Search Legislation

The Greenhouse Gas Emissions Trading Scheme Order 2020

Changes over time for: The Greenhouse Gas Emissions Trading Scheme Order 2020 (Schedules only)

 Help about opening options

Version Superseded: 07/02/2022

Status:

Point in time view as at 07/02/2022.

Changes to legislation:

There are currently no known outstanding effects for the The Greenhouse Gas Emissions Trading Scheme Order 2020. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 4(1)

SCHEDULE 1U.K.Aviation activity

Aviation activityU.K.

1.—(1) An aviation activity consists of any of the following activities other than excluded flights—

(a)a flight departing from an aerodrome situated in the United Kingdom and arriving in an aerodrome situated—

(i)in the United Kingdom;

(ii)in an EEA State;

(iii)in Gibraltar;

(iv)on an offshore structure in the UK sector of the continental shelf or an offshore structure in the continental shelf of an EEA state;

(b)a flight arriving in an aerodrome situated in the United Kingdom from an aerodrome situated in Gibraltar.

(2) In this paragraph a reference to a flight departing from an aerodrome situated in the United Kingdom and arriving in an aerodrome situated in an EEA state does not include a reference to a flight departing from an aerodrome situated in the United Kingdom and arriving in an aerodrome situated in an outermost region.

(3) In this paragraph, “continental shelf of an EEA state” means an area beyond the territorial sea of an EEA state, within which rights with respect to the seabed and subsoil and their natural resources are exercisable by that EEA state.

Commencement Information

I1Sch. 1 para. 1 in force at 12.11.2020, see art. 2(1)

Excluded flightsU.K.

2.—(1) For the purposes of this Order, subject to sub-paragraph (2), all of the following are excluded flights—

(a)flights performed exclusively for the transport, on official mission, of a reigning Monarch and their immediate family, Heads of State, Heads of Government and Government Ministers, of a country other than the United Kingdom;

(b)military flights;

(c)customs and police flights performed by both civil registered and military aircraft;

(d)search and rescue flights;

(e)firefighting flights;

(f)humanitarian flights;

(g)emergency medical service flights;

(h)flights performed exclusively under the visual flight rules set out in Annex 2 to the Chicago Convention;

(i)flights terminating at the aerodrome from which the aircraft has taken off and during which no intermediate landing has been made;

(j)training flights performed exclusively for the purpose of obtaining a licence, or a rating in the case of cockpit flight crew, provided that the flights do not serve for the transport of passengers or cargo;

(k)flights performed exclusively for the purpose of scientific research partially or totally performed in-flight;

(l)flights performed exclusively for the purpose of checking, testing or certifying aircraft or equipment whether airborne or ground-based;

(m)flights performed by aircraft with a certified maximum take-off mass of less than 5,700 kilograms.

(2) Excluded flights referred to in sub-paragraph (1)(a), (j), (k) and (l) do not include flights for the positioning or ferrying of the aircraft.

(3) In this paragraph—

emergency medical service flights” means flights for the exclusive purpose of facilitating emergency medical assistance, where immediate and rapid transportation is essential, by carrying medical personnel, medical supplies, including equipment, blood, organs, drugs, or ill and injured persons and other persons directly involved;

firefighting flights” means flights performed exclusively to combat wildfires;

“Government Ministers” are the members of the government as listed in the national official journal of the country concerned, excluding members of regional or local governments of a country;

humanitarian flights” means flights operated exclusively for humanitarian purposes which carry relief personnel and relief supplies such as food, clothing, shelter, medical and other items during or after an emergency or disaster, or are used to evacuate persons from a place where their life or health is threatened by such emergency or disaster to a safe haven in the same State or another State willing to receive such persons;

“immediate family” comprises exclusively the spouse, any partner considered as equivalent to the spouse, the children and the parents;

military flights” means flights directly related to the conduct of military activities and performed by military aircraft;

official mission” means a mission in which the person concerned is acting in an official capacity;

search and rescue flights” means flights offering search and rescue services, including the performance of distress monitoring, communication, coordination and search and rescue functions, initial medical assistance or medical evacuation, through the use of public and private resources, including cooperating aircraft, vessels and other craft and installations.

Commencement Information

I2Sch. 1 para. 2 in force at 12.11.2020, see art. 2(1)

Article 4(1)

SCHEDULE 2U.K.Meaning of installation and regulated activity

InterpretationU.K.

1.—(1) In this Schedule—

combustion unit” means a stationary technical unit in which fuels are combusted (and includes all types of boiler, burner, turbine, heater, furnace, incinerator, calciner, kiln, oven, dryer, engine, fuel cell, chemical looping combustion unit, flare and thermal or catalytic post-combustion unit);

hazardous waste” means—

(a)

in relation to an installation in Northern Ireland or UK coastal waters adjacent to Northern Ireland, hazardous waste for the purposes of regulation 6 of the Hazardous Waste Regulations (Northern Ireland) 2005 M1;

(b)

in relation to an installation in Scotland or UK coastal waters adjacent to Scotland, special waste within the meaning of regulation 2 of the Special Waste Regulations 1996 M2;

(c)

in relation to an installation in Wales or UK coastal waters adjacent to Wales, hazardous waste for the purposes of regulation 6 of the Hazardous Waste (Wales) Regulations 2005 M3;

(d)

in any other case, hazardous waste for the purposes of regulation 6 of the Hazardous Waste (England and Wales) Regulations 2005 M4;

municipal waste” has the meaning given in section 21(3) of the Waste and Emissions Trading Act 2003 M5.

(2) For the purposes of this Schedule, a combustion unit or installation that uses only biomass as a fuel includes a combustion unit or installation that uses fossil fuels only during start-up or shut-down of operations.

Commencement Information

I3Sch. 2 para. 1 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M1S.R. 2005/300, to which there are amendments not relevant to this Order.

M2S.I. 1996/972. The definition of “special waste” was substituted by regulation 2(3) of S.S.I 2004/112 and is substituted prospectively by regulation 7(4) of S.S.I. 2019/26 with effect from IP completion day.

M3S.I. 2005/1806. Regulation 6 was amended by regulation 3(5) of S.I. 2015/1417.

M4S.I. 2005/894, to which there are amendments not relevant to this Order.

M52003 c. 33. Section 21(3) was amended by regulation 6(2)(b) of S.I. 2011/2499.

Meaning of installationU.K.

2.—(1) Subject to sub-paragraph (2), in this Order, “installation” means a stationary technical unit or units where one or more regulated activities are carried out.

(2) “Installation” does not include any of the following (which are outside the scope of the UK ETS)—

(a)an installation that uses only biomass as a fuel;

(b)an installation, or part of an installation, the primary purpose of which is research and development (including the testing of new products and processes);

(c)an installation, the primary purpose of which is the incineration of hazardous or municipal waste;

(d)a relevant Northern Ireland electricity generator.

(3) In sub-paragraph (2), a reference to an installation is a reference to what would be an installation, but for that sub-paragraph.

(4) References in this Order to an installation include references to part of an installation.

Commencement Information

I4Sch. 2 para. 2 in force at 12.11.2020, see art. 2(1)

Meaning of regulated activity, etc.U.K.

3.—(1) In this Order, “regulated activity” means—

(a)an activity set out in an entry in column 1 of table C that results in emissions of the gases set out in the corresponding entry in column 2; and

(b)where such an activity is carried out on a site, the combustion of fuels in any combustion unit (including a combustion unit referred to in sub-paragraph (5)(a) or (b)) operated on the site that results in emissions of such gases, except for a combustion unit to which sub-paragraph (2) applies.

(2) This sub-paragraph applies to a combustion unit if—

(a)the primary purpose of the unit is the incineration of hazardous or municipal waste; and

(b)the unit does not exclusively serve the stationary technical unit or units where the activity referred to in sub-paragraph (1)(a) is carried out.

(3) But sub-paragraph (2) does not apply to a combustion unit that is a flare.

Table C

Column 1Column 2
ActivitiesGreenhouse gases
Combustion of fuels on a site where combustion units with a total rated thermal input exceeding 20 megawatts are operatedCarbon dioxide
Refining of mineral oilCarbon dioxide
Production of cokeCarbon dioxide
Metal ore (including sulphide ore) roasting or sintering, including palletisationCarbon dioxide
Production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2.5 tonnes per hourCarbon dioxide
Production or processing of ferrous metals (including ferro-alloys) on a site where combustion units with a total rated thermal input exceeding 20 megawatts are operated (and “processing” includes processing in rolling mills, re-heaters, annealing furnaces, smitheries, foundries, coating and pickling)Carbon dioxide
Production of primary aluminiumCarbon dioxide
Perfluorocarbons
Production of secondary aluminium on a site where combustion units with a total rated thermal input exceeding 20 megawatts are operatedCarbon dioxide
Production or processing of non-ferrous metals (including production of alloys, refining and foundry casting) on a site where combustion units with a total rated thermal input (including fuels used as reducing agents) exceeding 20 megawatts are operatedCarbon dioxide
Production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other furnaces with a production capacity exceeding 50 tonnes per dayCarbon dioxide
Production of lime or calcination of dolomite or magnesite in rotary kilns or in other furnaces with a production capacity exceeding 50 tonnes per dayCarbon dioxide
Manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per dayCarbon dioxide
Manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain, with a production capacity exceeding 75 tonnes per dayCarbon dioxide
Manufacture of mineral wool insulation material using glass, rock or slag with a melting capacity exceeding 20 tonnes per dayCarbon dioxide
Drying or calcination of gypsum or production of plaster boards and other gypsum products on a site where combustion units with a total rated thermal input exceeding 20 megawatts are operatedCarbon dioxide
Production of pulp from timber or other fibrous materialsCarbon dioxide
Production of paper or cardboard with a production capacity exceeding 20 tonnes per dayCarbon dioxide
Production of carbon black involving the carbonisation of organic substances such as oils, tars, cracker and distillation residues on a site where combustion units with a total rated thermal input exceeding 20 megawatts are operatedCarbon dioxide
Production of nitric acidCarbon dioxide
Nitrous oxide
Production of adipic acidCarbon dioxide
Nitrous oxide
Production of glyoxal and glyoxylic acidCarbon dioxide
Nitrous oxide
Production of ammoniaCarbon dioxide
Production of bulk organic chemicals by cracking, reforming, partial or full oxidation or by similar processes, with a production capacity exceeding 100 tonnes per dayCarbon dioxide
Production of hydrogen (H2) and synthesis gas by reforming or partial oxidation with a production capacity exceeding 25 tonnes per dayCarbon dioxide
Production of soda ash (Na2CO3) and sodium bicarbonate (NaHCO3)Carbon dioxide
Capture of greenhouse gases from other installations for the purpose of transport and geological storage in a storage siteCarbon dioxide
Transport of greenhouse gases by pipelines for geological storage in a storage siteCarbon dioxide
Geological storage of greenhouse gases in a storage siteCarbon dioxide

(4) For the purpose of calculating the production or other capacity set out in an entry in column 1 of table C, where more than one activity referred to in the entry is carried out on a site, the capacities of all such activities must be added together.

(5) For the purpose of calculating the total rated thermal input of combustion units operated on a site, the rated thermal input of all combustion units on the site must be added together, except for—

(a)combustion units with a rated thermal input below 3 megawatts;

(b)combustion units that use only biomass as a fuel.

(6) Where the carrying out of an activity referred to in paragraph (a) of sub-paragraph (1) (that is to say, an activity set out in an entry in column 1 of table C) falls within both—

(a)an entry that does not refer to a threshold expressed as total rated thermal input; and

(b)an entry that refers to such a threshold,

for the purpose of this Order, the reference to the activity in that paragraph must be treated as a reference to the activity falling within the entry referred to in paragraph (a) of this sub-paragraph.

(7) In this Order, “specified emissions” means, in relation to a regulated activity referred to in sub-paragraph (1), the emissions of the gases referred to in that sub-paragraph.

Commencement Information

I5Sch. 2 para. 3 in force at 12.11.2020, see art. 2(1)

Article 15

SCHEDULE 3U.K.Applications, notices, etc.

PART 1 U.K.Applications, notices, etc. submitted to regulators

Submission of applications, notices, etc. to regulatorsU.K.

1.—(1) This paragraph applies to an application, notice or report submitted to a regulator under—

(a)this Order;

[F1(aa)the Monitoring and Reporting Regulation 2018;

(ab)the Verification Regulation 2018;

(ac)the Free Allocation Regulation;

(ad)the Activity Level Changes Regulation;]

(b)a permit;

(c)an emissions monitoring plan.

(2) An application, notice or report—

(a)must be in writing; and

(b)unless the regulator agrees otherwise in writing, must be made on a form provided by the regulator for that purpose.

(3) The regulator must set out in the form—

(a)the information required by the regulator to determine the application; or

(b)the matters required to be included in the notice or report.

(4) Unless the regulator agrees otherwise in writing—

(a)the form must be submitted to the regulator electronically and, if the form specifies an email address for submission, to that address;

(b)if the form is provided by the regulator for submission through a website, the form must be submitted through the website and in accordance with any instructions given for completion and submission.

(5) Unless the information has been provided in a previous application made to the regulator [F2(including an application under GGETSR 2012)], an application must set out—

(a)the name, postal address (including postcode) and telephone number of the applicant;

(b)either—

(i)an email address for service; or

(ii)a postal address (including postcode) in the United Kingdom for service.

(6) In the case of an application under paragraph 7 of Schedule 6 (transfer of permits), sub-paragraph (5) applies to both the transferring operator and the new operator referred to in that paragraph.

(7) Subject to sub-paragraphs (8) and (9), an application must be accompanied by the charge for the application set out in the charging scheme published under article 36.

(8) Where an application is submitted electronically, the charge may be sent to the regulator separately from the application; and in that case, for the purposes of this Order, the application must be treated as not being received by the regulator until the charge is also received.

(9) Where an application is made to the Secretary of State (including an application submitted electronically), the charge need not be paid until the end of the period of 28 days beginning with the date on which the Secretary of State gives notice to the applicant requesting payment of the charge.

(10) An application may be withdrawn at any time before it is determined.

(11) The regulator may, by notice to a person submitting an application, require the applicant to provide such further information specified in the notice, within the period so specified, [F3as may be required] to determine the application.

(12) For the purposes of this Order, the application must be treated as being withdrawn if—

(a)the applicant fails to provide that information before the end of that period (or on or before such later date as may be agreed with the regulator); and

(b)the regulator gives notice to the applicant that the application is treated as having been withdrawn.

(13) For the purposes of this paragraph, “application” includes any proposed plan required to be submitted with the application.

Textual Amendments

Commencement Information

I6Sch. 3 para. 1 in force at 12.11.2020, see art. 2(1)

Determination of applications by regulatorsU.K.

2.—(1) Where an application under this Order is made to a regulator in accordance with the requirements of this Order, the application must be determined by the regulator within—

(a)the period of 2 months beginning with the date on which the application is received; or

(b)such longer period as may be agreed in writing with the applicant.

(2) For the purposes of sub-paragraph (1)—

(a)an application is determined when notice of the determination is given to the applicant by the regulator;

(b)in calculating the period of 2 months, no account must be taken of any period beginning with the date on which a notice under paragraph 1(11) is given to the applicant and ending with the date on which the applicant provides the information specified in the notice.

(3) Where the regulator fails to determine an application before the end of the period referred to in sub-paragraph (1)—

(a)the applicant may give to the regulator notice that the applicant treats the application as having been refused; and

(b)if such notice is given, for the purposes of this Order, the application must be treated as having been refused at the end of that period.

(4) Where the application is an application for a permit or for the transfer of a permit, any permit that is issued or transferred as a result of the application must be attached to the notice under sub-paragraph (2)(a).

(5) This paragraph does not apply to an application under—

[F4(za)article 34L (application for aviation free allocation entitlement);

(zb)article 34Q (application for transfer of aviation free allocation entitlement);]

(a)paragraph 5 of Schedule 7 (obtaining hospital or small emitter status for 2026-2030 allocation period);

(b)paragraph 3 of Schedule 8 (obtaining ultra-small emitter status for 2026-2030 allocation period).

Textual Amendments

Commencement Information

I7Sch. 3 para. 2 in force at 12.11.2020, see art. 2(1)

PART 2U.K.Notices, etc. given by regulators, national authorities [F5, UK ETS authority or registry administrator]

Service of notices, etc.U.K.

3.—(1) This paragraph applies to a notice or direction that must or may be given under this Order by—

(a)a regulator;

(b)a national authority;

(c)the UK ETS authority.

[F6(d)the registry administrator.]

(2) A notice or direction must be in writing.

(3) A notice or direction may be given to a person in any of the following ways—

(a)by delivering it to the person;

(b)by sending it to a postal or email address provided by the person for the purpose of the service of notices or directions [F7(including an address provided under GGETSR 2012)];

(c)by leaving it at the person's proper address;

(d)by sending it by post or electronic means to the person's proper address;

(e)if the person is a body corporate, by giving it to the secretary or clerk of the body in accordance with any of sub-paragraphs (a) to (d);

(f)if the person is a partnership, by giving it to a partner or a person having the control or management of the partnership business in accordance with any of sub-paragraphs (a) to (d).

[F8(3A) A notice may be given by the registry administrator to a person who holds an account—

(a)in any of the ways set out in paragraph (3);

(b)by sending it by electronic means in the registry.]

(4) In this paragraph, “proper address” means—

(a)in the case of a body corporate—

(i)the registered or principal office of the body; or

(ii)the email address of the secretary or clerk of the body;

(b)in the case of a partnership—

(i)the principal office of the partnership; or

(ii)the email address of the partner or person having control or management of the partnership business;

(c)in any other case, the person's last known address (including an email address).

(5) For the purposes of sub-paragraph (4), where a body corporate registered outside the United Kingdom or a partnership established outside the United Kingdom has an office in the United Kingdom, the principal office of the body corporate or partnership is its principal office in the United Kingdom.

(6) For the purposes of sub-paragraph (4)(c), where the person is an aircraft operator, the proper address includes an address derived from information supplied by Eurocontrol.

[F9(7) In this paragraph and paragraph 4, a reference to this Order includes a reference to the Monitoring and Reporting Regulation 2018, the Verification Regulation 2018, the Free Allocation Regulation and the Activity Level Changes Regulation.]

Textual Amendments

Commencement Information

I8Sch. 3 para. 3 in force at 12.11.2020, see art. 2(1)

Service on certain Crown operatorsU.K.

4.—(1) This paragraph applies in relation to an installation operated by a person acting on behalf of—

(a)the Royal Household;

(b)the Duchy of Lancaster; or

(c)the Duke of Cornwall or other possessor of the Duchy of Cornwall.

(2) In relation to the giving of notices or directions under this Order, the following person must be treated as the operator—

(a)in relation to sub-paragraph (1)(a), the Keeper of the Privy Purse;

(b)in relation to sub-paragraph (1)(b), the person appointed by the Chancellor of the Duchy of Lancaster for that purpose;

(c)in relation to sub-paragraph (1)(c), the person appointed by the Duke of Cornwall or other possessor of the Duchy of Cornwall for that purpose.

Commencement Information

I9Sch. 3 para. 4 in force at 12.11.2020, see art. 2(1)

Article 24

SCHEDULE 4U.K.Modifications to [F10Monitoring and Reporting Regulation 2018]

Textual Amendments

1.  [F11The Monitoring and Reporting Regulation 2018] is to be read as if—

(a)for “competent authority” in each place it occurs there were substituted “ regulator ”;

[F12(aa)for “greenhouse gas emissions permit” in each place there were substituted “ permit ”;]

(b)Articles 10, 52, 57, 70, 74, 75, 76 and 77 were omitted; and

(c)the words “This Regulation shall be binding in its entirety and directly applicable in all Member States”, immediately following Article 78, were omitted,

and subject to the following additional modifications.

Textual Amendments

Commencement Information

I10Sch. 4 para. 1 in force at 12.11.2020, see art. 2(1)

2.  Article 1 is to be read as if for the words from “pursuant to” to the end there were substituted “ for the purposes of the 2020 Order ”.U.K.

Commencement Information

I11Sch. 4 para. 2 in force at 12.11.2020, see art. 2(1)

3.  Article 2 is to be read as if for the words from “greenhouse gas emissions” to the end of the first subparagraph there were substituted “ specified emissions (as defined in the 2020 Order) from regulated activities, activity data from installations, CO2 emissions from aviation activity and tonne-kilometre data from aviation activity ”.U.K.

Commencement Information

I12Sch. 4 para. 3 in force at 12.11.2020, see art. 2(1)

4.  Article 3 is to be read as if—U.K.

(a)in the words before point (1), for “the following definitions” there were substituted “ except where the context otherwise requires, terms defined in the Greenhouse Gas Emissions Trading Scheme Order 2020 have the meanings given by that Order and the following additional definitions ”;

(b)before point (1), there were inserted—

(A1) ‘greenhouse gas emissions’ and ‘emissions’ mean specified emissions (as defined in the 2020 Order) from regulated activities or CO2 emissions from aviation activity;;

(c)for point (2), there were substituted—

(2) ‘trading period’, in references to the trading period immediately preceding the first trading period of the UK ETS, means the period beginning with 1st January 2013 and ending with 31st December 2020;;

(d)after point (2), there were inserted—

(2a) ‘the 2020 Order’ means the Greenhouse Gas Emissions Trading Scheme Order 2020;;

[F13(e)after point (5), there were inserted—

(5a) ‘Implementing Regulation (EU) 2018/2067’ or ‘Commission Implementing Regulation (EU) 2018/2067’ means the Verification Regulation 2018 (as defined in the 2020 Order);

(5b) ‘monitoring plan’ in relation to an aircraft operator, except in Articles 11 to 13 of this Regulation, means the aircraft operator's emissions monitoring plan as defined in article 4 of the 2020 Order;;]

(f)in point (12), the words from “or, for tonne-kilometre data” to the end were omitted;

(g)point (18) were omitted;

(h)in point (28), for “Annex II to Directive 2003/87/EC” substitute “ column 2 of table C in Schedule 2 to the 2020 Order ”;

(i)in point (44) “, or equivalent applicable international rules” were omitted;

(j)in each of points (46) and (47), “listed in Annex I to Directive 2003/87/EC” were omitted;

(k)point (50) were omitted;

(l)in each of points (54) and (55), for “under Directive 2009/31/EC” there were substituted “ in accordance with the CCS licensing regime ”;

(m)after point (55), there were inserted—

(55a) ‘the CCS licensing regime’ means Chapter 3 of Part 1 of the Energy Act 2008 M6 and other domestic legislation which immediately before IP completion day implemented Directive 2009/31/EC M7;.

Textual Amendments

Commencement Information

I13Sch. 4 para. 4 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M7OJ No. L 140, 5.6.2009, p. 114.

5.  Article 4 is to be read as if for “under Directive 2003/87/EC” there were substituted “ for the purposes of the Greenhouse Gas Emissions Trading Scheme Order 2020 ”.U.K.

Commencement Information

I14Sch. 4 para. 5 in force at 12.11.2020, see art. 2(1)

6.  Article 5 is to be read as if for the words from “activities listed” to “that Directive” there were substituted “ regulated activities and aviation activity ”.U.K.

Commencement Information

I15Sch. 4 para. 6 in force at 12.11.2020, see art. 2(1)

7.  Article 9 is to be read as if for “Article 15 of Directive 2003/87/EC” there were substituted “ Commission Implementing Regulation (EU) No 2018/2067 ”.U.K.

Commencement Information

I16Sch. 4 para. 7 in force at 12.11.2020, see art. 2(1)

[F148.  Article 12 is to be read as if—U.K.

(a)paragraph 3 were omitted;

(b)after paragraph 2 there were inserted—

4.  Where the operator of an installation has submitted a monitoring plan to the regulator, the regulator must, by notice to the operator:

(a)if the plan is in accordance with this Regulation, approve it; or

(b)reject it.

(See articles 28 to 30 of the 2020 Order in relation to the submission of a monitoring plan by an aircraft operator.).]

9.  Article 13 is to be read as if—U.K.

(a)for paragraph 1 there were substituted—

1.  Subject in each case to the approval of the regulator, operators and aircraft operators may use standardised or simplified monitoring plans that conform to templates published by the regulator.;

(b)in paragraph 2, for “Member States” there were substituted “ The regulator ”.

Commencement Information

I17Sch. 4 para. 9 in force at 12.11.2020, see art. 2(1)

10.  Article 14(1) is to be read as if “in accordance with Article 7 of Directive 2003/87/EC” were omitted.U.K.

Commencement Information

I18Sch. 4 para. 10 in force at 12.11.2020, see art. 2(1)

11.  Article 15 is to be read as if—U.K.

[F15(za)for paragraph 1 there were substituted—

1.  The operator or aircraft operator must notify the regulator of:

(a)any significant modification (within the meaning of paragraph 3) of the monitoring plan at least 14 days before making the modification or, where this is not possible, as soon as reasonably practicable; and

(b)any other modification of the monitoring plan on or before 31 December in the year in which the modification is made.;]

(a)in paragraph 3—

(i)in point (g), for “or de minimis” there were substituted “ , de minimis or marginal ”;

(ii)point (h) were omitted.

(b)in paragraph 4—

(i)in point (a)(ii), for “calculation methods as laid down in Annex III” there were substituted “ the calculation methods referred to in Article 53(2) ”;

(ii)in point (a)(iv), for “Article 28a(6) of Directive 2003/87/EC” there were substituted “ article 33(2) of the 2020 Order ”.

Textual Amendments

Commencement Information

I19Sch. 4 para. 11 in force at 12.11.2020, see art. 2(1)

12.  Article 16(1) is to be read as if for the words from “shall carry out” to the end there were substituted “ must use, in parallel, both the modified and the original monitoring plan to carry out all monitoring and reporting, according to both plans, and must keep the results of both monitoring approaches in their records ”.U.K.

Commencement Information

I20Sch. 4 para. 12 in force at 12.11.2020, see art. 2(1)

13.  Article 18 is to be read as if—U.K.

(a)in paragraph 1, for “EUR 20” there were substituted “ £20 ”;

(b)in paragraph 3(c)—

(i)for “Member State” there were substituted “ United Kingdom ”;

(ii)after “adopted”, there were inserted “ before IP completion day ”;

(c)in paragraph 4—

(i)for “EUR 2000” there were substituted “ £2000 ”;

(ii)for “EUR 500” there were substituted “ £500 ”.

Commencement Information

I21Sch. 4 para. 13 in force at 12.11.2020, see art. 2(1)

14.  Article 19(3) is to be read as if—U.K.

(a)after point (b) there were inserted—

(ba)marginal source streams, where the source streams selected by the operator jointly account for less than 10 tonnes of fossil CO2 per year;;

[F16(aa)in point (c) for “points (a) and (b)” there were substituted “points (a), (b) and (ba)”;]

(b)in the final subparagraph, for “or a de minimis source stream” there were substituted “ , a de minimis source stream or a marginal source stream ”.

Textual Amendments

Commencement Information

I22Sch. 4 para. 14 in force at 12.11.2020, see art. 2(1)

15.  Article 20 is to be read as if—U.K.

(a)in paragraph 1, in the second subparagraph—

(i)after “belonging to” there were inserted “ regulated ”;

(ii)the words from “and listed in” to the end were omitted;

(b)in paragraph 3—

(i)in the first subparagraph, for “within the meaning of Directive 2009/31/EC” there were substituted “ containing a storage site permitted in accordance with the CCS licensing regime ”;

(ii)in the second subparagraph, for “pursuant to Article 16 of Directive 2009/31/EC have been taken”, there were substituted “ have been taken in accordance with the CCS licensing regime ”.

Commencement Information

I23Sch. 4 para. 15 in force at 12.11.2020, see art. 2(1)

16.  Article 26(3) is to be read as if after “source streams” there were inserted “ and marginal source streams ”.U.K.

Commencement Information

I24Sch. 4 para. 16 in force at 12.11.2020, see art. 2(1)

17.  Article 31(1)(b) is to be read as if for “Member State” there were substituted “ United Kingdom ”.U.K.

Commencement Information

I25Sch. 4 para. 17 in force at 12.11.2020, see art. 2(1)

18.  Article 38 is to be read as if—U.K.

(a)in paragraph 2, after “zero” there were inserted “ , but the emission factor for bioliquids shall be zero only if the sustainability criteria set out in Article 17(2) to (5) of Directive 2009/28/EC have been fulfilled ”;

(b)in paragraph 4, after “de minimis” there were inserted “ or marginal ”.

Commencement Information

I26Sch. 4 para. 18 in force at 12.11.2020, see art. 2(1)

19.  Article 39 is to be read as if—U.K.

(a)in paragraph 2, the third subparagraph were omitted;

(b)in paragraph 3, for “Articles 2(j) and 15 of Directive 2009/28/EC” there were substituted “ the Electricity (Guarantees of Origin of Electricity Produced from Renewable Energy Sources) Regulations 2003 M8 or the Electricity (Guarantees of Origin of Electricity Produced from Renewable Energy Sources) Regulations (Northern Ireland) 2003 M9.

Commencement Information

I27Sch. 4 para. 19 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M8S.I. 2003/2562, amended by S.I. 2010/2715 and 2011/1043 and amended prospectively by S.I. 2018/1093 with effect from IP completion day.

M9S.R. 2003 No. 470, amended by S.R. 2010 No. 374 and S.I. 2011/1043; there are other amending instruments, but none is relevant.

20.  Article 42(1) is to be read as if, in the second subparagraph, “, standards published by the Commission” were omitted.U.K.

Commencement Information

I28Sch. 4 para. 20 in force at 12.11.2020, see art. 2(1)

[F1720A.  Article 43(4)(c) is to be read as if for “Commission” there were substituted “UK ETS authority”.]U.K.

21.  Article 47(1) is to be read as if for “Annex I to Directive 2003/87/EC” there were substituted “ paragraph 3 of Schedule 2 to the 2020 Order ”.U.K.

Commencement Information

I29Sch. 4 para. 21 in force at 12.11.2020, see art. 2(1)

22.  Article 48(2) is to be read as if—U.K.

(a)for “activities covered by Annex I to Directive 2003/87/EC or included pursuant to Article 24 of that Directive” there were substituted “ regulated activities ”;

(b)for “activity covered by that Directive” there were substituted “ regulated activity ”;

(c)for “not covered by that Directive” there were substituted “ not covered by the 2020 Order ”.

Commencement Information

I30Sch. 4 para. 22 in force at 12.11.2020, see art. 2(1)

23.  Article 49 is to be read as if—U.K.

(a)in paragraph 1—

(i)in the words before point (a), for “activities covered by Annex I to Directive 2003/87/EC” there were substituted “ regulated activities ”;

(ii)in point (a), for “under Directive 2009/31/EC” in each place it occurs there were substituted “ in accordance with the CCS licensing regime ”;

(b)in paragraph 2—

(i)in the first subparagraph, the words from “the operator” in the first place it occurs to “other cases,” were omitted;

(ii)for the second subparagraph there were substituted—

In its annual emissions report, the operator of the receiving installation shall provide the name, address and contact information of a contact person for the transferring installation..

Commencement Information

I31Sch. 4 para. 23 in force at 12.11.2020, see art. 2(1)

24.  Article 50 is to be read as if—U.K.

(a)in paragraph 1—

(i)in the first subparagraph, for “activities covered by Annex I to Directive 2003/87/EC for which that Annex specifies N2O as relevant” there were substituted “ regulated activities in respect of which N2O emissions are specified emissions (as defined in the 2020 Order) ”;

(ii)in the third subparagraph, for “not covered by Directive 2003/87/EC” there were substituted “ not covered by the 2020 Order ”;

(b)for paragraph 2 there were substituted—

2.  In its annual emissions report, the operator of the transferring installation shall provide the name, address and contact information of a contact person for the receiving installation.

In its annual emissions report, the operator of the receiving installation shall provide the name, address and contact information of a contact person for the transferring installation..

Commencement Information

I32Sch. 4 para. 24 in force at 12.11.2020, see art. 2(1)

25.  Article 51 is to be read as if—U.K.

(a)in paragraph 1, for “activities for all flights included in Annex I to Directive 2003/87/EC that are” there were substituted “ activity that is ”;

(b)paragraphs 2 to 4 were omitted.

Commencement Information

I33Sch. 4 para. 25 in force at 12.11.2020, see art. 2(1)

26.  Article 53 is to be read as if—U.K.

(a)in paragraph 2, for “section 1 of Annex III” there were substituted “ Appendix 2 to Annex 16, Volume IV to the Chicago Convention ”M10 ;

(b)in paragraph 3, for “section 1 of Annex III” there were substituted “ Appendix 2 to Annex 16, Volume IV to the Chicago Convention ”.

Commencement Information

I34Sch. 4 para. 26 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M101st Edition, October 2018, available electronically at https://www.icao.int/environmental-protection/CORSIA/Pages/SARPs-Annex-16-Volume-IV.aspx or in paper form from the International Civil Aviation Organisation, 999 Robert-Bourassa Boulevard, Montreal, Quebec, Canada H3C 5H7.

[F1827.  Article 54 is to be read as if for the whole Article there were substituted—U.K.

Article 54U.K.Specific provisions for biofuels

1.  For mixed fuels, the aircraft operator may either assume the absence of biomass and apply a default fossil fraction of 100% or determine a biomass fraction in accordance with paragraph 2 or 3.

2.  Where biofuels are physically mixed with fossil fuels and delivered to an aircraft in physically identifiable batches, the aircraft operator may carry out analyses in accordance with Articles 32 to 35 to determine the biomass fraction on the basis of a relevant standard and the analytical methods set out in those Articles, provided that the use of that standard and those analytical methods is approved by the regulator. Where the aircraft operator provides evidence to the satisfaction of the regulator that such analyses would incur unreasonable costs or are technically not feasible, the aircraft operator may base an estimation of the biomass fraction on a mass balance of fossil fuels and biofuels purchased.

3.  Where purchased biofuel batches are not physically delivered to a specific aircraft, the aircraft operator shall not use analyses to determine the biomass fraction of the fuels used. In such a case, the aircraft operator may determine the biomass fraction using purchase records of biofuel of equivalent energy content, provided that the aircraft operator provides evidence to the satisfaction of the regulator that there is no double counting of the same biofuel quantity, in particular that the biofuel purchased is not claimed to be used by anyone else.

4.  Where a biofuel meets the sustainability criteria referred to in the Schedule to the Renewable Transport Fuel Obligations Order 2007, the emission factor of the biofuel shall be zero; and for the purpose of determining whether the sustainability criteria are met, the biofuel (wherever supplied) must be treated as supplied in the United Kingdom.

5.  Where a biofuel does not meet those criteria, the carbon content of the biofuel shall be treated as fossil carbon..]

28.  Article 55(2) is to be read as if for “Commission” there were substituted “ UK ETS authority ”.U.K.

Commencement Information

I35Sch. 4 para. 28 in force at 12.11.2020, see art. 2(1)

29.  Article 58(1) is to be read as if the second subparagraph were omitted.U.K.

Commencement Information

I36Sch. 4 para. 29 in force at 12.11.2020, see art. 2(1)

30.  Article 68 is to be read as if for the whole Article there were substituted—U.K.

Article 68U.K.Obligations for reporting

Annex X (minimum content of annual reports) has effect for the purposes of article 33 of and paragraph 4(2)(b) of Schedule 6 and paragraph 11(2)(b) of Schedule 7 to the 2020 Order..

Commencement Information

I37Sch. 4 para. 30 in force at 12.11.2020, see art. 2(1)

31.  Article 71 is to be read as if—U.K.

(a)the first sentence were omitted;

(b)for “With regard to the application of the exception, as specified in Article 4(2)(d) of Directive 2003/4/EC”, there were substituted “ With regard to the potential application in relation to emission reports of the exemption in section 43 of the Freedom of Information Act 2000 M11, the exception in regulation 12(5)(e) of the Environmental Information Regulations 2004 M12 or the exception in regulation 10(5)(e) of the Environmental Information (Scotland) Regulations 2004 M13.

Commencement Information

I38Sch. 4 para. 31 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M12S.I. 2004/3391, to which there are amendments not relevant to this Order.

M13S.S.I. 2004/520, to which there are amendments not relevant to this Order.

[F1931A.  Article 72(1) is to be read as if for the first subparagraph there were substituted—U.K.

Total annual emissions of each of the greenhouse gases CO2, N2O and PFCs shall be reported as rounded tonnes of CO2 or CO2(e). The total annual emissions of the installation shall be calculated as the sum of these three rounded values..]

32.  Article 72(3) is to be read as if “calculating the distance and payload pursuant to Article 57 and” were omitted.U.K.

Commencement Information

I39Sch. 4 para. 32 in force at 12.11.2020, see art. 2(1)

33.  Article 73 is to be read as if—U.K.

(a)in the words before point (a), for the words from “Each activity” to “aircraft operator” there were substituted “ Each regulated activity carried out by an operator and each aviation activity carried out by an aircraft operator ”;

(b)points (b) and (c) were omitted;

F20(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Commencement Information

I40Sch. 4 para. 33 in force at 12.11.2020, see art. 2(1)

34.  Article 78 is to be read as if the words from “However” to the end were omitted.U.K.

Commencement Information

I41Sch. 4 para. 34 in force at 12.11.2020, see art. 2(1)

35.  Annex 1 is to be read as if—U.K.

(a)in section 1, in point (2)(b), for “and de minimis” in both places it occurs there were substituted “ , de minimis and marginal ”;

(b)in section 2, in point 1—

(i)in point (a), “the administering Member State,” were omitted;

(ii)in point (d), for “covered by Annex I to Directive 2003/87/EC” there were substituted “ an aviation activity ”;

(iii)in point (k), for “Article 28a(6) of Directive 2003/87/EC” there were substituted “ article 33(2) of the 2020 Order ”;

[F21(c)in section 2, in point 2—

(i)in point (b)(i) “(Method A or Method B)” were omitted;

(ii)after point (e) there were inserted—

(f)where applicable, a description of the procedure used to assess if biofuels meet the sustainability criteria referred to in the Schedule to the Renewable Transport Fuel Obligations Order 2007;

(g)where applicable, a description of the procedure used to determine biofuel quantities based on purchase records in accordance with Article 54(3)..]

Textual Amendments

Commencement Information

I42Sch. 4 para. 35 in force at 12.11.2020, see art. 2(1)

[F2236.  Annex 2 is to be read as if—U.K.

(a)in section 2—

(i)in the first subparagraph before section 2.1—

(aa)for “all activities as listed in Annex I to Directive 2003/87/EC or included in the Union system under Article 24 of that Directive” there were substituted “all regulated activities”;

(bb)for “section 5” there were substituted “section 4”;

(ii)in the second subparagraph before section 2.1 for “sections 4 and 5” there were substituted “section 4”;

(iii)in section 2.4 in the subparagraph relating to Tier 1 for “competent authority or the Commission” there were substituted “UK ETS authority”;

(b)in section 4—

(i)for the heading there were substituted Definition of tiers for the calculation factors forCO2 process emissions;

(ii)for the subparagraph before section 4.1 (beginning “For all process emissions” and ending “from the process”) there were substituted—

For all CO2 process emissions (including emissions from the decomposition of carbonates and from process materials containing carbon other than in the form of carbonates, including urea, coke and graphite), where they are monitored using the standard methodology in accordance with Article 24(2), the tiers defined in this section for the applicable calculation factors shall be applied.

In the case of mixed materials which contain inorganic as well as organic forms of carbon, the operator may choose:

—to determine a total preliminary emission factor for the mixed material by analysing the total carbon content, and using a conversion factor and – if applicable – biomass fraction and net calorific value related to that total carbon content; or

—to determine the organic and inorganic contents separately and treat them as two separate source streams.

For emissions from the decomposition of carbonates, the operator may choose for each source stream one of the following methods:

(a)Method A (Input based): The emission factor, conversion factor and activity data are related to the amount of material input into the process.

(b)Method B (Output based): The emission factor, conversion factor and activity data are related to the amount of output from the process.

For other CO2 process emissions, the operator shall apply only method A.;

(iii)in section 4.1 in the subparagraph relating to Tier 1 for point (a) there were substituted—

(a)the standard factors listed in Table 2 of Annex 6 in the case of carbonate decomposition or in Tables 1, 4 or 5 of that Annex for other process materials;;

(iv)after section 4.4 there were inserted—

4.5  Tiers for the net calorific value

If relevant, the operator shall determine the net calorific value (“NCV”) of the process material using the tiers defined in section 2.2 of this Annex. NCV is considered not relevant for marginal or de minimis source streams or where the material is not itself combustible without other fuels being added. If in doubt, the operator shall seek confirmation by the regulator on whether NCV has to be monitored and reported.

4.6  Tiers for the biomass fraction

If relevant, the operator shall determine the biomass fraction of the carbon contained in the process material using the tiers defined in section 2.4 of this Annex.;

(c)section 5 were omitted.]

37.  Annex 3 is to be read as if section 1 were omitted.U.K.

Commencement Information

I43Sch. 4 para. 37 in force at 12.11.2020, see art. 2(1)

38.  Annex 4 is to be read as if—U.K.

[F23(a)in section 1—

(i)in subsection A for “all activities as listed in Annex I to Directive 2003/87/EC or included in the Union system under Article 24 of that Directive” there were substituted “all regulated activities”;

(ii)in subsection C.2 in the first subparagraph for “section 5” there were substituted “section 4”;

(aa)in each of the headings of sections 2 to 20 for “Annex I to Directive 2003/87/EC” there were substituted “Schedule 2 to the Greenhouse Gas Emissions Trading Scheme Order 2020”;

(ab)in section 4 in subsection B for “sections 2, 4 and 5” there were substituted “sections 2 and 4”;

(ac)in section 8—

(i)in subsection A “, and any guidelines published by the Commission for this purpose” were omitted;

(ii)in subsection B in calculation method B (overvoltage method) for “FCF2F6” in both places there were substituted “FC2F6;

(ad)in section 9—

(i)in subsection A for “organic” there were substituted “non-carbonate”;

(ii)in subsection B in the second subparagraph for “organic” there were substituted “non-carbonate”;

(iii)in subsection D for “The following tier definitions” in both places there were substituted “By way of derogation from section 4 of Annex 2, the following tier definitions”;

(ae)in section 10—

(i)in subsection B in the first subparagraph—

(aa)“and section 5” were omitted;

(bb)for “organic” there were substituted “non-carbonate”;

(ii)after subsection B there were inserted—

C.  Emissions from non-carbonate carbon in raw materials

The operator shall determine the emissions from non-carbonate carbon at least from limestone, shale or alternative raw materials in the kiln in accordance with Article 24(2).

By way of derogation from section 4 of Annex 2, the following tier definitions for the emission factor shall apply:

Tier 1: The content of non-carbonate carbon in the relevant raw material shall be estimated using industry best practice guidelines.

Tier 2: The content of non-carbonate carbon in the relevant raw material shall be determined at least annually following the provisions of Articles 32 to 35.

By way of derogation from section 4 of Annex 2, the following tier definitions for the conversion factor shall apply:

Tier 1: A conversion factor of 1 shall be applied.

Tier 2: The conversion factor shall be calculated applying industry best practice.;

(af)in section 11 in subsection B in the first subparagraph for “section 5” there were substituted “section 4”;

(ag)in section 12—

(i)in subsection A for “fossil organic material” there were substituted “non-carbonate carbon content”;

(ii)in subsection B in the first subparagraph—

(aa)for “sections 4 and 5” there were substituted “section 4”;

(bb)for “organic content” there were substituted “non-carbonate carbon content”;

(cc)for “organic carbon” there were substituted “non-carbonate carbon”.]

(b)in each of the headings of sections 21, 22 and 23, for “Directive 2009/31/EC” there were substituted “ the CCS licensing regime ”;

(c)in section 21, in subsection A, for “other activities covered by Directive 2003/87/EC” there were substituted “ other regulated activities ”;

(d)in section 22, in subsection B, for “Directive 2003/87/EC” in both places it occurs there were substituted “ the 2020 Order ”;

(e)in section 23—

(i)in subsection A, in the first subparagraph, for “Directive 2009/31/EC” there were substituted “ the CCS licensing regime ”;

(ii)in subsection A, in the second subparagraph, after “with”, there were inserted “ domestic legislation which immediately before IP completion day implemented ”;

(iii)in subsection B.3, in the definition of “Tend”, after “with”, there were inserted “ domestic legislation which immediately before IP completion day implemented ”.

Textual Amendments

F23Sch. 4 para. 38(a)-(ag) substituted for Sch. 4 para. 38(a)(aa) (7.2.2022) by The Greenhouse Gas Emissions Trading Scheme (Amendment) Order 2021 (S.I. 2021/1455), arts. 2, 22(8) (with art. 28)

Commencement Information

I44Sch. 4 para. 38 in force at 12.11.2020, see art. 2(1)

39.  Section 2(7) of Annex 9 is to be read as if—U.K.

(a)in point (c)—

(i)after “storage permit”, there were inserted “ for the storage site ”;

(ii)for “Article 9 of Directive 2009/31/EC” there were substituted “ the CCS licensing regime ”;

(b)in each of points (d), (e) and (f), after “with”, there were inserted “ domestic legislation which immediately before IP completion day implemented ”.

Commencement Information

I45Sch. 4 para. 39 in force at 12.11.2020, see art. 2(1)

40.  Annex 10 is to be read as if—U.K.

(a)in the heading, for “68(3)” there were substituted “ 68 ”;

(b)in section 1—

[F24(ai)for point (1) there were substituted—

(1) Name and address of the installation and details of the following:

(a)type and number of regulated activities carried out at the installation;

(b)address, telephone number and email address of two contact persons;

(c)name of the operator of the installation;

(d)permit number;;]

(i)in point (6), for “Information” there were substituted “ Subject to the subparagraph after point (13), information ”;

[F25(ia)in point (8)(g) for “as recognised in accordance with the acts adopted pursuant to Article 19(3) of Directive 2003/87/EC” there were substituted “in the registry”;]

(ii)in the subparagraph after point (13), at the end there were inserted “Emissions occurring from marginal source streams may be reported in an aggregate manner.”;

(iii)in the final subparagraph, after “with”, there were inserted “ domestic legislation which immediately before IP completion day implemented ”;

(c)in section 2—

(i)in point (1), after “Directive 2003/87/EC”, there were inserted “(read as if references in that Annex to “its administering Member State” and “in the administering Member State” were omitted and as if references to “aviation activities listed in Annex I” were references to “aviation activity”)”;

(ii)in point (6), for “aviation activities covered by Annex I to Directive 2003/87/EC” there were substituted “ aviation activity ”;

(iii)in point (9), for “Member State” there were substituted “ state ”;

[F26(iiia)for point (12) there were substituted—

(12) Memo-items:

(a)amount of biofuels used during the reporting year (in tonnes or m3) listed per fuel type, and whether the biofuels meet the sustainability criteria referred to in the Schedule to the Renewable Transport Fuel Obligations Order 2007;

(b)the net calorific value of biofuels and alternative fuels;;]

(iv)in point (13), for “operator” in both places it occurs there were substituted “ aircraft operator ”;

(d)in section 3—

(i)in point (1), after “Directive 2003/87/EC”, there were inserted “(read as if references in that Annex to “its administering Member State” and “in the administering Member State” were omitted and as if references to “aviation activities listed in Annex I” were references to “aviation activity”)”;

(ii)in point (6), for “aviation activities covered by Annex I to Directive 2003/87/EC” there were substituted “ aviation activity ”;

(iii)in point (8), for “aviation activities listed in Annex I of Directive 2003/87/EC” there were substituted “ aviation activity ”.

Textual Amendments

Commencement Information

I46Sch. 4 para. 40 in force at 12.11.2020, see art. 2(1)

Article 25

[F27SCHEDULE 5U.K.Modifications to Verification Regulation 2018

Textual Amendments

Commencement Information

I47Sch. 5 in force at 31.12.2020 immediately after IP completion day, see art. 2(2)(b)

1.  The Verification Regulation 2018 is to be read as if—U.K.

(a)for “…/…” in each place there were substituted “ 2019/331 ”;

(b)for “competent authority” in each place there were substituted “ regulator ”;

(c)Articles 56, 65 to 68, 74, 75, 78 and 79 were omitted;

(d)the words “This Regulation shall be binding in its entirety and directly applicable in all Member States”, immediately following Article 79, were omitted,

and subject to the following additional modifications.

2.  Article 1 is to be read as if—U.K.

(a)in the first subparagraph for “Directive 2003/87/EC” there were substituted “ the 2020 Order, Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 ”;

(b)the second subparagraph were omitted.

3.  Article 2 is to be read as if for “2019, reported pursuant to Article 14 of Directive 2003/87/EC” there were substituted “ 2021, reported pursuant to the 2020 Order and permits issued in accordance with it ”.U.K.

4.  Article 3 is to be read as if—U.K.

(a)for the words before point (1) there were substituted—

In this Regulation, references to Implementing Regulation (EU) 2018/2066 are to that Regulation as modified by the Greenhouse Gas Emissions Trading Scheme Order 2020 (“the modified MRR”) and expressions used in both the modified MRR and this Regulation have the same meaning in this Regulation as they do in the modified MRR; in addition the following definitions apply for the purposes of this Regulation:;

(b)in point (2)—

(i)for “a national” there were substituted “ the national ”;

(ii)for “harmonised standards, within the meaning of point 9 of Article 2 of Regulation (EC) No 765/2008,” there were substituted “ EN ISO 14065:2013 ”;

(c)in point (3)—

(i)for “a national” there were substituted “ the national ”;

(ii)the words “or a natural person otherwise authorised, without prejudice to Article 5(2) of that Regulation,” were omitted;

(d)after point (3) there were inserted—

(3a) ‘national accreditation body’ means the national accreditation body of the United Kingdom appointed in accordance with Article 4(1) of Regulation (EC) 765/2008;;

(e)after point (4) there were inserted—

(4a) ‘Delegated Regulation (EU) 2019/331’ means the Free Allocation Regulation (as defined in the 2020 Order);

(4b) ‘Implementing Regulation (EU) 2019/1842’ means the Activity Level Changes Regulation (as defined in the 2020 Order);;

(f)after point (6) there were inserted—

(6a) ‘annual activity level report’ means a report submitted by an operator pursuant to Article 3(3) of Implementing Regulation (EU) 2019/1842;;

(g)for point (7) there were substituted—

(7) ‘operator's or aircraft operator's report’ means the annual emission report to be submitted by the operator or aircraft operator pursuant to a permit issued in accordance with Schedule 6 or 7 to the 2020 Order or pursuant to article 33 of the 2020 Order, the baseline data report submitted by the operator pursuant to Article 4(2) of Delegated Regulation (EU) 2019/331, the new entrant data report submitted by the operator pursuant to Article 5(5) of that Regulation or the annual activity level report;;

(h)in point (13)—

(i)in paragraph (a) “greenhouse gas emissions” were omitted;

(ii)for paragraph (c) there were substituted—

(c)for the purposes of verifying the baseline data report submitted by the operator pursuant to Article 4(2)(a) of Delegated Regulation (EU) 2019/331, the new entrant data report submitted by the operator pursuant to Article 5(5) of that Regulation or the annual activity level report, any act or omission of an act by the operator that is contrary to the requirements in the monitoring methodology plan;;

(i)in points (22) and (23) for “EU” in each place there were substituted “ UK ”;

(j)in point (22) for “an” in the first place it occurs there were substituted “ a ”;

(k)in point (26) for “a” in the second place it occurs there were substituted “ the ”;

(l)after point (27) there were inserted—

(27a) ‘monitoring methodology plan’ has the same meaning as in Delegated Regulation (EU) 2019/331;;

(m)after point (28) there were inserted—

(28a) ‘baseline period’ has the same meaning as in Delegated Regulation (EU) 2019/331;;

(n)after point (29) there were inserted—

(30) ‘activity level reporting period’ means the applicable period preceding the submission of the annual activity level report pursuant to Article 3(1) of Implementing Regulation (EU) 2019/1842..

5.  Article 4 is to be read as if—U.K.

(a)for the words from “the relevant harmonised standards” to “European Union” there were substituted “ EN ISO 14065:2013 ”;

(b)for “the applicable harmonised standards” there were substituted “ those standards ”.

6.  Article 5 is to be read as if for “bodies” there were substituted “ body ”.U.K.

7.  Article 6 is to be read as if for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”.U.K.

8.  Article 7 is to be read as if—U.K.

(a)in paragraph 3 for “competent authorities responsible for Directive 2003/87/EC” there were substituted “ regulator ”;

(b)in paragraph 4—

(i)in point (a) for the words from “or in Annex IV” to the end there were substituted “ , in Annex IV to Delegated Regulation (EU) 2019/331 or in Article 3(2) of Implementing Regulation (EU) 2019/1842, as appropriate; ”;

(ii)in point (b) “greenhouse gas emissions” were omitted;

(iii)in point (c) for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(c)in paragraph 5 for the words from “or with” to “that irregularity” there were substituted “ , Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842, that irregularity ”;

(d)in paragraph 6 for the second subparagraph there were substituted—

If the monitoring methodology plan has not been approved by the regulator pursuant to Article 8 of Delegated Regulation (EU) 2019/331 or is incomplete, or if significant modifications referred to in Article 9(5) of that Regulation have been made which have not been approved by the regulator, the verifier must advise the operator to obtain the necessary approval from the regulator..

9.  Article 10(1) is to be read as if—U.K.

(a)in point (a) “greenhouse gas emissions” were omitted;

(b)in point (h) for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(c)in point (i) for the words from “and annual” to the end there were substituted “ under Directive 2003/87/EC and any previous allocation periods under the UK ETS, together with annual activity level reports of the previous years submitted to the competent authority for the purposes of Implementing Regulation (EU) 2019/1842 ”;

(d)after point (k) there were inserted—

(ka)if the monitoring methodology plan was modified, a record of all modifications in accordance with Article 9 of Delegated Regulation (EU) 2019/331;;

(e)in point (l) for “report referred to in Article 69(4)” there were substituted “ reports referred to in Article 69(1) and (4) ”;

(f)after point (l) there were inserted—

(la)where applicable, information on how the operator has corrected nonconformities or addressed recommendations of improvements that were reported in the verification report concerning an annual activity level report from the previous year or a relevant baseline data report;;

(g)in point (n) after “methodology plan” there were inserted “ as well as corrections of reported data ”;

(h)in point (p)—

(i)for “Directive 2009/31/EC” there were substituted “ the CCS licensing regime ”;

(ii)for “required by that Directive and the reports required by Article 14 of that Directive” there were substituted “ and reports required by that regime ”.

10.  Article 11(4) is to be read as if—U.K.

(a)in point (b) the words from “or” to the end were omitted;

(b)after point (b) there were inserted—

(ba)whether there have been any modifications to the monitoring methodology plan during the baseline period or the activity level reporting period, as appropriate;;

(c)in point (c) for the words from “notified” to the end there were substituted “ notified to and, if required, approved by the regulator pursuant to Part 4 of or Schedule 6 to the 2020 Order ”;

(d)in point (d) for the words from “point (b)” to the end there were substituted “ point (ba) have been notified to and, if required, approved by the regulator pursuant to Schedule 6 to the 2020 Order ”.

11.  Article 13(1)(c) is to be read as if for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”.U.K.

12.  Article 16(2) is to be read as if—U.K.

(a)in point (b) for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(b)in point (c) for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(c)in point (d) “listed in Annex I to Directive 2003/87/EC” were omitted;

(d)after point (f) there were inserted—

(fa)for the purposes of verifying an annual activity level report, the accuracy of the parameters listed in Article 16(5), 19, 20, 21 or 22 of Delegated Regulation (EU) 2019/331 as well as data required under paragraphs 1, 2 and 4 of Article 6 of Implementing Regulation (EU) 2019/1842;.

13.  Article 17 is to be read as if—U.K.

(a)in paragraph 3—

(i)in the words before point (a) for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(ii)in point (d) for “delegated acts adopted pursuant to Article 10b(5) of Directive 2003/87/EC” there were substituted “ Commission Delegated Decision (EU) 2019/708 ”;

(iii)at the end there were inserted—

(e)whether the energy consumption has been correctly attributed to each sub-installation where applicable;

(f)whether the value of the parameters listed in Articles 16(5), 19, 20, 21 or 22 of Delegated Regulation (EU) 2019/331 is based on a correct application of that Regulation;

(g)for the purposes of verifying an annual activity level report and a new entrant data report, the date of start of normal operation as referred to in Article 5(5) of Delegated Regulation (EU) 2019/331;

(h)for the purposes of verifying an annual activity level report whether the parameters listed in points 2.3 to 2.7 of Annex IV to Delegated Regulation (EU) 2019/331, as appropriate to the installation, have been monitored and reported in the correct way in accordance with the monitoring methodology plan.;

(b)in paragraph 4 after “is not counted” there were inserted “ as emitted ”;

(c)paragraph 5 were omitted.

14.  Article 18 is to be read as if for paragraph 3 there were substituted—U.K.

3.  Where data gaps in baseline data reports, new entrant data reports or annual activity level reports have occurred, the verifier shall check whether methods are laid down in the monitoring methodology plan to deal with data gaps pursuant to Article 12 of Delegated Regulation (EU) 2019/331, whether those methods were appropriate for the specific situation and whether they have been applied correctly.

Where no applicable data gap method is laid down in the monitoring methodology plan, the verifier shall check whether the approach used by the operator to compensate for the missing data is based on reasonable evidence and ensures that the data required by Annex IV to Delegated Regulation (EU) 2019/331 or Article 3(2) of Implementing Regulation (EU) 2019/1842 are not underestimated or overestimated..

15.  Article 21 is to be read as if—U.K.

(a)in paragraph 4 for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(b)in paragraph 5 for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”.

16.  Article 22 is to be read as if—U.K.

(a)in paragraph 1—

(i)in the first subparagraph for the words from “or Delegated” to “as appropriate” there were substituted “ , Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 as appropriate ”;

(ii)in the third subparagraph for the words from “or Delegated” to “has been identified” there were substituted “ , Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 has been identified ”;

(b)in paragraph 2 for the words from “or Delegated” to “that have” there were substituted “ , Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 that have ”;

(c)in paragraph 3 in the fourth subparagraph for the words from “or Delegated” to “in accordance” there were substituted “ , Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 in accordance ”.

17.  Article 23(4) is to be read as if in the words before point (a) for “or new entrant data reports” there were substituted “ , new entrant data reports or annual activity level reports ”.U.K.

18.  Article 27 is to be read as if—U.K.

(a)in paragraph 1 in the words before point (a) for “or new entrant data report” there were substituted “ , new entrant data report or annual activity level report ”;

(b)in paragraph 3—

(i)for point (f) there were substituted—

(f)in the case of verification of a baseline data report or new entrant data report, unless the monitoring methodology plan has already been approved by the regulator, the verifier's confirmation that the monitoring methodology plan, so far as it is used as a basis for the report, is compliant with Delegated Regulation (EU) 2019/331;;

(ii)in point (g) for “per activity referred to in Annex 1 to Directive 2003/87/EC and per installation or aircraft operator” there were substituted “ per regulated activity and per installation or per aviation activity and per aircraft operator ”;

(iii)after point (h) there were inserted—

(ha)where it concerns the verification of the annual activity level report, aggregated annual verified data for each year in the activity level reporting period for each sub-installation for its annual activity level;;

(iv)in point (i) for “or baseline period” there were substituted “ , baseline period or activity level reporting period ”;

(v)for point (o) there were substituted—

(o)any issues of non-compliance with Implementing Regulation (EU) 2018/2066, Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 which have become apparent during the verification;;

(vi)point (r) were omitted;

(vii)after point (s) there were inserted—

(sa)where the verifier has observed relevant changes to the parameters listed in Article 16(5), 19, 20, 21 or 22 of Delegated Regulation (EU) 2019/331 or changes in the energy efficiency pursuant to paragraphs 1, 2 and 3 of Article 6 of Implementing Regulation 2019/1842, a description of those changes and related remarks;

(sb)where applicable, confirmation that the date of start of normal operation as referred to in Article 5(5) of Delegated Regulation (EU) 2019/331 has been checked;;

(viii)in point (t) for “EU” in both places there were substituted “ UK ”;

(c)in paragraph 4—

(i)in the words before point (a), for “or Delegated” to “in sufficient detail” there were substituted “ , Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 in sufficient detail ”;

(ii)for point (a) there were substituted—

(a)the size and nature of the misstatement, non-conformity or non-compliance with Implementing Regulation (EU) 2018/2066, Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842;;

(iii)for point (d) there were substituted—

(d)to which Article in Implementing Regulation (EU) 2018/2066, Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 the non-compliance relates.;

(d)paragraph 5 were omitted.

19.  Article 28 is to be read as if point (e) were omitted.U.K.

20.  Article 29 is to be read as if after paragraph 1 there were inserted—U.K.

1A.  For the purposes of the verification of the annual activity level report, the verifier shall assess whether the operator has corrected the non-conformities indicated in the verification report related to the corresponding baseline data report, the new entrant data report or the annual activity level report from the previous activity level reporting period.

If the operator has not corrected those non-conformities, the verifier shall consider whether the omission increases or may increase the risk of misstatements.

The verifier shall report in the verification report whether those non-conformities have been resolved by the operator..

21.  Article 30(1)(e) is to be read as if for “and new entrant reports” there were substituted “ , new entrant data reports and annual activity level reports ”.U.K.

22.  Article 31 is to be read as if—U.K.

(a)in paragraph 1—

(i)for “a” in the first place it occurs there were substituted “ the ”;

(ii)in point (c) after “paragraph 3” there were inserted “ , read with paragraph 3b, ”;

(b)in paragraph 3—

(i)in point (a) after “emission report” there were inserted “ or annual activity level report ”;

(ii)in point (b) at the beginning there were inserted “for the purposes of verifying the operator's emission report,”;

(iii)after point (b) there were inserted—

(ba)for the purposes of verifying the operator's annual activity level report, if a verifier has not carried out a site visit during the verification of an annual activity level report or a baseline data report in the two activity level reporting periods immediately preceding the current activity level reporting period;;

(iv)after point (c) there were inserted—

(ca)if, during the activity level reporting period, there have been significant changes to the installation or its sub-installations which require significant modifications to the monitoring methodology plan, including those changes referred to in Article 9(5) of Delegated Regulation (EU) 2019/331;;

(c)after paragraph 3 there were inserted—

3A.  The reference in point (b) of paragraph 3 to reporting periods immediately preceding the current reporting period includes reporting periods for the purposes of Directive 2003/87/EC.

3B.  In respect of installations within Article 32(5), points (b) and (ba) of paragraph 3 apply as if, in each of those points, for “two” there were substituted “ four ”.;

(d)for paragraph 4 there were substituted—

4.  Points (c) and (ca) of paragraph 3 are not applicable where, during the reporting period, there have been only modifications of the default value as referred to in Article 15(3)(h) of Implementing Regulation (EU) 2018/2066 or Article 9(5)(c) of Delegated Regulation (EU) 2019/331..

23.  Article 32 is to be read as if—U.K.

(a)in point (1) after “verification” there were inserted “ of an operator's emission report ”;

(b)in point (2) after “verification” there were inserted “ of an operator's emission report ”;

(c)in point (3) after “verification” there were inserted “ of an operator's emission report ”;

(d)after point (3) there were inserted—

(3a) the verification of an operator's annual activity level report concerns a category A installation referred to in Article 19(2)(a) of Implementing Regulation (EU) 2018/2066, a category B installation referred to in Article 19(2)(b) of that Implementing Regulation or an installation with low emissions as referred to in Article 47(2) of that Implementing Regulation and:

(a)that installation's only sub-installation is one to which a product benchmark pursuant to Article 10(2) of Delegated Regulation (EU) 2019/331 is applicable; and

(b)the production data relevant for the product benchmark has been evaluated as part of an audit for financial accounting purposes and the operator provides evidence of that;

(3b) the verification of an operator's annual activity level report concerns a category A installation referred to in Article 19(2)(a) of Implementing Regulation (EU) 2018/2066, a category B installation referred to in Article 19(2)(b) of that Implementing Regulation or an installation with low emissions as referred to in Article 47(2) of that Implementing Regulation and:

(a)the installation has no more than two sub-installations;

(b)if the installation has two sub-installations, one contributes less than 5% to the installation's total final allocation of allowances; and

(c)the verifier has sufficient data available to assess the split of sub-installations if relevant;

(3c) the verification of an operator's annual activity level report concerns a category A installation referred to in Article 19(2)(a) of Implementing Regulation (EU) 2018/2066, a category B installation referred to in Article 19(2)(b) of that Implementing Regulation or an installation with low emissions as referred to in Article 47(2) of that Implementing Regulation and:

(a)the installation has only heat benchmark or district heating sub-installations; and

(b)the verifier has sufficient data available to assess the split of sub-installations if relevant;;

(e)in point (4)—

(i)in the words before point (a) after “verification” there were inserted “ of the operator's emission report or annual activity level report ”;

(ii)in paragraph (c) after “2018/2066” there were inserted “ or Article 11 of Delegated Regulation (EU) 2019/331 ”;

(f)in point (5)—

(i)in the words before point (a) after “verification” there were inserted “ of the operator's emission report or annual activity level report ”;

(ii)in paragraph (b) after “2018/2066” there were inserted “ or Article 11 of Delegated Regulation (EU) 2019/331 ”;

(g)at the end there were inserted—

Point (3b) may not be applied if the sub-installation contributing 95% or more to the installation's total final allocation of allowances is a sub-installation to which a product benchmark pursuant to Article 10(2) of Delegated Regulation (EU) 2019/331 is applicable, unless the production data relevant for the product benchmark has been evaluated as part of an audit for financial accounting purposes and the operator provides evidence of that..

24.  The Verification Regulation 2018 is to be read as if after Article 34 there were inserted—U.K.

Article 34aU.K.Virtual site visits because of force majeure

Where serious, extraordinary and unforeseeable circumstances, outside the control of the operator or aircraft operator, prevent the verifier from carrying out a physical site visit in accordance with Article 21(1) and where these circumstances cannot, after using all reasonable efforts, be overcome, the verifier may decide, subject to the approval of the regulator in accordance with the second and third subparagraph of this Article, to carry out a virtual site visit. The verifier shall take measures to reduce the verification risk to an acceptable level and carry out a physical visit to the site of the installation or aircraft operator without undue delay. The decision to carry out a virtual site visit shall be based on the outcome of the risk analysis and after determining that the conditions for carrying out a virtual site visit are met. The verifier shall inform the operator or aircraft operator thereof without undue delay.

The operator or the aircraft operator shall submit an application to the regulator requesting the regulator to approve the verifier's decision to carry out a virtual site visit.

On an application submitted by the operator or aircraft operator concerned, the regulator shall decide whether to approve the verifier's decision to carry out a virtual site visit, taking into consideration all of the following elements:

(a)evidence that it is not possible to carry out a physical site visit because of the force majeure circumstances;

(b)the information provided by the verifier on the outcome of the risk analysis;

(c)information on how the virtual site visit will be carried out;

(d)evidence that measures are taken to reduce the verification risk to an acceptable level..

25.  Article 36 is to be read as if—U.K.

(a)in paragraphs 2(b) and 6 for “EU” in each place there were substituted “ UK ”;

(b)in paragraph 6 for “an” there were substituted “ a ”.

26.  Article 37 is to be read as if—U.K.

(a)in paragraph 2 for “an” there were substituted “ a ”;

(b)in paragraphs 2 and 6 for “EU” in each place there were substituted “ UK ”;

(c)in paragraph 5—

(i)in the first subparagraph the second sentence were omitted;

(ii)in the second subparagraph for “and new entrant data reports” there were substituted “ , new entrant data reports or annual activity level reports ”.

27.  Article 38 is to be read as if—U.K.

(a)for “EU ETS” in each place (including the heading) there were substituted “ UK ETS ”;

(b)in paragraph 1 in the words before point (a), for “An” there were substituted “ A ”;

(c)for paragraph 1(a) there were substituted—

(a)knowledge of the 2020 Order, Implementing Regulation (EU) 2018/2066, Delegated Regulation (EU) 2019/331 and Implementing Regulation (EU) 2019/1842 in the case of verification of the baseline data report, new entrant data report or annual activity level report, this Regulation, relevant standards, and other relevant legislation and applicable guidelines;;

(d)in paragraph 2—

(i)for “An” there were substituted “ A ”;

(ii)for “an” there were substituted “ a ”.

28.  Article 39(2) is to be read as if for “an EU” there were substituted “ a UK ”.U.K.

29.  Article 40 is to be read as if for “EU” in each place there were substituted “ UK ”.U.K.

30.  Article 41 is to be read as if “harmonised” were omitted in both places.U.K.

31.  Article 42 is to be read as if “harmonised” were omitted in both places.U.K.

32.  Article 43 is to be read as if—U.K.

(a)in paragraph 1 at the end there were inserted “or under the trading scheme established by the 2020 Order”;

(b)in paragraphs 2, 5 and 6 “harmonised” were omitted in each place;

(c)after paragraph 6 there were inserted—

6A.  When verifying the same operator or aircraft operator as in the previous year, the verifier shall consider the risk to impartiality and take measures to reduce the risk to impartiality.;

(d)in paragraph 7 for “EU” in both places there were substituted “ UK ”;

(e)at the end there were inserted—

8.  If the UK ETS lead auditor undertakes verifications of emissions or allocation data for an installation in respect of five consecutive years beginning with 2021 or a subsequent year, then the UK ETS lead auditor may not undertake such verifications for that installation in respect of any of the next three years..

33.  Article 45 is to be read as if, in the words before point (a), for “each” there were substituted “ the ”.U.K.

34.  Article 46(1) is to be read as if “harmonised” were omitted.U.K.

35.  Article 47 is to be read as if—U.K.

(a)in paragraph 1 for “each” there were substituted “ the ”;

(b)in paragraph 2 “harmonised” were omitted.

36.  Article 48 is to be read as if in each of paragraphs 1 and 2 “harmonised” were omitted.U.K.

37.  Article 49 is to be read as if “harmonised” were omitted in both places.U.K.

38.  Article 50 is to be read as if—U.K.

(a)in paragraph 3 “harmonised” were omitted;

(b)paragraph 5 were omitted.

39.  Article 51(2) is to be read as if “harmonised” were omitted.U.K.

40.  Article 52(2) is to be read as if “harmonised” were omitted.U.K.

41.  Article 54(4) is to be read as if for “Member States” there were substituted “ The national accreditation body ”.U.K.

42.  Article 55 is to be read as if—U.K.

(a)in paragraph 1 for the words from “national accreditation bodies” to the end there were substituted “ national accreditation body ”;

(b)paragraphs 2 to 5 were omitted;

(c)in paragraph 6 “harmonised” were omitted.

43.  Article 57(4) is to be read as if “harmonised” were omitted.U.K.

44.  Article 59(1) is to be read as if—U.K.

(a)in point (a) for “harmonised standard pursuant to Regulation (EC) No 765/2008” there were substituted “ standard ”;

(b)in point (b) for the words from “Directive 2003/87/EC” to “where” there were substituted “ the 2020 Order, Implementing Regulation (EU) 2018/2066, Delegated Regulation (EU) 2019/331 and Implementing Regulation 2019/1842 where ”.

45.  Article 60(2)(a) is to be read as if for the words from “Directive 2003/87/EC” to “where” there were substituted “ the 2020 Order, Implementing Regulation (EU) 2018/2066, Delegated Regulation (EU) 2019/331 and Implementing Regulation 2019/1842 where ”.U.K.

46.  Article 63(2) is to be read as if for “harmonised standard pursuant to Regulation (EC) No 765/2008” there were substituted “ standard ”.U.K.

47.  Article 69 is to be read as if—U.K.

(a)in paragraph 1—

(i)for “Member States” there were substituted “ The regulator ”;

(ii)the words from “in accordance with Article 74(1)” to the end were omitted;

(b)in paragraph 2 “in accordance with Article 74(2) of Implementing Regulation (EU) 2018/2066” were omitted.

48.  Article 70 is to be read as if—U.K.

(a)in paragraph 1—

(i)for “Member State” there were substituted “ UK ETS authority ”;

(ii)for “their” there were substituted “ the ”;

(iii)“, or where applicable, the national authority entrusted with the certification of verifiers,” were omitted;

(b)in paragraph 2—

(i)for the words from “Where” to “competent authorities” there were substituted “ The Environment Agency or such other regulator as may be designated by the UK ETS authority from time to time is ”;

(ii)after “information” there were inserted “ for the purposes of this Chapter ”.

49.  Article 71 is to be read as if—U.K.

(a)in paragraph 1 in the words before point (a)—

(i)“of each Member State” were omitted;

(ii)for “that” in the first place it occurs there were substituted “ the ”;

(iii)for “those Member States” there were substituted “ the United Kingdom ”;

(b)paragraph (1)(d) were omitted;

(c)in paragraph 3—

(i)in the words before point (a), for “that” in the second place it occurs there were substituted “ the ”;

(ii)in point (a) for “that” in the second place it occurs there were substituted “ the ”.

50.  Article 72 is to be read as if—U.K.

(a)for “a national” there were substituted “ the national ”;

(b)for the words from “following parties” to the end there were substituted “ regulator ”.

51.  Article 73(1) is to be read as if—U.K.

(a)for “of the Member State where the verifier is carrying out the verification” there were substituted “ of the operator of an installation or of an aircraft operator whose data is verified by a verifier ”;

(b)“which has accredited that verifier” were omitted.

52.  Article 76 is to be read as if—U.K.

(a)in paragraph 1—

(i)for “National accreditation bodies, or where applicable national authorities referred to in Article 55(2),” there were substituted “ The national accreditation body ”;

(ii)“other national accreditation bodies,” were omitted;

(iii)for “competent authorities” there were substituted “ regulators ”;

(iv)the second subparagraph were omitted;

(b)in paragraph 2(a) for “that” there were substituted “ the ”;

(c)paragraph 2(b) were omitted.

53.  Article 77(1)(b) is to be read as if for “or new entrant data reports” there were substituted “ , new entrant data reports or annual activity level reports ”.U.K.

54.  Annex 1 is to be read as if—U.K.

(a)in the words before the table the words from “pursuant to Annex I” to the end were omitted;

(b)in the table—

(i)in the entry for group 10 for “Directive 2003/87/EC” there were substituted “ the 2020 Order ”;

(ii)in the entries for groups 10 and 11 for “Directive 2009/31/EC” in each place there were substituted “ the CCS licensing regime ”;

(iii)in the entry for group 98 for “Article 10a of Directive 2003/87/EC” there were substituted “ Part 4A of the 2020 Order, Delegated Regulation (EU) 2019/331 or Implementing Regulation (EU) 2019/1842 ”;

(iv)the entry for group 99 were omitted.

55.  Annex 2 is to be read as if for “the harmonised standard pursuant to Regulation (EC) No 765/2008” there were substituted “ EN ISO 14065:2013 ”.U.K.

56.  Annex 3 is to be read as if for “the harmonised standard pursuant to Regulation (EC) No 765/2008” there were substituted “ EN ISO/IEC 17011:2017 ”.]U.K.

Article 25A

[F28SCHEDULE 5AU.K.Registry

PART 1U.K.Preliminary

InterpretationU.K.

1.  In this Schedule—

account permission” has the meaning given in paragraph 16(4);

Auctioning Regulations” means regulations under section 96 of the Finance Act 2020;

authorised representative” means an authorised representative appointed for an account under paragraph 16;

operational authorised representative” has the meaning given in paragraph 16(11);

serious offence” means—

(a)

an offence specified, or falling within a description specified, in Schedule 1 to the Serious Crime Act 2007;

(b)

an offence under the law of a country or territory outside the United Kingdom which, if committed in or as regards any part of the United Kingdom, would be an offence referred to in paragraph (a);

(c)

conduct which facilitates the commission by another person of an offence referred to in paragraph (a) or (b), whether the conduct takes place in the United Kingdom or elsewhere;

working day” means any day other than—

(a)

Saturday, Sunday, Good Friday or Christmas Day;

(b)

a bank holiday in any part of the United Kingdom under the Banking and Financial Dealings Act 1971.

Submission of applications, etc. to registry administratorU.K.

2.(1) An application, notice, instruction or request to the registry administrator under this Order must be in writing and must be given to the registry administrator in any of the following ways—

(a)by sending it to a postal or email address provided by the registry administrator for that purpose;

(b)by sending it by electronic means in the registry;

(c)by any other means permitted by the registry administrator.

(2) A charge that is required to be paid to the registry administrator must be paid by making payment to a postal address or an account provided by the registry administrator for that purpose.

Account holders: fit and proper personU.K.

3.  When assessing for the purposes of this Schedule whether an account holder or prospective account holder is a fit and proper person to hold an account of a particular type, the registry administrator may take account of any information or factors that the registry administrator considers relevant, including in particular—

(a)where the account holder or prospective account holder is an individual, whether the account holder or prospective account holder is under investigation for, or has been convicted in the preceding 5 years of, a serious offence;

(b)where the account holder or prospective account holder is a body corporate, whether a person with significant control of the body corporate is under investigation for, or has been convicted in the preceding 5 years of, a serious offence;

(c)whether the registry administrator considers that the account may be used in relation to the commission of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom.

Authorised representatives: fit and proper personU.K.

4.  When assessing for the purposes of this Schedule whether an individual is a fit and proper person to be an authorised representative, the registry administrator may take account of any information or factors that the registry administrator considers relevant, including in particular—

(a)whether the individual is under investigation for, or has been convicted in the preceding 5 years of, a serious offence;

(b)whether the registry administrator considers that the individual may use the account in relation to the commission of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom;

(c)whether the appointment of the individual as an authorised representative would create a conflict of interest.

PART 2U.K.Establishment and operation of registry

RegistryU.K.

5.(1) The UK ETS authority must establish an electronic system (the “registry”) for the purposes of the UK ETS, in particular, to keep track of—

(a)operators of installations and aircraft operators participating in the UK ETS;

(b)allowances held by persons and the allocation and transfer of allowances;

(c)reportable emissions of installations and aviation emissions of aircraft operators;

(d)the surrender of allowances by operators and aircraft operators in accordance with articles 27 and 34.

(2) The UK ETS authority must ensure that the registry is established so as to allow for—

(a)the following types of account in which allowances may be held—

(i)central accounts (see paragraph 9);

(ii)an auction delivery account (see paragraph 10);

(iii)operator holding accounts for installations (see paragraph 11);

(iv)aircraft operator holding accounts (see paragraph 13);

(v)trading accounts (see paragraph 14);

(b)individuals to be appointed as authorised representatives for accounts with access to the registry to perform actions in relation to accounts on behalf of account holders.

Operation of registryU.K.

6.(1) The registry administrator must operate the registry and for that purpose may, in particular—

(a)establish administrative arrangements and rules for the operation of the registry;

(b)take such actions the registry administrator considers necessary to ensure the proper functioning and good administration of the registry;

(c)perform actions in relation to accounts in accordance with instructions from account holders.

(2) In the operation of the registry, the registry administrator must, as soon as reasonably practicable and to the extent possible, comply with a notice or instruction given under this Order by the UK ETS authority or a regulator.

[F29Reportable emissions and aviation emissions to be recorded in registryU.K.

6A.(1) The regulator and the registry administrator must exercise their functions to ensure that the following provisions of this paragraph are complied with.

(2) Where the operator of an installation submits a report of the installation’s reportable emissions to the regulator in accordance with a condition of a greenhouse gas emissions permit included under paragraph 4(2)(b) of Schedule 6, the reportable emissions stated in the report must be recorded in the operator holding account for the installation on or before 30th April in the year in which the report is submitted.

(3)  Where an aircraft operator submits a report of the aircraft operator’s aviation emissions to the regulator in accordance with article 33, the aviation emissions stated in the report must be recorded in the aircraft operator’s aircraft operator holding account on or before 30th April in the year in which the report is submitted.

(4) Where the regulator makes a determination of emissions under article 45 of—

(a)an installation for any period for which a greenhouse gas emissions permit for the installation is in force; or

(b)an aircraft operator,

the reportable emissions or aviation emissions so determined must be recorded in the operator holding account for the installation or, as the case may be, the aircraft operator’s aircraft operator holding account within 1 month after the date on which notice of the determination is given under paragraph (5) of that article.]

Suspension of registry due to security concernsU.K.

7.(1) The UK ETS authority or the registry administrator may suspend access to the registry if the UK ETS authority or the registry administrator considers that—

(a)a security breach has occurred; or

(b)there is a significant risk that a security breach will occur.

(2) Where access to the registry is suspended, the UK ETS authority or, as the case may be, the registry administrator must, as soon as reasonably practicable after the suspension takes effect, inform—

(a)each regulator;

(b)if the UK ETS authority suspends access to the registry, the registry administrator;

(c)if the registry administrator suspends access to the registry, the UK ETS authority.

(3) The UK ETS authority must, as soon as reasonably practicable and in any event within 2 working days beginning with the day (the “relevant day”) on which the UK ETS authority suspends access to the registry or is informed of a suspension under sub-paragraph (2)(c) or, if the relevant day is not a working day, within 2 working days beginning with the first working day after the relevant day consider whether the suspension should remain in place and—

(a)if the UK ETS authority considers the suspension should remain in place, inform each regulator and the registry administrator that the suspension will remain in place; or

(b)if the UK ETS authority considers the suspension should be lifted—

(i)lift the suspension or instruct the registry administrator to lift the suspension;

(ii)inform each regulator and, where the UK ETS authority lifts the suspension, the registry administrator that the suspension has been lifted.

(4) Where the suspension remains in place in accordance with sub-paragraph (3)(a), the UK ETS authority must, as soon as reasonably practicable after the UK ETS authority considers that the circumstances giving rise to the suspension no longer exist—

(a)lift the suspension or instruct the registry administrator to lift the suspension;

(b)inform each regulator and, where the UK ETS authority lifts the suspension, the registry administrator that the suspension has been lifted.

Suspension of registry for technical reasonsU.K.

8.(1) The UK ETS authority may suspend access to the registry for technical reasons.

(2) Where the suspension is unscheduled (for example, because a technical issue needs to be addressed immediately), the UK ETS authority must inform each regulator and the registry administrator as soon as reasonably practicable after the suspension takes effect.

(3) Where the suspension is scheduled, the UK ETS authority must inform each regulator and the registry administrator as soon as reasonably practicable and in any event at least 2 working days before the suspension takes effect.

(4) Where, after a suspension, the UK ETS authority considers that the reason for the suspension no longer exists, the UK ETS authority must as soon as reasonably practicable—

(a)lift the suspension;

(b)inform each regulator and the registry administrator that the suspension has been lifted.

[F30Exemption from liabilityU.K.

8A.(1) Each of the following is exempt from liability in damages for anything done or omitted in the exercise or purported exercise of functions conferred or imposed on the UK ETS authority or the registry administrator under this Schedule—

(a)a national authority;

(b)a person referred to in article 9(1) (meaning of regulator).

(2) Sub-paragraph (1) does not apply—

(a)if the act or omission is shown to have been in bad faith; or

(b)so as to prevent an award of damages made in respect of an act or omission on the ground that the act or omission was unlawful as a result of section 6(1) of the Human Rights Act 1998.]

PART 3U.K.Accounts

CHAPTER 1U.K.Opening accounts

Central accountsU.K.

9.(1) The UK ETS authority may open accounts in the name of the UK ETS authority for the purposes of the UK ETS, in particular—

(a)a total quantity account (for the creation of allowances under article 18);

(b)an allocation account (to hold allowances to be allocated under Part 4A);

(c)a new entrants' reserve account (to keep track of the new entrants' reserve referred to in article 34G);

(d)an auction account (to hold allowances to be auctioned under the Auctioning Regulations);

(e)a market stability mechanism account (to hold excess allowances unsold at auctions under the Auctioning Regulations);

(f)a deletion account (to hold allowances deleted under paragraph 23);

(g)a surrender account (to hold allowances surrendered under paragraph 24);

(h)one or more general holding accounts (to hold allowances transferred from accounts before closure under paragraph 30).

(2) An account held by the UK ETS authority is a “central account”.

Auction delivery accountU.K.

10.(1) Where a recognised auction platform is appointed to auction allowances under the Auctioning Regulations, the UK ETS authority must, as soon as reasonably practicable, instruct the registry administrator to open an auction delivery account in the name of the recognised auction platform.

(2) The recognised auction platform must as soon as reasonably practicable after appointment under the Auctioning Regulations submit to the registry administrator—

(a)the charge for opening the account set out in the charging scheme published under article 36A;

(b)applications under paragraph 16 to appoint at least 2 individuals as operational authorised representatives for the account with account permissions such that they are together able to propose and approve all types of action in relation to the account.

(3) The registry administrator may, by notice to the UK ETS authority or the recognised auction platform, require the UK ETS authority or the recognised auction platform to provide, in the form specified in the notice, such information as the registry administrator considers necessary to open the account.

(4) As soon as reasonably practicable after receiving the charge required under sub-paragraph (2)(a) and any information required under sub-paragraph (3) and at least 2 operational authorised representatives with the account permissions referred to in sub-paragraph (2)(b) have been appointed for the account, the registry administrator must open the account.

(5) In this paragraph, “recognised auction platform” means a recognised investment exchange in relation to which a recognition order under the Recognised Auction Platform Regulations 2011 is in force.

(6) In sub-paragraph (5), “recognised investment exchange” means an investment exchange in relation to which a recognition order under section 290 of the Financial Services and Markets Act 2000 is in force.

Operator holding accountsU.K.

11.(1) This paragraph applies where the regulator—

(a)issues a greenhouse gas emissions permit for an installation under paragraph 3 of Schedule 6;

(b)grants an application for the partial transfer of a greenhouse gas emissions permit under paragraph 9 of Schedule 6;

(c)converts an installation's hospital or small emitter permit into a greenhouse gas emissions permit under paragraph 24(2) or 26(3) of Schedule 7; or

(d)converts an installation's permit (within the meaning of GGETSR 2012) into a greenhouse gas emissions permit under paragraph 1(4)(a) of Schedule 11.

(2) The regulator must, as soon as reasonably practicable—

(a)instruct the registry administrator to open an operator holding account for the installation in the name of the operator of the installation or, where sub-paragraph (1)(b) applies, for the installation consisting of the transferred units (as defined in paragraph 8(1) of Schedule 6) in the name of the new operator (as defined in paragraph 7(1) of that Schedule); or

(b)inform the registry administrator that a new operator holding account is not required.

(3) Where sub-paragraph (2)(a) applies, the registry administrator may, by notice to the operator or the regulator, require the operator or the regulator to provide, in the form specified in the notice, such information as the registry administrator considers necessary to—

(a)open the account; and

(b)assess whether the operator is a fit and proper person to hold an operator holding account.

(4) As soon as reasonably practicable after receiving an instruction under sub-paragraph (2)(a) and any information required under sub-paragraph (3), the registry administrator must assess whether the operator is a fit and proper person to hold an operator holding account and—

(a)if the registry administrator considers that the operator is a fit and proper person to hold an operator holding account, open the account; or

(b)if the registry administrator does not consider that the operator is a fit and proper person to hold an operator holding account, open, and immediately suspend, the account, imposing the restriction set out in paragraph 25(2)(b) or (c) (or both).

(5) The registry administrator must give notice to the operator and the regulator of a decision to open and suspend an account under sub-paragraph (4)(b).

(6) A notice under sub-paragraph (5) must include the reason for the suspension unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

(7) Where, after a suspension under sub-paragraph (4)(b), the registry administrator subsequently considers that the operator is a fit and proper person to hold an operator holding account, the registry administrator must, as soon as reasonably practicable—

(a)lift the suspension;

(b)give notice to the operator and the regulator that the suspension has been lifted.

Transfer of operator holding accountsU.K.

12.(1) Where the regulator grants an application for the transfer (other than a partial transfer) of an installation's greenhouse gas emissions permit under paragraph 9 of Schedule 6, the regulator must, as soon as reasonably practicable—

(a)instruct the registry administrator to transfer the operator holding account for the installation held in the name of the transferring operator (as defined in paragraph 7(1) of Schedule 6) to the new operator (as defined in that sub-paragraph);

(b)instruct the registry administrator to—

(i)open an operator holding account for the installation in the name of the new operator; and

(ii)close the operator holding account held in the name of the transferring operator; or

(c)inform the registry administrator that no action under paragraph (a) or (b) is required.

(2) Where paragraph (1)(a) or (b) applies, the registry administrator may, by notice to the new operator or the regulator, require the new operator or the regulator to provide, in the form specified in the notice, such information as the registry administrator considers necessary to—

(a)transfer or, as the case may be, open the account; and

(b)assess whether the new operator is a fit and proper person to hold an operator holding account.

(3) As soon as reasonably practicable after receiving an instruction under sub-paragraph (1)(a) or (b) and any information required under sub-paragraph (2), the registry administrator must assess whether the new operator is a fit and proper person to hold an operator holding account and—

(a)if the registry administrator considers that the new operator is a fit and proper person to hold an operator holding account, transfer or, as the case may be, open the account; or

(b)if the registry administrator does not consider that the new operator is a fit and proper person to hold an operator holding account—

(i)transfer or, as the case may be, open the account; and

(ii)immediately suspend the account, imposing the restriction set out in paragraph 25(2)(b) or (c) (or both).

(4) The registry administrator must give notice to the new operator and the regulator of a decision to transfer or, as the case may be, open and suspend an account under sub-paragraph (3)(b).

(5) A notice under sub-paragraph (4) must include the reason for the suspension unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

(6) Where, after a suspension under sub-paragraph (3)(b), the registry administrator subsequently considers that the new operator is a fit and proper person to hold an operator holding account, the registry administrator must, as soon as reasonably practicable—

(a)lift the suspension;

(b)give notice to the new operator and the regulator that the suspension has been lifted.

(7) Where the registry administrator receives an instruction to transfer an operator holding account under sub-paragraph (1)(a), no action may be performed in relation to the account until the registry administrator complies with sub-paragraph (3).

Aircraft operator holding accountsU.K.

13.(1) Where the regulator issues an emissions monitoring plan to a person under article 29, the regulator must, as soon as reasonably practicable, instruct the registry administrator to open an aircraft operator holding account in the name of the person.

(2) The registry administrator may, by notice to the person or the regulator, require the person or the regulator to provide, in the form specified in the notice, such information as the registry administrator considers necessary to—

(a)open the account; and

(b)assess whether the person is a fit and proper person to hold an aircraft operator holding account.

(3) As soon as reasonably practicable after receiving an instruction under sub-paragraph (1) and any information required under sub-paragraph (2), the registry administrator must assess whether the person is a fit and proper person to hold an aircraft operator holding account and—

(a)if the registry administrator considers that the person is a fit and proper person to hold an aircraft operator holding account, open the account; or

(b)if the registry administrator does not consider that the person is a fit and proper person to hold an aircraft operator holding account, open, and immediately suspend, the account imposing the restriction set out in paragraph 25(2)(b) or (c) (or both).

(4) The registry administrator must give notice to the person and the regulator of a decision to open and suspend an account under sub-paragraph (3)(b).

(5) A notice under sub-paragraph (4) must include the reason for the suspension unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

(6) Where, after a suspension under sub-paragraph (3)(b), the registry administrator subsequently considers that the person is a fit and proper person to hold an aircraft operator holding account, the registry administrator must, as soon as reasonably practicable—

(a)lift the suspension;

(b)give notice to the person and the regulator that the suspension has been lifted.

Trading accountsU.K.

14.(1) Any person may apply to the registry administrator to open a trading account on terms agreed by the registry administrator.

(2) An application must be accompanied by—

(a)the charge for the application set out in the charging scheme published under article 36A;

(b)applications under paragraph 16 to appoint at least 2 individuals as operational authorised representatives for the account with account permissions such that they are together able to propose and approve all types of action in relation to the account.

(3) After receiving an application, the registry administrator may, by notice to the applicant, require the applicant to provide, in the form specified in the notice, such information as the registry administrator considers necessary to determine the application.

(4) As soon as reasonably practicable after receiving the application and any information required under sub-paragraph (3), the registry administrator must assess whether the applicant is a fit and proper person to hold a trading account and—

(a)if the registry administrator considers that the applicant is a fit and proper person to hold a trading account and at least 2 operational authorised representatives with the account permissions referred to in sub-paragraph (2)(b) have been appointed for the account, open the account; or

(b)if either—

(i)the registry administrator does not consider that the applicant is a fit and proper person to hold a trading account; or

(ii)at least 2 operational authorised representatives with the account permissions referred to in sub-paragraph (2)(b) have not been appointed for the account,

give notice to the applicant that the application to open the account is refused.

(5) A notice under sub-paragraph (4)(b) must include the reason for the refusal unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

CHAPTER 2U.K.Account representatives

Primary contacts and alternative primary contactsU.K.

15.(1) An account holder must give details to the registry administrator of an individual whom the account holder appoints as a person authorised to give instructions to the registry administrator on the account holder's behalf in relation to the account.

(2) An individual appointed under sub-paragraph (1) is the “primary contact” for the account.

(3) An account holder who is an individual may appoint the account holder as the primary contact for the account.

(4) An account holder who has appointed a primary contact may give details to the registry administrator of a second individual whom the account holder appoints as a person authorised to give instructions to the registry administrator on the account holder's behalf in relation the account.

(5) An individual appointed under sub-paragraph (4) is the “alternative primary contact” for the account.

(6) The primary contact and any alternative primary contact must be at least 18 years of age.

(7) An account holder may, at any time by notice to the registry administrator—

(a)replace the primary contact;

(b)replace or remove the alternative primary contact.

Appointment of authorised representativesU.K.

16.(1) An account holder or a prospective account holder may apply to the registry administrator for one or more individuals (up to a maximum number of 8) to be appointed as authorised representatives for the account with access to the registry to perform actions in relation to the account on behalf of the account holder.

(2) An account holder who is an individual may apply for the account holder to be appointed as an authorised representative for the account.

(3) An authorised representative must be at least 18 years of age.

(4) An authorised representative may have one of the following permissions (an “account permission”)—

(a)permission to propose actions in relation to the account;

(b)permission to approve actions in relation to the account;

(c)permission to propose actions, and approve actions proposed by another operational authorised representative, in relation to the account;

(d)permission to review account information only.

(5) An application for an individual to be appointed as an authorised representative must—

(a)specify which account permission the individual is to have;

(b)be accompanied by the charge for the application set out in the charging scheme published under article 36A.

(6) After receiving an application, the registry administrator may, by notice to the applicant, require the applicant to provide, in the form specified in the notice, such information as the registry administrator considers necessary to determine the application.

(7) As soon as reasonably practicable after receiving the application and any information required under sub-paragraph (6), the registry administrator must assess whether the individual is a fit and proper person to be an authorised representative and—

(a)if the registry administrator considers that the individual is a fit and proper person to be an authorised representative, appoint the individual as an authorised representative with the account permission in respect of which the application is made and give notice to the applicant of the appointment; or

(b)if the registry administrator considers that the individual is not a fit and proper person to be an authorised representative, give notice to the applicant that the application is refused.

(8) A notice under sub-paragraph (7)(b) must include the reason for the refusal unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

(9) The registry administrator may, in administrative rules made under paragraph 6(1)(a), provide for whether actions of a particular type require the approval of a second operational authorised representative in addition to the operational authorised representative proposing the action.

(10) The appointment of an authorised representative for an account does not preclude the account holder from instructing the registry administrator to perform actions in relation to the account on behalf of the account holder.

(11) In this Schedule, “operational authorised representative” means an authorised representative who has an account permission referred to in sub-paragraph (4)(a), (b) or (c).

Change in account permission of authorised representativesU.K.

17.(1) An account holder may apply to the registry administrator to change the account permission of an individual appointed as an authorised representative.

(2) An application must—

(a)specify which account permission the individual is to have;

(b)be accompanied by the charge for the application set out in the charging scheme published under article 36A.

(3) After receiving an application, the registry administrator may, by notice to the account holder, require the account holder to provide, in the form specified in the notice, such information as the registry administrator considers necessary to determine the application.

(4) As soon as reasonably practicable after receiving the application and any information required under sub-paragraph (3), the registry administrator must assess whether the individual is still a fit and proper person to be an authorised representative and—

(a)if the registry administrator considers that the individual is still a fit and proper person to be an authorised representative, change the individual's account permission to the account permission in respect of which the application is made and give notice to the account holder of the change; or

(b)if the registry administrator considers that the individual has ceased to be a fit and proper person to be an authorised representative, give notice to the account holder that the application is refused.

(5) A notice under sub-paragraph (4)(b) must include the reason for the refusal unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

Suspension of access to registry of authorised representativesU.K.

18.(1) The registry administrator may suspend an authorised representative's access to the registry in either of the following circumstances—

(a)if the registry administrator considers that the suspension is necessary to ensure that the registry is secure and protected from misuse;

(b)if the registry administrator considers that the authorised representative has ceased to be a fit and proper person to be an authorised representative.

(2) Where the registry administrator suspends an authorised representative's access to the registry, the registry administrator must give notice of the suspension to the account holder as soon as reasonably practicable.

(3) A notice under sub-paragraph (2) must include the reason for the suspension unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

(4) Where, after a suspension under sub-paragraph (2), the registry administrator subsequently considers that the circumstances giving rise to the suspension no longer exist, the registry administrator must as soon as reasonably practicable—

(a)lift the suspension;

(b)give notice to the account holder that the suspension has been lifted.

Removal of authorised representativesU.K.

19.(1) The registry administrator may remove an individual as an authorised representative for an account—

(a)if the account holder requests the registry administrator to remove the individual as authorised representative;

(b)if the individual requests the registry administrator to remove the individual as authorised representative;

(c)if the registry administrator considers that the individual has ceased to be a fit and proper person to be an authorised representative; or

(d)where the individual's access to the registry has been suspended, if the registry administrator considers that the circumstances giving rise to the suspension still exist and are unlikely to be resolved within a reasonable period of time.

(2) The registry administrator must give notice to the account holder of a removal under sub-paragraph (1)(b), (c) or (d).

(3) A notice following a removal under sub-paragraph (1)(c) or (d) must include the reason for the removal unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

CHAPTER 3U.K.Transfers of allowances

Transfers between accountsU.K.

20.(1) An allowance may be transferred from one account to another.

(2) Sub-paragraph (1) is subject to—

(a)paragraph 11(4)(b) (operator holding accounts);

(b)paragraph 12(3)(b) or (7) (transfer of operator holding accounts);

(c)paragraph 13(3)(b) (aircraft operator holding accounts);

(d)paragraph 25 (suspension of accounts).

Transfer cancellationsU.K.

21.  The transfer of an allowance between accounts may be cancelled by the account holder of the transferring account at any time before the transfer has completed.

Transfer reversalsU.K.

22.(1) A transfer of an allowance that has completed may not be reversed except as set out in this paragraph.

(2) The registry administrator must reverse the transfer of an allowance to the deletion account if, within 14 days beginning with the day on which the transfer completes, the account holder requests the registry administrator to reverse the transfer.

(3) The registry administrator must reverse the transfer of an allowance to the surrender account if, within 14 days beginning with the day on which the transfer completes, the account holder requests the registry administrator to reverse the transfer.

(4) Sub-paragraph (3) is subject to paragraph 24 (surrender of allowances).

(5) Where the account from which the allowance was transferred has been closed since the transfer completed (and the transfer cannot therefore be reversed), the account holder who requests the reversal of a transfer must give notice to the registry administrator of an alternative account to which the allowance is to be transferred.

[F31(6) The registry administrator may reverse the transfer of an allowance from the allocation account if the transfer was made in error.]

Deletion of allowancesU.K.

23.(1) An account holder may delete an allowance by transferring the allowance from the account holder's account to the deletion account.

(2) An allowance transferred to the deletion account may not be transferred from the deletion account and ceases to be available for any other purpose unless the transfer is reversed under paragraph 22 (transfer reversals).

Surrender of allowancesU.K.

24.(1) The operator of an installation or a person who is an aircraft operator in relation to a scheme year may surrender an allowance by transferring the allowance from the operator's operator holding account for the installation or the aircraft operator's aircraft operator holding account to the surrender account.

(2) An allowance that has been transferred to the surrender account may not be transferred from the surrender account and ceases to be available for any other purpose.

(3) But the transfer of an allowance to the surrender account may be reversed under paragraph 22(3) if—

(a)the person requesting the reversal has complied with—

(i)where the person requesting the reversal is the operator of an installation, the person's obligations to surrender allowances under article 27 in respect of the installation;

(ii)where the person requesting the reversal is an aircraft operator in relation to a scheme year, the person's obligations to surrender allowances under article 34; and

(b)the reversal of the transfer would not result in the person being in breach of those obligations.

CHAPTER 4U.K.Suspension and closure of accounts

Suspension of accountsU.K.

25.(1) The registry administrator may suspend an account other than a central account in any of the following circumstances—

(a)if, on the death or dissolution of the account holder or the occurrence of an insolvency event in relation to the account holder, either—

(i)it is not clear who has the right to deal with the assets of the account holder; or

(ii)the registry administrator has not received instructions about the operation of the account from the person who has the right to deal with the assets of the account holder;

(b)if the registry administrator does not consider that the account holder is a fit and proper person to hold the account;

(c)if the registry administrator considers that the account has been, is being or may be used in relation to the commission of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom.

[F32(d)at the request of the account holder.]

(2) A suspended account may be subject to one or more of the following restrictions—

(a)no allowances may be transferred to the account except from the allocation account;

(b)no authorised representative may perform an action in relation to the account by accessing the registry;

(c)no allowances may be transferred from the account except to a central account.

(3) Where the registry administrator suspends an account [F33under sub-paragraph (1)(a), (b) or (c)], the registry administrator must give notice of the suspension to the account holder as soon as reasonably practicable.

(4) A notice under sub-paragraph (3) must include the reason for the suspension unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security .

(5) Where, after a suspension under sub-paragraph (1), the registry administrator subsequently considers that the circumstances giving rise to the suspension no longer exist, the registry administrator must as soon as reasonably practicable—

(a)lift the suspension;

(b)give notice to the account holder that the suspension has been lifted.

(6) For the purposes of this paragraph an “insolvency event” occurs in relation to an account holder if—

(a)an order for the winding-up of the account holder is made;

(b)a resolution for the voluntary winding-up of the account holder is passed;

(c)the account holder enters into administration;

(d)a bankruptcy order is made in relation to the account holder or, in Scotland, an award of sequestration is made against the account holder;

(e)a provisional liquidator is appointed for the account holder under section 135 of the Insolvency Act 1986; or

(f)an event (an “overseas insolvency event”) occurs in a country or territory outside the United Kingdom in relation to the account holder that the registry administrator considers corresponds to an event (a “UK insolvency event”) referred to in paragraphs (a) to (e).

(7) For the purpose of considering under sub-paragraph (6)(f) whether an overseas insolvency event corresponds to a UK insolvency event, where, in consequence of the UK insolvency event, a person is appointed to an office (for example, liquidator or trustee in bankruptcy) to deal with the assets of the account holder, it is immaterial whether or not there is a corresponding appointment in consequence of the overseas insolvency event.

Closure of central accounts and auction delivery accountU.K.

26.  The UK ETS authority may close—

(a)a central account;

(b)the auction delivery account.

Closure of operator holding accountsU.K.

27.(1) This paragraph applies where—

(a)(i)an installation's greenhouse gas emissions permit is cancelled under paragraph 9(5)(b) of Schedule 6;

(ii)after giving a surrender notice under paragraph 11(3) of that Schedule in respect of a greenhouse gas emissions permit for an installation, the regulator certifies under paragraph 11(6)(b) of that Schedule that the conditions of the permit and the requirements of the surrender notice have been complied with or that there is no reasonable prospect of their being complied with;

(iii)after giving a revocation notice under paragraph 12(4) of that Schedule in respect of a greenhouse gas emissions permit for an installation, the regulator certifies under paragraph 12(7)(b) of that Schedule that the conditions of the permit and the requirements of the revocation notice have been complied with or that there is no reasonable prospect of their being complied with; or

(iv)after the regulator converts an installation's greenhouse gas emissions permit into a hospital or small emitter permit under paragraph 10 of Schedule 7, the obligations of the operator under the permit in respect of specified emissions before 1st January 2026 are complied with; and

(b)where relevant, any notice given under article 34V (return of allowances: notice to operator, etc.) to the operator of the installation or to a transferring operator (as defined in paragraph 7(1) of Schedule 6) has been complied with or the regulator considers that there is no reasonable prospect of the notice being complied with.

(2) The regulator must instruct the registry administrator to close the operator holding account for the installation.

(3) The registry administrator must give notice to the operator of the installation as soon as reasonably practicable after the account is closed.

Closure of aircraft operator holding accountsU.K.

28.(1) This paragraph applies where—

(a)the regulator is satisfied under article 34P that a person has ceased to perform aviation activity and there is no realistic prospect that the person will resume aviation activity;

(b)the person has complied with the requirements of article 34(1) or the regulator considers that there is no reasonable prospect of the requirements being complied with; and

(c)where relevant, any notice given under article 34V (return of allowances: notice to operator, etc.) to the person has been complied with or the regulator considers that there is no reasonable prospect of the notice being complied with.

(2) The regulator must instruct the registry administrator to close the aircraft operator holding account.

(3) The registry administrator must give notice to the person as soon as reasonably practicable after the account is closed.

Closure of trading accountsU.K.

29.(1) Where the account holder of a trading account instructs the registry administrator to close the account, the registry administrator must close the account—

(a)within 14 days after receiving the instruction; or

(b)if there are allowances in the account at the date on which the instruction is received, as soon as reasonably practicable after the allowances are transferred to another account.

(2) Where a trading account has been suspended, the registry administrator may close the account if the registry administrator considers that the circumstances giving rise to the suspension still exist and are unlikely to be resolved within a reasonable period of time.

(3) Where no transfers have been made to or from a trading account for a period of at least 1 year, the registry administrator may give notice to the account holder that the trading account will be closed; and if the account holder does not object in writing to the closure within 60 days after the date on which the notice is given, the registry administrator may close the account.

(4) The registry administrator must give notice to the account holder as soon as reasonably practicable after the account is closed under sub-paragraph (2) or (3).

(5) A notice following the closure of an account under sub-paragraph (2) must include the reason for the closure unless the registry administrator considers that its inclusion might prejudice the investigation or prosecution of an offence under the law of any part of the United Kingdom or a country or territory outside the United Kingdom or would be contrary to the interests of national security.

Balance in accounts to be closedU.K.

30.(1) This paragraph applies where there are allowances in an account that is to be closed under paragraph 27, 28 or 29(2) or (3).

(2) Subject to sub-paragraph (3), the registry administrator must give notice to the account holder, requiring the account holder to transfer the allowances to another account on or before a date set out in the notice; and if the account holder does not comply with the notice, the registry administrator must transfer the allowances to a general holding account before closing the account.

(3) If the account to be closed has been suspended, the registry administrator must transfer the allowances to a general holding account before closing the account.]

Article 26(3)

SCHEDULE 6U.K.Permits

PART 1 U.K.Application for greenhouse gas emissions permits

Greenhouse gas emissions permits: applicationU.K.

1.—(1) The operator of an installation may apply to the regulator for a greenhouse gas emissions permit for the installation M14.

(2) But an application may not be made if a permit for the installation is already in force.

(3) In sub-paragraph (2), “permit” includes a permit within the meaning of GGETSR 2012 to which paragraph 1 of Schedule 11 applies (permits to be converted).

Commencement Information

I48Sch. 6 para. 1 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M14Paragraphs 24 and 26 of Schedule 7 and paragraph 1 of Schedule 11 provide for the conversion of permits into greenhouse gas emissions permits.

Greenhouse gas emissions permits: content of applicationU.K.

2.—(1) An application for a greenhouse gas emissions permit must contain—

(a)an address to which correspondence relating to the application should be sent (in addition to the addresses required by paragraph 1(5) of Schedule 3);

(b)if the operator of the installation is a body corporate—

(i)its registered number and the postal address of its registered or principal office; and

(ii)where the operator is a subsidiary of a holding company, the name of the holding company (other than a holding company which is itself a subsidiary) and the postal address of the holding company's registered or principal office,

and in this paragraph “subsidiary” and “holding company” have the meanings given in section 1159 of the Companies Act 2006 M15;

(c)in relation to the site of the installation—

(i)the postal address and national grid reference of the site (or in the case of an installation in UK coastal waters or the UK sector of the continental shelf equivalent information identifying the installation and its location);

(ii)a description of the site and the location of the installation on it; and

(iii)the name of any local authority where the site is situated;

(d)a description of the installation, the regulated activities to be carried out at the installation and the specified emissions from those activities;

(e)a description of the raw and auxiliary materials used in carrying out regulated activities at the installation, the use of which is likely to lead to specified emissions;

(f)a description of the sources of specified emissions from the regulated activities carried out at the installation;

(g)a monitoring plan in accordance with Article 12 of the Monitoring and Reporting Regulation 2018, together with—

(i)the supporting documents referred to in Article 12(1) of that Regulation;

(ii)except where the installation is an installation with low emissions within the meaning of Article 47(2) of that Regulation, the uncertainty assessment carried out under Article 28(1)(a) of that Regulation;

(h)a description, including the reference number, of any environmental licence issued in relation to the installation;

(i)any additional information that the operator wishes the regulator to take into account in considering the application;

(j)a non-technical summary of the information referred to in paragraphs (d) to (i); and

(k)the date on which the operator wishes the permit to come into force.

(2) In sub-paragraph (1)(h), “environmental licence” means—

(a)an authorisation under—

(i)Part 1 of the Environmental Protection Act 1990 M16;

(ii)the Industrial Pollution Control (Northern Ireland) Order 1997 M17;

(b)a permit under—

(i)the Pollution Prevention and Control (Scotland) Regulations 2012 M18;

(ii)the Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013 M19;

(iii)the Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013 M20;

(iv)the Environmental Permitting (England and Wales) Regulations 2016 M21;

(v)the Environmental Authorisations (Scotland) Regulations 2018 M22.

Commencement Information

I49Sch. 6 para. 2 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M152006 c. 46. In section 1159 of the Companies Act 2006, “company” includes any body corporate.

[F34Greenhouse gas emissions permits: issue of permitU.K.

3.  A greenhouse gas emissions permit for an installation may be issued only if—

(a)a monitoring plan has been approved in relation to the installation under the Monitoring and Reporting Regulation 2018; and

(b)the regulator considers that from the date on which the permit comes into force the operator of the installation will be capable of monitoring and reporting the installation’s reportable emissions in accordance with the monitoring and reporting conditions of the permit.]

Greenhouse gas emissions permits: content of permitU.K.

4.—(1) A greenhouse gas emissions permit must contain—

(a)the name and postal address in the United Kingdom (including postcode) of the operator and any other address for correspondence included by the operator in the application;

(b)the postal address and national grid reference of the installation (or, in the case of an installation in UK coastal waters or the UK sector of the continental shelf, equivalent information identifying the installation and its location);

(c)a description of the installation, the regulated activities to be carried out at the installation and the specified emissions from those activities;

(d)a description of the site and the location of the installation on the site;

(e)the date on which the permit comes into force;

(f)the monitoring plan—

(i)where an application is made for the permit, approved in relation to the installation under F35...the Monitoring and Reporting Regulation 2018;

(ii)where an existing permit is converted into a greenhouse gas emissions permit, approved in relation to the installation under F35...the Monitoring and Reporting Regulation 2012 or F35... the Monitoring and Reporting Regulation 2018 for the purpose of monitoring specified emissions at the installation immediately before the greenhouse gas emissions permit comes into force;

(g)the monitoring and reporting conditions (see sub-paragraph (2));

(h)the surrender condition (see sub-paragraphs (3) to (5));

[F36(ha)the free allocation conditions (see sub-paragraph (6));

(hb)where a monitoring methodology plan has been approved in relation to the installation under Article 8 of the Free Allocation Regulation, the monitoring methodology plan;]

(i)any conditions that the regulator considers necessary to ensure that the operator notifies the regulator of any planned or effective changes to the capacity, activity level or operation of the installation, on or before 31st December in the year in which the change is planned or occurs;

(j)any other conditions that the regulator considers appropriate to include in the permit.

(2) The monitoring and reporting conditions are—

(a)a condition requiring the operator to monitor the installation's reportable emissions in accordance with—

(i)the Monitoring and Reporting Regulation 2018; and

(ii)the monitoring plan (including the written procedures supplementing the monitoring plan);

(b)a condition requiring the operator to prepare in accordance with the Monitoring and Reporting Regulation 2018 a report of the installation's reportable emissions in each scheme year that is verified [F37as satisfactory] in accordance with the Verification Regulation 2018 and to submit the report [F38(and the verification report)] to the regulator on or before 31st March in the following year;

(c)a condition requiring the operator to satisfy the regulator, if an emission factor of zero is reported in respect of the use of bioliquids, that the sustainability criteria set out in Article 17(2) to (5) of Directive 2009/28/EC of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources M23 have been fulfilled; and

(d)any further conditions that the regulator considers necessary to give proper effect to the Monitoring and Reporting Regulation 2018 or the Verification Regulation 2018.

(3) The surrender condition is a condition requiring the operator to surrender allowances equal to the installation's reportable emissions in a scheme year on or before 30th April in the following year.

(4) For the purposes of the surrender condition, where an installation's reportable emissions in a scheme year (the “non-compliance year”) exceeds the allowances surrendered on or before 30th April in the following year, the installation's reportable emissions in the relevant scheme year must be treated as being increased by the difference.

(5) In sub-paragraph (4), the relevant scheme year means—

(a)the scheme year following the non-compliance year; or

(b)if the failure to comply with the surrender condition results from an error in the verified emissions report submitted by the operator, the scheme year in which the error is discovered.

[F39(6) The free allocation conditions are the following conditions, which must be expressed to apply while the installation is an FA installation—

(a)a condition requiring the operator to monitor the activity level of the installation in accordance with—

(i)the Free Allocation Regulation; and

(ii)the monitoring methodology plan approved under Article 8 of the Free Allocation Regulation (including the written documentation of the procedures referred to in Article 8(3) of that Regulation);

[F40(b)a condition requiring the operator, in accordance with the Activity Level Changes Regulation, to prepare an activity level report that is verified as satisfactory in accordance with the Verification Regulation 2018 and to submit the report (and the verification report) to the regulator—

(i)on or before 31st March in each scheme year; or

(ii)in the case of an installation in relation to which the Activity Level Changes Regulation has effect with the modifications referred to in paragraph 5 of Schedule 8A—

(aa)on or before 31st March in the first eligible scheme year (within the meaning of that Schedule) or, if later, within 3 months after the date on which the final annual number of allowances to be allocated in respect of the installation is approved under paragraph 4(6) of that Schedule;

(bb)on or before 31st March in each subsequent scheme year;]

(c)a condition requiring the operator, if the installation has ceased operation, to notify the regulator on or before 31st December in the scheme year in which the cessation occurs or within 1 month of the cessation, whichever is later;

(d)any further conditions that the regulator considers necessary to give proper effect to the Free Allocation Regulation or the Activity Level Changes Regulation.

(7) Where, after the date of issue of, or conversion of a permit into, a greenhouse gas emissions permit, a monitoring methodology plan is approved in relation to an installation under Article 8 of the Free Allocation Regulation, the regulator must vary the permit under paragraph 6 so that it contains the monitoring methodology plan.]

Greenhouse gas emissions permits: effect of permit, etc.U.K.

5.—(1) A greenhouse gas emissions permit for an installation—

(a)comes into force on the date set out in the permit;

(b)authorises the regulated activities set out in the permit to be carried out at the installation.

(2) The operator of the installation must comply with the conditions of the permit.

Commencement Information

I51Sch. 6 para. 5 in force at 12.11.2020, see art. 2(1)

PART 2 U.K.Greenhouse gas emissions permits and hospital or small emitter permits

Variation of permitsU.K.

6.—(1) The operator of an installation—

(a)may apply to the regulator to vary the installation's permit;

(b)must apply to the regulator to vary the installation's permit where required by a condition of the permit.

(2) The regulator may vary an installation's permit at any time if the regulator considers that it is necessary to do so for the purposes of the UK ETS and in particular may do so in consequence of any of the following—

(a)a report of the operator referred to in Article 69 of the Monitoring and Reporting Regulation 2018;

(b)a notification under a condition included under paragraph 4(1)(i) (notification of planned changes in operation);

(c)a failure by the operator to comply with a condition of the permit to apply for a variation.

[F41(d)a failure by the operator to implement—

(i)a recommendation for improvement of the monitoring methodology plan as required by Article 9(2)(e) of the Free Allocation Regulation; or

(ii)a modification of the monitoring methodology plan requested by the regulator under Article 9(5)(d) of that Regulation.]

(3) The regulator may vary a permit to comply with—

[F42(za)paragraph 4(7) (adding monitoring methodology plan);]

(a)[F43paragraph 9(3), (3A)], (4) or (5) (transfer of permits);

(b)any of the following provisions of Schedule 7—

(i)paragraph 10 (conversion of permit to hospital or small emitter permit);

(ii)paragraph 18 (calculation of later emissions targets where initial targets based on estimates);

[F44(iia)paragraph 19C (capacity increases);]

(iii)paragraph 20 (banking overachieved target);

(iv)paragraph 21 (emissions targets for 2026-2030 allocation period);

(v)paragraph 24 (conversion of permit on loss of hospital or small emitter status);

(vi)paragraph 26 (conversion of permit at end of 2021-2025 allocation period).

(4) The variation of an installation's permit is given effect by the regulator giving a notice to the operator of the installation setting out the variations to the permit.

(5) Where a permit is varied, the regulator may, by giving notice to the operator, replace the permit with a consolidated version that includes the variations.

Transfer of permits: applicationU.K.

7.—(1) Subject to sub-paragraphs (3) and (4), a permit holder (the “transferring operator”) and another person (the “new operator”) may jointly apply to the regulator—

(a)for the transfer of the permit to the new operator;

(b)for the partial transfer of the permit to the new operator.

(2) For the purposes of this Order, the partial transfer of a permit is the transfer in respect of part of the installation at which the permit authorises a regulated activity to be carried out.

(3) An application for the transfer or partial transfer of a permit may not be made in respect of an installation (or part of an installation) that has ceased operation.

(4) An application may not be made for the partial transfer of a hospital or small emitter permit.

(5) In this paragraph and paragraphs 8 to 10—

existing permit” has the meaning given in [F45paragraph 9(3A) or (5)];

new operator” has the meaning given in sub-paragraph (1);

transferred activities” has the meaning given in paragraph [F468(1)(a)];

transferred units” has the meaning given in paragraph [F468(1)(a)];

transferring operator” has the meaning given in sub-paragraph (1).

Textual Amendments

Commencement Information

I53Sch. 6 para. 7 in force at 12.11.2020, see art. 2(1)

Transfer of permits: contents of applicationU.K.

8.[F47(1)] An application for the transfer or partial transfer of a permit must contain—

(a)a description of the installation (or part of an installation) in respect of which the application is made (the “transferred units”) and of the regulated activities authorised to be carried out there (the “transferred activities”);

(b)in relation to both the transferring operator and the new operator, an address to which correspondence relating to the application should be sent (in addition to the addresses required by paragraph 1(5) of Schedule 3);

(c)if the new operator is a body corporate, the matters referred to in paragraph 2(1)(b) in relation to the new operator;

(d)either—

(i)the new operator's monitoring plan in accordance with Article 12 of the Monitoring and Reporting Regulation 2018, together with—

(aa)the supporting documents referred to in Article 12(1) of that Regulation;

(bb)except where the transferred units are an installation with low emissions within the meaning of Article 47(2) of that Regulation, the uncertainty assessment carried out under Article 28(1)(a) of that Regulation; or

(ii)the new operator's specification of the parts of the existing monitoring plan that it is proposed be varied and any necessary corresponding update of the supporting documents and any uncertainty assessment;

(e)in the case of an application for a partial transfer of a permit, the transferring operator's specification of the parts of the existing monitoring plan that it is proposed be varied and any necessary corresponding update of the supporting documents and any uncertainty assessment.

[F48(1A) Where an application is made—

(a)the new operator’s monitoring plan referred to in sub-paragraph (1)(d)(i) must be treated as if it had been submitted to the regulator for approval under Article 12 of the Monitoring and Reporting Regulation 2018; or

(b)if sub-paragraph (1)(d)(ii) or (e) applies, the new or transferring operator’s specification of the parts of an existing monitoring plan that it is proposed be varied must be treated as a significant modification within the meaning of Article 15 of that Regulation notified to the regulator for approval under that Article.]

[F49(2) Where the application is for the transfer or partial transfer of a greenhouse gas emissions permit for an installation that is an FA installation, the application must also contain—

(a)either—

(i)the new operator's monitoring methodology plan in accordance with Article 8 of the Free Allocation Regulation; or

(ii)the new operator's specification of the parts of the existing monitoring methodology plan that it is proposed be varied;

(b)in the case of an application for the partial transfer of the permit, the transferring operator's specification of the parts of the existing monitoring methodology plan that it is proposed be varied.

(3) But sub-paragraph (2) does not apply if the application contains a statement by the new operator that the new operator renounces free allocation in respect of the transferred units.]

[F50(4) Where sub-paragraph (2) applies—

(a)the new operator’s monitoring methodology plan referred to in sub-paragraph (2)(a)(i) must be treated as if it had been submitted to the regulator for approval under Article 8 of the Free Allocation Regulation; or

(b)if sub-paragraph (2)(a)(ii) or (b) applies, the new or transferring operator’s specification of the parts of an existing monitoring methodology plan that it is proposed be varied must be treated as a significant modification within the meaning of Article 9 of that Regulation notified to the regulator for approval under that Article.]

Transfer of permits: grant of applicationU.K.

9.[F51(1) An application for the transfer or partial transfer of a permit may be granted only if—

(a)the regulator considers that, from the transfer date, the new operator—

(i)will be the operator of the installation;

(ii)will be capable of monitoring and reporting the installation’s reportable emissions in accordance with the monitoring and reporting conditions of the permit (including as varied under this paragraph); and

(iii)where the application is for the transfer or partial transfer of a greenhouse gas emissions permit of an installation that is an FA installation, will be capable of complying with the free allocation conditions of the permit (including as varied under this paragraph);

(b)the monitoring plan or the variations referred to in paragraph 8(1)(d) and, in the case of an application for the partial transfer of the permit, the variations referred to in paragraph 8(1)(e) have been approved under the Monitoring and Reporting Regulation 2018 (see paragraph 8(1A)); and

(c)where the application is for the transfer or partial transfer of a greenhouse gas emissions permit of an installation that is an FA installation, the monitoring methodology plan or the variations referred to in paragraph 8(2)(a) and, in the case of an application for the partial transfer of the permit, the variations referred to in paragraph 8(2)(b) have been approved under the Free Allocation Regulation (see paragraph 8(4)).]

[F52(1A) But [F53sub-paragraph (1)(a)(iii) and (c) do not apply] if the application contains a statement by the new operator that the new operator renounces free allocation in respect of the transferred units.]

(2) Where an application for a transfer or a partial transfer is granted, the regulator must give notice of the transfer to—

(a)the transferring operator; and

(b)the new operator.

(3) Where an application for the partial transfer of a permit is granted—

(a)the regulator must issue a new greenhouse gas emissions permit (the “new permit”) to the new operator that—

(i)sets out that the new permit comes into force on the transfer date;

(ii)sets out the transferred activities and the transferred units at which the transferred activities may be carried out;

(iii)includes such other provisions as the regulator considers appropriate to take account of the transfer;

(b)the regulator may make such corresponding variations under paragraph 6 to the permit (the “original permit”) held by the transferring operator as the regulator considers appropriate to take account of the transfer;

(c)the new permit comes into force on the transfer date to authorise the transferred activities to be carried out at the transferred units from that date;

(d)the variations to the original permit have effect from the transfer date (which must be set out in the original permit).

[F54(3A) But if the new operator already holds a permit (the “existing permit”) for an installation that is on the same site as the transferred units, the regulator may, instead of issuing a new greenhouse gas emissions permit to the new operator under sub-paragraph (3), vary the existing permit under paragraph 6 so that it includes such variations as the regulator considers necessary to take account of the transferred units and transferred activities; and if the regulator does so—

(a)the regulator must make such corresponding variations under paragraph 6 to the permit (the “original permit”) held by the transferring operator as the regulator considers appropriate to take account of the transfer;

(b)the variations to the existing permit and the original permit have effect from the transfer date, which must be set out in the existing permit and the original permit.]

(4) Where an application for the transfer of a permit (other than for a partial transfer) is granted—

(a)the regulator must vary the permit under paragraph 6 so that it includes—

(i)the name and other particulars of the new operator;

(ii)the transfer date;

(iii)such variations to the monitoring plan as the regulator considers appropriate;

(b)the new operator is the holder of the permit as varied from the transfer date.

(5) But if the new operator already holds a permit (the “existing permit”) for an installation that is on the same site as the transferred units, the regulator may, instead of varying the transferring operator's permit under sub-paragraph (4)—

(a)vary the existing permit under paragraph 6 so that it includes such variations as the regulator considers necessary to take account of the transferred units and transferred activities; and the variations have effect from the transfer date, which must be set out in the existing permit; and

(b)by giving notice to the transferring operator, cancel the permit held by the transferring operator so that the permit ceases to authorise regulated activities to be carried out from the transfer date.

[F55(5A) Where a permit is cancelled under sub-paragraph (5)(b), the regulator must give notice to the registry administrator as soon as reasonably practicable.]

(6) In this paragraph, “transfer date” means the date agreed by the transferring operator, the new operator and the regulator as the date on which the transfer or partial transfer to the new operator is to take effect.

Transfer of permits: underreporting discovered after transferU.K.

10.—(1) This paragraph applies where—

(a)after the transfer of a greenhouse gas emissions permit under paragraph 9 takes effect, the regulator becomes aware, following a determination of reportable emissions under article 45, of an error in a report submitted for a scheme year by the transferring operator under the monitoring and reporting conditions of the permit; and

(b)as a result of the error, the transferring operator failed to comply with the surrender condition of the permit in respect of the scheme year to which the error relates.

(2) The regulator must give notice to the transferring operator of the error as soon as reasonably practicable.

(3) The transferring operator must within 1 month of the notice effect a transfer to the new operator of allowances equal to the reportable emissions in respect of which, as a result of the error, the transferring operator failed to comply with the surrender condition of the permit.

(4) The new operator must surrender the allowances within 1 month after the transfer of the allowances.

(5) In sub-paragraph (1), the reference to the transfer of a greenhouse gas emissions permit under paragraph 9 includes a reference to an application for a transfer of a permit to which effect is given by a variation of the new operator's existing permit under [F56sub-paragraph (3A) or (5)] of that paragraph.

Textual Amendments

Commencement Information

I56Sch. 6 para. 10 in force at 12.11.2020, see art. 2(1)

Surrender of permitsU.K.

11.—(1) Where a permit authorises a regulated activity to be carried out at an installation that has ceased operation, the operator must apply to the regulator to surrender the permit on or before—

(a)the last day of the period of 1 month beginning with the day on which it ceased operation; or

(b)such later date as may be agreed by the regulator.

(2) Where a permit authorises a regulated activity to be carried out at an installation where a regulated activity is no longer being carried out but it is not technically impossible to resume operation, the operator of the installation may apply to the regulator to surrender the permit.

(3) Where the regulator grants an application to surrender a permit under sub-paragraph (1) or (2), the regulator must give a notice (a “surrender notice”) to the operator.

(4) The surrender notice must—

(a)set out a date (the “end date”) on which the surrender of the permit takes effect;

(b)require the operator to—

(i)submit to the regulator on or before a date set out in the notice a report of the installation's reportable emissions in the period beginning on 1st January in the scheme year (the “end year”) in which the end date falls and ending on the end date;

(ii)ensure that the report is prepared and verified in accordance with the monitoring and reporting conditions of the permit;

(iii)where the permit is a greenhouse gas emissions permit, on or before a date set out in the notice, surrender allowances equal to the installation's reportable emissions in the period referred to in sub-paragraph (i).

(5) The operator must comply with the requirements of the surrender notice.

(6) Where a surrender notice is given—

(a)the permit ceases to be in force on the end date (and therefore ceases to authorise a regulated activity to be carried out at the installation from that date); but

(b)the conditions of the permit continue to have effect as if the permit were in force until the regulator certifies that the conditions of the permit and the requirements of the surrender notice have been complied with [F57or that there is no reasonable prospect of their being complied with].

(7) The reference in sub-paragraph (6)(b) to the conditions of the permit that continue to have effect includes a reference to conditions relating to reportable emissions before the end year that the operator is required to comply with on or before a date that may fall after the end date (for example, in the case of a greenhouse gas emissions permit, the condition referred to in paragraph 4(2)(b) and the surrender condition or, in the case of a hospital or small emitter permit, the condition referred to in paragraph 11(2)(b) of Schedule 7).

Textual Amendments

Commencement Information

I57Sch. 6 para. 11 in force at 12.11.2020, see art. 2(1)

Revocation of permitsU.K.

12.—(1) Where the operator of an installation fails to apply to surrender the installation's permit under paragraph 11(1) on or before the date referred to in that sub-paragraph, the regulator must revoke the permit as soon as reasonably practicable after that date.

(2) Where a permit authorises a regulated activity to be carried out at an installation that is included in the ultra-small emitter list for 2026-2030, the regulator must revoke the permit so that it ceases to be in force at the end of 31st December 2025.

(3) The regulator may revoke a permit if—

(a)the operator fails to comply with—

(i)a requirement imposed on the operator by or under—

(aa)this Order;

(bb)the Monitoring and Reporting Regulation 2018;

(cc)the Verification Regulation 2018;

[F58(dd)the Free Allocation Regulation;

(ee)the Activity Level Changes Regulation.]

(ii)a condition of the permit; or

(b)the operator of an installation fails to pay the charge for maintaining the permit in force M24.

(4) A permit is revoked by giving a notice (a “revocation notice”) to the operator.

(5) The revocation notice must—

(a)set out a date (the “end date”) on which the revocation of the permit takes effect;

(b)require the operator to—

(i)submit to the regulator on or before a date set out in the notice a report of the installation's reportable emissions in the period beginning on 1st January in the scheme year (the “end year”) in which the end date falls and ending on the end date;

(ii)ensure that the report is prepared and verified in accordance with the monitoring and reporting conditions of the permit;

(iii)where the permit is a greenhouse gas emissions permit, on or before a date set out in the notice, surrender allowances equal to the installation's reportable emissions in the period referred to in sub-paragraph (i).

(6) The operator must comply with the requirements of the revocation notice.

(7) Where a revocation notice is given—

(a)the permit ceases to be in force on the end date (and therefore ceases to authorise a regulated activity to be carried out at the installation from that date); but

(b)the conditions of the permit continue to have effect as if the permit were in force until the regulator certifies that the conditions of the permit and the requirements of the revocation notice have been complied with [F59or that there is no reasonable prospect of their being complied with].

(8) The reference in sub-paragraph (7)(b) to the conditions of the permit that continue to have effect includes a reference to conditions relating to reportable emissions before the end year that the operator is required to comply with on or before a date that may fall after the end date (for example, in the case of a greenhouse gas emissions permit, the condition referred to in paragraph 4(2)(b) and the surrender condition or, in the case of a hospital or small emitter permit, the condition referred to in paragraph 11(2)(b) of Schedule 7).

(9) A regulator who gives a revocation notice may, by notice to the operator, withdraw the revocation notice at any time before the end date.

Textual Amendments

Commencement Information

I58Sch. 6 para. 12 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M24Paragraph 23(4) of Schedule 7 provides for the regulator to give a conversion notice in respect of the hospital or small emitter permit instead of revoking the permit.

Article 26(4)

SCHEDULE 7U.K.Hospitals and small emitters

PART 1 U.K.Preliminary

InterpretationU.K.

1.—(1) In this Schedule—

conversion notice” has the meaning given in paragraph 23;

emissions report” has the meaning given in paragraph 11(2)(b);

emissions target”, in relation to an installation, means a target for the installation's reportable emissions (excluding emissions from biomass) set out in the installation's hospital or small emitter permit; and an emissions target for a scheme year is the emissions target for that year set out in the permit;

hospital-qualifying installation” means—

(a)

in relation to an installation included in the hospital and small emitter list for 2021-2025, an installation stated in that list to be a “hospital” by the inclusion of “Y” in the entry relating to the installation in the column headed “Hospital (YES/NO)”;

(b)

in relation to an installation included in the hospital and small emitter list for 2026-2030, an installation that meets condition A (whether or not the installation also meets condition B or C) (see paragraphs 5 and 6);

(c)

in relation to an installation included in the ultra-small emitter list for 2021-2025 or the ultra-small emitter list for 2026-2030—

(i)

in respect of which a notice under paragraph 7(2) of Schedule 8 is given; and

(ii)

that is a hospital or small emitter for a scheme year by virtue of paragraph 4 of this Schedule,

an installation that primarily provided services to a hospital in the scheme year before the notice was given;

maximum amount” means 24,999 tonnes of carbon dioxide equivalent.

(2) For the purposes of this Order, in determining whether or not an installation's reportable emissions or an estimate of reportable emissions exceed the maximum amount or an emissions target and in calculating an installation's emissions target based on reportable emissions or an estimate, emissions from biomass must be excluded.

Commencement Information

I59Sch. 7 para. 1 in force at 12.11.2020, see art. 2(1)

Meaning of installation that primarily provides services to a hospital in scheme yearU.K.

2.—(1) For the purposes of this Schedule, an installation is an installation that primarily provides services to a hospital in a scheme year if at least 85% of the heat produced by the installation in that year is used by or supplied to one or more hospitals.

(2) In sub-paragraph (1), “hospital” means—

(a)an institution for the reception and treatment of persons suffering from illness;

(b)a maternity home;

(c)an institution for the reception and treatment of persons during convalescence or persons requiring medical rehabilitation;

(d)a clinic, dispensary or out-patient department maintained in connection with an establishment referred to in any of paragraphs (a) to (c);

(e)a research or teaching facility that is associated with an establishment referred to in any of paragraphs (a) to (c) that has as its primary purpose medical research or medical teaching;

(f)any other facility that has as its primary purpose the provision of such services as are necessary to maintain the proper functioning of an establishment referred to in any of paragraphs (a) to (d), including in particular—

(i)blood transfusion services;

(ii)catering services;

(iii)laundry services;

(iv)medical sanitisation services.

(3) In sub-paragraph (2), “illness” includes any disorder or disability of the mind and any injury or disability requiring medical or dental treatment or nursing.

Commencement Information

I60Sch. 7 para. 2 in force at 12.11.2020, see art. 2(1)

PART 2 U.K.Hospital or small emitter status

Hospital or small emitter statusU.K.

3.—(1) This paragraph and paragraph 4 apply to determine whether or not an installation is a hospital or small emitter for a scheme year.

(2) Subject to sub-paragraphs (3) and (4), an installation is a hospital or small emitter for the scheme years in the 2021-2025 allocation period if the installation is included in the list (the “hospital and small emitter list for 2021-2025”) of installations to be excluded from the EU ETS under Article 27 of the Directive from 1st January 2021 published for the purposes of the EU ETS on the website of SEPA on 28th May 2020 M25.

(3) Where a conversion notice is given to the operator of the installation stating that the installation is not a hospital or small emitter for a scheme year in the 2021-2025 allocation period, the installation is not a hospital or small emitter for that scheme year or subsequent scheme years in the allocation period.

(4) Where a regulated activity does not begin to be carried out before 1st November 2020 at an installation that is included in the hospital and small emitter list for 2021-2025—

(a)the installation is not a hospital or small emitter for the scheme years in the 2021-2025 allocation period; and

(b)for the purposes of this Order, the hospital and small emitter list for 2021-2025 must be treated as not including the installation.

(5) Subject to sub-paragraphs (6) and (7), an installation is a hospital or small emitter for the scheme years in the 2026-2030 allocation period if the installation is included in the hospital and small emitter list for 2026-2030.

(6) Where a conversion notice is given to the operator of the installation stating that the installation is not a hospital or small emitter for a scheme year in the 2026-2030 allocation period, the installation is not a hospital or small emitter for that scheme year or subsequent scheme years in the allocation period.

(7) Where a regulated activity does not begin to be carried out before 1st November 2025 at an installation that is included in the hospital and small emitter list for 2026-2030—

(a)the installation is not a hospital or small emitter for the scheme years in the 2026-2030 allocation period; and

(b)for the purposes of this Order, the hospital and small emitter list for 2026-2030 must be treated as not including the installation.

Commencement Information

I61Sch. 7 para. 3 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M25The hospital and small emitter list for 2021-2025 can be accessed at www.sepa.org.uk/media/504726/uk-article-27-27a-installation-list.pdf. A copy of the list may be inspected at the Department for Business, Energy and Industrial Strategy, 1 Victoria Street, London SW1H 0ET; the Industrial Pollution and Radiochemical Inspectorate, Department for Agriculture, Environment and Rural Affairs, Klondyke Building, Cromac Avenue, Belfast BT7 2JA; the Scottish Government Directorate of Energy & Climate Change, Fourth Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow G2 8LU; and the offices of the Welsh Government, Cathays Park 2, Cathays Park, Cardiff CF10 2NQ.

Hospital or small emitter status: former ultra-small emittersU.K.

4.—(1) This paragraph applies to an installation if—

(a)the installation is included in—

(i)the ultra-small emitter list for 2021-2025; or

(ii)the ultra-small emitter list for 2026-2030;

(b)the regulator gives notice to the operator of the installation under paragraph 7(2) of Schedule 8 stating that the installation will not be an ultra-small emitter for a scheme year (the “relevant scheme year”); and

(c)the regulator gives notice to the operator under paragraph 7(5)(b) of that Schedule that the regulator considers that the installation is not an ineligible installation.

(2) Subject to paragraph 3(3), an installation to which this paragraph applies by virtue of sub-paragraph (1)(a)(i) is a hospital or small emitter for the relevant scheme year and for subsequent scheme years in the 2021-2025 allocation period.

(3) Subject to paragraph 3(6), an installation to which this paragraph applies by virtue of sub-paragraph (1)(a)(ii) is a hospital or small emitter for the relevant scheme year and for subsequent scheme years in the 2026-2030 allocation period.

(4) For the purpose of this paragraph, an installation is an ineligible installation if—

(a)where the activity referred to in column 1 of the first entry in table C in Schedule 2 (combustion of fuels) is carried out at the installation, the installation's rated thermal input is 35 megawatts or above—

(i)where the installation is included in the ultra-small emitter list for 2021-2025, in any of the scheme years (within the meaning of GGETSR 2012) beginning on 1st January 2016, 2017 or 2018;

(ii)where the installation is included in the ultra-small emitter list for 2026-2030, in any of the 2021, 2022 or 2023 scheme years; and

(b)the installation is not an installation that primarily provided services to a hospital in the scheme year preceding the scheme year in which the notice under paragraph 7(2) of Schedule 8 is given.

Commencement Information

I62Sch. 7 para. 4 in force at 12.11.2020, see art. 2(1)

Obtaining hospital or small emitter status for 2026-2030 allocation periodU.K.

5.—(1) The operator of an installation who wishes to apply for the installation to be a hospital or small emitter for the scheme years in the 2026-2030 allocation period must submit the following to the regulator—

(a)details of the installation, including details of any permit in force;

(b)evidence that the installation meets condition A, B or C (see paragraph 6);

(c)where the operator submits evidence that the installation meets condition A, the evidence and any estimate required by paragraph 6(3);

(d)where the operator submits evidence that the installation meets condition C, any estimate required by paragraph 6(6).

(2) An application—

(a)may not be made before 1st April 2024;

(b)must be made on or before 30th June 2024.

(3) After receiving an application, the regulator must on or before 30th September 2024—

(a)make a preliminary assessment of whether or not the installation meets condition A, B or C; and

(b)send the preliminary assessment and the reasons for it to the UK ETS authority.

(4) After receiving the preliminary assessment—

(a)the UK ETS authority must make a final assessment of whether or not the installation meets condition A, B or C; and

(b)if the UK ETS authority considers that the installation meets condition A, B or C, the UK ETS authority must include the installation in a list (the “hospital and small emitter list for 2026-2030”).

(5) The UK ETS authority must publish the hospital and small emitter list for 2026-2030 on or before 30th April 2025.

(6) Evidence of an installation's historic reportable emissions may not be taken into account for the purposes of assessing whether or not an installation meets condition B or C unless the evidence is—

(a)verified [F60as satisfactory] in accordance with the Verification Regulation 2018; or

(b)where relevant, set out in an emissions report accompanied by the declaration referred to in paragraph 11(2)(b)(ii).

(7) An application may not be made under this paragraph and paragraph 3 of Schedule 8.

Textual Amendments

Commencement Information

I63Sch. 7 para. 5 in force at 12.11.2020, see art. 2(1)

Obtaining hospital or small emitter status for 2026-2030 allocation period: Conditions A, B and CU.K.

6.—(1) This paragraph applies for the purposes of paragraph 5.

Condition A

(2) Condition A is that the installation—

(a)is an installation that primarily provides services to a hospital in the 2023 scheme year; or

(b)if a regulated activity has not begun to be carried out at the installation at the date of the application—

(i)a regulated activity will begin to be carried out at the installation before 1st November 2025; and

(ii)the installation will be an installation that primarily provides services to a hospital after that date.

(3) Where the operator submits evidence that the installation meets condition A, the operator must also submit—

(a)if a regulated activity begins to be carried out at the installation on or before 1st January 2021, evidence of—

(i)the installation's reportable emissions in each of the 2021, 2022 and 2023 scheme years, verified as mentioned in paragraph 5(6);

(ii)where the activity referred to in column 1 of the first entry in table C in Schedule 2 (combustion of fuels) is carried out at the installation, the installation's rated thermal input in each of those years;

(b)in any other case—

(i)where a regulated activity has begun to be carried out at the installation at the date of the application, such evidence of the matters referred to in paragraph (a)(i) and (ii) as is available at the date of the application; and

(ii)where the evidence submitted under sub-paragraph (i) does not include evidence of reportable emissions for a complete scheme year, an estimate of the installation's reportable emissions in the 2026 scheme year.

Condition B

(4) Condition B is that—

(a)a regulated activity begins to be carried out at the installation on or before 1st January 2021;

(b)the installation's reportable emissions in each of the 2021, 2022 and 2023 scheme years do not exceed the maximum amount; and

(c)where the activity referred to in column 1 of the first entry in table C in Schedule 2 (combustion of fuels) is carried out at the installation, the installation's rated thermal input is below 35 megawatts in each of those years.

Condition C

(5) Condition C is that—

(a)if a regulated activity is carried out at the installation at the date of the application, the regulated activity began to be carried out at the installation after 1st January 2021;

(b)if a regulated activity has not begun to be carried out at the installation at the date of the application, a regulated activity will begin to be carried out at the installation before 1st November 2025;

(c)the installation's reportable emissions—

(i)are not likely to exceed the maximum amount in each of the scheme years in the 2026-2030 allocation period; and

(ii)if a regulated activity has begun to be carried out at the installation at the date of the application, do not exceed the maximum amount in each of the scheme years for which, at the date of the application, evidence of reportable emissions is available; and

(d)where the activity referred to in column 1 of the first entry in table C in Schedule 2 (combustion of fuels) is carried out at the installation, the installation's rated thermal input—

(i)is likely to be below 35 megawatts in each of the scheme years in the 2026-2030 allocation period; and

(ii)if a regulated activity has begun to be carried out at the installation at the date of the application, is below 35 megawatts in each of the scheme years for which, at the date of the application, evidence of rated thermal input is available.

(6) Where the evidence submitted under sub-paragraph (5) does not include evidence of reportable emissions for a complete scheme year, the operator must also submit an estimate of the installation's reportable emissions in the 2026 scheme year.

Commencement Information

I64Sch. 7 para. 6 in force at 12.11.2020, see art. 2(1)

PART 3 U.K.Hospital or small emitter permits

Hospital or small emitter permits: applicationU.K.

7.—(1) The operator of an installation that is a hospital or small emitter for a scheme year may apply to the regulator for a hospital or small emitter permit to come into force in that year M26.

(2) But an application may not be made if a permit for the installation is already in force.

(3) In sub-paragraph (2), “permit” includes a permit within the meaning of GGETSR 2012 to which paragraph 1 of Schedule 11 applies (permits to be converted).

Commencement Information

I65Sch. 7 para. 7 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M26Paragraph 10 of Schedule 7 and paragraph 1 of Schedule 11 provide for the conversion of permits into hospital or small emitter permits.

Hospital or small emitter permits: content of applicationU.K.

8.  An application for a hospital or small emitter permit must contain the matters set out in paragraph 2 of Schedule 6, except for the uncertainty assessment referred to in sub-paragraph (1)(g)(ii) of that paragraph.

Commencement Information

I66Sch. 7 para. 8 in force at 12.11.2020, see art. 2(1)

[F61Hospital or small emitter permits: issue of permitU.K.

9.  A hospital or small emitter permit for an installation may be issued only if—

(a)the application is made for a permit to come into force in a scheme year for which the installation is a hospital or small emitter;

(b)a monitoring plan has been approved in relation to the installation under the Monitoring and Reporting Regulation 2018; and

(c)the regulator considers that from the date on which the permit comes into force the operator of the installation will be capable of monitoring and reporting the installation’s reportable emissions in accordance with the monitoring and reporting conditions of the permit.]

Hospital or small emitter permits: conversion of existing greenhouse gas emissions permit for 2026-2030 allocation periodU.K.

10.—(1) This paragraph applies where a greenhouse gas emissions permit is in force for an installation that is included in the hospital and small emitter list for 2026-2030.

(2) The regulator must convert the greenhouse gas emissions permit into a hospital or small emitter permit with effect from 1st January 2026 by varying it under paragraph 6 of Schedule 6, so that the provisions of the permit are replaced by provisions that satisfy the requirements of paragraph 11.

(3) When varying a permit under sub-paragraph (2), the regulator may make only such variations as the regulator considers necessary in consequence of the installation's inclusion in the hospital and small emitter list for 2026-2030.

(4) The conversion of the permit does not affect the obligations of the operator under the greenhouse gas emissions permit in respect of specified emissions before 1st January 2026.

Commencement Information

I67Sch. 7 para. 10 in force at 12.11.2020, see art. 2(1)

Hospital or small emitter permits: content of permitU.K.

11.—(1) A hospital or small emitter permit must contain—

(a)the name and postal address in the United Kingdom (including postcode) of the operator and any other address for correspondence included by the operator in the application;

(b)the postal address and national grid reference of the installation (or, in the case of an installation in UK coastal waters or the UK sector of the continental shelf, equivalent information identifying the installation and its location);

(c)a description of the installation, the regulated activities to be carried out at the installation and the specified emissions from those activities;

(d)a description of the site and the location of the installation on the site;

(e)the date on which the permit comes into force;

(f)an emissions target for the installation, calculated by the regulator in accordance with paragraphs 15 to 17—

(i)subject to paragraph 18, where the installation is included in the hospital and small emitter list for 2021-2025, for each scheme year in the 2021-2025 allocation period;

(ii)subject to paragraph 18, where the installation is included in the hospital and small emitter list for 2026-2030, for each scheme year in the 2026-2030 allocation period;

(iii)where the installation is included in the ultra-small emitter list for 2021-2025, for each scheme year in the 2021-2025 allocation period for which the installation is a hospital or small emitter (see paragraph 4(2));

(iv)where the installation is included in the ultra-small emitter list for 2026-2030, for each scheme year in the 2026-2030 allocation period for which the installation is a hospital or small emitter (see paragraph 4(3));

(g)the monitoring plan—

(i)where an application is made for the permit, approved in relation to the installation under F62... the Monitoring and Reporting Regulation 2018;

(ii)where an existing permit is converted into a hospital or small emitter permit, approved in relation to the installation under F62... the Monitoring and Reporting Regulation 2012 or F62... the Monitoring and Reporting Regulation 2018 for the purpose of monitoring reportable emissions at the installation immediately before the hospital or small emitter permit comes into force;

(h)the monitoring and reporting conditions (see sub-paragraph (2));

(i)any other conditions that the regulator considers appropriate to include in the permit.

(2) The monitoring and reporting conditions are—

(a)a condition requiring the operator to monitor the installation's reportable emissions in each scheme year for which the installation is a hospital or small emitter in accordance with—

(i)the Monitoring and Reporting Regulation 2018; and

(ii)the monitoring plan (including the written procedures supplementing the monitoring plan);

(b)a condition requiring the operator to prepare in accordance with the Monitoring and Reporting Regulation 2018 a report (the “emissions report”) of the installation's reportable emissions in each scheme year for which the installation is a hospital or small emitter that is—

(i)verified [F63as satisfactory] in accordance with the Verification Regulation 2018; or

(ii)accompanied by a declaration stating that—

(aa)in preparing the emissions report the operator has complied with the Monitoring and Reporting Regulation 2018;

(bb)the operator has complied with the monitoring plan; and

(cc)the emissions report is free from material misstatements,

and to submit the emissions report [F64and the verification report (where sub-paragraph (i) applies) or declaration (where sub-paragraph (ii) applies)] to the regulator on or before 31st March in the following year; and

(c)any further conditions that the regulator considers necessary to give proper effect to the Monitoring and Reporting Regulation 2018 or the Verification Regulation 2018.

(3) A hospital or small emitter permit for a hospital-qualifying installation must contain conditions requiring the operator—

(a)if the installation ceases to be an installation that primarily provides services to a hospital in a scheme year for which the installation is a hospital or small emitter, to give notice to the regulator on or before 31st March in the following year;

(b)except where the operator gives notice under paragraph (a)—

(i)to maintain records demonstrating that the installation continues to be an installation that primarily provides services to a hospital; and

(ii)to comply with requests from the regulator to inspect the records for the purpose of verifying the accuracy of the records and of the emissions report.

(4) A hospital or small emitter permit for an installation that is not a hospital-qualifying installation must contain a condition requiring the operator, if the installation's reportable emissions in a scheme year for which the installation is a hospital or small emitter exceed the maximum amount, to give notice to the regulator on or before 31st March in the following year.

(5) This paragraph is subject to paragraph 14.

Hospital or small emitter permits: effect of permit, etc.U.K.

12.—(1) A hospital or small emitter permit for an installation—

(a)comes into force on the date set out in the permit;

(b)authorises the regulated activities set out in the permit to be carried out at the installation.

(2) The operator of the installation must comply with the conditions of the permit.

Commencement Information

I69Sch. 7 para. 12 in force at 12.11.2020, see art. 2(1)

Hospitals and small emitters: modifications to Monitoring and Reporting Regulation 2018U.K.

13.—(1) Where an installation is a hospital or small emitter for a scheme year, the Monitoring and Reporting Regulation 2018 has effect with the following modifications (in addition to the modifications in Schedule 4).

F65(2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(3) Article 19 is to be read as if—

(a)in paragraph 2 for the words from “in one of the following categories” to the end there were substituted “ as a category A installation ”;

(b)paragraph 5 were omitted.

(4) Article 38(2) is to be read as if—

(a)in the first subparagraph “, but the emission factor for bioliquids shall be zero only if the sustainability criteria set out in Article 17(2) to (5) of Directive 2009/28/EC have been fulfilled” were omitted;

(b)in the second subparagraph for “each fuel” there were substituted “ a mixed fuel ”.

(5) Article 47 is to be read as if—

(a)every installation that is a hospital or small emitter for a scheme year were an installation to which Article 47 applies (that is to say, an installation that operates with low emissions, disregarding the second subparagraph of paragraph 1 of that Article);

[F66(aa)in paragraph 3—

(i)for “an improvement report” there were substituted “a report”;

(ii)after “in response to” there were inserted “outstanding non-conformities or”;]

(b)paragraph 8 were omitted.

(6) Where an emissions report submitted to the regulator under paragraph 11(2)(b) is accompanied by a declaration referred to in paragraph 11(2)(b)(ii) (and is not [F67verified as satisfactory in accordance] with the Verification Regulation 2018), in the Monitoring and Reporting Regulation 2018—

(a)Annex 10 must be read as if section 1(2) were omitted;

(b)a reference to a verified annual emission report is to be read as a reference to the emissions report;

(c)a reference to verified annual emissions or verified emissions is to be read as a reference to the reportable emissions reported in the emissions report;

(d)a reference to a verifier is to be read as a reference to the regulator;

(e)a reference to verifying or verification is to be read as a reference to auditing the reportable emissions reported in the emissions report by the regulator in accordance with the regulator's procedures for auditing reportable emissions of installations, the operators of which submit emissions reports under paragraph 11(2)(b)(ii);

(f)a reference to a verification report is to be read as a reference to the record of such an audit given to the operator by the regulator.

Former ultra-small emitters: hospital or small emitter permits coming into force after beginning of scheme yearU.K.

14.—(1) This paragraph applies where a hospital or small emitter permit for an installation referred to in paragraph 4(2) or (3) comes into force on a day after 1st January in the relevant scheme year.

(2) References in paragraph 11(2) to a scheme year for which the installation is a hospital or small emitter must be treated as not including a reference to the part of the relevant scheme year before the date on which the permit comes into force.

(3) The installation's emissions target for the relevant scheme year is the emissions target calculated under paragraph 16 or, as the case may be, 17 multiplied by the factor set out in sub-paragraph (4).

(4) The factor is (Y – D)/Y, where—

  • Y is the number of days in the relevant scheme year;

  • D is the number of days in the relevant scheme year before the date on which the permit comes into force.

(5) Paragraph 19 has effect as if the reference to the installation's reportable emissions in the relevant scheme year were a reference to the installation's reportable emissions in the relevant scheme year on and after the date on which the permit comes into force.

(6) In this paragraph, “relevant scheme year” has the meaning given in paragraph 4(1)(b).

Commencement Information

I71Sch. 7 para. 14 in force at 12.11.2020, see art. 2(1)

PART 4U.K.Emissions targets

Emissions targets other than for hospital-qualifying installations may not exceed maximum amountU.K.

15.—(1) Except in the case of a hospital-qualifying installation, an emissions target for a scheme year may not exceed the maximum amount.

(2) This paragraph overrides paragraphs 16 and 17.

Commencement Information

I72Sch. 7 para. 15 in force at 12.11.2020, see art. 2(1)

Emissions targets for 2021-2025 allocation periodU.K.

16.—(1) This paragraph applies for the purpose of calculating an installation's emissions targets for the scheme years in the 2021-2025 allocation period under paragraph 11(1)(f)(i) and (iii).

(2) Where a regulated activity began to be carried out at the installation before 2019, the installation's emissions target for a scheme year is the installation's relevant emissions multiplied by the reduction factor for the scheme year.

(3) For the purpose of sub-paragraph (2), the relevant emissions of an installation are—

(a)where a regulated activity began to be carried out at the installation before 2016, the sum of the installation's reportable emissions in 2016, 2017 and 2018 divided by 3;

(b)where a regulated activity began to be carried out at the installation in 2016, the sum of the installation's reportable emissions in 2017 and 2018 divided by 2;

(c)where a regulated activity began to be carried out at the installation in 2017, the installation's reportable emissions in 2018;

(d)where a regulated activity began to be carried out at the installation in 2018, the installation's reportable emissions in 2019.

(4) Where a regulated activity began to be carried out at the installation in 2019, the installation's emissions target—

(a)for the 2021 scheme year is the 2021 estimate multiplied by the reduction factor for the 2021 scheme year;

(b)for every other scheme year (the “relevant scheme year”) in the 2021-2025 allocation period is the installation's reportable emissions in 2020 multiplied by the reduction factor for the relevant scheme year.

(5) Where a regulated activity began to be carried out at the installation in the period beginning on 1st January 2020 and ending on 31st October 2020, the installation's emissions target—

(a)for the 2021 scheme year is the 2021 estimate multiplied by the reduction factor for the 2021 scheme year;

(b)for the 2022 scheme year is the 2021 estimate multiplied by the reduction factor for the 2022 scheme year;

(c)for every other scheme year (the “relevant scheme year”) in the 2021-2025 allocation period is the installation's reportable emissions in the 2021 scheme year multiplied by the reduction factor for the relevant scheme year.

(6) In sub-paragraphs (4) and (5), “2021 estimate” means the conservative estimate of annual average emissions referred to in Article 19(4) of the Monitoring and Reporting Regulation 2012 used for the purposes of a monitoring plan submitted under that Regulation and contained in the application for a permit under GGETSR 2012 (see paragraph 1(1)(f) of Schedule 4 to GGETSR 2012).

(7) For the purpose of this paragraph, the reduction factor for a scheme year set out in column 1 of table D is the value set out in the corresponding entry in column 2.

Table D
Column 1Column 2
Scheme yearReduction factor
20210.8697
20220.8461
20230.8224
20240.7988
20250.7751

(8) In this paragraph, a reference to reportable emissions is a reference to reportable emissions (within the meaning of GGETSR 2012 or this Order)—

(a)verified [F68as satisfactory] in accordance with the Verification Regulation 2012 or the Verification Regulation 2018;

[F69(aa)determined under regulation 44 of GGETSR 2012 or article 45 of this Order; or]

(b)where relevant, set out in an emissions report accompanied by the notice or declaration referred to in paragraph 3(8)(b)(ii) of Schedule 5 to GGETSR 2012 or paragraph 11(2)(b)(ii) of this Schedule.

(9) This paragraph is subject to paragraph 14.

Emissions targets for 2026-2030 allocation periodU.K.

17.—(1) This paragraph applies for the purpose of calculating an installation's emissions targets for the scheme years in the 2026-2030 allocation period under—

(a)paragraph 11(1)(f)(ii) and (iv);

(b)paragraph 21.

(2) Where a regulated activity begins to be carried out at the installation before 2024, the installation's emissions target for a scheme year is the installation's relevant emissions multiplied by the reduction factor for the scheme year.

(3) For the purpose of sub-paragraph (2), the relevant emissions of an installation are—

(a)where a regulated activity begins to be carried out at the installation before 2021, the sum of the installation's reportable emissions in 2021, 2022 and 2023 divided by 3;

(b)where a regulated activity begins to be carried out at the installation in 2021, the sum of the installation's reportable emissions in 2022 and 2023 divided by 2;

(c)where a regulated activity begins to be carried out at the installation in 2022, the installation's reportable emissions in 2023;

(d)where a regulated activity begins to be carried out at the installation in 2023, the installation's reportable emissions in 2024.

(4) Where a regulated activity begins to be carried out at the installation in 2024, the installation's emissions target—

(a)for the 2026 scheme year is the 2026 estimate multiplied by the reduction factor for the 2026 scheme year;

(b)for every other scheme year (the “relevant scheme year”) in the 2026-2030 allocation period is the installation's reportable emissions in the 2025 scheme year multiplied by the reduction factor for the relevant scheme year.

(5) Where a regulated activity begins to be carried out at the installation in the period beginning on 1st January 2025 and ending on 31st October 2025, the installation's emissions target—

(a)for the 2026 scheme year is the 2026 estimate multiplied by the reduction factor for the 2026 scheme year;

(b)for the 2027 scheme year is the 2026 estimate multiplied by the reduction factor for the 2027 scheme year;

(c)for every other scheme year (the “relevant scheme year”) in the 2026-2030 allocation period is the installation's reportable emissions in the 2026 scheme year multiplied by the reduction factor for the relevant scheme year.

(6) In sub-paragraphs (4) and (5), “2026 estimate” means the estimate of the installation's reportable emissions in the 2026 scheme year provided under—

(a)in the case of a hospital-qualifying installation, paragraph 6(3)(b);

(b)in any other case, paragraph 6(6).

(7) For the purpose of this paragraph, the reduction factor for a scheme year set out in column 1 of table E is the value set out in the corresponding entry in column 2.

Table E
Column 1Column 2
Scheme yearReduction factor
20260.8882
20270.8602
20280.8322
20290.8043
20300.7763

(8) In this paragraph, a reference to reportable emissions is a reference to reportable emissions—

(a)verified [F70as satisfactory] in accordance with the Verification Regulation 2018; F71...

[F72(aa)determined under article 45; or]

(b)where relevant, set out in an emissions report accompanied by the declaration referred to in paragraph 11(2)(b)(ii).

(9) This paragraph is subject to paragraph 14.

Emissions targets: calculation of later targets where initial targets based on estimatesU.K.

18.—(1) This paragraph applies where an installation's emission targets for the scheme years in an allocation period are required to be calculated under—

(a)paragraph 16(4) or (5);

(b)paragraph 17(4) or (5).

(2) Paragraph 11(1)(f)(i) and (ii) do not require the installation's hospital or small emitter permit to contain emissions targets for scheme years (the “relevant scheme years”) for which, at the date of issue of the permit, the information required to calculate the emission targets is not available.

(3) As soon as reasonably practicable after the information to calculate the installation's emissions targets for the relevant scheme years becomes available, the regulator must vary the installation's hospital or small emitter permit under paragraph 6 of Schedule 6 by adding the emissions targets.

(4) But sub-paragraph (3) does not apply if the regulator has given a conversion notice to the operator of the installation, the effect of which is that the installation will not be a hospital or small emitter for the relevant scheme years.

Commencement Information

I75Sch. 7 para. 18 in force at 12.11.2020, see art. 2(1)

Emissions targets: hospital or small emitters must not exceed targetsU.K.

19.—(1) The operator of an installation must ensure that the installation's reportable emissions in a scheme year for which the installation is a hospital or small emitter do not exceed the emissions target for that year.

(2) This paragraph is subject to paragraph 14.

Commencement Information

I76Sch. 7 para. 19 in force at 12.11.2020, see art. 2(1)

[F73Capacity increases: application to increase emissions targetsU.K.

19A.(1) Where a capacity increase is put into operation at an installation after the reference date, the operator of the installation may apply to the regulator to increase the installation’s emissions targets for scheme years after the capacity increase is put into operation (including, if the capacity increase is put into operation on or after 1st January 2021, for the scheme year in which the capacity increase is put into operation).

(2) An application may be made to increase emissions targets for scheme years in the 2021-2025 allocation period or the 2026-2030 allocation period (or both).

(3) But an application may not be made to increase an emissions target—

(a)for the 2021 or 2022 scheme year if the emissions target for that year was calculated under paragraph 16(4)(a) or (5)(a) or (b);

(b)for the 2026 or 2027 scheme year if the emissions target for that year was calculated under paragraph 17(4)(a) or (5)(a) or (b).

(4) Nor may an application be made to increase an emissions target—

(a)for the 2021 scheme year unless the application is made on or before 31st March 2022;

(b)for any other scheme year unless the application is made on or before the later of—

(i)the end of the scheme year; and

(ii)where the capacity increase is put into operation in the scheme year, 3 months after the date on which the capacity increase is put into operation.

(5) Subject to sub-paragraph (4), an application to increase emissions targets may be made at any time.

Capacity increases: content of applicationU.K.

19B.(1) For the purpose of an application to increase an installation’s emissions targets, the operator must divide the installation into sub-installations in accordance with Article 10 of the Free Allocation Regulation.

(2) The application must contain the following—

(a)evidence of the capacity increase and the sub-installation to which it relates, including evidence that it has been put into operation and is not temporary;

(b)evidence of any capacity decrease at the installation since the reference date and the sub-installation to which it relates, including, where relevant, evidence that it is temporary;

(c)evidence to enable the combined capacity utilisation factor to be calculated (see paragraph 19F);

(d)where the capacity increase or any capacity decrease relates to a district heating sub-installation or a heat benchmark sub-installation of an installation that consumes or exports measurable heat produced outside the installation, evidence of whether or not the capacity increase or capacity decrease is solely associated with measurable heat produced at the installation.

Capacity increases: grant of applicationU.K.

19C.(1) An application to increase an installation’s emissions targets may be granted only if the regulator considers that—

(a)a capacity increase has been put into operation at the installation;

(b)the capacity increase is not temporary; and

(c)the net change in installed capacity at the installation since the reference date (see paragraph 19D) is greater than zero.

(2) Where the application is granted, the regulator must—

(a)calculate new emissions targets for each scheme year for which the application is made by increasing the existing emissions target for the scheme year by the increase in the emissions target for the scheme year (see paragraph 19E); and

(b)vary the installation’s hospital or small emitter permit under paragraph 6 of Schedule 6 by substituting the new emissions targets for the existing targets.

(3) Except where the installation is a hospital-qualifying installation, if increasing the emissions target for a scheme year would result in an emissions target that exceeds the maximum amount, the emissions target must be increased by such amount as results in an emissions target of the maximum amount.

(4) Where, after calculating new emissions targets and varying the permit under sub-paragraph (2), the regulator considers that, as a result of incorrect or incomplete evidence in the application, either the application would not have been granted or the installation’s emissions targets would not have been increased to the same extent—

(a)the regulator may, for the current and future scheme years, determine that the emissions targets should not have been increased or, as the case may be, recalculate the new emissions targets under sub-paragraph (2)(a); and

(b)if the regulator does either of the things referred to in paragraph (a), the regulator must vary the permit under paragraph 6 of Schedule 6 accordingly.

Capacity increases: net change in installed capacity at installation since reference dateU.K.

19D.(1) The net change in installed capacity at the installation since the reference date must be calculated as follows.

Step 1

Calculate the following for each relevant sub-installation—

the net change in installed capacity at the relevant sub-installation since the reference date x the benchmark for the sub-installation.
Step 2

Add up all calculations done under Step 1.

The net change in installed capacity at the installation since the reference date is the result of Step 2.

(2) For the purposes of sub-paragraph (1)—

(a)the net change in installed capacity at a relevant sub-installation must be determined by taking into account only capacity increases and capacity decreases (other than capacity decreases that are temporary) that relate to the sub-installation since the reference date;

(b)where capacity decreases exceed capacity increases at a sub-installation, the net change in installed capacity must be a negative value;

(c)in calculating the net change in installed capacity at a district heating sub-installation or a heat benchmark sub-installation of an installation that consumes or exports measurable heat produced outside the installation, any capacity increase or capacity decrease that relates to the sub-installation must not be taken into account unless it is solely associated with measurable heat produced at the installation.

(3) In this paragraph, “relevant sub-installation” means—

(a)the sub-installation to which the capacity increase relates;

(b)any other sub-installation to which a capacity decrease at the installation since the reference date relates.

Capacity increases: increase in emissions targets for scheme yearsU.K.

19E.(1) The increase in an installation’s emissions target for each scheme year for which the application is made is NC x CCUF x RF x FYF, where—

NC is the net change in installed capacity at the installation since the reference date (see paragraph 19D);

CCUF is the combined capacity utilisation factor (see paragraph 19F);

RF is the reduction factor for the scheme year;

FYF is the first year factor.

(2) The reduction factor—

(a)for a scheme year set out in column 1 of table D in paragraph 16 is the value set out in the corresponding entry in column 2;

(b)for a scheme year set out in column 1 of table E in paragraph 17 is the value set out in the corresponding entry in column 2.

(3) The first year factor is—

(a)for the scheme year in which the capacity increase is put into operation, (Y-D)/Y;

(b)for any other scheme year, 1.

(4) For the purposes of sub-paragraph (3)—

(a)Y is the number of days in the scheme year;

(b)D is the number of days in the scheme year before the date on which the capacity increase is put into operation.

(5) Where an application is made in respect of two or more capacity increases, for the purpose of calculating the first year factor, the capacity increases must be treated as being put into operation on the date on which the last capacity increase is put into operation.

Capacity increases: combined capacity utilisation factorU.K.

19F.(1) The combined capacity utilisation factor must be calculated as follows.

Step 1

Calculate the following for each sub-installation to which the capacity increase relates—

the capacity increase x the benchmark for the sub-installation x the capacity utilisation factor.
Step 2

Add up all calculations done under Step 1.

Step 3

Calculate the following for each sub-installation to which the capacity increase relates—

the capacity increase x the benchmark for the sub-installation.
Step 4

Add up all calculations done under Step 3.

Step 5

Divide the result of Step 2 by the result of Step 4.

The combined capacity utilisation factor is the result of Step 5.

(2) In calculating the combined capacity utilisation factor, a capacity increase that relates to a district heating sub-installation or a heat benchmark sub-installation of an installation that consumes or exports measurable heat produced outside the installation must not be taken into account unless it is solely associated with measurable heat produced at the installation.

(3) Where an application is made in respect of two or more capacity increases that relate to the same sub-installation, for the purpose of calculating the combined capacity utilisation factor, the calculations under Steps 1 and 3 must be done separately for each such capacity increase as if the capacity increases related to separate sub-installations.

(4) In this paragraph, “capacity utilisation factor”, in relation to a capacity increase, means the expected level of production or consumption, expressed as a proportion of the increase in installed capacity.

Capacity increases: interpretationU.K.

19G.(1) In this paragraph and paragraphs 19A to 19F—

benchmark” means—

(a)

in relation to a sub-installation other than a process emissions sub-installation, the benchmark referred to in Article 16(2) of the Free Allocation Regulation used to determine the preliminary annual number of allowances allocated free of charge in respect of the sub-installation—

(i)

where an application is made to increase an installation’s emissions targets for scheme years in the 2021-2025 allocation period, for scheme years in that allocation period;

(ii)

where an application is made to increase an installation’s emissions targets for scheme years in the 2026-2030 allocation period, for scheme years in that allocation period;

(b)

in relation to a process emissions sub-installation, 0.97;

capacity decrease”, in relation to an installation or a sub-installation, means a decrease in installed capacity as a result of one or more physical changes relating to its technical configuration and functioning;

capacity increase”, in relation to an installation or a sub-installation, means an increase in installed capacity as a result of one or more physical changes relating to its technical configuration and functioning;

district heating sub-installation” has the meaning given in point (5) of Article 2(1) of the Free Allocation Regulation;

fuel benchmark sub-installation” has the meaning given in point (6) of Article 2(1) of the Free Allocation Regulation;

heat benchmark sub-installation” has the meaning given in point (3) of Article 2(1) of the Free Allocation Regulation;

installed capacity” means the maximum capacity—

(a)

in the case of a product benchmark sub-installation, for producing a product;

(b)

in the case of a district heating sub-installation or a heat benchmark sub-installation, for producing measurable heat;

(c)

in the case of a fuel benchmark sub-installation, for consuming fuel;

(d)

in the case of a process emissions sub-installation, for producing the emissions referred to in point (10) of Article 2(1) of the Free Allocation Regulation;

measurable heat” has the meaning given in point (7) of Article 2(1) of the Free Allocation Regulation;

process emissions sub-installation” has the meaning given in point (10) of Article 2(1) of the Free Allocation Regulation;

product benchmark sub-installation” has the meaning given in point (2) of Article 2(1) of the Free Allocation Regulation;

“reference date” must be determined in accordance with sub-paragraphs (2) to (5);

sub-installation” means a district heating sub-installation, a fuel benchmark sub-installation, a heat benchmark sub-installation, a process emissions sub-installation or a product benchmark sub-installation.

(2) Where an application is to increase an installation’s emissions targets for scheme years in the 2021-2025 allocation period, the reference date is—

(a)where a regulated activity began to be carried out at the installation before 2018, 31st December 2018;

(b)where a regulated activity began to be carried out at the installation in 2018, 31st December 2019;

(c)where a regulated activity began to be carried out at the installation in 2019 or 2020, 31st December 2020.

(3) But if the installation’s emissions targets for scheme years in the 2021-2025 allocation period were increased following an application in respect of a previous capacity increase, the reference date is the date on which the last such capacity increase was put into operation.

(4) Where an application is to increase an installation’s emissions targets for scheme years in the 2026-2030 allocation period, the reference date is—

(a)where a regulated activity begins to be carried out at the installation before 2023, 31st December 2023;

(b)where a regulated activity begins to be carried out at the installation in 2023, 31st December 2024;

(c)where a regulated activity begins to be carried out at the installation in 2024 or 2025, 31st December 2025.

(5) But if the installation’s emissions targets for scheme years in the 2026-2030 allocation period were increased following an application in respect of a previous capacity increase, the reference date is the date on which the last such capacity increase was put into operation.

(6) For the purpose of calculating the net change in installed capacity at an installation since the reference date under paragraph 19D or the combined capacity utilisation factor under paragraph 19F, a capacity increase or a capacity decrease at a sub-installation must be expressed in the following units—

(a)if the capacity increase or capacity decrease relates to a product benchmark sub-installation, tonnes of product produced per year;

(b)if the capacity increase or capacity decrease relates to a district heating sub-installation or a heat benchmark sub-installation, terajoules of measurable heat produced per year;

(c)if the capacity increase or capacity decrease relates to a fuel benchmark sub-installation, terajoules of fuel consumed per year;

(d)if the capacity increase or capacity decrease relates to a process emissions sub-installation, tonnes of carbon dioxide equivalent emitted per year.]

Emissions targets: banking overachieved targetU.K.

20.—(1) In this paragraph, an installation's “bankable amount”, in relation to a scheme year, means ET – RE, where—

  • ET is the installation's emissions target for that year;

  • RE is the reportable emissions stated in the installation's emissions report for that year.

(2) But if the installation's emissions target for a scheme year is calculated in accordance with any of the following provisions (emissions targets based on estimates), for the purposes of this paragraph the installation's bankable amount for that scheme year must be treated as zero—

(a)paragraph 16(4)(a);

(b)paragraph 16(5)(a) or (b);

(c)paragraph 17(4)(a);

(d)paragraph 17(5)(a) or (b).

(3) Subject to sub-paragraphs (5) and (6), where an installation's bankable amount for a scheme year (the “scheme year in question”) is greater than zero—

(a)the regulator may increase the installation's emissions target for the following scheme year (the “next scheme year”) by the bankable amount; and

(b)if the regulator does so, the regulator must vary the installation's hospital or small emitter permit under paragraph 6 of Schedule 6 by substituting the increased emissions target for the existing target.

(4) Subject to sub-paragraph (6), where the amount of reportable emissions stated in the installation's emissions report for the scheme year in question is amended following a determination of emissions under article 45, the regulator must—

(a)calculate the bankable amount for the scheme year in question as if RE in sub-paragraph (1) were the amount of reportable emissions for that year as amended following the determination; and

(b)where an increased emissions target for the next scheme year has been substituted under sub-paragraph (3)(b), further vary the permit under paragraph 6 of Schedule 6 by substituting a revised emissions target for that year, based on the revised calculation of the bankable amount under paragraph (a).

(5) Sub-paragraph (3) does not apply if the scheme year in question is—

(a)the 2025 scheme year;

(b)the 2030 scheme year.

(6) Except where the installation is a hospital-qualifying installation, if increasing the emissions target for the next scheme year would result in an emissions target that exceeds the maximum amount, the emissions target must be increased by such amount as results in an emissions target of the maximum amount.

Commencement Information

I77Sch. 7 para. 20 in force at 12.11.2020, see art. 2(1)

Emissions targets: targets for 2026-2030 allocation period for hospital or small emitters in 2021-2025 allocation periodU.K.

21.—(1) This paragraph applies where—

(a)a hospital or small emitter permit is in force for an installation that contains emissions targets for a scheme year in the 2021-2025 allocation period; and

(b)the installation is included in the hospital and small emitter list for 2026-2030.

(2) The regulator must, on or before 31st December 2025—

(a)calculate an emissions target for the installation for each scheme year in the 2026-2030 allocation period; and

(b)vary the installation's hospital or small emitter permit under paragraph 6 of Schedule 6 to include those emissions targets.

(3) But sub-paragraph (2) does not apply if the regulator has given a conversion notice to the operator of the installation (the effect of which is that the installation will not be a hospital or small emitter for the scheme years in the 2026-2030 allocation period).

Commencement Information

I78Sch. 7 para. 21 in force at 12.11.2020, see art. 2(1)

Emissions targets: errorsU.K.

22.—(1) This paragraph applies where the amount of an installation's reportable emissions used to calculate the installation's emission targets (including revised emissions targets under [F74paragraph 19C or 20]) for scheme years in an allocation period is amended following a determination of emissions under article 45.

(2) The regulator may calculate revised emissions targets for the current and future scheme years in the allocation period and, if the regulator does so, the regulator must vary the installation's hospital or small emitter permit under paragraph 6 of Schedule 6 to include those emissions targets.

(3) In calculating revised emissions targets under sub-paragraph (2), the regulator may take account of what revised emissions targets for past scheme years in the allocation period calculated under this paragraph might have been if the determination had been made earlier (but may not calculate revised emissions targets for past years).

(4) In this paragraph—

(a)a reference to reportable emissions used to calculate emissions targets for the 2021-2025 allocation period includes a reference to reportable emissions within the meaning of GGETSR 2012; and

(b)a reference to a determination of emissions under article 45 includes, in the case of reportable emissions referred to in paragraph (a), a reference to a determination of emissions under regulation 44(3) of GGETSR 2012 or Article 70(1) of the Monitoring and Reporting Regulation 2012.

Textual Amendments

Commencement Information

I79Sch. 7 para. 22 in force at 12.11.2020, see art. 2(1)

PART 5 U.K.End of hospital or small emitter status

End of hospital or small emitter status: ceasing to meet criteriaU.K.

23.—(1) Where—

(a)an installation (other than a hospital-qualifying installation) is a hospital or small emitter for any of the 2021, 2022, 2023, 2026, 2027 and 2028 scheme years; and

(b)the regulator considers that the installation's reportable emissions in any of those years exceed the maximum amount,

the regulator must, as soon as reasonably practicable, give a notice (a “conversion notice”) to the operator of the installation.

(2) Where the regulator considers that a hospital-qualifying installation ceases to be an installation that primarily provides services to a hospital in a scheme year (the “relevant scheme year”) for which the installation is a hospital or small emitter, the regulator must, as soon as reasonably practicable, give a notice (a “conversion notice”) to the operator of the installation.

(3) But sub-paragraph (2) does not apply—

(a)where the relevant scheme year is in the 2021-2025 allocation period and the installation was in operation in any of the 2016, 2017 and 2018 scheme years (within the meaning of GGETSR 2012), if—

(i)the installation's reportable emissions in each of those years did not exceed the maximum amount; and

(ii)where the activity referred to in column 1 of the first entry in table C in Schedule 2 (combustion of fuels) was carried out at the installation, the installation's rated thermal input was below 35 megawatts in each of those years.

(b)where the relevant scheme year is in the 2026-2030 allocation period and the installation was in operation in any of the 2021, 2022 and 2023 scheme years, if—

(i)the installation's reportable emissions in each of those years do not exceed the maximum amount; and

(ii)where the activity referred to in column 1 of the first entry in table C in Schedule 2 (combustion of fuels) is carried out at the installation, the installation's rated thermal input is below 35 megawatts in each of those years.

(4) Where a hospital or small emitter permit may be revoked under paragraph 12 of Schedule 6, the regulator may instead of revoking the permit give a notice (a “conversion notice”) to the operator of the installation.

Commencement Information

I80Sch. 7 para. 23 in force at 12.11.2020, see art. 2(1)

Conversion noticesU.K.

24.—(1) A conversion notice must—

(a)set out the grounds for the notice;

(b)state that the installation is not a hospital or small emitter for the scheme year following the year in which the notice is given;

(c)state that the operator must comply with the conditions of a greenhouse gas emissions permit from 1st January (the “date of conversion”) in the scheme year following the year in which the notice is given;

[F75(d)state that, unless the monitoring plan already complies with the Monitoring and Reporting Regulation 2018, the operator must apply to the regulator to vary the monitoring plan so that it does comply with that Regulation.]

(2) Where a conversion notice is given, the regulator must convert, with effect from the date of conversion, the installation's hospital or small emitter permit (if any) into a greenhouse gas emissions permit by varying it under paragraph 6 of Schedule 6 so that the provisions of the permit are replaced by provisions that satisfy the requirements of paragraph 4 of Schedule 6.

[F76(3) Despite sub-paragraph (2)—

(a)where the monitoring plan does not already comply with the Monitoring and Reporting Regulation 2018, the regulator may revoke the permit under paragraph 12 of Schedule 6 instead of converting it if—

(i)the operator fails to apply to the regulator to vary the monitoring plan; or

(ii)the variations applied for are not such that the plan would comply with that Regulation;

(b)the regulator must revoke the permit instead of converting it if the regulator considers that the operator will not be capable of monitoring and reporting the installation’s reportable emissions in accordance with the monitoring and reporting conditions of a greenhouse gas emissions permit.]

(4) When varying a permit, the regulator may make only such variations as the regulator considers necessary in consequence of the installation ceasing to be a hospital or small emitter.

(5) The conversion of the permit does not affect the obligations of the operator under the permit in respect of specified emissions before the date of conversion.

End of hospital or small emitter status: ceasing to meet criteria: publicationU.K.

25.—(1) The regulator must, as soon as reasonably practicable, inform the UK ETS authority about each installation in respect of which a conversion notice is given.

(2) The UK ETS authority must, from time to time, publish the information referred to in sub-paragraph (1).

Commencement Information

I82Sch. 7 para. 25 in force at 12.11.2020, see art. 2(1)

End of hospital or small emitter status: end of allocation periodU.K.

26.—(1) The regulator must, on or before 31st May 2025 give notice to the operator of an installation to which sub-paragraph (2) applies—

(a)stating that the operator must comply with the conditions of a greenhouse gas emissions permit from 1st January 2026; and

[F77(b)stating that, unless the monitoring plan already complies with the Monitoring and Reporting Regulation 2018, the operator must apply to the regulator on or before 30th September 2025 to vary the monitoring plan so that it does comply with that Regulation.]

(2) This sub-paragraph applies to an installation that is a hospital or small emitter for the 2025 scheme year other than an installation that is included in—

(a)the hospital and small emitter list for 2026-2030; or

(b)the ultra-small emitter list for 2026-2030.

(3) Where a notice under sub-paragraph (1) is given, the regulator must convert, with effect from 1st January 2026, the installation's hospital or small emitter permit (if any) into a greenhouse gas emissions permit by varying it under paragraph 6 of Schedule 6 so that the provisions of the permit are replaced by provisions that satisfy the requirements of paragraph 4 of Schedule 6.

[F78(4) Despite sub-paragraph (3)—

(a)where the monitoring plan does not already comply with the Monitoring and Reporting Regulation 2018, the regulator may revoke the permit under paragraph 12 of Schedule 6 instead of converting it if—

(i)the operator fails to apply to the regulator on or before 30th September 2025 to vary the monitoring plan; or

(ii)the variations applied for are not such that the plan would comply with that Regulation;

(b)the regulator must revoke the permit instead of converting it if the regulator considers that the operator will not be capable of monitoring and reporting the installation’s reportable emissions in accordance with the monitoring and reporting conditions of a greenhouse gas emissions permit.]

(5) When varying a permit, the regulator may make only such variations as the regulator considers necessary in consequence of the installation ceasing to be a hospital or small emitter.

(6) The conversion of the permit does not affect the obligations of the operator under the permit in respect of specified emissions before 1st January 2026.

Article 26(5)

SCHEDULE 8U.K.Ultra-small emitters

InterpretationU.K.

1.—(1) In this Schedule, “maximum amount” means 2,499 tonnes of carbon dioxide equivalent.

(2) For the purposes of this Order, in determining whether or not an installation's reportable emissions exceed the maximum amount, emissions from biomass must be excluded.

Commencement Information

I84Sch. 8 para. 1 in force at 12.11.2020, see art. 2(1)

Ultra-small emitter statusU.K.

2.—(1) This paragraph applies to determine whether or not an installation is an ultra-small emitter for a scheme year.

(2) An installation is an ultra-small emitter for the scheme years in the 2021-2025 allocation period if the installation is included in the list (the “ultra-small emitter list for 2021-2025”) of installations to be excluded from the EU ETS under Article 27a of the Directive from 1st January 2021 published for the purposes of the EU ETS on the website of SEPA on 28th May 2020 M27.

(3) But if a notice under paragraph 7(2) is given to the operator of the installation stating that the installation is not an ultra-small emitter for a scheme year in the 2021-2025 allocation period, the installation is not an ultra-small emitter for that scheme year or subsequent scheme years in the allocation period.

(4) An installation is an ultra-small emitter for the scheme years in the 2026-2030 allocation period if the installation is included in the ultra-small emitter list for 2026-2030.

(5) But if a notice under paragraph 7(2) is given to the operator of the installation stating that the installation is not an ultra-small emitter for a scheme year in the 2026-2030 allocation period, the installation is not an ultra-small emitter for that scheme year or subsequent scheme years in the allocation period.

Commencement Information

I85Sch. 8 para. 2 in force at 12.11.2020, see art. 2(1)

Marginal Citations

M27The ultra-small emitter list for 2021-2025 can be accessed at www.sepa.org.uk/media/504726/uk-article-27-27a-installation-list.pdf. A copy of the list may be inspected at the Department for Business, Energy and Industrial Strategy, 1 Victoria Street, London SW1H 0ET; the Industrial Pollution and Radiochemical Inspectorate, Department for Agriculture, Environment and Rural Affairs, Klondyke Building, Cromac Avenue, Belfast BT7 2JA; the Scottish Government Directorate of Energy & Climate Change, Fourth Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow G2 8LU; and the offices of the Welsh Government, Cathays Park 2, Cathays Park, Cardiff CF10 2NQ.

Obtaining ultra-small emitter status for 2026-2030 allocation periodU.K.

3.—(1) The operator of an installation who wishes to apply for the installation to be an ultra-small emitter for the scheme years in the 2026-2030 allocation period must submit the following to the regulator—

(a)details of the installation, including details of any permit in force;

(b)evidence that the installation meets the relevant condition.

(2) An application—

(a)may not be made before 1st April 2024;

(b)must be made on or before 30th June 2024.

(3) After receiving an application, the regulator must on or before 30th September 2024

(a)make a preliminary assessment of whether or not the installation meets the relevant condition; and

(b)send the preliminary assessment and the reasons for it to the UK ETS authority.

(4) The relevant condition is that—

(a)a regulated activity begins to be carried out at the installation on or before 1st January 2021; and

(b)the installation's reportable emissions in each of the 2021, 2022 and 2023 scheme years do not exceed the maximum amount.

(5) After receiving the preliminary assessment—

(a)the UK ETS authority must make a final assessment of whether or not the installation meets the relevant condition; and

(b)if the UK ETS authority considers that the installation meets the relevant condition, the UK ETS authority must include the installation in a list (the “ultra-small emitter list for 2026-2030”).

(6) The UK ETS authority must publish the ultra-small emitter list for 2026-2030 on or before 30th April 2025.

(7) Evidence of an installation's reportable emissions may not be taken into account for the purposes of assessing whether or not an installation meets the relevant condition unless the evidence is—

(a)verified [F79as satisfactory] in accordance with the Verification Regulation 2018; or

(b)where relevant, in an emissions report accompanied by the declaration referred to in paragraph 11(2)(b)(ii) of Schedule 7.

(8) An application may not be made under this paragraph and paragraph 5 of Schedule 7.

Textual Amendments

Commencement Information

I86Sch. 8 para. 3 in force at 12.11.2020, see art. 2(1)

Obtaining ultra-small emitter status for 2026-2030 allocation period: modifications to Verification Regulation 2018 for ultra-small emitters in 2021-2025 allocation periodU.K.

4.—(1) For the purposes of paragraph 3(7)(a), where an installation is included in the ultra-small emitter list for the 2021-2025 allocation period, the Verification Regulation 2018 has effect with the following modifications.

(2) References in the Verification Regulation 2018—

(a)to the operator's report or emission report are to be read as references to the evidence of the installation's reportable emissions provided to the verifier by the operator for verification and intended to be submitted under paragraph 3(1)(b);

(b)to the monitoring plan or the monitoring plan approved by the regulator are to be read as references to the appropriate monitoring plan referred to in paragraph 5, including any modifications to the plan made under Article 14 of the Monitoring and Reporting Regulation 2018, as applied by paragraph 5(4) of this Schedule (even though such modifications do not require the approval of the regulator: see paragraph 5(5)).

F80(3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(4) Article 3(13)(a) is to be read as if “the permit and” were omitted.

(5) Article 7 is to be read as if—

(a)in paragraph 4—

[F81(i)in point (a) the words from “and meets the requirements” to the end were omitted;]

(ii)in point (b) “the permit and” were omitted;

(b)in paragraph 5 the reference to non-compliance with the Monitoring and Reporting Regulation 2018 were a reference to non-compliance with the provisions of that Regulation referred to in paragraph 5(4) to (6) of this Schedule;

(c)paragraph 6 were omitted.

(6) Article 10(1) is to be read as if—

(a)point (a) were omitted;

(b)in point (b) “as well as any other relevant versions of the monitoring plan approved by the regulator, including evidence of the approval” were omitted;

(c)points [F82(c) and] (l) to (n) were omitted.

(7) Article 11 is to be read as if paragraph 4(c) were omitted.

(8) Article 17 is to be read as if paragraph 4 were omitted.

(9) Article 18(1) is to be read as if—

(a)the second subparagraph were omitted;

(b)in the third subparagraph for “is not able to obtain such approval in time” there were substituted “ uses methods other than those referred to in the first subparagraph ”.

(10) Article 19(1) is to be read as if for “Implementing Regulation (EU) 2018/2066” there were substituted “ the monitoring plan ”.

(11) Article 21(1) is to be read as if after “verification process” there were inserted “ but at least once during the 2021-2025 allocation period (as defined in the Greenhouse Gas Emissions Trading Scheme Order 2020) ”.

(12) Article 22 is to be read as if—

(a)references to non-compliance with the Monitoring and Reporting Regulation 2018 were references to non-compliance with the provisions of that Regulation referred to in paragraph 5(4) to (6) of this Schedule;

(b)in paragraph 1 in the third subparagraph “notify the regulator and” were omitted.

(13) Article 27 is to be read as if—

(a)references to non-compliance with the Monitoring and Reporting Regulation 2018 were references to non-compliance with the provisions of that Regulation referred to in paragraph 5(4) to (6) of this Schedule;

(b)in paragraph 3—

(i)point (n) were omitted;

(ii)for point (p) there were substituted—

(p)a confirmation whether the method used to complete the data gap pursuant to the last subparagraph of Article 18(1) is conservative and whether it does or does not lead to material misstatements;.

(14) Article 29(1) is to be read as if—

(a)the reference to the verification report related to the previous monitoring period were a reference to—

(i)the verification report under [F83Commission Implementing Regulation (EU) 2018/2067 (as it had effect in EU law)] in respect of the scheme year (within the meaning of GGETSR 2012) beginning on 1st January 2020; or

(ii)where the operator has previously provided evidence of the installation's reportable emissions in the [F842021-2025] allocation period to the verifier for verification for the purposes of submission under paragraph 3(1)(b) of this Schedule, the verifier's last report under the Verification Regulation 2018 (as modified by this paragraph) on that evidence;

(b)“according to the requirements on the operator referred to in Article 69(4) of Implementing Regulation (EU) 2018/2066, where relevant” were omitted;

(c)“pursuant to Article 69(4) of Implementing Regulation (EU) 2018/2066” were omitted.

(15) The Verification Regulation 2018 is to be read as if Articles 30 to 32 were omitted.

Duty to monitor reportable emissions, etc.U.K.

5.—(1) Where an installation is an ultra-small emitter for a scheme year, the operator of the installation must monitor the installation's reportable emissions in the scheme year in accordance with the appropriate monitoring plan.

(2) The appropriate monitoring plan is—

(a)the monitoring plan approved in relation to the installation under F85... the Monitoring and Reporting Regulation 2018 for the 2025 scheme year, including—

(i)any modifications approved by the regulator in that scheme year; and

(ii)any modifications that are not significant (within the meaning of Article 15(3) of that Regulation) notified to the regulator on or before 31st December 2025; or

(b)if there is no such monitoring plan, the monitoring plan approved in relation to the installation under F85... the Monitoring and Reporting Regulation 2012 for the purposes of the EU ETS for the scheme year (within the meaning of GGETSR 2012) beginning on 1st January 2020, including—

(i)any modifications approved by the regulator in that scheme year; and

(ii)any modifications that are not significant (within the meaning of Article 15(3) of that Regulation) notified to the regulator on or before 31st December 2020.

(3) Subject to sub-paragraphs (4) to (6), where an installation is an ultra-small emitter for a scheme year, the Monitoring and Reporting Regulation 2018 does not apply to the monitoring or reporting of emissions of greenhouse gases from the installation in the scheme year.

(4) Article 14 of the Monitoring and Reporting Regulation 2018 applies to the operator of an installation that is an ultra-small emitter for a scheme year, but is to be read as if—

(a)references to the monitoring plan were references to the appropriate monitoring plan;

(b)in paragraph 1 “, and whether the monitoring methodology can be improved” were omitted;

(c)in paragraph 2—

(i)after “the following situations” there were inserted “ and those referred to in Article 15(3)(c), (f) and (i) ”;

(ii)points (b) and (d) to (f) were omitted.

(5) Any modifications to the appropriate monitoring plan under Article 14 of the Monitoring and Reporting Regulation 2018 must be made in accordance with the provisions of that Regulation; but this sub-paragraph does not require—

(a)the operator to give notice of the modifications to the regulator;

(b)the regulator to approve the modifications;

(c)the regulator to assess whether a monitoring methodology is technically feasible or would incur unreasonable costs.

(6) Where the appropriate monitoring plan is modified under Article 14 of the Monitoring and Reporting Regulation 2018, Article 16 of that Regulation applies in relation to the modifications, but is to be read as if—

(a)paragraphs 1 and 2 were omitted;

(b)in paragraph 3—

(i)references to the monitoring plan were references to the appropriate monitoring plan;

(ii)points (c) and (d) were omitted;

(iii)in point (e) “in accordance with paragraph 2 of this Article” were omitted.

(7) Where the appropriate monitoring plan is modified under Article 14 of the Monitoring and Reporting Regulation 2018, sub-paragraph (1) of this paragraph has effect as if the reference to the appropriate monitoring plan included a reference to the plan as modified.

Textual Amendments

Commencement Information

I88Sch. 8 para. 5 in force at 12.11.2020, see art. 2(1)

Reportable emissions must not exceed maximum amountU.K.

6.  If an installation's reportable emissions in a scheme year for which the installation is an ultra-small emitter exceed the maximum amount, the operator of the installation must give notice to the regulator on or before 31st March in the following year.

Commencement Information

I89Sch. 8 para. 6 in force at 12.11.2020, see art. 2(1)

End of ultra-small emitter status: ceasing to meet criteriaU.K.

7.—(1) This paragraph applies where—

(a)an installation is an ultra-small emitter for any of the 2021, 2022, 2023, 2026, 2027 and 2028 scheme years; and

(b)the regulator considers that the installation's reportable emissions in any of those years (the “excess year”) exceed the maximum amount.

(2) Subject to sub-paragraph (7), the regulator must, as soon as reasonably practicable, give a notice to the operator of the installation.

(3) The notice must—

(a)set out the grounds for the notice;

(b)state that the installation is not an ultra-small emitter—

(i)where the notice is given in the scheme year following the excess year, for the scheme year following the scheme year in which the notice is given;

(ii)where the notice is given after the scheme year following the excess year, for the scheme year in which the notice is given;

(c)state that the operator must—

(i)apply for a greenhouse gas emissions permit; and

(ii)comply with the conditions of the permit—

(aa)where paragraph (b)(i) applies, from 1st January in the scheme year following the year in which the notice is given; or

(bb)where paragraph (b)(ii) applies, from no later than the date (the “relevant date”) set out in the notice.

(4) But the notice must also state that, where sub-paragraph (5) applies, the operator must apply for a hospital or small emitter permit and comply with the requirements of that permit, instead of a greenhouse gas emissions permit.

(5) This sub-paragraph applies where—

(a)the operator within 14 days of the date of the notice—

(i)gives notice to the regulator that the operator prefers to comply with the conditions of a hospital or small emitter permit instead of a greenhouse gas emissions permit; and

(ii)submits evidence to the regulator that the installation is not an ineligible installation for the purposes of paragraph 4 of Schedule 7; and

(b)the regulator gives notice to the operator that the regulator considers that the installation is not an ineligible installation.

(6) Where sub-paragraph (3)(b)(ii) applies, although the installation is not an ultra-small emitter for the scheme year in which the notice is given (see paragraph 2), the operator—

(a)must comply with paragraph 5 in respect of the period beginning on 1st January in the scheme year in which the notice is given and ending on the earlier of—

(i)the day before a permit for the installation comes into force; and

(ii)the relevant date;

(b)is not liable to a civil penalty under article 50 in respect of that period (but is liable to a civil penalty under article 60).

(7) Sub-paragraph (2) does not apply where—

(a)it is not possible for the notice to be given in the same allocation period as the excess year; or

(b)although it is possible for the notice to be given in the same allocation period as the excess year, the regulator considers that it would not be reasonable to expect the operator to apply for a permit before the end of the allocation period.

Commencement Information

I90Sch. 8 para. 7 in force at 12.11.2020, see art. 2(1)

End of ultra-small emitter status: publicationU.K.

8.—(1) The regulator must, as soon as reasonably practicable, inform the UK ETS authority about—

(a)each installation in respect of which a notice under paragraph 7(2) is given; and

(b)where relevant, whether the operator of the installation applied for a greenhouse gas emissions permit or a hospital or small emitter permit.

(2) The UK ETS authority must, from time to time, publish the information referred to in sub-paragraph (1).

Commencement Information

I91Sch. 8 para. 8 in force at 12.11.2020, see art. 2(1)

Article 34HA

[F86SCHEDULE 8AU.K.Free allocation for former hospital or small emitters and ultra-small emitters

InterpretationU.K.

1.  In this Schedule—

eligible scheme year” means—

(a)

the first eligible scheme year;

(b)

any subsequent scheme year in the relevant allocation period;

first eligible scheme year” means—

(a)

if the relevant notice is a conversion notice under paragraph 23 of Schedule 7, the scheme year following the year in which the conversion notice is given;

(b)

if the relevant notice is a notice under paragraph 7 of Schedule 8—

(i)

where the notice is given in the scheme year following the excess year (as defined in sub-paragraph (1) of that paragraph), the scheme year following the year in which the notice is given;

(ii)

where the notice is given after the scheme year following the excess year, the scheme year in which the relevant date (as defined in sub-paragraph (3)(c)(ii) of that paragraph) falls;

relevant allocation period” means the allocation period that the first eligible scheme year is in;

relevant notice” has the meaning given in paragraph 2(a);

sub-installation” has the same meaning as in the Free Allocation Regulation.

ApplicationU.K.

2.  This Schedule applies to an installation if—

(a)the regulator gives to the operator of the installation either of the following notices (in either case, the “relevant notice”)—

(i)a conversion notice under paragraph 23 of Schedule 7;

(ii)except where paragraph 7(5) of Schedule 8 applies, a notice under paragraph 7 of that Schedule; and

(b)the UK ETS authority informed the regulator under Article 15a(4) of the Free Allocation Regulation that an application for free allocation in the relevant allocation period in respect of the installation was valid.

Monitoring methodology plan to be submitted for approvalU.K.

3.(1) If the operator of the installation wants free allocation in respect of the installation for eligible scheme years, the operator must, within 2 months after the date on which the relevant notice is given, submit to the regulator the monitoring methodology plan previously submitted under the Free Allocation Regulation together with either—

(a)any modifications necessary to ensure that the plan complies with Article 8 of, and Annex 6 to, that Regulation; or

(b)a statement that no such modifications are necessary.

(2) Where the monitoring methodology plan and any modifications or a statement are submitted under sub-paragraph (1), the plan (with any modifications) must be treated as if it had been submitted to the regulator for approval under Article 8 of the Free Allocation Regulation.

Calculation and approval of final allocationU.K.

4.(1) This paragraph applies where—

(a)either—

(i)the installation’s hospital or small emitter permit is converted into a greenhouse gas emissions permit; or

(ii)a greenhouse gas emissions permit is issued for the installation; and

(b)a monitoring methodology plan is approved in relation to the installation under Article 8 of the Free Allocation Regulation.

(2) The regulator must as soon as reasonably practicable—

(a)calculate the final annual number of allowances to be allocated in respect of the installation and of each sub-installation of the installation for each eligible scheme year;

(b)send the calculation to the UK ETS authority.

(3) The final annual number of allowances to be allocated in respect of a sub-installation for an eligible scheme year is the preliminary annual number of allowances to be allocated for the scheme year calculated under Article 16 of the Free Allocation Regulation (including any corrections required under Article 16(11)) multiplied by the reduction factor for the scheme year (as defined in Article 18(11) of the Free Allocation Regulation).

(4) But where the relevant notice is a notice under paragraph 7 of Schedule 8 and the first eligible scheme year is the scheme year referred to in paragraph (b)(ii) of the definition of that term in paragraph 1 of this Schedule, the final annual number of allowances to be allocated in respect of a sub-installation for the first eligible scheme year is the number calculated under sub-paragraph (3) of this paragraph multiplied by D/Y, where—

  • D is the number of days in the first eligible scheme year after the date on which the installation’s greenhouse gas emissions permit comes into force;

  • Y is the number of days in the first eligible scheme year.

(5) The final annual number of allowances to be allocated in respect of an installation for an eligible scheme year is the sum of the final annual number of allowances to be allocated in respect of all sub-installations of the installation for the scheme year.

(6) On receipt of the calculation, the UK ETS authority must as soon as reasonably practicable—

(a)approve the final annual number of allowances to be allocated in respect of the installation, making any corrections to the calculation that the UK ETS authority considers appropriate;

(b)inform the regulator accordingly.

(7) The regulator must give notice to the operator of the final annual number of allowances approved under sub-paragraph (6).

(8) For the purpose of the calculations referred to in sub-paragraphs (3) to (5), the number of allowances to be allocated in respect of sub-installations and installations must be expressed as the nearest integer, taking 0.5 as nearest to the previous integer.

Modifications to Activity Level Changes RegulationU.K.

5.(1) Where an installation to which this Schedule applies becomes an FA installation, the Activity Level Changes Regulation has effect with the following modifications.

(2) Article 3 is to be read as if—

(a)in paragraph 1 for “In 2021, this report” there were substituted “In the first eligible scheme year (within the meaning of Schedule 8A to the UK ETS Order), this report”;

(b)in paragraph 3 for “on or before 30 June in the 2021 scheme year” there were substituted “on or before 31 March in the first eligible scheme year (or, if later, within 3 months after the date on which the final annual number of allowances to be allocated in respect of the installation is approved under paragraph 4(6) of Schedule 8A to the UK ETS Order)”.]

Article 74(1)

SCHEDULE 9U.K.Appeals to Scottish Land Court

1.—(1) A person who wishes to appeal to the Scottish Land Court under article 70 against a decision of the regulator [F87or the registry administrator (in either case, the “respondent”)] must—U.K.

(a)send the appropriate form to the Scottish Land Court together with the documents referred to in sub-paragraph (2);

(b)at the same time, send a copy of that form to the [F88respondent] together with copies of the documents referred to in sub-paragraph (2)(a) and (f).

(2) The documents are—

(a)a statement of the grounds of appeal;

(b)a copy of any relevant application;

(c)a copy of any relevant plan;

(d)a copy of any relevant correspondence between the appellant and the [F89respondent];

(e)a copy of any notice (or particulars of any deemed refusal) which is the subject matter of the appeal;

(f)a statement indicating whether the appellant wishes the appeal to be—

(i)in the form of a hearing; or

(ii)to be disposed of on the basis of written representations.

(3) An appeal to the Scottish Land Court may be made on one or more of the following grounds—

(a)the decision or notice was based on an error of fact;

(b)the decision or notice was wrong in law;

(c)the decision or notice was unreasonable for any other reason (including that the amount of a penalty was unreasonable);

(d)any other reason.

(4) In this Schedule—

appropriate form” has the meaning given in rule 3 of the Rules of the Scottish Land Court Order 2014 M28;

decision” includes a deemed refusal under this Order.

Textual Amendments

Commencement Information

I92Sch. 9 para. 1 in force at 12.11.2020, see art. 2(1)

Marginal Citations

2.—(1) Subject to sub-paragraph (2), the appropriate form must be sent to the Scottish Land Court before the expiry of the period of 28 days beginning with the date of the decision.U.K.

(2) The Scottish Land Court may accept the appropriate form after the expiry of that period where satisfied that there was a good reason for the failure to bring the appeal in time.

Commencement Information

I93Sch. 9 para. 2 in force at 12.11.2020, see art. 2(1)

3.—(1) The Scottish Land Court may determine an appeal, or any part of an appeal, on the basis of written representations and without a hearing where—U.K.

(a)the parties agree; or

(b)the Scottish Land Court considers it can determine the matter justly without a hearing.

(2) The Scottish Land Court must not determine the appeal without a hearing without first giving the parties notice of its intention to do so, and an opportunity to make written representations as to whether there should be a hearing.

Commencement Information

I94Sch. 9 para. 3 in force at 12.11.2020, see art. 2(1)

4.—(1) The [F90respondent] must, within 16 days of receipt of the copy of the appropriate form, give notice of it to any person who appears to the [F90respondent] to have a particular interest in the appeal (“interested party”).U.K.

(2) A notice under sub-paragraph (1) must—

(a)state that an appeal has been initiated;

(b)state the name of the appellant;

(c)describe the decision or notice to which the appeal relates;

(d)state that, if a hearing is to be held wholly or partly in public, an interested party will be notified of the date, time and location of the hearing;

(e)state that an interested party may request to be heard at a hearing.

(3) An interested party may request the [F90respondent] to provide the interested party with a copy of the documents set out in paragraph 1(2) only for the purposes of the appeal.

(4) Where a request is made under sub-paragraph (3), the [F90respondent] must provide the documents to the interested party as soon as reasonably practicable.

(5) An interested party may—

(a)make representations to the Scottish Land Court in relation to the appeal;

(b)be heard at a hearing in relation to the appeal.

(6) The representations by an interested party must be made within 16 days of the date of the notice under sub-paragraph (1).

(7) The Scottish Land Court must provide a copy of any representations to the parties.

(8) The [F90respondent] must, within 8 days of sending a notice under sub-paragraph (1), give notice to the Scottish Land Court of the persons to whom and the date on which the notice was sent.

(9) If an appeal is withdrawn, the [F90respondent] must give notice to all interested parties about the withdrawal.

Textual Amendments

Commencement Information

I95Sch. 9 para. 4 in force at 12.11.2020, see art. 2(1)

Article74(2)

SCHEDULE 10 U.K.Appeals to Planning Appeals Commission (Northern Ireland)

1.—(1) A person who wishes to appeal to the Planning Appeals Commission under article 70 against a decision of the regulator [F91or the registry administrator (in either case, the “respondent”)] must give to the Planning Appeals Commission—U.K.

(a)written notice of the appeal; and

(b)a statement of the grounds of appeal.

(2) The notice of appeal must be accompanied by any fee for the appeal prescribed in regulations made under section 223(7)(b) of the Planning Act (Northern Ireland) 2011; and for that purpose section 223(7)(b) has effect as if the reference to an appeal under that Act included a reference to an appeal under this Order.

(3) The Planning Appeals Commission must as soon as reasonably practicable send a copy of the notice of appeal and the statement of grounds to the [F92respondent].

Textual Amendments

Commencement Information

I96Sch. 10 para. 1 in force at 12.11.2020, see art. 2(1)

2.  A notice of appeal under paragraph 1 must be given before the expiry of the period of 47 days beginning with the date on which the decision of the [F93respondent] takes effect.U.K.

Textual Amendments

Commencement Information

I97Sch. 10 para. 2 in force at 12.11.2020, see art. 2(1)

3.—(1) An appellant may withdraw an appeal by giving notice to the Planning Appeals Commission.U.K.

(2) If an appellant withdraws an appeal, the Planning Appeals Commission must give notice to the [F94respondent] of the withdrawal as soon as reasonably practicable.

Textual Amendments

Commencement Information

I98Sch. 10 para. 3 in force at 12.11.2020, see art. 2(1)

4.—(1) The Planning Appeals Commission must determine the appeal; and section 204(1), (3) and (4) of the Planning Act (Northern Ireland) 2011 apply in relation to the determination of the appeal as they apply in relation to the determination of an appeal in accordance with that Act.U.K.

(2) The Planning Appeals Commission must—

(a)determine the process for determining the appeal; and

(b)when doing so, take into account any requests by either party to the appeal.

Commencement Information

I99Sch. 10 para. 4 in force at 12.11.2020, see art. 2(1)

Article 77

SCHEDULE 11U.K.Transitional provisions: installations

Permits under GGETSR 2012U.K.

1.—(1) This paragraph applies to a permit within the meaning of GGETSR 2012 that immediately before this Schedule comes into force authorises a regulated activity to be carried out at an installation.

(2) But this paragraph does not apply to a permit—

(a)in respect of which an application under regulation 13 of GGETSR 2012 for the surrender of the permit has been made but has yet to be determined;

(b)that is due, in accordance with provision made under GGETSR 2012, to be surrendered or revoked; or

(c)that authorises a regulated activity to be carried out at an installation included in the ultra-small emitter list for 2021-2025.

(3) Where the installation is included in the hospital and small emitter list for 2021-2025, the regulator must—

(a)convert the permit into a hospital or small emitter permit the provisions of which satisfy the requirements of paragraph 11 of Schedule 7 and that authorises the regulated activity to be carried out at the installation from 1st January 2021; and

(b)give notice of the conversion to the operator of the installation.

(4) In any other case, the regulator must—

(a)convert the permit into a greenhouse gas emissions permit the provisions of which satisfy the requirements of paragraph 4 of Schedule 6 and that authorises the regulated activity to be carried out at the installation from 1st January 2021; and

(b)give notice of the conversion to the operator of the installation.

(5) When converting a permit under sub-paragraph (3) or (4), the regulator may make only such changes to the operator's obligations under the permit as the regulator considers necessary to convert the permit into a greenhouse gas emissions permit or, as the case may be, a hospital or small emitter permit.

(6) But sub-paragraph (5) does not prevent the regulator correcting errors.

(7) When converting a permit under sub-paragraph (4), the regulator may include under paragraph 4(2)(d) of Schedule 6 a condition to give proper effect to Article 69(4) of the Monitoring and Reporting Regulation 2018 that requires the operator to submit a report to the regulator relating to non-conformities or recommendations for improvements stated in a verification report under [F95Commission Implementing Regulation (EU) 2018/2067 (as it had effect in EU law)] in respect of the scheme year (within the meaning of GGETSR 2012) beginning on 1st January 2020.

(8) The conversion of a permit under sub-paragraph (3) or (4) does not affect the operator's obligations under the permit in respect of specified emissions before 1st January 2021 (and GGETSR 2012 continue to apply in relation to such obligations).

(9) A permit that is converted under this paragraph continues in force as if issued under this Order until cancelled, surrendered or revoked under this Order.

Textual Amendments

Commencement Information

I100Sch. 11 para. 1 in force at 12.11.2020, see art. 2(1)

Applications for permits, etc. under GGETSR 2012U.K.

2.—(1) An application under regulation 10 of GGETSR 2012 for a permit for an installation that is made to the regulator before 1st January 2021, but not determined before that date—

(a)where the installation is included in the hospital and small emitter list for 2021-2025, must be treated as an application for a hospital or small emitter permit under paragraph 7 of Schedule 7 to this Order;

(b)in any other case (except where the installation is included in the ultra-small emitter list for 2021-2025), must be treated as an application for a greenhouse gas emissions permit under paragraph 1 of Schedule 6 to this Order.

(2) An application under regulation 11 of GGETSR 2012 to vary a permit that is made to the regulator before 1st January 2021, but not determined before that date, must be treated as an application to vary the permit under paragraph 6 of Schedule 6 to this Order.

(3) An application under regulation 12 of GGETSR 2012 for the transfer of a permit that is made to the regulator before 1st January 2021, but not determined before that date, must be treated as an application to transfer the permit under paragraph 7 of Schedule 6 to this Order.

[F96(4) This sub-paragraph applies where—

(a)a permit for an installation is converted into a greenhouse gas emissions permit under paragraph 1(4);

(b)the monitoring methodology plan approved in respect of the installation under Article 8 of the Free Allocation Regulation is contained in the permit by virtue of paragraph 4(1)(hb) or (7) of Schedule 6; and

(b)a significant modification of the monitoring methodology plan is notified for approval under Article 9 of the Free Allocation Regulation on or before 31st December 2020, but not approved before that date.

(5) Where sub-paragraph (4) applies, the notification of the significant modification must be treated as an application to vary the permit under paragraph 6 of Schedule 6 to make the significant modification.]

Textual Amendments

Commencement Information

I101Sch. 11 para. 2 in force at 12.11.2020, see art. 2(1)

Schedule does not apply to permits for relevant Northern Ireland electricity generators, etc.U.K.

3.—(1) This Schedule does not apply to—

(a)relevant Northern Ireland permits; or

(b)applications for, or in relation to, relevant Northern Ireland permits.

(2) In this paragraph, “relevant Northern Ireland permit” means a permit within the meaning of GGETSR 2012 that authorises a regulated activity to be carried out at a relevant Northern Ireland electricity generator.

Commencement Information

I102Sch. 11 para. 3 in force at 12.11.2020, see art. 2(1)

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources