The North London Heat and Power Generating Station Order 2017

Parameters

5.  The authorised development must be constructed within the following parameters—

(1) Works No. 1a (Drawing C_0003 Rev 01 of the works plans)—

DescriptionWorks No.Length (m)Width (m)Height (m)Height (m AOD)
Tipping hallWorks No. 1a (a)(i)487431.5+44.0 AOD
Waste bunker and waste handling equipmentWorks No. 1a (a)(ii)42.38544.5+57.0 AOD
Two process lines consisting of a moving grate, furnace, boiler and flue gas treatment plant and steam turbinesWorks No. 1a (a)(iii) and (v)130.77456.5+69.0 AOD
Facilities for the recovery of incinerator bottom ash and air pollution control residueWorks No. 1a (a)(iv)Below ground only
Control room containing operational and environmental control and monitoring systems and officesWorks No. 1a (a)(vi)65.62144.5+57 AOD
Stack containing flues for flue gas exhaustWorks No. 1a (c)2412.5105+117.5 AOD
Cooling equipmentWorks No. 1a (d)602428.7+41.2 AOD
Observation platform enclosureWorks No.1a (e)17136 (above +44.0 AOD)+50 AOD

(2) Works No. 1b (Drawing C_0002 Rev 01 of the works plans)—

DescriptionWorks No.Height (m)Height (m AOD)
Wastewater treatment facility, water pre-treatment plant, external stores and workshops, fuelling area and fuel storage, vehicle wash, transport offices and staff facilities, toilets, natural gas intake and management compound, fire control water tanks and electrical substationsWorks No. 1b1830.5

(3) Works No. 2 (Drawing C_0005 Rev 01 of the works plans)—

DescriptionWorks No.Length (m)Width (m)Height (m)Height (m AOD)
Resource recovery facilityWorks No. 2 (a), (b) and (c)12718020+30.5 AOD
Maximum dimensions based on dimensions of enclosing rectangle oriented north-south.

(4) Works No. 3 (Drawing C_0007 Rev 01 of the works plans)—

DescriptionWorks No.Length (m)Width (m)Height (m)Height (m AOD)
Visitor, community and education facilities, office accommodation and boat canopyWorks No. 34116.714+24.6 AOD