Article 6(2)
Works plans | Submission document reference number 2.3 Revision 4 |
Rights of way, streets and access plan | Submission document reference number 2.7 Revision 3 |
Article 6(3)
Building or Structure | Maximum height (metres above 211 metres AOD) | Minimum height (metres above 211 metres AOD) | Maximum length (metres) | Minimum length (metres) | Maximum width (metres) | Minimum width (metres) |
---|---|---|---|---|---|---|
Each gas turbine generator (where one gas turbine generator is constructed) (part of numbered work 2A) | 19.0 | - | 50.0 | - | 40.0 | - |
Each gas turbine generator (where two gas turbine generators are constructed) (part of numbered work 2A) | 19.0 | – | 30.0 | – | 30.0 | – |
Each gas turbine generator (where three, four or five gas turbine generators are constructed) (part of numbered work 2A) | 10.0 | – | 36.0 | – | 23.0 | – |
Each exhaust gas emission flue stack (where one gas turbine generator is constructed) (part of numbered work 2A) | 35.0 | 30.0 | – | – | 11.0 (up to and includi-ng a height of 16.5 metres above 211 metres AOD) and 10.0 (from a height of 16.5 metres above 211 metres AOD to a height of 35.0 metres above 211 metres AOD) | – |
Each exhaust gas emission flue stack (where two, three, four or five gas turbine generators are constructed) (part of numbered work 2A) | 35.0 | 30.0 | – | – | 10.0 | – |
Control room/office/workshop (part of numbered work 2B) | 6.0 | – | 29.0 | – | 23.0 | – |
Natural gas receiving station (part of numbered work 2B) | 5.0 | - | 50.0 | - | 36.0 | - |
Gas treatment compound (part of numbered work 2B) | 5.0 | - | 29.0 | - | 16.0 | - |
Each black start diesel generator (part of numbered work 2B) | 5.0 | – | 17.0 | – | 5.0 | – |
External fin fan cooler (where one gas turbine generator is constructed) (part of numbered work 2B) | 6.0 | – | 13.0 | – | 10.0 | – |
Switchyard/b-anking compound (part of numbered work 2C) | 11.3 | – | 60.0 | – | 60.0 | – |
Switchgear building (part of numbered work 2C) | 11.3 | – | 21.0 | – | 15.0 | – |
Gatehouse (part of numbered work 2E) | 4.5 | – | 9.0 | – | 8.0 | – |
Demineralis-ed water tank (part of numbered work 2E) | 16.0 | – | 23.0 | – | 23.0 | – |
Raw/fire water tank (part of numbered work 2E) | 18.0 | – | 15.0 | – | 15.0 | – |
Bat mitigation structure (part of numbered work 2E) | 6.0 | – | 10.0 | – | 5.0 | – |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: