Article 4
SCHEDULE 1SCHEDULED WORKS
DESCRIPTION OF WORKS SPECIFICALLY AUTHORISED
In the Metropolitan Borough of Wirral—
Work No.1—
A tramway forming a single line of rails (715 metres in length) commencing at the Woodside Ferry Terminal Exhibition Square and proceeding in a north westerly direction along Woodside Ferry approach, Hamilton Street and Shore Road, terminating 40 metres east of the southern end of “E” Bridge.
Work No.1A—
A curved tramway forming a single line of rails 62 metres in length commencing at a junction (points) with Work No.1, 290 metres from the commencement of Work No.1 and terminating at the Pacific Road Tramsheds.
Work No.1B—
A curved tramway forming a single line of rails 65 metres in length commencing at a junction (points) with Work No.1, 370 metres from the commencement of Work No.1 and terminating at the Pacific Road Tramsheds.
Article 13(1)
SCHEDULE 2TRAMWAY CROSSINGS IN STREETS
In the Metropolitan Borough of Wirral—
The southern access road to Woodside Business Park Access (Private) adjacent to Shore Road.
The northern access road to Woodside Business Park Access (Private) adjacent to Shore Road.
Two road crossings in Pacific Road adjacent to Shore Road.