Print Options
PrintThe Whole
Instrument
PrintThis
Schedule
only
Changes over time for: SCHEDULE 11
Timeline of Changes
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Status:
Point in time view as at 29/12/2022.
Changes to legislation:
There are currently no known outstanding effects for the The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022, SCHEDULE 11.
Changes to Legislation
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Requirement 5
SCHEDULE 11E+W+SDESIGN PARAMETERS
1. Maximum parameters for buildings and structures are set out at table 6.E+W+S
2. The finished ground level in respect of Work No. 1A, Work No. 1C and Work No. 1E may be higher than 2.8 metres above ordinance datum (AOD) but in all cases the maximum heights measured AOD shall not exceed the measurement in column 5 of table 6.E+W+S
3. Maximum parameters of the A18 Gatehouse building (Work No. 8B) are set out in table 7.E+W+S
4. Maximum parameters for length (m), width (m) or diameter (m) exclude external support structures such as (but not limited to) ladders, platforms, external piping and structural supports.E+W+S
Table 6
(1)
Component
| (2)
Length (m)
| (3)
Width (m) or diameter (m)
| (4)
Height (m) above ground level (AGL) (in the case that the finished ground level is 2.8m AOD)
| (5)
Height (M) AOD (in all cases)
|
---|
Gas Turbine Hall (Work No. 1A) | 22 | 50 | 31.8 | 34.6 |
Steam Turbine Hall (Work No. 1A) | 50 | 40 | 34.8 | 37.6 |
HRSG Building (Work No. 1A) | 28 | 50 | 55.8 | 58.6 |
Absorber (Work No. 1C) (in the case that a single absorber is developed) | 16 (Note 4) | 43 (Note 4) | 98.8 | 101.6 |
Absorber Stack (Work No. 1C) (in the case that a single absorber is developed) | - | 6.7 | 104.8 | 107.6 |
Twin Absorbers (Work No. 1C) (in the case that two absorbers are developed) | - | 19.0 (Note 4) | 80 | 82.8 |
Twin Absorber Stacks (Work No. 1C) (in the case that two absorbers are developed) | - | 6.7 | 95.5 | 98.3 |
HRSG Stack (Work No. 1A) | - | 8.0 | 84.8 | 87.6 |
Carbon Dioxide stripper (Work No. 1C) | - | 15.0 (Note 4) | 63 | 65.8 |
| | | | |
Table 7
(1)
Component
| (2)
Length (m)
| (3)
Width (m)
| (4)
Height (m) above ground level (AGL)
| (5)
Height (m) AOD
|
---|
A18 Gatehouse (Work No. 8B) | 6 | 7 | 4 | 5.5 |
Back to top