- Latest available (Revised)
- Original (As made)
There are currently no known outstanding effects for the The A303 Sparkford to Ilchester Dualling Development Consent Order 2021.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1. This Order may be cited as the A303 Sparkford to Ilchester Dualling Development Consent Order 2021 and comes into force on 19th February 2021.
Commencement Information
I1Art. 1 in force at 19.2.2021, see art. 1
2.—(1) In this Order except where provided otherwise—
“the 1961 Act” means the Land Compensation Act 1961 M1;
“the 1965 Act” means the Compulsory Purchase Act 1965 M2;
“the 1980 Act” means the Highways Act 1980 M3;
“the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981 M4;
“the 1984 Act” means the Road Traffic Regulation Act 1984 M5;
“the 1990 Act” means the Town and Country Planning Act 1990 M6;
“the 1991 Act” means the New Roads and Street Works Act 1991 M7;
“the 2008 Act” means the Planning Act 2008 M8;
“address” includes any number or address for the purposes of electronic transmission;
“adjacent land” means that land which is necessary to carry out the development of the Works or ensure the safe construction of any section or part of the Works;
“apparatus” has the same meaning as in Part 3 of the 1991 Act;
“authorised development” means the development and associated development described in Schedule 1 (authorised development) which is development within the meaning of section 32 (meaning of “development”) of the 2008 Act;
“the book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order and set out in Part 6 (land plans, crown land plan and book of reference) of Schedule 9 (documents to be certified[F1)];
“bridleway” has the same meaning as in the 1980 Act;
“building” includes any structure or erection or any part of a building, structure or erection;
“carriageway” has the same meaning as in the 1980 Act;
“the classification of roads plans” means the plans certified by the Secretary of State as the classification of roads plans for the purposes of this Order and set out in Part 1 (classification of roads plans) of Schedule 9;
“commence” means beginning to carry out any material operation (as defined in section 56(4) (time when development begun) of the 1990 Act M9) forming part of the authorised development other than operations consisting of archaeological investigations, investigations for the purpose of assessing ground conditions, remedial work in respect of any contamination or other adverse ground conditions, creation of working areas for remedial works, erection of any temporary means of enclosure, receipt and erection of construction plant and equipment, and the temporary display of site notices or advertisements, and “commencement” is to be construed accordingly;
“cycle track” has the same meaning as in section 329(1) (further provision as to interpretation) of the 1980 Act M10;
“the de-trunking plans” means the plans certified by the Secretary of State as the de-trunking plans for the purposes of this Order set out in Part 2 (de-trunking plans) of Schedule 9;
“electronic transmission” means a communication transmitted—
by means of an electronic communications network; or
by other means but while in electronic form,
and in this definition “electronic communications network” has the same meaning as in section 32(1) (meaning of electronic communications networks and services) of the Communications Act 2003 M11;
“the environmental statement” means the documents certified by the Secretary of State as the environmental statement for the purposes of this Order set out in Part 4 (the environmental statement) of Schedule 9;
“footpath” and “footway” have the same meaning as in the 1980 Act;
“the general arrangement plans” means the plans certified by the Secretary of State as the general arrangement plans for the purposes of this Order set out in Part 5 (general arrangement plans) of Schedule 9;
“highway” has the same meaning as in the 1980 Act;
“the land plans” means the plans certified by the Secretary of State as the land plans for the purposes of this Order set out in Part 6 of Schedule 9;
“the limits of deviation” means the limits of deviation referred to in article 8 (limits of deviation);
“the local highway authority” means Somerset County Council;
“maintain” includes, to the extent assessed in the environmental statement, inspect, repair, adjust, alter, remove, replace or reconstruct in relation to the authorised development and any derivative of “maintain” is to be construed accordingly;
“the Order land” means the land shown on the land plans which is within the limits of land to be acquired or used permanently or temporarily, and described in the book of reference;
“the Order limits” means the limits of the land to be acquired or used permanently or temporarily shown on the land plans and works plans within which the authorised development may be carried out;
“the outline environmental management plan” means the document of that description certified by the Secretary of State as the outline environmental management plan for the purposes of this Order and set out in Part 11 (other documents) of Schedule 9;
“the outline written heritage scheme of investigation” means the document of that description certified by the Secretary of State as the outline written heritage scheme of investigation for the purposes of this Order and set out in Part 11 of Schedule 9;
“owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 1981 M12;
“the relevant planning authority” means the local planning authority for the land and matter in question, being South Somerset District Council or Somerset County Council;
“the rights of way and access plans” means the plans certified by the Secretary of State as the rights of way and access plans for the purposes of this Order set out in Part 8 (rights and way and access plans) of Schedule 9;
“the Secretary of State” means the Secretary of State for Transport;
“statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers' land) of the 2008 Act;
“street” means a street within the meaning of section 48 M13 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;
“street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;
“traffic authority” has the same meaning as in section 121A M14 (traffic authorities) of the 1984 Act;
“the traffic regulation measures plans” means the plans certified by the Secretary of State as the traffic regulation measures plans for the purposes of this Order set out in Part 9 (traffic regulation measures plans) of Schedule 9;
“trunk road” means a highway which is a trunk road by virtue of—
“the undertaker” means Highways England Company Limited, company number 09346363, whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ;
“watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain; and
“the works plans” means the plans certified by the Secretary of State as the works plans for the purposes of this Order set out in Part 10 (work plans) of Schedule 9.
(2) References in this Order to rights over land include references to rights to do or to place and maintain, anything in, on or under land or in the airspace above its surface and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or is otherwise comprised in the Order land.
(3) All distances, directions, areas and lengths referred to in this Order are approximate and distances between points on a work comprised in the authorised development are taken to be measured along that work.
(4) For the purposes of this Order, all areas described in square metres in the book of reference are approximate.
(5) References in this Order to points identified by letters or numbers are to be construed as references to points so lettered or numbered on the specified plan(s).
(6) References in this Order to numbered works are references to the works as numbered in Schedule 1 (authorised development).
Textual Amendments
F1Art. 2(1): bracket inserted (21.5.2021) by The A303 Sparkford to Ilchester Dualling Development Consent (Correction) Order 2021 (S.I. 2021/607), arts. 1, 2, Sch.
Commencement Information
I2Art. 2 in force at 19.2.2021, see art. 1
Marginal Citations
M9Section 56(4) was amended by paragraph 10(2) of Schedule 7 to, the Planning and Compensation Act 1991 (c. 34).
M10The definition of “cycle track” was amended by section 1 of the Cycle Tracks Act 1984 (c. 38) and paragraph 21(2) of Schedule 3 to the Road Traffic (Consequential Provisions) Act 1988 (c. 54).
M112003 c. 21. Section 32(1) was amended by S.I. 2011/1210.
M121981 c. 67. The definition of “owner” was amended by paragraph 9 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34). There are other amendments to section 7 which are not relevant to this Order.
M13Section 48 was amended by section 124(1) and (2) of the Local Transport Act 2008 (c. 26).
M14Section 121Awas inserted by section 168(1) of, and paragraph 70 of Schedule 8 to, the 1991 Act. It has been amended by section 1(6) of, and paragraph 95(2) and (3) of Schedule 1 to, the Infrastructure Act 2015 (c. 7) and there are other amendments to the section that are not relevant to this Order.
M15Section 10 was amended by section 22(2) of the 1991 Act, paragraph 22 of Schedule 2 to the 2008 Act and section 1(6) of, and paragraph 10 of Schedule 1 to, the Infrastructure Act 215.
M16As amended by section 1 of, and paragraph 15 of Schedule 1 to, the Infrastructure Act 2015.
3.—(1) The following provisions do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development–
(a)the provisions of any byelaws made under, or having effect as if made under, paragraphs 5, 6 or 6A of Schedule 25 (bye-law making powers of the appropriate agency) to the Water Resources Act 1991 M17;
(b)section 23 (prohibition on obstructions etc. in watercourses) of the Land Drainage Act 1991 M18;
(c)section 32 (variation of awards) of the Land Drainage Act 1991; and
(d)the provisions of any byelaws made under section 66 (powers to make byelaws) of the Land Drainage Act 1991.
(2) In so far as they relate to the temporary possession of land, the provisions of the Neighbourhood Planning Act 2017 M19 do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development and any maintenance of any part of the authorised development.
4.—(1) Nothing in this Order, or the construction, maintenance or operation of the authorised development under it, affects any responsibility for the maintenance of any works connected with the drainage of land, whether that responsibility is imposed or allocated by or under any enactment, or otherwise, unless otherwise agreed in writing between the undertaker and the person responsible.
(2) In this article “drainage” has the same meaning as in section 72 M20 (interpretation) of the Land Drainage Act 1991.
Commencement Information
I4Art. 4 in force at 19.2.2021, see art. 1
Marginal Citations
M20The definition of “drainage” was substituted by paragraphs 191 and 194 of Schedule 22 to the Environment Act 1995 (c. 25).
5.—(1) Subject to the provisions of this Order, including the requirements in Schedule 2 (requirements), the undertaker is granted development consent for the authorised development to be carried out within the Order limits.
(2) Any enactment applying to land within the Order limits or adjacent land has effect subject to the provisions of this Order.
Commencement Information
I5Art. 5 in force at 19.2.2021, see art. 1
6. The undertaker may at any time maintain the authorised development, except to the extent that this Order, or an agreement made under this Order, provides otherwise.
Commencement Information
I6Art. 6 in force at 19.2.2021, see art. 1
7. If planning permission is granted under the powers conferred by the 1990 Act for development any part of which is within the Order limits following the coming into force of this Order that is—
(a)not itself a nationally significant infrastructure project under the 2008 Act or part of such a project; or
(b)required to complete or enable the use or operation of any part of the development authorised by this Order,
then the carrying out, use or operation of such development under the terms of the planning permission does not constitute a breach of the terms of this Order.
Commencement Information
I7Art. 7 in force at 19.2.2021, see art. 1
8. In carrying out the authorised development the undertaker may—
(a)deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; and
(b)deviate vertically from the levels of the authorised development shown on the engineering drawings and sections—
(i)in respect of Work Nos. 81, 85 and 92 to a maximum of 1 metre upwards or 5 metres downwards; or
(ii)for all other works to a maximum of 1 metre upwards or downwards.
except that these maximum limits of vertical deviation do not apply where it is demonstrated by the undertaker to the Secretary of State's satisfaction and the Secretary of State, after consultation with the relevant planning authority and the local highway authority, certifies accordingly that a deviation in excess of these limits would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
Commencement Information
I8Art. 8 in force at 19.2.2021, see art. 1
9.—(1) Subject to article 10 (consent to transfer benefit of Order) and paragraph (2), the provisions of this Order conferring powers on the undertaker have effect solely for the benefit of the undertaker.
(2) Paragraph (1) does not apply to the works for which the consent is granted by this Order for the express benefit of owners and occupiers of land, statutory undertakers and other persons affected by the authorised development.
Commencement Information
I9Art. 9 in force at 19.2.2021, see art. 1
10.—(1) The undertaker may—
(a)transfer to another person (“the transferee”) any or all of the benefit of the provisions of this Order and such related statutory rights as may be agreed between the undertaker and the transferee; or
(b)grant to another person (“the lessee”) for a period agreed between the undertaker and the lessee any or all of the benefit of the provisions of this Order and such related statutory rights as may be so agreed.
(2) Where an agreement has been made in accordance with paragraph (1), references in this Order to the undertaker, except in paragraph (3), include references to the transferee or the lessee.
(3) The exercise by a person of any benefits or rights conferred in accordance with any transfer or grant under paragraph (1) is subject to the same restrictions, liabilities and obligations as would apply under this Order if those benefits or rights were exercised by the undertaker.
(4) The consent of the Secretary of State is required for a transfer or grant under this article, except where the transfer or grant is made to—
(a)Southern Electric Power Distribution plc (company number 04094290, whose registered office is at No.1 Forbury Place, 43 Forbury Road, Reading, United Kingdom, RG1 3JH) for the purposes of undertaking Work Nos. 9, 35, 37, 38, 38a, 48. 70, 73, 76 and 79;
(b)Wessex Water Services Limited (company number 02366648, whose registered office is at Wessex Water Operations Centre, Claverton Down Road, Claverton Down, Bath, BA2 7WW); for the purposes of undertaking Works No. 32, 44, 46, 74 and 77;
(c)British Telecommunications Public Limited Company (company number 01800000, whose registered office is at 81 Newgate Street, London, EC1A 7AJ) for the purposes of undertaking the other works;
(d)Openreach Limited (company number 10690039, whose registered office is at Kelvin House, 123 Judd Street, London, WC1H 9NP) for the purposes of undertaking the other works;
(e)Sky Telecommunications Services Limited, company number 02883980, whose registered office is at Grant Way, Isleworth, Middlesex, TW7 5QD) for the purposes of undertaking the other works;
(f)Virgin Media Limited, (company number 02591237, whose registered office is at 500 Brook Drive, Reading, United Kingdom, RG2 6UU) for the purposes of undertaking the other works;
(g)Level 3 Communications Limited, (company number 03514850, whose registered office is at 260-266 Goswell Road, London EC1V 7EB) for the purposes of undertaking the other works;
(h)CenturyLink Limited (company number 09626356, whose registered office is at 260-266 Goswell Road, London EC1V 7EB) for the purposes of undertaking the other works; or
(i)O'Connor Utilities Limited, (company number 02916906, whose registered office is at 10 Sandfold Lane, Manchester, M19 3BJ) for the purposes of undertaking the other works.
(5) In paragraph (4)(c) to (i) “the other works” means Work Nos. 8, 13, 31, 33, 34, 36, 43, 45, 47, 69, 71, 72, 75, 78, 84, 96, 97 and 98.
Commencement Information
I10Art. 10 in force at 19.2.2021, see art. 1
11.—(1) The undertaker may, for the purposes of the authorised development, enter on so much of any of the streets as are within the Order limits and may—
(a)break up or open the street, or any sewer, drain or tunnel under it;
(b)tunnel or bore under the street;
(c)place apparatus in the street;
(d)maintain apparatus in the street or change its position; and
(e)execute any works required for, or incidental to, any works referred to in sub-paragraphs (a), (b), (c) and (d).
(2) The authority given by paragraph (1) is a statutory right for the purposes of sections 48(3) (streets, street works and undertakers) and 51(1) (prohibition of unauthorised street works) of the 1991 Act.
(3) Subject to article 12 (application of the 1991 Act), the provisions of sections 54 to 106 of the 1991 Act apply to any street works carried out under paragraph (1).
Commencement Information
I11Art. 11 in force at 19.2.2021, see art. 1
12.—(1) Works executed under this Order in relation to a highway which consists of or includes a carriageway are to be treated for the purposes of Part 3 (street works in England and Wales) of the 1991 Act as major highway works if—
(a)they are of a description mentioned in any of paragraphs (a), (c) to (e), (g) and (h) of section 86(3) (which defines what highway authority works are major highway works) of that Act; or
(b)they are works which, had they been executed by the local highway authority, might have been carried out in exercise of the powers conferred by section 64 M21 (dual carriageways and roundabouts) of the 1980 Act or section 184 M22 (vehicle crossings over footways and verges) of that Act.
(2) In Part 3 of the 1991 Act references to the highway authority concerned are, in relation to works which are major highway works by virtue of paragraph (1), to be construed as references to the undertaker.
(3) The following provisions of the 1991 Act do not apply in relation to any works executed under the powers conferred by this Order—
(a)section 56 M23 (provisions to give directions as to timing of street works);
(b)section 56A M24 (power to give directions as to placing of apparatus);
(c)section 58 M25 (restriction on works following substantial road works);
(d)section 58A M26 (restriction on works following substantial street works); and
(e)Schedule 3A M27 (restriction on works following substantial street works).
(4) The provisions of the 1991 Act mentioned in paragraph (5) (which, together with other provisions of that Act, apply in relation to the execution of street works) and any regulations made, or code of practice issued or approved, under those provisions apply (with the necessary modifications) in relation to any stopping up, alteration or diversion of a street of a temporary nature by the undertaker under the powers conferred by article 15 (temporary stopping up and restriction of use of streets and highways) whether or not the stopping up, alteration or diversion constitutes street works within the meaning of that Act.
(5) The provisions of the 1991 Act M28 referred to in paragraph (4) are—
(a)section 54 M29 (advance notice of certain works), subject to paragraph (6);
(b)section 55 M30 (notice of starting date of works), subject to paragraph (6);
(c)section 57 M31 (notice of emergency works);
(d)section 59 M32 (general duty of street authority to co-ordinate works);
(e)section 60 (general duty of undertakers to co-operate);
(f)section 68 (facilities to be afforded to street authority);
(g)section 69 (works likely to affect other apparatus in the street);
(h)section 75 (inspection fees);
(i)section 76 (liability for cost of temporary traffic regulation); and
(j)section 77 (liability for cost of use of alternative route),
and all such other provisions as apply for the purposes of the provisions mentioned above.
(6) Sections 54 and 55 of the 1991 Act as applied by paragraph (4) have effect as if references in section 57 of that Act to emergency works were a reference to a stopping up, alteration or diversion (as the case may be) required in a case of emergency.
(7) Nothing in article 13 (construction and maintenance of new, altered or diverted streets and other structures)—
(a)affects the operation of section 87 (prospectively maintainable highways) of the 1991 Act, and the undertaker is not by reason of any duty under that article to maintain a street or to be taken to be the street authority in relation to that street for the purposes of Part 3 of that Act; or
(b)has effect in relation to street works to which the provisions of Part 3 of the 1991 Act apply.
Commencement Information
I12Art. 12 in force at 19.2.2021, see art. 1
Marginal Citations
M21Section 64 was amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the 1991 Act.
M22Section 184 was amended by section 4 of, and paragraph 45(11) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11); and paragraph 9 of Schedule 8 and Schedule 9 to, the 1991 Act.
M23Section 56 was amended by sections 40 and 43 of the Traffic Management Act 2004 (c. 18).
M24Section 56A was inserted by section 44 of the Traffic Management Act 2004.
M25Section 58 was amended by section 51 of the Traffic Management Act 2004.
M26Section 58A was inserted by section 52(1) of the Traffic Management Act 2004.
M27Schedule 3A was inserted by section 52(2) of, and Schedule 4 to, the Traffic Management Act 2004.
M28Sections 54, 55, 57, 60, 68 and 69 were amended by section 40(1) and (2) of, and Schedule 1 to, the Traffic Management Act 2004.
M29Section 54 was also amended by section 49(1) of the Traffic Management Act 2004.
M30Section 55 was also amended by section 49(2) and 51(9) of the Traffic Management Act 2004.
M31Section 57 was amended by section 52(3) of the Traffic Management Act 2004.
M32Section 59 was amended by section 42 of the Traffic Management Act 2004.
13.—(1) Any highway (other than a trunk road) to be constructed under this Order must be completed to the reasonable satisfaction of the local highway authority and, unless otherwise agreed in writing with the local highway authority, the highway including any culverts or other structures laid under it must be maintained by and at the expense of the local highway authority from its completion.
(2) Where a highway (other than a trunk road which is not de-trunked by this Order) is altered or diverted under this Order, the altered or diverted part of the highway must be completed to the reasonable satisfaction of the local highway authority and, unless otherwise agreed in writing with the local highway authority, that part of the highway including any culverts or other structures laid under it must be maintained by and at the expense of the local highway authority from its completion.
(3) Where a street which is not and is not intended to be a public highway is constructed, altered or diverted under this Order, the street (or part of the street as the case may be) must, when completed to the reasonable satisfaction of the street authority and unless otherwise agreed in writing with the street authority, be maintained by and at the expense of the undertaker for a period of 12 months from its completion and at the expiry of that period by and at the expense of the street authority.
(4) Where a highway described in Part 2A (roads to be de-trunked and vested in Somerset County Council) of Schedule 3 (classification of roads, etc.) is de-trunked under this Order—
(a)section 265 M33 (transfer of property and liabilities upon a highway becoming or ceasing to be a trunk road) of the 1980 Act applies in respect of that highway; and
(b)any alterations to that highway undertaken under powers conferred by this Order prior to and in connection with that de-trunking must, unless otherwise agreed in writing with the local highway authority, be maintained by and at the expense of the local highway authority from the date of completion.
(5) Where a highway described in Part 2B (roads to be de-trunked and remain under the control and management of the undertaker) of Schedule 3 to this Order is de-trunked under this Order, section 265(7) of the 1980 Act does not apply in respect of that de-trunking, and the undertaker shall remain the highway authority for the highway in question.
(6) In the case of a bridge constructed under this Order to carry a highway (other than a trunk road) over or under a trunk road, the highway surface must from its completion be maintained by and at the expense of the local highway authority and the structure of the bridge must be maintained by and at the expense of the undertaker.
(7) In the case of a bridge constructed under this Order to carry a highway (other than a trunk road) over another highway which is not a trunk road, both the highway surface and the structure of the bridge must be maintained by and at the expense of the local highway authority from the date of their completion.
(8) In any action against the undertaker in respect of loss or damage resulting from any failure by it to maintain a street under this article, it is a defence (without prejudice to any other defence or the application of the law relating to contributory negligence) to prove that the undertaker had taken such care as in all the circumstances was reasonably required to secure that the part of the street to which the action relates was not dangerous to traffic.
(9) For the purposes of a defence under paragraph (8), the court must in particular have regard to the following matters—
(a)the character of the street and the traffic which was reasonably to be expected to use it;
(b)the standard of maintenance appropriate for a street of that character and used by such traffic;
(c)the state of repair in which a reasonable person would have expected to find the street;
(d)whether the undertaker knew, or could reasonably have been expected to know, that the condition of the part of the street to which the action relates was likely to cause danger to users of the street; and
(e)where the undertaker could not reasonably have been expected to repair that part of the street before the cause of action arose, what warning notices of its condition had been displayed,
but for the purposes of such a defence it is not relevant to prove that the undertaker had arranged for a competent person to carry out or supervise the maintenance of the part of the street to which the action relates unless it is also proved that the undertaker had given the competent person proper instructions with regard to the maintenance of the street and that the competent person had carried out those instructions.
(10) Any street formed on the Order land which is not open to vehicular use by the public, and which is used by the undertaker for the purposes of maintaining the authorised development, must be maintained by and at the expense of the undertaker or any successor in function, as the landowner of the land on which the street is situated.
Commencement Information
I13Art. 13 in force at 19.2.2021, see art. 1
Marginal Citations
M33Section 265 was amended by section 146 of, and paragraph 45 of Schedule 13 to, the 1984 Act and section 1(6) of, and paragraph 52 of Schedule 1 to, the Infrastructure Act 2015 (c. 7).
14.—(1) On the date on which the roads described in Part 1 (trunk roads) of Schedule 3 are completed and open for traffic, they are to become trunk roads as if they had become so by virtue of an order under section 10(2) M34 (general provision as to trunk roads) of the 1980 Act specifying that date as the date on which they were to become trunk roads.
(2) On such day as the undertaker may determine, the roads described in Parts 2A and 2B of Schedule 3 are to cease to be trunk roads as if they had ceased to be trunk roads by virtue of an order made under section 10(2) of the 1980 Act specifying that date as the date on which they were to cease to be trunk roads.
(3) On the date on which the roads described in Parts 3 and 4 (classified roads) of Schedule 3 are completed, they are to become classified roads for the purpose of any enactment or instrument which refers to highways classified as classified roads as if such classification had been made under section 12(3) (general provision as to principal and classified roads) of the 1980 Act.
(4) On the date on which the roads described in Part 5 (unclassified roads) of Schedule 3 are completed, they are to become unclassified roads for the purpose of any enactment or instrument which refers to unclassified roads.
(5) On and after the date on which the roads described in Part 6 (speed limits) of Schedule 3 are open for traffic, no person is to drive any motor vehicle at a speed exceeding the limit specified in column (3) of that Part along the lengths of road identified in the corresponding row of column (2) of that Part.
(6) Unless otherwise agreed with the local highway authority, the public rights of way set out in Part 11 (public rights of way) of Schedule 3 and identified on the rights of way and access plans are to be constructed by the undertaker in the specified locations and open for use no later than the date on which the authorised development is open for traffic.
(7) On such day as the undertaker may determine, the orders specified in column (3) of Part 10 (revocations and variations of orders) of Schedule 3 are to be varied or revoked as specified in the corresponding row of column (4) of that Part in respect of the lengths of roads specified in the corresponding row of column (2) of that Part.
(8) The application of paragraphs (1) to (6) may be varied or revoked by any instrument made under any enactment which provides for the variation or revocation of such matters, including by an instrument made under the 1984 Act where the matter in question could have been included in an order made under that Act.
(9) Any determination of a day made by the undertaker under this article does not take effect unless the notification requirements set out in Part 12 (notification of dates to be determined) of Schedule 3 have been complied with.
(10) The phasing in relation to the classification or declassification of roads or parts of roads referred to in paragraphs (1) to (4) have effect from the date or dates notified by the undertaker in accordance with the notification requirements specified in paragraph (9).
Commencement Information
I14Art. 14 in force at 19.2.2021, see art. 1
Marginal Citations
M34Section 10(2) was amended by section 22(2)(a) of the 1991 Act, and by section 1(6) of, and paragraph 10(2) of Schedule 1 to, the Infrastructure Act 2015 c. 7).
15.—(1) The undertaker, during and for the purposes of carrying out the authorised development, may temporarily stop up, alter, divert or restrict the use of any street or highway and may for any reasonable time—
(a)divert the traffic from the street or highway; and
(b)subject to paragraph (3), prevent all persons from passing along the street or highway.
(2) Without limitation on the scope of paragraph (1), the undertaker may use any street or highway temporarily stopped up or restricted under the powers conferred by this article, and which is within the Order limits, as a temporary working site for the carrying out of the works.
(3) The undertaker must provide reasonable access for pedestrians going to or from premises abutting a street or highway affected by the temporary stopping up, alteration, diversion or restriction of a street or highway under this article if there would otherwise be no such access.
(4) The undertaker must not temporarily stop up, alter, divert or restrict the use of any street or highway for which it is not the street or highway authority without the consent of the street or highway authority, which may attach reasonable conditions to any consent, but such consent must not be unreasonably withheld or delayed.
(5) Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(6) If a street authority or local highway authority which receives an application for consent under paragraph (4) fails to notify the undertaker of its decision before the end of the period of 28 days beginning with the date on which the application was made, it is deemed to have granted consent.
(7) The undertaker will consult South Somerset District Council before seeking any consent under this article.
(8) In paragraph (2), “temporary working site” means any area within the Order limits which is occupied for the purposes of carrying out the works in or in the vicinity of that area and within which materials may only be stored temporarily.
Commencement Information
I15Art. 15 in force at 19.2.2021, see art. 1
16.—(1) Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development, stop up each of the streets and private means of access specified in columns (1) and (2) of Parts 1, 2, 3 and 4 of Schedule 4 (permanent stopping up of highways and private means of access and provision of new highways and private means of access) to the extent specified and described in column (3) of those Parts of that Schedule.
(2) No street or private means of access specified in columns (1) and (2) of Parts 2 and 4 of Schedule 4 (being a street or private means of access to be stopped up for which a substitute is to be provided) is to be wholly or partly stopped up under this article unless—
(a)the new street or private means of access to be constructed and substituted for it, which is specified in column (4) of those Parts of that Schedule, has been completed to the reasonable satisfaction of the street authority or local highway authority and is open for use; or
(b)a temporary alternative route for the passage of such traffic as could have used the street or private means of access to be stopped up is first provided and subsequently maintained by the undertaker, to the reasonable satisfaction of the street authority or local highway authority, between the commencement and termination points for the stopping up of the highway, street or private means of access until the completion and opening of the new highway, street or private means of access in accordance with sub-paragraph (a).
(3) No street or private means of access specified in columns (1) and (2) of Parts 1 and 3 of Schedule 4 (being a street or private means of access to be stopped up for which no substitute is to be provided) is to be wholly or partly stopped up under this article unless the condition specified in paragraph (4) is satisfied in relation to all the land which abuts on either side of the highway, street or private means of access to be stopped up.
(4) The condition referred to in paragraph (3) is that—
(a)the undertaker is in possession of the land;
(b)there is no right of access to the land from the street or private means of access concerned;
(c)there is reasonably convenient access to the land otherwise than from the highway, street or private means of access concerned; or
(d)the owners and occupiers of the land have agreed to the stopping up.
(5) On and after a date to be determined by the undertaker, the owners and occupiers of land which is accessed along the tracks and other accesses to be created on Order Land and listed in column (4) of Part 4 Schedule 4, are entitled to access that land at all times with or without vehicles across or along those tracks and other accesses.
(6) The date to be determined under paragraph (5) must not be later than the date on which the private means of access listed in column (2) of Part 4 of Schedule 4 is stopped up.
(7) In paragraph (5), “owners and occupiers of land” includes their agents and contractors and any person who has the permission of the owner or occupier to access the land.
(8) Where a highway, street or private means of access has been stopped up under this article—
(a)all rights of way over or along the highway, street or private means of access so stopped up are extinguished; and
(b)the undertaker may appropriate and use for the purposes of the authorised development so much of the site of the highway, street or private means of access as is bounded on both sides by land owned by the undertaker.
(9) The undertaker may, in connection with the carrying out of the authorised development, alter the private means of access specified in column (1) of Part 5 (alterations to private means of access) of Schedule 4 as specified in column (2) of that Part.
(10) Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(11) This article is subject to article 36 (apparatus and rights of statutory undertakers in stopped up streets).
Commencement Information
I16Art. 16 in force at 19.2.2021, see art. 1
17. The undertaker may, for the purposes of the authorised development, form and lay out means of access, or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.
Commencement Information
I17Art. 17 in force at 19.2.2021, see art. 1
18.—(1) On and after such day as the undertaker may determine, except as provided in paragraph (4), no person is to cause or permit any vehicle to wait on any part of the lengths of road described in column (2) of Part 7 (traffic regulation measures (clearways and prohibitions)) of Schedule 3 (classification of roads, etc.), except upon the direction of, or with the permission of, a uniformed constable or uniformed traffic officer.
(2) On and after such day as the undertaker may determine, except as provided in paragraph (4) and (5), no person may cause or permit any vehicle to use any part of the lengths of road described in column (2) of Part 8 (traffic regulation measures (weight restrictions)) of Schedule 3 where that vehicle exceeds the weight restriction specified in column (3) of that Part.
(3) On and after such day as the undertaker may determine, except as provided in paragraph (4), no person may cause or permit any vehicle to wait on any part of the lengths of road described in column (2) of Part 9 (traffic regulation measures (waiting restrictions)) of Schedule 3 for a period exceeding two hours.
(4) Nothing in paragraphs (1), (2) or (3) applies—
(a)to render it unlawful to cause or permit a vehicle to wait on any part of a road, for so long as may be necessary to enable that vehicle to be used in connection with—
(i)the removal of any obstruction to traffic;
(ii)the maintenance, improvement, reconstruction or operation of the road;
(iii)the laying, erection, inspection, maintenance, alteration, repair, renewal or removal in or near the road of any sewer, main pipe, conduit, wire, cable or other apparatus for the supply of gas, water, electricity or any electronic communications apparatus as defined in Schedule 3A (the Electronic Communications Code) to the Communications Act 2003 M35; or
(iv)any building operation or demolition;
(b)in relation to a vehicle being used—
(i)for police, ambulance, fire and rescue authority or traffic officer purposes;
(ii)in the service of a local authority, safety camera partnership or Driver and Vehicle Standards Agency in pursuance of statutory powers or duties;
(iii)in the service of a water or sewerage undertaker within the meaning of the Water Industry Act 1991 M36; or
(iv)by a universal service provider for the purposes of providing a universal postal service as defined by the Postal Service Act 2000 M37; or
(c)in relation to a vehicle waiting when the person in control of it is—
(i)required by law to stop;
(ii)obliged to stop in order to avoid an accident; or
(iii)prevented from proceeding by circumstances outside the person's control.
(5) Nothing in paragraph (2) applies in relation to a vehicle being used—
(a)for the conveyance of goods or merchandise to or from any premises that are reasonably accessible only from the highway to which the restriction in question applies;
(b)vehicles being used in conjunction with any building operation or demolition on land in or adjacent to the highway to which the restriction applies;
(c)vehicles being used for the laying, erection, alteration or repair of any apparatus on land adjacent to the highway to which the restriction applies;
(d)vehicles being used by the emergency services or on behalf of a local authority;
(e)public service vehicles within the meaning of section 1(1) (definition of public service vehicle) of the Public Passenger Vehicles Act 1981 M38.
(6) No person is to cause or permit any vehicle to wait on any part of the roads described in paragraphs (1) and (3) for the purposes of selling, or dispensing of, goods from that vehicle, unless the goods are immediately delivered at, or taken into, premises adjacent to the land on which the vehicle stood when the goods were sold or dispensed.
(7) Paragraphs (1), (2), (3), (4), (5) and (6) have effect as if made by order under the 1984 Act, and their application may be varied or revoked by an order made under that Act or any other enactment which provides for the variation or revocation of such orders.
(8) In this article, “traffic officer” means an individual designated under section 2 (designation of traffic officers) of the Traffic Management Act 2004 M39.
Commencement Information
I18Art. 18 in force at 19.2.2021, see art. 1
Marginal Citations
M352003 c. 21. Schedule 3A was inserted by paragraph 1 of Schedule 1 to the Digital Economy Act 2017 (c. 30).
19.—(1) This article applies to roads in respect of which the undertaker is not the traffic authority.
(2) Subject to the provisions of this article, and the consent of the traffic authority in whose area the road concerned is situated, which consent must not be unreasonably withheld, the undertaker may, for the purposes of the authorised development—
(a)revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act;
(b)permit, prohibit or restrict the stopping, waiting, loading or unloading of vehicles on any road;
(c)authorise the use as a parking place of any road;
(d)make provision as to the direction or priority of vehicular traffic on any road; and
(e)permit or prohibit vehicular access to any road,
either at all times or at times, on days or during such periods as may be specified by the undertaker.
(3) The power conferred by paragraph (2) may be exercised at any time prior to the expiry of 12 months from the opening of the authorised development for public use but subject to paragraph (7) any prohibition, restriction or other provision made under paragraph (2) may have effect both before and after the expiry of that period.
(4) The undertaker must consult the chief officer of police and the traffic authority in whose area the road is situated before complying with the provisions of paragraph (5).
(5) The undertaker must not exercise the powers conferred by paragraph (2) unless the undertaker has—
(a)given not less than—
(i)12 weeks' notice in writing of the undertaker's intention so to do in the case of a prohibition, restriction or other provision intended to have effect permanently; or
(ii)4 weeks' notice in writing of the undertaker's intention so to do in the case of a prohibition, restriction or other provision intended to have effect temporarily,
to the chief officer of police and to the traffic authority in whose area the road is situated; and
(b)advertised the undertaker's intention in such manner as the traffic authority may specify in writing within 28 days of its receipt of notice of the undertaker's intention in the case of sub-paragraph (a)(i), or within 7 days of its receipt of notice of the undertaker's intention in the case of sub-paragraph (a)(ii).
(6) Any prohibition, restriction or other provision made by the undertaker under paragraph (2)—
(a)has effect as if duly made by, as the case may be—
(i)the traffic authority in whose area the road is situated, as a traffic regulation order under the 1984 Act; or
(ii)the local authority in whose area the road is situated, as an order under section 32 (power of local authorities to provide parking spaces) of the 1984 Act,
and the instrument by which it is effected may specify savings and exemptions to which the prohibition, restriction or other provision is subject; and
(b)is deemed to be a traffic order for the purposes of Schedule 7 (road traffic contraventions subject to civil enforcement) to the Traffic Management Act 2004 M40.
(7) Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the undertaker from time to time by subsequent exercise of the powers conferred by paragraph (2) within a period of 24 months from the opening of the authorised development.
(8) Before exercising the powers conferred by paragraph (2) the undertaker must consult South Somerset District Council and such other persons as the undertaker considers necessary and appropriate and must take into consideration any representations made to the undertaker by any such person.
(9) Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.
(10) The powers conferred on the undertaker by this article with respect to any road have effect subject to any agreement entered into by the undertaker with any person with an interest in (or who undertakes activities in relation to) premises served by the road.
(11) If the traffic authority fails to notify the undertaker of its decision within 28 days of receiving an application for consent under paragraph (2) the traffic authority is deemed to have granted consent.
20.—(1) Subject to paragraphs (3) and (4), the undertaker may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out, maintenance or use of the authorised development and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain.
(2) Any dispute arising from the making of connections to or the use of a public sewer or drain by the undertaker under paragraph (1) is to be determined as if it were a dispute under section 106 (right to communication with public sewers) of the Water Industry Act 1991 M41.
(3) The undertaker must not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs; and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld.
(4) The undertaker must not make any opening into any public sewer or drain except—
(a)in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and
(b)where that person has been given the opportunity to supervise the making of the opening.
(5) The undertaker must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain or to the ground under this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension or dissolved pollutants.
(6) In this article—
(a)“public sewer or drain” means a sewer or drain which belongs to Homes England, the Environment Agency, an internal drainage board, a joint planning board, a local authority, a sewerage undertaker or an urban development corporation; and
(b)other expressions, excluding watercourse, used both in this article and in the Water Resources Act 1991 M42 have the same meaning as in that Act.
(7) If a person who receives an application for consent under paragraph (3) or approval under paragraph (4)(a) fails to notify the undertaker of a decision within 28 days of receiving an application, that person is deemed to have granted consent or given approval, as the case may be.
Commencement Information
I20Art. 20 in force at 19.2.2021, see art. 1
Marginal Citations
M411991 c. 56. Section 106 was amended by sections 35(1) and (8) and 43(2) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2010 (c. 29).
21.—(1) Subject to the following provisions of this article, the undertaker may at its own expense carry out such protective works to any building which may be affected by the authorised development as the undertaker considers necessary or expedient.
(2) Protective works may be carried out—
(a)at any time before or during the carrying out in the vicinity of the building of any part of the authorised development; or
(b)after the completion of that part of the authorised development in the vicinity of the building at any time up to the end of the period of 5 years beginning with the day on which that part of the authorised development is first opened for use.
(3) For the purpose of determining how the functions under this article are to be exercised the undertaker may (subject to paragraph (5)) enter and survey any building falling within paragraph (1) and any land within its curtilage.
(4) For the purpose of carrying out protective works to a building under this article the undertaker may (subject to paragraphs (5) and (6))—
(a)enter the building and any land within its curtilage; and
(b)where the works cannot be carried out reasonably conveniently without entering land which is adjacent to the building but outside its curtilage, enter the adjacent land (but not any building erected on it).
(5) Before exercising—
(a)a right under paragraph (1) to carry out protective works to a building;
(b)a right under paragraph (3) to enter a building and land within its curtilage;
(c)a right under paragraph (4)(a) to enter a building and land within its curtilage; or
(d)a right under paragraph (4)(b) to enter land,
the undertaker must, except in the case of emergency, serve on the owners and occupiers of the building or land not less than 14 days' notice of its intention to exercise that right and, in a case falling within sub-paragraph (a) or (c), specifying the protective works proposed to be carried out.
(6) Where a notice is served under paragraph (5)(a), (c) or (d), the owner or occupier of the building or land concerned may, by serving a counter-notice within the period of 10 days beginning with the day on which the notice was served, require the question whether it is necessary or expedient to carry out the protective works or to enter the building or land to be referred to arbitration under article 45 (arbitration).
(7) The undertaker must compensate the owners and occupiers of any building or land in relation to which rights under this article have been exercised for any loss or damage arising to them by reason of the exercise of those rights.
(8) Where—
(a)protective works are carried out under this article to a building; and
(b)within the period of 5 years beginning with the day on which the part of the authorised development carried out in the vicinity of the building is first opened for use it appears that the protective works are inadequate to protect the building against damage caused by the carrying out or use of that part of the authorised development,
the undertaker must compensate the owners and occupiers of the building for any loss or damage sustained by them.
(9) Nothing in this article relieves the undertaker from any liability to pay compensation under section 152 M43 (compensation in case where no right to claim in nuisance) of the 2008 Act.
(10) Any compensation payable under paragraph (7) or (8) is to be determined, in case of dispute, under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
(11) In this article “protective works” in relation to a building means—
(a)underpinning, strengthening and any other works the purpose of which is to prevent damage which may be caused to the building by the carrying out, maintenance or use of the authorised development; and
(b)any works the purpose of which is to remedy any damage which has been caused to the building by the carrying out, maintenance or use of the authorised development.
Commencement Information
I21Art. 21 in force at 19.2.2021, see art. 1
Marginal Citations
M43Section 152 was amended by S.I. 2009/1307.
22.—(1) The undertaker may for the purposes of this Order enter on any land shown within the Order limits or which may be affected by the authorised development and—
(a)survey or investigate the land (including any watercourses, ground water, static water bodies or vegetation on the land);
(b)without limitation on the scope of sub-paragraph (a), make any excavations, trial holes and boreholes in such positions on the land as the undertaker thinks fit to investigate the nature of the surface layer, subsoil and ground water, remove soil samples and discharge water samples on to the land;
(c)without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land, including making any excavations or trial holes on the land for such purposes; and
(d)place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes and boreholes.
(2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least 14 days' notice has been served on every owner and occupier of the land.
(3) Any person entering land under this article on behalf of the undertaker—
(a)must, if so required, before or after entering the land, produce written evidence of their authority to do so; and
(b)may take onto the land such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes and boreholes.
(4) No trial holes or boreholes are to be made under this article—
(a)in land located within the highway boundary for which the local highway authority is the highway authority, without the consent of the local highway authority; or
(b)in a private street without the consent of the street authority,
but such consent must not be unreasonably withheld.
(5) The undertaker must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the powers conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(6) If either the local highway authority or a street authority which receives an application for consent fails to notify the undertaker of its decision within 28 days of receiving the application for consent—
(a)under paragraph (4)(a) in the case of the local highway authority; or
(b)under paragraph (4)(b) in the case of a street authority,
that authority is deemed to have granted consent.
Commencement Information
I22Art. 22 in force at 19.2.2021, see art. 1
23.—(1) The undertaker may acquire compulsorily so much of the Order land as is required to carry out or to facilitate, or is incidental to, the authorised development.
(2) This article is subject to paragraph (2) of article 26 (compulsory acquisition of rights) and paragraph (8) of article 33 (temporary use of land for carrying out the authorised development).
Commencement Information
I23Art. 23 in force at 19.2.2021, see art. 1
24. Parts 2 and 3 of Schedule 2 (minerals) to the Acquisition of Land Act 1981 M44 are incorporated into this Order subject to the modifications that—
(a)paragraph 8(3) is not incorporated;
(b)for “the acquiring authority” substitute “ the undertaker ”; and
(c)for “undertaking” substitute “ authorised development ”.
25.—(1) After the end of the period of 5 years beginning on the day on which this Order is made—
(a)no notice to treat is to be served under Part 1 of the 1965 Act; and
(b)no declaration is to be executed under section 4 (execution of declaration) of the 1981 Act as applied by article 30 (application of the 1981 Act).
(2) The authority conferred by article 33 (temporary use of land for carrying out the authorised development) ceases at the end of the period referred to in paragraph (1), except that nothing in this paragraph prevents the undertaker from remaining in possession of land after the end of that period, if the land was entered and possession was taken before the end of that period.
Commencement Information
I25Art. 25 in force at 19.2.2021, see art. 1
26.—(1) The undertaker may acquire such rights over the Order land or impose restrictive covenants affecting the land as may be required for any purpose for which that land may be acquired under article 23 (compulsory acquisition of land), by creating them as well as acquiring rights already in existence.
(2) In the case of the Order land specified in column (1) of Schedule 5 (land in which only new rights etc. may be acquired) the undertaker's powers of compulsory acquisition are limited to the acquisition of such wayleaves, easements, new rights in the land or the imposition of restrictive covenants as may be required for the purpose specified in relation to that land in column (2) of that Schedule and relating to that part of the authorised development specified in column (3) of that Schedule.
(3) The power to impose restrictive covenants under paragraph (1) is exercisable only in respect of plots specified in column (1) of Schedule 5.
(4) Subject to Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as substituted by paragraph 5(8) of Schedule 6 (modification of compensation and compulsory purchase enactments for creation of new rights)), where the undertaker acquires a right over land or the benefit of a restrictive covenant, the undertaker is not required to acquire a greater interest in that land.
(5) Schedule 6 has effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article of a right over land by the creation of a new right or the imposition of a restrictive covenant.
Commencement Information
I26Art. 26 in force at 19.2.2021, see art. 1
27.—(1) The public rights of way identified in columns (1) to (3) of Parts 1 and 2 of Schedule 4 (permanent stopping up of highways and private means of access and provision of new highways and private means of access) and shown on the rights of way and access plans are to be extinguished on the date of the expiry of the notice given under paragraph (2).
(2) Prior to the extinguishment of each of the public rights of way identified in columns (1) to (3) of Parts 1 and 2 of Schedule 4 and shown on the rights of way and access plans, the undertaker must erect a site notice at each end of the rights of way to be extinguished no less than 28 days prior to the extinguishment of that right of way.
Commencement Information
I27Art. 27 in force at 19.2.2021, see art. 1
28.—(1) Subject to the provisions of this article, all private rights over land subject to compulsory acquisition under this Order are extinguished—
(a)from the date of acquisition of the land by the undertaker, whether compulsorily or by agreement; or
(b)on the date of entry on the land by the undertaker under section 11(1) (powers of entry) of the 1965 Act,
whichever is the earlier.
(2) Subject to the provisions of this article, all private rights over land subject to the compulsory acquisition of rights or the imposition of restrictive covenants under this Order are extinguished in so far as their continuance would be inconsistent with the exercise of the right or burden of the restrictive covenant—
(a)from the date of the acquisition of the right or the benefit of the restrictive covenant by the undertaker, whether compulsorily or by agreement; or
(b)on the date of entry on the land by the undertaker under section 11(1) (power of entry) of the 1965 Act,
whichever is the earlier.
(3) Subject to the provisions of this article, all private rights over land owned by the undertaker within the Order limits which are required to be interfered with or breached for the purposes of this Order are extinguished on commencement of any activity authorised by this Order which interferes with or breaches those rights.
(4) Subject to the provisions of this article, all private rights over land of which the undertaker takes temporary possession under this Order are suspended and unenforceable for as long as the undertaker remains in lawful possession of the land.
(5) Any person who suffers loss by the extinguishment or suspension of any private right under this article is entitled to compensation in accordance with the terms of section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act to be determined, in case of dispute, under Part 1 of the 1961 Act.
(6) This article does not apply in relation to any right to which section 138 (extinguishment of rights, and removal of apparatus, of statutory undertakers etc.) of the 2008 Act or article 35 (statutory undertakers) applies.
(7) Paragraphs (1) to (4) have effect subject to—
(a)any notice given by the undertaker before—
(i)the completion of the acquisition of the land or the acquisition of the rights or the imposition of restrictive covenants over or affecting the land;
(ii)the undertaker's appropriation of it;
(iii)the undertaker's entry onto it; or
(iv)the undertaker's taking temporary possession of it,
that any or all of those paragraphs do not apply to any right specified in the notice; and
(b)any agreement made at any time between the undertaker and the person in or to whom the right in question is vested or belongs.
(8) If any such agreement as is referred to in paragraph (7)(b)—
(a)is made with a person in or to whom the right is vested or belongs; and
(b)is expressed to have effect also for the benefit of those deriving title from or under that person,
it is effective in respect of the persons so deriving title, whether the title was derived before or after the making of the agreement.
(9) Reference in this article to private rights over land include any trust, incident, easement, liberty, privilege, right or advantage annexed to land and adversely affecting other land, including any natural right to support and include restrictions as to the user of land arising by virtue of a contract, agreement or undertaking having that effect.
Commencement Information
I28Art. 28 in force at 19.2.2021, see art. 1
29.—(1) Part 1 of the 1965 Act, as applied to this Order by section 125 (application of compulsory acquisition provisions) of the 2008 Act, is modified as follows.
(2) In section 4A(1) M45 (extension of time limit during challenge) for “section 23 of the Acquisition of Land Act 1981 (application to High Court in respect of compulsory purchase order), the three year period mentioned in section 4” substitute “ section 118 of the Planning Act 2008 (legal challenges relating to applications for orders granting development consent), the five year period mentioned in article 25 (time limit for exercise of authority to acquire land compulsorily) of the A303 Sparkford to Ilchester Dualling Development Consent Order 2021 ”.
(3) In section 11A M46 (powers of entry: further notice of entry)—
(a)in subsection (1)(a), after “land” insert “ under that provision ”;
(b)in subsection (2), after “land” insert “ under that provision ”.
(4) In section 22(2) (expiry of time limit for exercise of compulsory purchase power not to affect acquisition of interests omitted from purchase), for “section 4 of this Act” substitute “ article 25 of the A303 Sparkford to Ilchester Dualling Development Consent Order 2021 ”.
(5) In Schedule 2A (counter-notice requiring purchase of land not in notice to treat)—
(a)for paragraphs 1(2) and 14(2) substitute—
“(2) But see article 31(3) (acquisition of subsoil or airspace only) of the A303 Sparkford to Ilchester Dualling Development Consent Order 2021, which excludes the acquisition of subsoil or airspace only from this Schedule;” and
(b)after paragraph 29, end insert—
30. In this Schedule, references to entering on and taking possession of land do not include doing so under articles 21 (protective works to buildings), 33 (temporary use of land for carrying out the authorised development) or 34 (temporary use of land for maintaining the authorised development) of the A303 Sparkford to Ilchester Dualling Development Consent Order 2021.”.
Commencement Information
I29Art. 29 in force at 19.2.2021, see art. 1
Marginal Citations
M45Section 4A(1) was inserted by section 202(1) of the Housing and Planning Act 2016 (c. 22).
M46Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016.
30.—(1) The 1981 Act applies as if this Order were a compulsory purchase order.
(2) The 1981 Act, as applied by paragraph (1), has effect with the following modifications.
(3) In section 1 (application of Act), for subsection 2 substitute—
“(2) This section applies to any Minister, any local or other public authority or any other body or person authorised to acquire land by means of a compulsory purchase order.”.
(4) In section 5 (earliest date for execution of declaration), in subsection (2), omit the words from “, and this subsection” to the end.
(5) Omit section 5A M47 (time limit for general vesting declaration).
(6) In section 5B M48 (extension of time limit during challenge) for “section 23 of the Acquisition of Land Act 1981 (application to High Court in respect of compulsory purchase order), the three year period mentioned in section 5A” substitute “ section 118 M49 (legal challenges relating to applications for orders granting development consent) of the Planning Act 2008, the five year period mentioned in article 25 (time limit for exercise of authority to acquire land compulsorily) of the A303 Sparkford to Ilchester Dualling Development Consent Order 2021 ”.
(7) In section 6 M50 (notices after execution of declaration), in subsection (1)(b), for “section 15 of, or paragraph 6 of Schedule 1 to, the Acquisition of Land Act 1981” substitute “ section 134 M51 (notice of authorisation of compulsory acquisition) of the Planning Act 2008 ”.
(8) In section 7 (constructive notice to treat), in subsection (1)(a), omit “(as modified by section 4 of the Acquisition of Land Act 1981)”.
(9) In Schedule A1 M52 (counter-notice requiring purchase of land not in general vesting declaration) for paragraph 1(2) substitute—
“(2) But see article 31(3) (acquisition of subsoil or airspace only) of the A303 Sparkford to Ilchester Dualling Development Consent Order 2021, which excludes the acquisition of subsoil or airspace only from this Schedule.”.
(10) References to the 1965 Act in the 1981 Act are to be construed as references to the 1965 Act as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and as modified by article 29 (modification of Part 1 of the 1965 Act)) to the compulsory acquisition of land under this Order.
Commencement Information
I30Art. 30 in force at 19.2.2021, see art. 1
Marginal Citations
M47Section 5A was inserted by section 182(2) of the Housing and Planning Act 2016.
M48Section 5B was inserted by section 202(2) of the Housing and Planning Act 2016.
M49Section 118 was amended by paragraphs 1 and 59 of Schedule 13, and Part 20 of Schedule 25 to, the Localism Act 2011 (c. 20) and section 92(4) of the Criminal Justice and Courts Act 2015 (c. 2).
M50Section 6 was amended by paragraph 52(2) of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11) and paragraph 7 of Schedule 15 to the Housing and Planning Act 2016.
M51Section 134 was amended by section 142 of, and Part 21 of Schedule 25 to, the Localism Act 2011 (c. 20) and S.I. 2017/16.
M52Schedule A1 was inserted by paragraph 6 of Schedule 18 to the Housing and Planning Act 2016.
31.—(1) The undertaker may acquire compulsorily so much of, or such rights in, the subsoil of or the airspace over the land referred to in paragraph (1) of article 23 (compulsory acquisition of land) as may be required for any purpose for which that land may be acquired under that provision instead of acquiring the whole of the land.
(2) Where the undertaker acquires any part of, or rights in, the subsoil of or the airspace over the land referred to in paragraph (1), the undertaker is not required to acquire an interest in any other part of the land.
(3) The following do not apply in connection with the exercise of the power under paragraph (1) in relation to subsoil or airspace only—
(a)Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act;
(b)Schedule A1 (counter-notice requiring purchase of land not in general vesting declaration) to the 1981 Act; and
(c)Section 153(4A) (blighted land: proposed acquisition of part interest; material detriment test) of the 1990 Act.
(4) Paragraphs (2) and (3) are to be disregarded where the undertaker acquires a cellar, vault, arch or other construction forming part of a house, building or manufactory or airspace above a house, building or manufactory.
Commencement Information
I31Art. 31 in force at 19.2.2021, see art. 1
32.—(1) The undertaker may enter on and appropriate so much of the subsoil of, or airspace over, any street within the Order limits as may be required for the purposes of the authorised development and may use the subsoil or airspace for those purposes or any other purpose ancillary to the authorised development.
(2) Subject to paragraph (3), the undertaker may exercise any power conferred by paragraph (1) in relation to a street without being required to acquire any part of the street or any easement or right in the street.
(3) Paragraph (2) does not apply in relation to—
(a)any subway or underground building; or
(b)any cellar, vault, arch or other construction in, on or under a street which forms part of a building fronting onto the street.
(4) Subject to paragraph (5), any person who is an owner or occupier of land in respect of which the power of appropriation conferred by paragraph (1) is exercised without the undertaker acquiring any part of that person's interest in the land, and who suffers loss as a result, is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
(5) Compensation is not payable under paragraph (4) to any person who is a statutory undertaker to whom section 85 (sharing of cost of necessary measures) of the 1991 Act applies in respect of measures of which the allowable costs are to be borne in accordance with that section.
Commencement Information
I32Art. 32 in force at 19.2.2021, see art. 1
33.—(1) The undertaker may, in connection with the carrying out of the authorised development, but subject to article 25(2) (time limit for exercise of authority to acquire land compulsorily)—
(a)enter on and take temporary possession of—
(i)the land specified in column (1) of Schedule 7 (land of which temporary possession may be taken) for the purpose specified in relation to that land in column (2) of that Schedule relating to the part of the authorised development specified in column (3) of that Schedule; and
(ii)any other Order land in respect of which no notice of entry has been served under section 11 M53 (powers of entry) of the 1965 Act (other than in connection with the acquisition of rights only) and no declaration has been made under section 4 (execution of declaration) of the 1981 Act;
(b)remove any buildings and vegetation from that land;
(c)construct temporary works (including the provision of means of access) and buildings on that land; and
(d)construct any permanent works specified in relation to that land in column (2) of Schedule 7, or any other mitigation works in connection with the authorised development.
(2) Not less than 14 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land and explain the purpose for which entry is taken in respect of land specified under paragraph (1)(a)(ii).
(3) The undertaker must not, without the agreement of the owners of the land, remain in possession of any land under this article—
(a)in the case of land specified in paragraph (1)(a)(i), after the end of the period of one year beginning with the date of completion of the part of the authorised development specified in relation to that land in column (3) of Schedule 7; or
(b)in the case of any land referred to in paragraph (1)(a)(ii), after the end of the period of one year beginning with the date of completion of the work for which temporary possession of the land was taken unless the undertaker has, by the end of that period, served a notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act in relation to that land.
(4) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but the undertaker is not required to—
(a)replace a building removed under this article;
(b)restore the land on which any permanent works (including ground strengthening works) have been constructed under paragraph (1)(d); or
(c)remove any measures installed over or around statutory undertakers' apparatus to protect that apparatus from the authorised development.
(5) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.
(6) Any dispute as to a person's entitlement to compensation under paragraph (5), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.
(7) Nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (5).
(8) The undertaker may not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(i) except that the undertaker is not to be precluded from acquiring any part of the subsoil of or airspace over (or rights in the subsoil of or airspace over) that land under article 31 (acquisition of subsoil or airspace only).
(9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
(10) Section 13 M54 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
(11) Paragraph (1)(a)(ii) does not authorise the undertaker to take temporary possession of any land which the undertaker is not authorised to acquire under article 23 (compulsory acquisition of land) or article 26 (compulsory acquisition of rights).
Commencement Information
I33Art. 33 in force at 19.2.2021, see art. 1
Marginal Citations
M53Section 11 was amended by section 34(1) of, and paragraph 14 of Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, paragraph 6 of Schedule 14 to and paragraph 3 of Schedule 16, to the Housing and Planning Act 2016 (c.22), and S.I. 2009/1307.
M54Section 13 was amended by sections 62(3) and 139 of, and paragraphs 27 and 28 of Schedule 13, and Part 3 of Schedule 23, to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
34.—(1) Subject to paragraph (2), at any time during the maintenance period relating to any part of the authorised development, the undertaker may—
(a)enter upon and take temporary possession of any land within the Order limits if such possession is reasonably required for the purpose of maintaining the authorised development;
(b)enter on any land within the Order limits for the purpose of gaining such access as is reasonably required for the purpose of maintaining the authorised development; and
(c)construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.
(2) Paragraph (1) does not authorise the undertaker to take temporary possession of—
(a)any house or garden belonging to a house; or
(b)any building (other than a house) if it is for the time being occupied.
(3) Not less than 28 days before entering upon and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.
(4) The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.
(5) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.
(6) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.
(7) Any dispute as to a person's entitlement to compensation under paragraph (6), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.
(8) Nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under paragraph (6).
(9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
(10) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
(11) In this article “the maintenance period”, in relation to any part of the authorised development, means the period of 5 years beginning with the date on which that part of the authorised development is first opened for use.
Commencement Information
I34Art. 34 in force at 19.2.2021, see art. 1
35.—(1) Subject to the provisions of article 26(3) (compulsory acquisition of rights), Schedule 8 (protective provisions) and paragraph (2), the undertaker may—
(a)acquire compulsorily, or acquire new rights or impose restrictive covenants over, any Order land belonging to statutory undertakers; and
(b)extinguish the rights of, or remove or reposition the apparatus belonging to, statutory undertakers over or within the Order land.
(2) Paragraph (1)(b) has no effect in relation to apparatus in respect of which the following provisions apply—
(a)Part 3 (street works in England and Wales) of the 1991 Act; and
(b)article 36 (apparatus and rights of statutory undertakers in stopped up streets).
Commencement Information
I35Art. 35 in force at 19.2.2021, see art. 1
36.—(1) Where a street is stopped up under article 16 (permanent stopping up and restriction of use of highways, streets and private means of access), any statutory utility whose apparatus is under, in, on, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this article, as if this Order had not been made.
(2) Where a street is stopped up under article 16 any statutory utility whose apparatus is under, in, on, over, along or across the street may, and if reasonably requested to do so by the undertaker must—
(a)remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the utility may reasonably determine and have power to place it; or
(b)provide other apparatus in substitution for the existing apparatus and place it in such position as described in sub-paragraph (a).
(3) Subject to the following provisions of this article, the undertaker must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—
(a)the execution of the relocation works required in consequence of the stopping up of the street; and
(b)the doing of any other work or thing rendered necessary by the execution of the relocation works.
(4) If in the course of the execution of relocation works under paragraph (2)—
(a)apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or
(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which, apart from this paragraph, would be payable to the statutory utility by virtue of paragraph (3) is to be reduced by the amount of that excess.
(5) For the purposes of paragraph (4)—
(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
(6) An amount which, apart from this paragraph, would be payable to a statutory utility in respect of works by virtue of paragraph (3) (and having regard, where relevant, to paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
(7) Paragraphs (3) to (6) do not apply where the authorised development constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 of the 1991 Act, but instead—
(a)the allowable costs of the relocation works are to be determined in accordance with section 85 (sharing of cost of necessary measures) of that Act and any regulations for the time being having effect under that section; and
(b)the allowable costs are to be borne by the undertaker and the statutory utility in such proportions as may be prescribed by any such regulations.
(8) In this article—
“apparatus” has the same meaning as in Part 3 of the 1991 Act;
“relocation works” means work executed, or apparatus provided, under paragraph (2); and
“statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in section 151(1) of the Communications Act 2003 M55.
37.—(1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 35 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
(2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 35, any person who is—
(a)the owner or occupier of premises the drains of which communicated with that sewer; or
(b)the owner of a private sewer which communicated with that sewer,
is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.
(3) This article does not have effect in relation to apparatus to which article 36 (apparatus and rights of statutory undertakers in stopped up streets) or Part 3 of the 1991 Act applies.
(4) In this paragraph—
“public communications provider” has the same meaning as in section 151(1) (interpretation of Chapter 1) of the Communications Act 2003; and
“public utility undertaker” means a gas, water, electricity or sewerage undertaker.
Commencement Information
I37Art. 37 in force at 19.2.2021, see art. 1
38.—(1) Subject to paragraphs (6) and (7), the undertaker may fell or lop any tree or shrub, or cut back its roots, within or overhanging land within the Order limits if it reasonably believes it to be necessary to do so to prevent the tree or shrub—
(a)from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or
(b)from constituting a danger to persons using the authorised development.
(2) In carrying out any activity authorised by paragraph (1), the undertaker must—
(a)do no unnecessary damage to any tree or shrub;
(b)pay compensation to any person for any loss or damage arising from such activity; and
(c)take steps to avoid a breach of the provisions of the Wildlife and Countryside Act 1981 M56, the Conservation of Habitats and Species Regulations 2017 M57 and the Natural Environment and Rural Communities Act 2006 M58.
(3) Any dispute as to a person's entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined under Part 1 of the 1961 Act.
(4) The undertaker may, for the purposes of carrying out the authorised development but subject to paragraph (2), remove any hedgerow within the Order limits that is required to be removed.
(5) In this article “hedgerow” means a hedgerow to which the Hedgerows Regulations 1997 M59 apply and includes important hedgerows.
(6) Except where necessary to prevent or remove a danger to persons using the authorised development, the powers set out in this article may not be used to remove any tree, shrub or hedgerow which is shown as being retained on the works plans or the approved detailed design for the authorised development.
(7) Except where the removal and replacement of any tree, shrub or other planting which fails to establish, dies or becomes diseased is required, the powers set out in this article may not be used to fell or lop any tree or shrub or remove any part of any hedgerow planted in accordance with the approved detailed design for the authorised development other than in accordance with the provisions of the LEMP or HEMP as applicable.
(8) In paragraphs (6) and (7)—
“the approved detailed design for the authorised development” means the detailed design for the authorised development as approved under the requirements in Schedule 2 (requirements);
“HEMP” and “LEMP” have the same meanings as in Schedule 2.
39.—(1) This article applies to—
(a)any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same; and
(b)any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it,
so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person's use.
(2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
(3) No such enactment or rule of law applies in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
(a)exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
(b)confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
(c)restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.
Commencement Information
I39Art. 39 in force at 19.2.2021, see art. 1
40. Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) (cases in which land is to be treated as operational land for the purposes of that Act) of the 1990 Act.
Commencement Information
I40Art. 40 in force at 19.2.2021, see art. 1
41.—(1) Where proceedings are brought under section 82(1) (summary proceedings by person aggrieved by statutory nuisance) of the Environmental Protection Act 1990 M60 in relation to a nuisance falling within paragraph (d), (fb), (g) or (ga) of section 79(1) (statutory nuisances and inspections therefor) of that Act no order is to be made, and no fine may be imposed, under section 82(2) M61 of that Act if the defendant shows that the nuisance—
(a)relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61 (prior consent for work on construction sites), of the Control of Pollution Act 1974 M62; or
(b)is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or
(c)is a consequence of the use of the authorised development and that it cannot reasonably be avoided.
(2) Section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.
Commencement Information
I41Art. 41 in force at 19.2.2021, see art. 1
Marginal Citations
M601990 c. 43. There are amendments to this subsection which are not relevant to this Order.
M61Section 82(2) was amended by section 51(1) and (2) of the Noise and Statutory Nuisance Act 1993 (c. 40). There are other amendments to this subsection which are not relevant to this Order.
M621974 c. 40. Section 61 was amended by section 162 of, and paragraph 15(1) and (3) of Schedule 15 to, the Environmental Protection Act 1990 (c. 43). There are other amendments to section 61 which are not relevant to this Order.
42. Schedule 8 (protective provisions) has effect.
Commencement Information
I42Art. 42 in force at 19.2.2021, see art. 1
43.—(1) The undertaker must, as soon as practicable after the making of this Order, and no later than ten working days from the date of the making of this Order, submit to the Secretary of State for certification that they are true copies of the plans and documents referred to in this Order copies of—
(a)each of the plans and documents set out in Schedule 9 (documents to be certified); and
(b)any other plans or documents referred to in this Order requiring certification.
(2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(3) The undertaker must make copies of the certified plans available in electronic form to the public no later than 14 days after certification under paragraph (1) until no earlier than one year after the completion of all of the works.
Commencement Information
I43Art. 43 in force at 19.2.2021, see art. 1
44.—(1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
(a)by post;
(b)by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
(c)with the consent of the recipient and subject to paragraphs (5) to (8) by electronic transmission.
(2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
(3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978 M63 as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
(a)in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
(b)in any other case, the last known address of that person at the time of service.
(4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
(a)addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
(b)either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
(5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is to be taken to be fulfilled only where—
(a)the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
(b)the notice or document is capable of being accessed by the recipient;
(c)the notice or document is legible in all material respects; and
(d)the notice or document is in a form sufficiently permanent to be used for subsequent reference.
(6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender must provide such a copy as soon as reasonably practicable and in any event within 10 working days of such a notification being received by the sender.
(7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).
(8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
(a)that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
(b)such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
(9) This article does not exclude the employment of any method of service not expressly provided for by it.
(10) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.
45. Except where otherwise expressly provided for in this Order and unless otherwise agreed between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the Lands Chamber of the Upper Tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.
Commencement Information
I45Art. 45 in force at 19.2.2021, see art. 1
46.—(1) In this article “the specified land” means the land within the Order limits.
(2) Before the undertaker carries out any development or works which will or may disturb any human remains in the specified land it must remove those human remains from the specified land, or cause them to be removed, in accordance with the following provisions of this article.
(3) Before any such remains are removed from the specified land the undertaker must consult South Somerset District Council on the intended removal, following which the undertaker must give notice of the intended removal describing the specified land and stating the general effect of the following provisions of this article by—
(a)publishing a notice once in each of two successive weeks in a newspaper circulating in the area of the authorised development; and
(b)displaying a notice in a conspicuous place on or near to the specified land for a minimum of 28 days.
(4) As soon as reasonably practicable after the first publication of a notice under paragraph (3) the undertaker must send a copy of the notice to South Somerset District Council.
(5) At any time within 56 days after the first publication of a notice under paragraph (3) any person who is a personal representative or relative of any deceased person whose remains are interred in the specified land may give notice in writing to the undertaker of that person's intention to undertake the removal of the remains.
(6) Where a person has given notice under paragraph (5), and the remains in question can be identified, that person may cause such remains to be—
(a)removed and re-interred in any burial ground or cemetery in which burials may legally take place; or
(b)removed to, and cremated in, any crematorium,
and that person is to, as soon as reasonably practicable after such re-interment or cremation, provide to the undertaker a certificate for the purpose of enabling compliance with paragraph (11).
(7) If the undertaker is not satisfied that any person giving notice under paragraph (5) is the personal representative or relative as that person claims to be, or that the remains in question can be identified, the question is to be determined on the application of either party in a summary manner by the county court, and the court may make an order specifying who must remove the remains and as to the payment of the costs of the application.
(8) The undertaker must pay the reasonable expenses of removing and re-interring or cremating the remains of any deceased person under this article.
(9) If—
(a)within the period of 56 days referred to in paragraph (5) no notice under that paragraph has been given to the undertaker in respect of any remains in the specified land; or
(b)such notice is given and no application is made under paragraph (7) within 56 days after the giving of the notice but the person who gave the notice fails to remove the remains within a further period of 56 days; or
(c)within 56 days after any order is made by the county court under paragraph (7) any person, other than the undertaker, specified in the order fails to remove the remains; or
(d)it is determined that the remains to which any such notice relates cannot be identified,
subject to paragraph (10) the undertaker is to remove the remains and cause them to be re-interred in such burial ground or cemetery in which burials may legally take place as the undertaker thinks suitable for the purpose; and, so far as possible, remains from individual graves are to be re-interred in individual containers which are to be identifiable by a record prepared with reference to the original position of burial of the remains that they contain.
(10) If the undertaker is satisfied that any person giving notice under paragraph (5) is the personal representative or relative as that person claims to be and that the remains in question can be identified, but that person does not remove the remains, the undertaker must comply with any reasonable request that person may make in relation to the removal and re-interment of cremation of the remains.
(11) On the re-interment or cremation of any remains under this article—
(a)a certificate of re-interment or cremation is to be sent to the Registrar General by the undertaker giving the date of re-interment or cremation and identifying the place from which the remains were removed and the place in which they were re-interred or cremated; and
(b)a copy of the certificate of re-interment or cremation and the record mentioned in paragraph (9) is to be sent by the undertaker to South Somerset District Council.
(12) The removal of the remains of any deceased person under this article must be carried out in accordance with any directions which may be given by the Secretary of State for Justice.
(13) Any jurisdiction or function conferred on the county court by this article may be exercised by the district judge of the court.
(14) Section 25 of the Burial Act 1857 M64 (bodies not to be removed from burial grounds, save under faculty, without licence of Secretary of State) does not apply to a removal carried out in accordance with this article.
Commencement Information
I46Art. 46 in force at 19.2.2021, see art. 1
Marginal Citations
M641857 c. 81. Section 25 was substituted by section 2 of the Church of England (Miscellaneous Provisions) 2014 (2014 No. 1) and amended by section 96(1) of and paragraph 1 in Schedule 3 to, the Ecclesiastical Jurisdiction and Care of Churches Measure 2018 (2018 No. 3).
47.—(1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and in particular, nothing in this Order authorises the undertaker to use, enter upon or in any manner interfere with any land or rights of any description—
(a)belonging to Her Majesty in right of the Crown and forming part of the Crown Estate without the consent in writing of the Crown Estate Commissioners;
(b)belonging to Her Majesty in right of the Crown and not forming part of the Crown Estate without the consent in writing of the government department having the management of that land; or
(c)belonging to a government department or held in trust for Her Majesty for the purposes of a government department without the consent in writing of that government department.
(2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory purchase of any interest in any Crown land (as defined in the 2008 Act) for the time being held otherwise than by or on behalf of the Crown.
(3) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions; and is deemed to have been given in writing where it is sent electronically.
Commencement Information
I47Art. 47 in force at 19.2.2021, see art. 1
Signed by authority of the Secretary of State for Transport
Natasha Kopala
Head of the Transport and Works Act Orders Unit
Department for Transport
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: