Chwilio Deddfwriaeth

The Environmental Impact Assessment (Agriculture) Regulations (Northern Ireland) 2007

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: The Environmental Impact Assessment (Agriculture) Regulations (Northern Ireland) 2007 (Schedules only)

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Environmental Impact Assessment (Agriculture) Regulations (Northern Ireland) 2007. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

SCHEDULE 1N.I.Thresholds

Commencement Information

I1Sch. 1 in operation at 5.11.2007, see reg. 1

Column 1Column 2Column 3
Uncultivated land project2 hectares2 hectares
Restructuring project involving the addition or removal of any field boundary (including any wall, fence, bank, ditch or watercourse)4 kilometres2 kilometres
Restructuring project which involves an area of land100 hectares50 hectares

Regulations 6 and 8

[F1SCHEDULE 2N.I.Selection criteria for a screening notice or a screening decision

1.    Characteristics of projectsN.I.

The characteristics of project must be considered, with particular regard:—

(a)the size and design of the whole project;

(b)cumulation with other existing and/or approved project;

(c)the use of natural resources, in particular land, soil, water and biodiversity;

(d)the production of waste;

(e)pollution and nuisances;

(f)the risk of major accidents and/or disasters which are relevant to the project concerned including those caused by climate change, in accordance with scientific knowledge;

(g)the risks to human health (for example due to water contamination or air pollution).

2.    Location of projectsN.I.

The environmental sensitivity of geographical areas likely to be affected by projects must be considered, with particular regard to:—

(a)the existing and approved land use;

(b)the relative abundance, availability, quality and regenerative capacity of natural resources (including soil, land, water, and biodiversity) in the area and its underground;

(c)the absorption capacity of the natural environment, paying particular attention to the following areas:—

(i)wetlands, riparian areas, river mouths;

(ii)coastal zones and the marine environment;

(iii)mountain and forest areas;

(iv)nature reserves and parks;

(v)areas classified or protected under legislation (“including European sites or Areas of Special Scientific Interest” or “Natura 2000 areas F2...”);

(vi)areas in which there has already been a failure to meet the environmental quality standards, laid down in Union legislation and relevant to the project, or in which it is considered that there is such a failure;

(vii)densely populated areas;

(viii)landscapes and sites of historical, cultural or archaeological significance.

3.    Type and characteristics of the potential impactN.I.

The likely significant effects of projects on the environment must be considered in relation to criteria set out in paragraphs 1 and 2 of this schedule, with regard to the impact of the project on the factors specified in regulation 9(3), taking into account:—

(a)the magnitude and spatial extent of the impact (for example geographical area and size of the population likely to be affected);

(b)the nature of the impact;

(c)the transboundary nature of the impact;

(d)the intensity and complexity of the impact;

(e)the probability of the impact;

(f)the expected onset, duration, frequency and reversibility of the impact;

(g)the cumulation of the impact with the impact of other existing and/or approved projects;

(h)the possibility of effectively reducing the impact.]

Regulation 7

[F3SCHEDULE 2AN.I.Information to be provided for a Screening decision

1.  A plan sufficient to identify the relevant land.N.I.

2.  A description of the project, including in particular a description of—N.I.

(a)the physical characteristics of the whole project and, where relevant, of demolition works;

(b)the location of the project, with particular regard to the environmental sensitivity of geographical areas likely to be affected.

3.  A description of the aspects of the environment likely to be significantly affected by the project.N.I.

4.  A description of any features of the proposed project or measures to avoid or prevent any likely significant adverse effects on the environment.N.I.

5.  A description under paragraph 2 must include a description or any likely significant effects, of the project on the environment resulting from—N.I.

(a)the expected residues and emissions and the production of waste, where relevant, and

(b)the use of natural resources, in particular soil, land, water and biodiversity.

6.  When compiling the information in accordance with paragraphs 1 to 4, the applicant must take into account—N.I.

(a)the criteria of Schedule 2 which are relevant to the project, and

(b)the results of any relevant EU environmental assessments which are reasonably available to the applicant.]

Regulations 2(1) and 9A

[F4SCHEDULE 3N.I.Information for inclusion in the Environmental Statements

PART 1N.I.

1.  The information to be provided shall include at least:—N.I.

(a)a description of the project comprising information on the site, design, size and other relevant features of the project;

(b)a description of the likely significant effects of the project on the environment;

(c)a description of the features of the project and/or measures envisaged in order to avoid, prevent or reduce and, if possible offset likely significant adverse effects on the environment;

(d)a description of the reasonable alternative studied by the developer, which are relevant to the project and its specific characteristics, and an indication of the main reasons for the option chosen, taking into account the effects of the project on the environment;

(e)a non-technical summary of the information referred to in sub-paragraphs (a) to (d); and

(f)any additional information specified in Part 2 of this Schedule relevant to the specific characteristics of a particular project or type of project and to the environmental features likely to be effected.

PART 2N.I.

1.  Description of the project, including in particular:—N.I.

(a)a description of the location of the project;

(b)a description of the physical characteristics of the whole project including, where relevant, requisite demolition works and the land-use requirements during the construction and operational phases;

(c)a description of the main characteristics of the operational phase of the project (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used;

(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) and quantities and types of waste produced during the construction and operation phases.

2.  A description of the reasonable alternatives (for example in terms of project design, technology, location, size and scale) studied by the developer, which are relevant to the proposed project and its specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.N.I.

3.  A description of the relevant aspects of the current state of the environment (baseline scenario) and an outline of the likely evolution thereof without implementation of the project as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.N.I.

4.  A description of the factors specified in regulation 9(3) likely to be significantly affected by the project: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, scaling), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscapes.N.I.

5.  A description of the likely significant effects of the project on the environment resulting from, including:—N.I.

(a)the construction and existence of the project, including, where relevant, demolition works;

(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;

(c)the emission of pollutants, noise, vibration, light heat and radiation, the creation of nuisances, and the disposal and recovery of waste;

(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);

(e)the cumulation of effects with other existing and/or approved projects, taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;

(f)the impact of the project on climate (for example the nature and magnitude of green house gas emissions) and the vulnerability of the project to climate change;

(g)the technologies and the substances used.

The description of the likely significant effects on the factors specified in regulation 9(3) should cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the project. This description should take into account the environmental protection objectives established [F5in Union legislation or under other national legislation] which are relevant to the project.

6.  A description of the forecasting methods or evidence, used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.N.I.

7.  A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis). That description should explain the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases.N.I.

8.  A description of the expected significant adverse effects of the project on the environment deriving from the vulnerability of the project to risks of major accidents and/or disasters which are relevant to the project concerned. [F6Relevant information available and obtained through risk assessments pursuant to Union legislation or UK environmental assessments may be used for this purpose provided that the requirements of any law that implemented Directive 2011/92/EU of the European Parliament and of the Council on the assessment of the effects of certain public and private projects on the environment are met.] Where appropriate this description should include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.N.I.

9.  A non-technical summary of the information provided under paragraphs 1 to 8.N.I.

10.  A reference list detailing the sources used for the descriptions and assessments included in the report.]N.I.

SCHEDULE 4N.I.Review of decisions and consents

1.  As soon as is reasonably practicable the Department must, for the purpose of determining whether the project permitted by the decision or consent will adversely affect the integrity of the site, make an appropriate assessment of the implications of the project for the European site or Area of Special Scientific Interest in view of the site’s conservation objectives.N.I.

Commencement Information

I2Sch. 4 para. 1 in operation at 5.11.2007, see reg. 1

2.  For the purposes of the assessment, the Department may —N.I.

(a)require any person interested in the relevant land to supply it with such information as it reasonably thinks necessary; and

(b)if it considers it necessary, consult members of the public.

Commencement Information

I3Sch. 4 para. 2 in operation at 5.11.2007, see reg. 1

3.  Unless, following the assessment, the Department is satisfied that the project permitted by the decision or consent will not adversely affect the integrity of the European site or Area of Special Scientific Interest, and regulation 17(4) does not apply, The Department shall—N.I.

(a)in the case of a decision, revoke the decision; and

(b)in the case of a consent, either—

(i)revoke the consent; or

(ii)make such modifications to the consent as appear to it to be necessary to ensure that the project will not adversely affect the integrity of the European site or Area of Special Scientific Interest,

and the Department must notify all persons who appear to it to have an interest in the relevant land of its decision (its “further decision”).

Commencement Information

I4Sch. 4 para. 3 in operation at 5.11.2007, see reg. 1

4.  Subject to paragraph 5, a further decision does not affect any works that have already been carried out in relation to a decision or consent.N.I.

Commencement Information

I5Sch. 4 para. 4 in operation at 5.11.2007, see reg. 1

5.—(1) If—N.I.

(a)a project which is subject to a further decision has commenced; and

(b)it appears to the Department to be necessary to safeguard the integrity of the European site or Area of Special Scientific Interest,

the Department may by notice require the person responsible for carrying out such works, or the owner/occupier of the relevant land, to carry out such works of reinstatement as may be reasonable in the circumstances,

(2) A notice under paragraph (1) must state the period during which the works must be carried out.

(3) Any person who carries out such reinstatement works is entitled, on making a claim in accordance with paragraph 8, to recover from the Department compensation in respect of any expenses reasonably incurred by him in carrying out those works.

Commencement Information

I6Sch. 4 para. 5 in operation at 5.11.2007, see reg. 1

6.—(1) Regulation 28 applies to a further decision made under paragraph 3.N.I.

(2) Regulation 27 applies to a notice served under paragraph 5.

Commencement Information

I7Sch. 4 para. 6 in operation at 5.11.2007, see reg. 1

7.  If, following a further decision, a person has incurred expenditure in carrying out work which is rendered abortive by the further decision or has otherwise sustained loss of damage which is directly attributable to the further decision, he is entitled to be paid compensation on submitting a claim in accordance with paragraph 8.N.I.

Commencement Information

I8Sch. 4 para. 7 in operation at 5.11.2007, see reg. 1

8.  A claim for compensation payable under paragraph 5(3) or 7 must be submitted to the Department within 6 weeks of the notification of the further decision and must be accompanied by such evidence as the Department may reasonably require.N.I.

Commencement Information

I9Sch. 4 para. 8 in operation at 5.11.2007, see reg. 1

9.  Any dispute as to the amount of compensation payable under paragraph 5(3) or 7 may be referred to the Lands Tribunal within 6 years of the date of notification of the further decision in respect of which compensation is payable.N.I.

Commencement Information

I10Sch. 4 para. 9 in operation at 5.11.2007, see reg. 1

10.  Nothing in this Schedule affects anything done in pursuance of a decision or consent before the date the site became a European site or Area of Special Scientific Interest.N.I.

Commencement Information

I11Sch. 4 para. 10 in operation at 5.11.2007, see reg. 1

SCHEDULE 5N.I.Consultation Bodies

Commencement Information

I12Sch. 5 in operation at 5.11.2007, see reg. 1

  • Agri-Food and Biosciences Institute

  • Causeway Coast and Glens Heritage Trust

  • Council for Nature, Conservation and the Countryside

  • Countryside Access Activities Network

  • Department of Agriculture and Food (Republic of Ireland)

  • F7...

  • Department for the Environment, Food and Rural Affairs

  • [F8Department for Communities]

  • Farming and Wildlife Advisory Group

  • Forest Service

  • Mourne Heritage Trust

  • National Trust

  • Northern Ireland Agricultural Producers’ Association

  • Northern Ireland Biodiversity Group

  • Northern Ireland Environment Link

  • Rivers Agency

  • Royal Society for the Protection of Birds

  • Scottish Executive Environment and Rural Affairs Department

  • Ulster Farmers’ Union

  • Ulster Wildlife Trust

  • Welsh Assembly

  • World Wildlife Fund Northern Ireland

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill