Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulation 2(1)

SCHEDULE 1E+WDESCRIPTIONS OF DEVELOPMENT FOR THE PURPOSES OF THE DEFINITION OF “SCHEDULE 1 DEVELOPMENT”

InterpretationE+W

In this Schedule—

airport” means an airport which complies with the definition in the 1944 Chicago Convention setting up the International Civil Aviation Organisation (Annex 14) M1;

express road” means a road which complies with the definition in the European Agreement on Main International Traffic Arteries of 15th November 1975 M2; and

“nuclear power station” and “other nuclear reactor” do not include an installation from the site of which all nuclear fuel and other radioactive contaminated materials have been permanently removed; and development for the purpose of dismantling or decommissioning a nuclear power station or other nuclear reactor is to be treated as development of the description mentioned in paragraph 2(2) of this Schedule.

Marginal Citations

M1Command Paper 6614.

M2Command Paper 6993.

Descriptions of developmentE+W

The carrying out of development to provide any of the following—

1.  Crude‑oil refineries (excluding undertakings manufacturing only lubricants from crude‑oil) and installations for the gasification and liquefaction of 500 tonnes or more of coal or bituminous shale per day.E+W

2.—(1) Thermal power stations and other combustion installations with a heat output of 300 megawatts or more.E+W

(2) Nuclear power stations and other nuclear reactors (except research installations for the production and conversion of fissionable and fertile materials, whose maximum power does not exceed 1 kilowatt continuous thermal load).

3.—(1) Installations for the reprocessing of irradiated nuclear fuel.E+W

(2) Installations designed—

(a)for the production or enrichment of nuclear fuel;

(b)for the processing of irradiated nuclear fuel or high‑level radioactive waste;

(c)for the final disposal of irradiated nuclear fuel;

(d)solely for the final disposal of radioactive waste;

(e)solely for the storage (planned for more than ten years) of irradiated nuclear fuels or radioactive waste in a different site than the production site.

4.—(1) Integrated works for the initial smelting of cast‑iron and steel.E+W

(2) Installations for the production of non‑ferrous crude metals from ore, concentrates or secondary raw materials by metallurgical, chemical or electrolytic processes.

5.  Installations for the extraction of asbestos and for the processing and transformation of asbestos and products containing asbestos—E+W

(a)for asbestos‑cement products, with an annual production of more than 20,000 tonnes of finished products;

(b)for friction material, with an annual production of more than 50 tonnes of finished products; and

(c)for other uses of asbestos, utilisation of more than 200 tonnes per year.

6.  Integrated chemical installations, that is to say, installations for the manufacture on an industrial scale of substances using chemical conversion processes, in which several units are juxtaposed and are functionally linked to one another and which are—E+W

(a)for the production of basic organic chemicals;

(b)for the production of basic inorganic chemicals;

(c)for the production of phosphorous–, nitrogen– or potassium‑based fertilisers (simple or compound fertilisers);

(d)for the production of basic plant health products and of biocides;

(e)for the production of basic pharmaceutical products using a chemical or biological process; or

(f)for the production of explosives.

7.—(1) Construction of lines for long‑distance railway traffic and of airports with a basic runway length of 2,100 metres or more.E+W

(2) Construction of motorways and express roads.

(3) Construction of a new road of four or more lanes, or realignment and/or widening of an existing road of two lanes or less so as to provide four or more lanes, where such new road, or realigned and/or widened section of road, would be 10 kilometres or more in a continuous length.

8.—(1) Inland waterways and ports for inland‑waterway traffic which permit the passage of vessels of over 1,350 tonnes.E+W

(2) Trading ports, piers for loading and unloading connected to land and outside ports (excluding ferry piers) which can take vessels of over 1,350 tonnes.

9.  Waste disposal installations for the incineration, chemical treatment (as defined in Annex I to Directive 2008/98/EC of the European Parliament and of the Council of 19 November 2008 on waste M3 under heading D9), or landfill of hazardous waste as defined in Article 3(2) of that Directive.E+W

Marginal Citations

M3OJ No. L 312, 22.11.2008, p.3.

10.  Waste disposal installations for the incineration or chemical treatment (as defined in Annex I to Directive 2008/98/EC under heading D9) of non‑hazardous waste with a capacity exceeding 100 tonnes per day.E+W

11.  Groundwater abstraction or artificial groundwater recharge schemes where the annual volume of water abstracted or recharged is equivalent to or exceeds 10 million cubic metres.E+W

12.—(1) Works for the transfer of water resources, other than piped drinking water, between river basins where the transfer aims at preventing possible shortages of water and where the amount of water transferred exceeds 100 million cubic metres per year.E+W

(2) In all other cases, works for the transfer of water resources, other than piped drinking water, between river basins where the multi‑annual average flow of the basin of abstraction exceeds 2,000 million cubic metres per year and where the amount of water transferred exceeds 5% of this flow.

13.  Waste water treatment plants with a capacity exceeding 150,000 population equivalent as defined in Article 2(6) of Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment M4.E+W

Marginal Citations

M4OJ No. L 135, 30.5.1991, p.40, last amended by Regulation (EC) No. 1137/2008 (O.J. No. L 311, 21.11.2008, p.1).

14.  Extraction of petroleum and natural gas for commercial purposes where the amount extracted exceeds 500 tonnes per day in the case of petroleum and 500,000 cubic metres per day in the case of gas.E+W

15.  Dams and other installations designed for the holding back or permanent storage of water, where a new or additional amount of water held back or stored exceeds 10 million cubic metres.E+W

16.  Pipelines with a diameter of more than 800 millimetres and a length of more than 40 kilometres for the transport of—E+W

(a)gas, oil or chemicals; or

(b)carbon dioxide streams for the purposes of geological storage, including associated booster stations.

17.  Installations for the intensive r earing of poultry or pigs with more than—E+W

(a)85,000 places for broilers or 60,000 places for hens;

(b)3,000 places for production pigs (over 30 kg); or

(c)900 places for sows.

18.  Industrial plants for—E+W

(a)the production of pulp from timber or similar fibrous materials;or

(b)the production of paper and board with a production capacity exceeding 200 tonnes per day.

19.  Quarries and open‑cast mining where the surface of the site exceeds 25 hectares, or peat extraction where the surface of the site exceeds 150 hectares.E+W

20.  Construction of overhead electrical power lines with a voltage of 220 kV or more and a length of more than 15 km.E+W

21.  Installations for storage of petroleum, petrochemical or chemical products with a capacity of 200,000 tonnes or more.E+W

22.  Storage sites pursuant to Directive 2009/31/EC M5 of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide.E+W

Marginal Citations

M5OJ L 140, 5.6.2009, p. 114.

23.  Installations for the capture of carbon dioxide streams for the purposes of geological storage pursuant to Directive 2009/31/EC from installations referred to in this Schedule, or where the total yearly capture of carbon dioxide is 1.5 megatonnes or moreE+W

24.  Any change to or extension of development listed in this Schedule where such a change or extension in itself meets the thresholds, if any, or description of development set out in this Schedule.E+W

Regulation 2(1)

SCHEDULE 2E+WDESCRIPTIONS OF DEVELOPMENT AND APPLICABLE THRESHOLDS AND CRITERIA FOR THE PURPOSES OF THE DEFINITION OF “SCHEDULE 2 DEVELOPMENT”

1.  In the table below—E+W

area of the works” includes any area occupied by apparatus, equipment, machinery, materials, plant, spoil heaps or other facilities or stores required for construction or installation;

controlled waters” has the same meaning as in the Water Resources Act 1991 M6; and

floorspace” means the floorspace in a building or buildings.

The carrying out of development to provide any of the following—

Column 1Description of developmentColumn 2Applicable thresholds and criteria
1 Agriculture and aquaculture
(a) Projects for the use of uncultivated land or semi-natural areas for intensive agricultural purposes;The area of the development exceeds 0.5 hectare.
(b) Water management projects for agriculture, including irrigation and land drainage projects;The area of the works exceeds 1 hectare.
(c) Intensive livestock installations (unless included in Schedule 1);The area of new floorspace exceeds 500 square metres.
(d) Intensive fish farming;The installation resulting from the development is designed to produce more than 10 tonnes of dead weight fish per year.
(e) Reclamation of land from the sea.All development.
2 Extractive industry

(a) Quarries, open cast mining and peat extraction (unless included in Schedule 1);

(b) Underground mining;

All development except the construction of buildings or other ancillary structures where the new floorspace does not exceed 1,000 square metres.
(c) Extraction of minerals by fluvial or marine dredging;All development.

(d) Deep drillings, in particular—

(i) geothermal drilling;

(ii) drilling for the storage of nuclear waste material;

(iii) drilling for water supplies;

with the exception of drillings for investigating the stability of the soil.

(i) In relation to any type of drilling, the area of the works exceeds 1 hectare; or

(ii) in relation to geothermal drilling and drilling for the storage of nuclear waste material, the drilling is within 100 metres of any controlled waters

(e) Surface industrial installations for the extraction of coal, petroleum, natural gas and ores, as well as bituminous shale.The area of the development exceeds 0.5 hectare.
3 Energy industry
(a) Industrial installations for the production of electricity, steam and hot water (unless included in Schedule 1);The area of the development exceeds 0.5 hectare.
(b) Industrial installations for carrying gas, steam and hot water;The area of the works exceeds 1 hectare.

(c) Surface storage of natural gas;

(d) Underground storage of combustible gases;

(e) Surface storage of fossil fuels;

(i) The area of any new building, deposit or structure exceeds 500 square metres; or

(ii) a new building, deposit or structure is to be sited within 100 metres of any controlled waters.

(f) Industrial briquetting of coal and lignite;The area of new floorspace exceeds 1,000 square metres.
(g) Installations for the processing and storage of radioactive waste (unless included in Schedule 1);

(i)The area of new floorspace exceeds 1,000 square metres; or

(ii) the installation resulting from the development will require the grant of an environmental permit under the Environmental Permitting (England and Wales) Regulations 2016 M7 in relation to a radioactive substances activity described in paragraphs 11(2)(b), (2)(c) or (4) of Part 2 of Schedule 23 to those Regulations, or the variation of such a permit.

(h) Installations for hydroelectric energy production;The installation is designed to produce more than 0.5 megawatts.

(i) Installations for the harnessing of wind power for energy production (wind farms).

(i) The development involves the installation of more than 2 turbines; or

(ii) the hub height of any turbine or height of any other structure exceeds 15 metres.

(j) Installations for the capture of carbon dioxide streams for the purposes of geological storage pursuant to Directive 2009/31/EC from installations not included in Schedule 1.All development.
4 Production and processing of metals

(a) Installations for the production of pig iron or steel (primary or secondary fusion) including continuous casting;

(b) Installations for the processing of ferrous metals—

(i) hot-rolling mills;

(ii) smitheries with hammers;

(iii) application of protective fused metal coats.

(c) Ferrous metal foundries;

(d) Installations for the smelting, including the alloyage, of non-ferrous metals, excluding precious metals, including recovered products (refining, foundry casting, etc);

(e) Installations for surface treatment of metals and plastic materials using an electrolytic or chemical process;

(f) Manufacture and assembly of motor vehicles and manufacture of motor-vehicle engines;

(g) Shipyards;

(h) Installations for the construction and repair of aircraft;

(i) Manufacture of railway equipment;

(j) Swaging by explosives;

(k) Installations for the roasting and sintering of metallic ores.

The area of new floorspace exceeds 1,000 square metres.
5 Mineral industry

(a) Coke ovens (dry coal distillation);

(b) Installations for the manufacture of cement;

(c) Installations for the production of asbestos and the manufacture of asbestos-based products (unless included in Schedule 1);

(d) Installations for the manufacture of glass including glass fibre;

(e) Installations for smelting mineral substances including the production of mineral fibres;

(f) Manufacture of ceramic products by burning, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain.

The area of new floorspace exceeds 1,000 square metres.
6 Chemical industry (unless included in Schedule 1)

(a) Treatment of intermediate products and production of chemicals;

(b) Production of pesticides and pharmaceutical products, paint and varnishes, elastomers and peroxides;

The area of new floorspace exceeds 1,000 square metres.
(c) Storage facilities for petroleum, petrochemical and chemical products.

(i) The area of any new building or structure exceeds 0.05 hectare; or

(ii) more than 200 tonnes of petroleum, petrochemical or chemical products is to be stored at any one time.

7 Food industry

(a) Manufacture of vegetable and animal oils and fats;

(b) Packing and canning of animal and vegetable products;

(c) Manufacture of dairy products;

(d) Brewing and malting;

(e) Confectionery and syrup manufacture;

(f) Installations for the slaughter of animals;

(g) Industrial starch manufacturing installations;

(h) Fish-meal and fish-oil factories;

(i) Sugar factories.

The area of new floorspace exceeds 1,000 square metres.
8 Textile, leather, wood and paper industries

(a) Industrial plants for the production of paper and board (unless included in Schedule 1);

(b) Plants for the pre-treatment (operations such as washing, bleaching, mercerisation) or dyeing of fibres or textiles;

(c) Plants for the tanning of hides and skins;

(d) Cellulose-processing and production installations.

The area of new floorspace exceeds 1,000 square metres.
9. Rubber industry
Manufacture and treatment of elastomer-based products.The area of new floorspace exceeds 1,000 square metres.
10. Infrastructure projects
(a) Industrial estate development projects;The area of the development exceeds 0.5 hectare.
(b) Urban development projects, including the construction of shopping centres and car parks, sports stadiums, leisure centres and multiplex cinemas;

(i) The development includes more than 1 hectare of urban development which is not dwellinghouse development; or

(ii) the development includes more than 150 dwellings; or

(iii) the overall area of the development exceeds 5 hectares.

(c) Construction of intermodal transshipment facilities and of intermodal terminals (unless included in Schedule 1);The area of the development exceeds 0.5 hectare.
(d) Construction of railways (unless included in Schedule 1);The area of the works exceeds 1 hectare.
(e) Construction of airfields (unless included in Schedule 1);

(i) The development involves an extension to a runway; or

(ii) the area of the works exceeds 1 hectare.

(f) Construction of roads (unless included in Schedule 1);The area of the works exceeds 1 hectare.
(g) Construction of harbours and port installations including fishing harbours (unless included in Schedule 1);The area of the works exceeds 1 hectare.

(h) Inland-waterway construction not included in Schedule 1, canalisation and flood-relief works;

(i) Dams and other installations designed to hold water or store it on a long-term basis (unless included in Schedule 1);

(j)Tramways, elevated and underground railways, suspended lines or similar lines of a particular type, used exclusively or mainly for passenger transport;

The area of the works exceeds 1 hectare.

(k) Oil and gas pipeline installations and pipelines for the transport of carbon dioxide streams for the purposes of geological storage (unless included in Schedule 1);

(l) Installations of long-distance aqueducts;

(i) The area of the works exceeds 1 hectare; or,

(ii) in the case of a gas pipeline, the installation has a design operating pressure exceeding 7 bar gauge.

(m) Coastal work to combat erosion and maritime works capable of altering the coast through the construction, for example, of dykes, moles, jetties and other sea defence works, excluding the maintenance and reconstruction of such works;All development.

(n) Groundwater abstraction and artificial groundwater recharge schemes not included in Schedule 1;

(o) Works for the transfer of water resources between river basins not included in Schedule 1;

The area of the works exceeds 1 hectare.
(p) Motorway service areas.The area of the development exceeds 0.5 hectare.
11 Other projects
(a) Permanent racing and test tracks for motorised vehicles;The area of the development exceeds 1 hectare.
(b) Installations for the disposal of waste (unless included in Schedule 1);

(i) The disposal is by incineration; or

(ii) the area of the development exceeds 0.5 hectare; or

(iii) the installation is to be sited within 100 metres of any controlled waters.

(c) Waste-water treatment plants (unless included in Schedule 1);The area of the development exceeds 1,000 square metres.

(d) Sludge-deposition sites;

(e) Storage of scrap iron, including scrap vehicles;

(i) The area of deposit or storage exceeds 0.5 hectare; or

(ii) a deposit is to be made or scrap stored within 100 metres of any controlled waters

(f) Test benches for engines, turbines or reactors;

(g) Installations for the manufacture of artificial mineral fibres;

(h) Installations for the recovery or destruction of explosive substances;

(i) Knackers' yards.

The area of new floorspace exceeds 1,000 square metres.
12 Tourism and leisure
(a) Ski-runs, ski-lifts and cable-cars and associated developments;

(i) The area of the works exceeds 1 hectare; or

(ii) the height of any building or other structure exceeds 15 metres.

(b) Marinas;The area of the enclosed water surface exceeds 1,000 square metres.

(c) Holiday villages and hotel complexes outside urban areas and associated developments;

(d) Theme parks;

The area of the development exceeds 0.5 hectare.
(e) Permanent camp sites and caravan sites;The area of the development exceeds 1 hectare.
(f) Golf courses and associated developments.The area of the development exceeds 1 hectare.
13 Changes and extensions
(a) Any change to or extension of development of a description listed in Schedule 1 (other than a change or extension falling within paragraph 24 of that Schedule) where that development is already authorised, executed or in the process of being executed.

Either—

(i) The development as changed or extended may have significant adverse effects on the environment; or

(ii) in relation to development of a description mentioned in a paragraph in Schedule 1 indicated below, the thresholds and criteria in column 2 of the paragraph of this table indicated below applied to the change or extension are met or exceeded.

Paragraph in  Paragraph of this table

Schedule 1

1      6(a)

2(a)    3(a)

2(b)    3(g)

3      3(g)

4      4

5      5

6      6(a)

7(a)     10(d) (in relation to railways)

       or 10(e) (in relation to airports)

7(b) and (c)  10(f)

8(a)     10(h)

8(b)     10(g)

9       11(b)

10      11(b)

11      10(n)

12      10(o)

13      11(c)

14      2(e)

15      10(i)

16      10(k)

17      1(c)

18      8(a)

19      2(a)

20      6(c)

(b) Any change to or extension of development of a description listed in paragraphs 1 to 12 of column 1 of this table, where that development is already authorised, executed or in the process of being executed.

Either—

(i) The development as changed or extended may have significant adverse effects on the environment; or

(ii) in relation to development of a description mentioned in column 1 of this table, the thresholds and criteria in the corresponding part of column 2 of this table applied to the change or extension are met or exceeded.

(c) Development of a description mentioned in Schedule 1 undertaken exclusively or mainly for the development and testing of new methods or products and not used for more than two years.All development.

Regulation 5(4)

SCHEDULE 3E+WSELECTION CRITERIA FOR SCREENING SCHEDULE 2 DEVELOPMENT

Characteristics of developmentE+W

1.  The characteristics of development must be considered with particular regard to—

(a)the size and design of the whole development;

(b)cumulation with other existing development and/or approved development;

(c)the use of natural resources, in particular land, soil, water and biodiversity;

(d)the production of waste;

(e)pollution and nuisances;

(f)the risk of major accidents and/or disasters relevant to the development concerned, including those caused by climate change, in accordance with scientific knowledge;

(g)the risks to human health (for example, due to water contamination or air pollution).

Location of developmentE+W

2.—(1) The environmental sensitivity of geographical areas likely to be affected by development must be considered, with particular regard, to—

(a)the existing and approved land use;

(b)the relative abundance, availability, quality and regenerative capacity of natural resources (including soil, land, water and biodiversity) in the area and its underground;

(c)the absorption capacity of the natural environment, paying particular attention to the following areas—

(i)wetlands, riparian areas, river mouths;

(ii)coastal zones and the marine environment;

(iii)mountain and forest areas;

(iv)nature reserves and parks;

(v)European sites and other areas classified or protected under national legislation;

(vi)areas in which there has already been a failure to meet the environmental quality standards, laid down in Union legislation and relevant to the project, or in which it is considered that there is such a failure;

(vii)densely populated areas;

(viii)landscapes and sites of historical, cultural or archaeological significance.

Types and characteristics of the potential impactE+W

3.  The likely significant effects of the development on the environment must be considered in relation to criteria set out in paragraphs 1 and 2 above, with regard to the impact of the development on the factors specified in regulation 4(2), taking into account—

(a)the magnitude and spatial extent of the impact (for example geographical area and size of the population likely to be affected);

(b)the nature of the impact;

(c)the transboundary nature of the impact;

(d)the intensity and complexity of the impact;

(e)the probability of the impact;

(f)the expected onset, duration, frequency and reversibility of the impact;

(g)the cumulation of the impact with the impact of other existing and/or approved development;

(h)the possibility of effectively reducing the impact.

Regulation 18(3)

SCHEDULE 4E+WINFORMATION FOR INCLUSION IN ENVIRONMENTAL STATEMENTS

1.  A description of the development, including in particular:E+W

(a)a description of the location of the development;

(b)a description of the physical characteristics of the whole development, including, where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases;

(c)a description of the main characteristics of the operational phase of the development (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used;

(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation and quantities and types of waste produced during the construction and operation phases.

2.  A description of the reasonable alternatives (for example in terms of development design, technology, location, size and scale) studied by the developer, which are relevant to the proposed project and its specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.E+W

3.  A description of the relevant aspects of the current state of the environment (baseline scenario) and an outline of the likely evolution thereof without implementation of the development as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.E+W

4.  A description of the factors specified in regulation 4(2) likely to be significantly affected by the development: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape.E+W

5.  A description of the likely significant effects of the development on the environment resulting from, inter alia:E+W

(a)the construction and existence of the development, including, where relevant, demolition works;

(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;

(c)the emission of pollutants, noise, vibration, light, heat and radiation, the creation of nuisances, and the disposal and recovery of waste;

(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);

(e)the cumulation of effects with other existing and/or approved projects, taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;

(f)the impact of the project on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the project to climate change;

(g)the technologies and the substances used.

The description of the likely significant effects on the factors specified in regulation 4(2) should cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the development. This description should take into account the environmental protection objectives established at Union or Member State level which are relevant to the project, including in particular those established under Council Directive 92/43/EEC M8 and Directive 2009/147/EC M9.

Marginal Citations

M8OJ No. L 206, 22.7.1992, p.7.

M9OJ No. L 20, 26.1.2010, p.7.

6.  A description of the forecasting methods or evidence, used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.E+W

7.  A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis). That description should explain the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases.E+W

8.  A description of the expected significant adverse effects of the development on the environment deriving from the vulnerability of the development to risks of major accidents and/or disasters which are relevant to the project concerned. Relevant information available and obtained through risk assessments pursuant to EU legislation such as Directive 2012/18/EU M10 of the European Parliament and of the Council or Council Directive 2009/71/Euratom M11 or UK environmental assessments may be used for this purpose provided that the requirements of this Directive are met. Where appropriate, this description should include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.E+W

Marginal Citations

M10OJ No. L 197, 24.7.2012, p. 1.

M11OJ No. L 172, 2.7.2009, p. 18.

9.  A non-technical summary of the information provided under paragraphs 1 to 8.E+W

10.  A reference list detailing the sources used for the descriptions and assessments included in the environmental statement.E+W

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources