The M42 Junction 6 Development Consent Order 2020

Changes to legislation:

There are currently no known outstanding effects for the The M42 Junction 6 Development Consent Order 2020. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Information:

You searched for provisions that are applicable to England. The matching provisions are highlighted below. Where no highlighting is shown the matching result may be contained within a footnote.

  1. Introductory TextNext Match

  2. PART 1 PRELIMINARYPrevious MatchNext Match

    1. 1.Citation and commencementPrevious MatchNext Match

    2. 2.InterpretationPrevious MatchNext Match

  3. PART 2 PRINCIPAL POWERSPrevious MatchNext Match

    1. 3.Development consent etc. granted by the OrderPrevious MatchNext Match

    2. 4.Maintenance of authorised developmentPrevious MatchNext Match

    3. 5.Maintenance of drainage worksPrevious MatchNext Match

    4. 6.Limits of deviationPrevious MatchNext Match

    5. 7.Benefit of OrderPrevious MatchNext Match

    6. 8.Consent to transfer benefit of OrderPrevious MatchNext Match

    7. 9.Application of the 1990 ActPrevious MatchNext Match

    8. 10.Application of the Community Infrastructure Levy Regulations 2010Previous MatchNext Match

    9. 11.Planning permissionPrevious MatchNext Match

  4. PART 3 STREETSPrevious MatchNext Match

    1. 12.Street worksPrevious MatchNext Match

    2. 13.Application of the 1991 ActPrevious MatchNext Match

    3. 14.Construction and maintenance of new, altered or diverted streets and other structuresPrevious MatchNext Match

    4. 15.Classification of roads etc.Previous MatchNext Match

    5. 16.Temporary stopping up and restriction of use of streetsPrevious MatchNext Match

    6. 17.Permanent stopping up, restriction of use of streets, public rights of way and private means of accessPrevious MatchNext Match

    7. 18.Access to worksPrevious MatchNext Match

    8. 19.Clearways, prohibitions and restrictionsPrevious MatchNext Match

    9. 20.Traffic regulationPrevious MatchNext Match

  5. PART 4 SUPPLEMENTAL POWERSPrevious MatchNext Match

    1. 21.Discharge of waterPrevious MatchNext Match

    2. 22.Protective work to buildingsPrevious MatchNext Match

    3. 23.Authority to survey and investigate the landPrevious MatchNext Match

  6. PART 5 POWERS OF ACQUISITION AND POSSESSION OF LANDPrevious MatchNext Match

    1. 24.Compulsory acquisition of landPrevious MatchNext Match

    2. 25.Compulsory acquisition of land – incorporation of the mineral codePrevious MatchNext Match

    3. 26.Time limit for exercise of authority to acquire land compulsorilyPrevious MatchNext Match

    4. 27.Compulsory acquisition of rights and restrictive covenantsPrevious MatchNext Match

    5. 28.Private rights over landPrevious MatchNext Match

    6. 29.Modification of Part 1 of the 1965 ActPrevious MatchNext Match

    7. 30.Application of the 1981 ActPrevious MatchNext Match

    8. 31.Acquisition of subsoil or airspace onlyPrevious MatchNext Match

    9. 32.Rights under or over streetsPrevious MatchNext Match

    10. 33.Temporary use of land for carrying out the authorised developmentPrevious MatchNext Match

    11. 34.Temporary use of land for maintaining the authorised developmentPrevious MatchNext Match

    12. 35.Statutory undertakersPrevious MatchNext Match

    13. 36.Apparatus and rights of statutory undertakers in stopped up streetsPrevious MatchNext Match

    14. 37.Crown rightsPrevious MatchNext Match

    15. 38.Recovery of costs of new connectionsPrevious MatchNext Match

  7. PART 6 OPERATIONSPrevious MatchNext Match

    1. 39.Felling or lopping of trees and removal of hedgerowsPrevious MatchNext Match

  8. PART 7 MISCELLANEOUS AND GENERALPrevious MatchNext Match

    1. 40.Application of landlord and tenant lawPrevious MatchNext Match

    2. 41.Operational land for purposes of the 1990 ActPrevious MatchNext Match

    3. 42.Defence to proceedings in respect of statutory nuisancePrevious MatchNext Match

    4. 43.Protection of interestsPrevious MatchNext Match

    5. 44.Certification of plans and documents, etc.Previous MatchNext Match

    6. 45.Service of noticesPrevious MatchNext Match

    7. 46.No double recoveryPrevious MatchNext Match

    8. 47.ArbitrationPrevious MatchNext Match

    9. 48.Removal of human remainsPrevious MatchNext Match

    10. 49.Application, disapplication and modification of legislative provisionsPrevious MatchNext Match

    11. 50.Amendment of local legislationPrevious MatchNext Match

  9. SignaturePrevious MatchNext Match

  10. SCHEDULES

    1. SCHEDULE 1Previous MatchNext Match

      AUTHORISED DEVELOPMENTPrevious MatchNext Match

    2. SCHEDULE 2Previous MatchNext Match

      REQUIREMENTSPrevious MatchNext Match

      1. PART 1 REQUIREMENTSPrevious MatchNext Match

        1. 1.InterpretationPrevious MatchNext Match

        2. 2.Time limitsPrevious MatchNext Match

        3. 3.Detailed designPrevious MatchNext Match

        4. 4.Outline Environmental Management PlanPrevious MatchNext Match

        5. 5.LandscapingPrevious MatchNext Match

        6. 6.Contaminated land and groundwaterPrevious MatchNext Match

        7. 7.Protected speciesPrevious MatchNext Match

        8. 8.Surface and foul water drainagePrevious MatchNext Match

        9. 9.Archaeological remainsPrevious MatchNext Match

        10. 10.Traffic managementPrevious MatchNext Match

        11. 11.Amendments to approved detailsPrevious MatchNext Match

        12. 12.FencingPrevious MatchNext Match

        13. 13.Bickenhill Meadows SSSIPrevious MatchNext Match

        14. 14.Relocation of Work No. 35 underground storage tank and accessPrevious MatchNext Match

      2. PART 2 PROCEDURE FOR DISCHARGE OF REQUIREMENTSPrevious MatchNext Match

        1. 15.Applications made under requirementsPrevious MatchNext Match

        2. 16.Further informationPrevious MatchNext Match

        3. 17.Register of requirementsPrevious MatchNext Match

        4. 18.Anticipatory steps towards compliance with any requirementPrevious MatchNext Match

    3. SCHEDULE 3Previous MatchNext Match

      STREETS SUBJECT TO STREET WORKSPrevious MatchNext Match

    4. SCHEDULE 4Previous MatchNext Match

      CLASSIFICATION OF ROADS, ETC.Previous MatchNext Match

      1. PART 1 SPECIAL ROADSPrevious MatchNext Match

      2. PART 2 TRUNK ROADSPrevious MatchNext Match

      3. PART 3 CLASSIFIED ROADSPrevious MatchNext Match

      4. PART 4 UNCLASSIFIED ROADSPrevious MatchNext Match

      5. PART 5 SPEED LIMITSPrevious MatchNext Match

      6. PART 6 PUBLIC RIGHTS OF WAYPrevious MatchNext Match

    5. SCHEDULE 5Previous MatchNext Match

      STREETS TO BE TEMPORARILY STOPPED UPPrevious MatchNext Match

    6. SCHEDULE 6Previous MatchNext Match

      PERMANENT STOPPING UP OF STREETS, PUBLIC RIGHTS OF WAY AND PRIVATE MEANS OF ACCESSPrevious MatchNext Match

      1. PART 1 STREETS TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDEDPrevious MatchNext Match

      2. PART 2 STREETS TO BE STOPPED UP AND FOR WHICH NO SUBSTITUTE IS TO BE PROVIDEDPrevious MatchNext Match

      3. PART 3 PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDEDPrevious MatchNext Match

      4. PART 4 PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH NO SUBSTITUTE IS TO BE PROVIDEDPrevious MatchNext Match

      5. PART 5 PRIVATE MEANS OF ACCESS TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDEDPrevious MatchNext Match

      6. PART 6 PRIVATE MEANS OF ACCESS TO BE STOPPED UP AND FOR WHICH NO SUBSTITUTE IS TO BE PROVIDEDPrevious MatchNext Match

      7. PART 7 ALTERATIONS TO PRIVATE MEANS OF ACCESSPrevious MatchNext Match

    7. SCHEDULE 7Previous MatchNext Match

      CLEARWAYS, PROHIBITIONS AND RESTRICTIONSPrevious MatchNext Match

      1. PART 1 TRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS)Previous MatchNext Match

      2. PART 2 TRAFFIC REGULATION MEASURES (WEIGHT RESTRICTIONS)Previous MatchNext Match

    8. SCHEDULE 8Previous MatchNext Match

      LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDPrevious MatchNext Match

    9. SCHEDULE 9Previous MatchNext Match

      MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTSPrevious MatchNext Match

      1. Compensation enactmentsPrevious MatchNext Match

        1. 1.The enactments for the time being in force with respect...Previous MatchNext Match

        2. 2.(1) Without limitation on the scope of paragraph 1, the...Previous MatchNext Match

        3. 3.(1) Without limitation on the scope of paragraph 1, the...Previous MatchNext Match

      2. Application of the 1965 ActPrevious MatchNext Match

        1. 4.Part 1 (compulsory purchase under Acquisition of Land Act 1946)...Previous MatchNext Match

        2. 5.(1) The modifications referred to in paragraph 4(a) are as...Previous MatchNext Match

    10. SCHEDULE 10Previous MatchNext Match

      LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENPrevious MatchNext Match

    11. SCHEDULE 11Previous MatchNext Match

      FELLING OR LOPPING OF TREES AND REMOVAL OF HEDGEROWSPrevious MatchNext Match

      1. PART 1 TREES IN CONSERVATION AREAPrevious MatchNext Match

      2. PART 2 HEDGEROWS TO BE REMOVED OR MANAGEDPrevious MatchNext Match

    12. SCHEDULE 12Previous MatchNext Match

      PROTECTIVE PROVISIONSPrevious MatchNext Match

      1. PART 1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERSPrevious MatchNext Match

        1. 1.(1) For the protection of the utility undertakers referred to...Previous MatchNext Match

        2. 2.In this Part of this Schedule— “alternative apparatus” means alternative...Previous MatchNext Match

        3. On street apparatusPrevious MatchNext Match

          1. 3.This Part of this Schedule does not apply to apparatus...Previous MatchNext Match

        4. Apparatus in stopped up streetsPrevious MatchNext Match

          1. 4.(1) Where any street is stopped up under article 17...Previous MatchNext Match

        5. Protective works to buildingsPrevious MatchNext Match

          1. 5.The undertaker, in the case of the powers conferred by...Previous MatchNext Match

        6. Acquisition of landPrevious MatchNext Match

          1. 6.Regardless of any provision in this Order or anything shown...Previous MatchNext Match

        7. Removal of apparatusPrevious MatchNext Match

          1. 7.(1) If, in the exercise of the powers conferred by...Previous MatchNext Match

        8. Facilities and rights for alternative apparatusPrevious MatchNext Match

          1. 8.(1) Where, in accordance with the provisions of this Part...Previous MatchNext Match

        9. Retained apparatusPrevious MatchNext Match

          1. 9.(1) Not less than 28 days before starting the execution...Previous MatchNext Match

        10. Expenses and costsPrevious MatchNext Match

          1. 10.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

          2. 11.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        11. Co-operationPrevious MatchNext Match

          1. 12.Where in consequence of the proposed construction of any part...Previous MatchNext Match

          2. 13.Nothing in this Part of this Schedule affects the provisions...Previous MatchNext Match

      2. PART 2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKSPrevious MatchNext Match

        1. 14.For the protection of any operator, the following provisions have...Previous MatchNext Match

        2. 15.In this Part of this Schedule— “the 2003 Act” means...Previous MatchNext Match

        3. 16.The exercise of the powers conferred by article 35 (statutory...Previous MatchNext Match

        4. 17.(1) Subject to sub-paragraphs (2) to (4), if as the...Previous MatchNext Match

      3. PART 3 FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY UNDERTAKERPrevious MatchNext Match

        1. ApplicationPrevious MatchNext Match

          1. 18.(1) For the protection of National Grid as referred to...Previous MatchNext Match

        2. InterpretationPrevious MatchNext Match

          1. 19.In this Part of this Schedule— “alternative apparatus” means appropriate...Previous MatchNext Match

          2. 20.Except for paragraphs 21, 26, 27 and 28, this Part...Previous MatchNext Match

        3. Apparatus of National Grid in stopped up streetsPrevious MatchNext Match

          1. 21.(1) Where any street is stopped up under article 17...Previous MatchNext Match

        4. Protective works to buildingsPrevious MatchNext Match

          1. 22.The promoter, in the case of the powers conferred by...Previous MatchNext Match

        5. Acquisition of landPrevious MatchNext Match

          1. 23.(1) Regardless of any provision in this Order or anything...Previous MatchNext Match

        6. Removal of apparatusPrevious MatchNext Match

          1. 24.(1) If, in the exercise of the powers conferred by...Previous MatchNext Match

        7. Facilities and rights for alternative apparatusPrevious MatchNext Match

          1. 25.(1) Where, in accordance with the provisions of this Part...Previous MatchNext Match

        8. Retained apparatus: protection of electricity undertakerPrevious MatchNext Match

          1. 26.(1) Not less than 56 days before the commencement of...Previous MatchNext Match

        9. ExpensesPrevious MatchNext Match

          1. 27.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        10. IndemnityPrevious MatchNext Match

          1. 28.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        11. Enactments and agreementsPrevious MatchNext Match

          1. 29.Nothing in this Part of this Schedule affects the provisions...Previous MatchNext Match

        12. Co-operationPrevious MatchNext Match

          1. 30.(1) Where in consequence of the proposed construction of any...Previous MatchNext Match

        13. AccessPrevious MatchNext Match

          1. 31.If in consequence of the agreement reached in accordance with...Previous MatchNext Match

        14. ArbitrationPrevious MatchNext Match

          1. 32.Any difference or dispute arising between the promoter and National...Previous MatchNext Match

        15. NoticesPrevious MatchNext Match

          1. 33.Notwithstanding article 45 (service of notices), any plans submitted to...Previous MatchNext Match

      4. PART 4 FOR THE PROTECTION OF HIGH SPEED TWO (HS2) LIMITEDPrevious MatchNext Match

        1. 34.The following provisions of this Part of this Schedule have...Previous MatchNext Match

        2. 35.In this Part of this Schedule— “the Act limits” has...Previous MatchNext Match

        3. Regulation of powersPrevious MatchNext Match

          1. 36.(1) The undertaker must before commencing construction of any specified...Previous MatchNext Match

          2. 37.(1) Any specified work must, when commenced, be constructed— Previous MatchNext Match

          3. 38.The undertaker must— (a) at all times afford reasonable facilities...Previous MatchNext Match

          4. 39.The undertaker must repay to the company all fees, costs,...Previous MatchNext Match

          5. 40.(1) Regardless of any provision in this Order or anything...Previous MatchNext Match

        4. Co-operationPrevious MatchNext Match

          1. 41.(1) On a monthly basis, or such other period as...Previous MatchNext Match

        5. IndemnityPrevious MatchNext Match

          1. 42.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

      5. PART 5 FOR THE PROTECTION OF CADENT GAS LIMITEDPrevious MatchNext Match

        1. ApplicationPrevious MatchNext Match

          1. 43.For the protection of Cadent the following provisions will, unless...Previous MatchNext Match

        2. InterpretationPrevious MatchNext Match

          1. 44.In this Part of this Schedule— “alternative apparatus” means appropriate...Previous MatchNext Match

        3. On Street apparatusPrevious MatchNext Match

          1. 45.(1) This Part of this Schedule does not apply to...Previous MatchNext Match

        4. Apparatus of Cadent in stopped up streetsPrevious MatchNext Match

          1. 46.(1) Where any street is stopped up under article 17...Previous MatchNext Match

        5. Protective works to buildingsPrevious MatchNext Match

          1. 47.The undertaker must exercise the powers conferred by article 22...Previous MatchNext Match

        6. Acquisition of landPrevious MatchNext Match

          1. 48.(1) Regardless of any provision in this Order or anything...Previous MatchNext Match

        7. Removal of apparatusPrevious MatchNext Match

          1. 49.(1) If, in the exercise of the powers conferred by...Previous MatchNext Match

        8. Facilities and rights for alternative apparatusPrevious MatchNext Match

          1. 50.(1) Where, in accordance with the provisions of this Part...Previous MatchNext Match

        9. Retained apparatus: protection of CadentPrevious MatchNext Match

          1. 51.(1) Not less than 56 days before the commencement of...Previous MatchNext Match

        10. ExpensesPrevious MatchNext Match

          1. 52.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        11. IndemnityPrevious MatchNext Match

          1. 53.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        12. Enactments and agreementsPrevious MatchNext Match

          1. 54.Except where this Part of this Schedule provides otherwise, nothing...Previous MatchNext Match

        13. Co-operationPrevious MatchNext Match

          1. 55.(1) Where in consequence of the proposed construction of any...Previous MatchNext Match

        14. AccessPrevious MatchNext Match

          1. 56.If in consequence of any agreement reached in accordance with...Previous MatchNext Match

        15. ArbitrationPrevious MatchNext Match

          1. 57.Save for differences or disputes arising under sub-paragraphs 49(2) and...Previous MatchNext Match

        16. NoticesPrevious MatchNext Match

          1. 58.Notwithstanding article 45 (service of notices) any plans submitted to...Previous MatchNext Match

    13. SCHEDULE 13Previous MatchNext Match

      CERTIFICATION OF PLANS AND DOCUMENTS, ETC.Previous MatchNext Match

  11. Explanatory NotePrevious Match

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources