Statutory Instruments

2024 No. 195

ELECTRICITY, ENGLAND

The Electricity (Individual Exemption from the Requirement for a Generation Licence) (Slough Multifuel) (England) Order 2024

Made

22nd February 2024

Laid before Parliament

26th February 2024

Coming into force

29th March 2024

The Secretary of State makes this Order in exercise of the powers conferred by section 5(1) of the Electricity Act 1989(1).

The Secretary of State has given notice of the proposal to make this Order in accordance with sections 5(2) and 5(3) of that Act. No representations in respect of the proposal have been made.

Citation, commencement, extent and application

1.—(1) This Order may be cited as the Electricity (Individual Exemption from the Requirement for a Generation Licence) (Slough Multifuel) (England) Order 2024 and comes into force on 29th March 2024.

(2) This Order extends to England and Wales and Scotland.

(3) This Order applies in relation to England only.

Interpretation

2.  In this Order—

the Act” means the Electricity Act 1989;

Slough Multifuel generating station” means the electricity generating station known as Slough Multi-fuel generating station located in Slough, Berkshire, England, whose entrance is situated at Ordnance Survey map reference SU952815(2);

SSE Slough Multifuel Limited” means the company of that name registered in England and Wales with company number 11271136;

the total system” means all transmission systems and distribution systems, located in Great Britain, of holders of licenses under section 6(1)(b) and (c) of the Act(3).

Exemption from prohibition of unlicensed generation of electricity for supply

3.  Exemption is granted from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) to SSE Slough Multifuel Limited in respect of Slough Multifuel generating station.

Conditions on exemption

4.  The exemption granted by article 3 of this Order is subject to compliance with the following conditions—

(a)Slough Multifuel generating station is connected to the total system;

(b)Slough Multifuel generating station does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of SSE Slough Multifuel Limited; and

(c)SSE Slough Multifuel Limited does not hold a licence under section 6(1)(a) of the Act in relation to Slough Multifuel generating station.

Claire Coutinho

Secretary of State for Energy Security and Net Zero

Department for Energy Security and Net Zero

22nd February 2024

Explanatory Note

(This note is not part of the Order)

Article 3 of this Order grants an exemption from the requirements of section 4(1)(a) of the Electricity Act 1989 (which prohibits unlicensed generation of electricity for supply to any premises) to SSE Slough Multifuel Limited in relation to Slough Multifuel generating station, an electricity generating station located in Slough, Berkshire, England.

A full impact assessment has not been produced for this instrument as no, or no significant, impact on the private, voluntary or public sector is foreseen. A regulatory impact assessment in respect of exemptions from the requirements of section 4(1)(a) of the Electricity Act 1989 was prepared in 2001 and can be obtained from the Department for Energy Security and Net Zero, 3-8 Whitehall Place, London, S1A 2EG. Copies have been placed in the libraries of both Houses of Parliament.

(1)

1989 c. 29; section 5 was substituted by section 29 of the Utilities Act 2000 (c. 27).

(2)

The Ordnance Survey map reference system is used to identify the position of a feature on Ordnance Maps (as defined in section 5 and Schedule 1 to the Interpretation Act 1978 (c.30)).

(3)

Section 6 was substituted by section 30 of the Utilities Act 2000 and section 6(1)(b) was further substituted by section 136(1) of the Energy Act 2004 (c. 20).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources