at the Department of Energy and Climate Change, 3 Whitehall Place, London, SW1A 2HH.
M3Version 2.1, dated 15th January 2014, an electronic copy of which can be found here: http://www.microgenerationcertification.org/mcs-standards/product-standards and a copy of the MCS Planning Standards may be inspected at the Department of Energy and Climate Change, 3 Whitehall Place, London, SW1A 2HH.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: