The Mersey Docks and Harbour Company (Liverpool Cruise Terminal Extension) Harbour Revision Order 2021

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening Options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Power to construct and maintain works

This section has no associated Explanatory Memorandum

3.—(1) Subject to the provisions of this Order, the Company may within the limits of deviation and according to the levels shown on the deposited plans and sections construct and maintain the whole or part of the following works, together with all necessary works and conveniences connected with or incidental to them—

Work No. 1A — The demolition of the existing timber jetty and deck (known as Princes Jetty) as shown hatched red on Sheet No. 3 of the deposited plans and sections.

Work No. 1B — The demolition of the existing concrete decked jetty (known as Princes Jetty) as shown hatched red on Sheet No. 3 of the deposited plans and sections.

Work No. 2 — The construction of a reinforced concrete suspended deck on piles driven into the river bed together with the creation of a new cruise liner terminal building, with a gross floor area of 10,000m2, as shown coloured yellow on Sheet No. 3 of the deposited plans and sections, for use as a baggage hall, passenger lounges and other associated facilities.

Work No. 3A — The construction of a vehicular and pedestrian linkspan bridge approximately 85 meters in length commencing at a point at 53.409703, -3.0018239 proceeding in a southerly direction, terminating at a point at 53.408985, -3.0013267 and connecting to a new floating pontoon at Work No. 3B so as to connect the new cruise liner terminal at Work No. 2 with the existing landing stage at Work No. 4 as shown on Sheet No. 4 of the deposited plans and sections.

Work No. 3B — The construction of a new floating pontoon approximately 20 metres in length commencing at a point at 53.409048, -3.0013685 and terminating at a point at 53.408882, - 3.0012533 so as to connect the new linkspan bridge at Work No. 3A with the existing landing stage at Work No. 4 as shown on Sheet No. 4 of the deposited plans and sections.

Work No. 4 — The modification of the existing landing stage, including—

(a)

the removal and relocation of the existing pilot boat launch facility;

(b)

the removal and replacement of the existing walkway cover so as to connect to the pedestrian linkspan bridge at Work No. 2; and

(c)

works to the existing lower terminal buildings.

Work No. 5 — The removal of two existing steel mono pile mooring dolphins and the construction of two new steel mono pile mooring dolphins set into the river bed commencing at a point at 53.409441, -3.0017667 proceeding in a southerly direction, terminating at a point at 53.409231, -3.0016213 as shown on Sheet No. 4 of the deposited plans and sections, the access to which will be via a fixed bridge from the suspended deck.

(2) The Company may within the limits of deviation alter, replace, relay, reconstruct, extend and enlarge the works and may maintain the same as altered, replaced, relayed, reconstructed, extended or enlarged.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources