Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

PART 1 E+W+SHIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED

(1) Area(2) Highway to be stopped up(3) Extent of stopping up(4) New highway to be substituted/provided
The rights of way and access plans – sheet 1
In the administrative area of the Royal Borough of Greenwich; in the county of Greater LondonBoord Street and Dreadnought StreetA length from a point on the existing Boord Street 130 metres south-west of its junction with the existing Millennium Way to the existing Dreadnought Street, and then in a generally north westerly direction, for a total distance of 90 metres.

Reference A

To be substituted by a length of new highway from a point on Boord Street 130 metres south-west of its junction with the existing Millennium Way to the premises known as Studio 338, in a generally north westerly direction, for a distance of 80 metres.

Footbridge (including National Cycle Route No. 1 & Thames Path)The whole footbridge.

Reference B

To be substituted by a length of new Boord Street foot and cycle bridge from a point on Boord Street 140 metres south-west of its junction with the existing Millennium Way, in a generally south westerly direction, to its junction with the improved Tunnel Avenue.

Reference C

Silvertown Tunnel Southbound.

A length of new highway from the new Silvertown Tunnel South Portal, in a generally north-easterly direction to the new Silvertown Tunnel North Portal, for a distance of 1425 metres.

Reference D

Silvertown Tunnel Northbound.

A length of new highway from the new Silvertown Tunnel South Portal, in a generally south-westerly direction to the new Silvertown Tunnel North Portal, for a distance of 1405 metres.

Reference E

Silvertown Tunnel southern approach Southbound.

A length of new highway from the new South Portal of the Silvertown Tunnel, in a generally south easterly direction, for a distance of 160 metres.

Reference F

Silvertown Tunnel southern approach Northbound.

A length of new highway from its junction with the existing A102 Blackwall Tunnel southern approach northbound, in a generally north-easterly direction to the new South Portal of the Silvertown Tunnel, for a distance of 130 metres.

Reference G

Pavilion Lane (Realigned)

A length of new highway from a point on the existing A102 Blackwall Tunnel southern approach Southbound 130 metres south of the existing Blackwall Tunnel Southbound South Portal, in a generally southerly direction then turning eastwards to its junction with the northbound carriageway of the existing Millennium Way, for a distance of 150 metres.

Reference H

Pavilion Lane (Realigned)

A length of new highway from a point on the northbound carriageway of the existing Millennium Way 75 metres to the north west of its junction with the existing Edmund Halley Way, in a generally southerly direction to its junction with the Silvertown Tunnel southern approach Northbound, for a distance of 215 metres.

The rights of way and access plans – sheet 2

In the administrative areas of the Royal Borough of Greenwich and the London Borough of Newham; in the county of Greater London

Reference C – Refer to sheet 1

Reference D – Refer to sheet 1

The rights of way and access plans – sheet 3

In the administrative area of the London Borough of Newham; in the county of Greater London

Dock Road (including National Cycle Route No. 13 (part))A length from its junction with the existing Tidal Basin Roundabout, in a south westerly direction and then in a south easterly direction, for a total distance of 395 metres.

Reference A

To be substituted by a length of new highway from a point 110 metres west of the point where the existing A1020 Silvertown Way off-slip joins the Tidal Basin Roundabout, in a generally south-easterly direction, to a point where it joins the existing North Woolwich Road, for a distance of 430 metres.

Scarab Close (part)A length from its junction with the existing Dock Road in a south westerly direction, for a distance of 25 metres.

Reference A (part)

To be substituted in part by new highway (being part of the realigned Dock Road (Reference A)) from a point 110 metres west of the existing A1020 Silvertown Way off-slip, in a generally southerly direction, to a point where it joins the existing Scarab Close, for a distance of 55 metres.

Reference B

New left turn off-slip.

A length of new highway from a point on the existing A1020 Silvertown Way off-slip 40 metres south-east of the Tidal Basin Roundabout, initially in a north-westerly direction then turning in a southerly direction, to a point where it joins the Silvertown Tunnel northern approach Southbound, for a distance of 95 metres.

Reference C – Refer to sheet 1

Reference D – Refer to sheet 1

Reference E

Silvertown Tunnel northern approach Southbound.

A length of new highway from a point 70 metres west of the point where the existing A1020 Silvertown Way off-slip joins the Tidal Basin Roundabout, in a generally south-easterly direction to the new North Portal of the Silvertown Tunnel, for a distance of 205 metres.

Reference F

Silvertown Tunnel northern approach Northbound.

A length of new highway from the North Portal of the new Silvertown Tunnel, in a generally north-westerly direction to its junction with the new (part of the) Tidal Basin Roundabout, for a distance of 210 metres.

Reference G

A length of new highway from a point on the new Dock Road (realigned), 60 metres to the south-east of its tie-in with the North Woolwich Road, in a generally north westerly direction, for a distance of 80 metres.

Tidal Basin Roundabout (part)

(including National Cycle Route No. 13 (part))

A length from a point on the existing Tidal Basin Roundabout where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the northern side of the existing roundabout, in a generally south-easterly direction, and then in a southerly direction and then in an easterly direction, to a point where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the southern side of the existing roundabout.

Reference H (part)

To be substituted by a length of new highway from a point on the existing Tidal Basin Roundabout where the new Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the northern side of the existing roundabout, in a generally south-easterly direction, and then in a southerly direction and then in an easterly direction, to a point where the new Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the southern side of the existing roundabout, for a distance of 270 metres.

Reference H (part)

A length of new highway within the central island of the new part of Tidal Basin Roundabout from a point on the new Tidal Basin Roundabout 90 metres south west of the centre point of where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way, in a generally south-easterly direction for a distance of 45 metres to a point where it joins the new Tidal Basin Roundabout at a point 95 metres south west of the centre point of where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources