Commission Decision of 3 November 2010 laying down criteria and measures for the financing of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO2 as well as demonstration projects of innovative renewable energy technologies under the scheme for greenhouse gas emission allowance trading within the Community established by Directive 2003/87/EC of the European Parliament and of the Council (notified under document C(2010) 7499) (2010/670/EU)

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes over time for: Commission Decision of 3 November 2010 laying down criteria and measures for the financing of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO2 as well as demonstration projects of innovative renewable energy technologies under the scheme for greenhouse gas emission allowance trading within the Community established by Directive 2003/87/EC of the European Parliament and of the Council (notified under document C(2010) 7499) (2010/670/EU) (Annexes only)

 Help about opening options

Version Superseded: 01/01/2024

Status:

Point in time view as at 31/01/2020.

Changes to legislation:

There are currently no known outstanding effects for the Commission Decision of 3 November 2010 laying down criteria and measures for the financing of commercial demonstration projects that aim at the environmentally safe capture and geological storage of CO2 as well as demonstration projects of innovative renewable energy technologies under the scheme for greenhouse gas emission allowance trading within the Community established by Directive 2003/87/EC of the European Parliament and of the Council (notified under document C(2010) 7499) (2010/670/EU). Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

ANNEX IU.K. ELIGIBILITY CRITERIA

A.PROJECT CATEGORIESU.K.

I. CCS demonstration project categories (with minimum capacity thresholds (1) ) U.K.

  • power generation: pre-combustion 250 MW,

  • power generation: post-combustion 250 MW,

  • power generation: oxyfuel 250 MW,

  • industrial applications implementing: (a) CCS on refineries with 500 kilotonnes per year (kt/y) stored CO2 from one or more sources within the refinery; (b) CCS application to cement kiln with 500 kt/y stored CO2; (c) CCS application for primary production routes in iron and steel production with 500 kt/y stored CO2; or (d) CCS application for primary production routes in aluminium production with 500 kt/y stored CO2.

II. Innovative RES demonstration project categories (with minimum size thresholds) U.K.

  • Bioenergy – project subcategories:

    • Lignocellulose to intermediate solid, liquid or slurry bioenergy carriers via pyrolysis with capacity 40 kt/y of the final product.

    • Lignocellulose to intermediate solid, liquid or slurry bioenergy carriers via torrefaction with capacity 40 kt/y of the final product.

    • Lignocellulose to Synthetic Natural Gas or synthesis gas and/or to power via gasification with capacity 40 million normal cubic metres per year (MNm3/y) of the final product or 100 GWh/y of electricity.

    • Lignocellulose to biofuels or bioliquids and/or to power including via directly heated gasification with capacity 15 million litres per year (Ml/y) of the final product or 100 GWh/y of electricity. Production of Synthetic Natural Gas is excluded under this subcategory.

    • Lignocellulosic raw material, such as black liquor and/or products from pyrolysis or torrefaction, via entrained flow gasification to any biofuels with capacity 40 Ml/y of the final product.

    • Lignocellulose to electricity with 48 % efficiency based on lower heating value (50 % moisture) with capacity 40 MWe or higher.

    • Lignocellulose to ethanol and higher alcohols via chemical and biological processes with capacity 40 Ml/y of the final product.

    • Lignocellulose and/or household waste to biogas, biofuels or bioliquids via chemical and biological processes with capacity 6 MNm3/y of Methane or 10 Ml/y of the final product.

    • Algae and/or micro-organisms to biofuels or bioliquids via biological and/or chemical processes with capacity 40 Ml/y of the final product.

    Note: sustainability criteria as provided in Directive 2009/28/EC of the European Parliament and of the Council(2) on the promotion of the use of energy from renewable sources shall be met for biofuels and bioliquids within the meaning of that Directive.U.K.

  • Concentrated solar power – project subcategories:

    • Parabolic trough or Fresnel system using molten salts or other environmentally-benign heat transfer fluid with nominal capacity 30 MW.

    • Parabolic trough or Fresnel system based on Direct Steam Generation with nominal capacity 30 MW. Direct steam solar temperature to be above 500 °C.

    • Tower system using superheated steam cycle (either multi-tower or combination liner collectors – tower) with nominal capacity 50 MW.

    • Tower system using pressurised air with temperature above 750 °C and solar hybrid gas turbine with nominal capacity 30 MW.

    • Large-scale Stirling dish power plants with solar to electric efficiency of over 20 % and nominal capacity of at least 25 MW.

    Note: Dry cooling, hybridisation and (advanced) heat storage solution may be included in the demonstration plants.U.K.

  • Photovoltaics – project subcategories:

    • Large-scale concentrator photovoltaics power plants with nominal capacity 20 MW.

    • Large-scale multi-junction Si-thin-film photovoltaics power plants with nominal capacity 40 MW.

    • Large-scale Copper indium gallium (di)selenide (CIGS)-based photovoltaics power plants with nominal capacity 40 MW.

  • Geothermal – project subcategories:

    • Enhanced geothermal systems in tensional stress fields with nominal capacity 5 MWe.

    • Enhanced geothermal systems in compressional stress fields with nominal capacity 5 MWe.

    • Enhanced geothermal systems in areas with deep compact sedimentary and granite rocks and other crystalline structures with nominal capacity 5 MWe.

    • Enhanced geothermal systems in deep limestone with nominal capacity 5 MWe.

    Note: Combined Heat and Power (CHP) applications with the same electricity thresholds are equally eligible.U.K.

  • Wind – project subcategories:

    • Off-shore wind (minimum turbines size 6 MW) with nominal capacity 40 MW.

    • Off-shore wind (minimum turbines size 8 MW) with nominal capacity 40 MW.

    • Off-shore wind (minimum turbines size 10 MW) with nominal capacity 40 MW.

    • Floating off-shore wind systems with nominal capacity 25 MW.

    • On-shore wind turbines optimised for complex terrains (such as forested terrains or mountainous areas): with nominal capacity 25 MW.

    • On-shore wind turbines optimised for cold climates (compatible with temperature lower than – 30 °C and severe icing conditions) with nominal capacity 25 MW.

  • Ocean – project subcategories:

    • Wave energy devices with nominal capacity 5 MW.

    • Marine/tidal currents energy devices with nominal capacity 5 MW.

    • Ocean thermal energy conversion (OTEC) with nominal capacity 10 MW.

  • Hydropower – project subcategories:

    • Power generation with High Temperature Superconducting Generators: 20 MW.

  • Distributed Renewable Management (smart grids) – project subcategories:

    • Renewable energy management and optimisation for small and medium-scale Distributed Generators in rural environment with predominant solar generation: 20 MW on Low Voltage (LV) network + 50 MW on Medium Voltage (MV) network.

    • Renewable energy management and optimisation for small and medium-scale Distributed Generators in rural environment with predominant wind generation: 20 MW on LV network + 50 MW on MV network.

    • Renewable energy management and optimisation for small and medium-scale Distributed Generators in urban environment: 20 MW on LV network + 50 MW on MV network.

    Note: The use of active loads (electric heaters/heat pumps etc.) shall not be excluded.U.K.

B.PROJECT REQUIREMENTSU.K.

I. Common requirements U.K.

  • The capacity thresholds laid down in Part A must be met.

  • With regard to the first round of calls for proposals, projects must demonstrate a reasonable expectation of entry into operation by 31 December 2015 on the basis of the adoption of the respective award decision by 31 December 2011.

  • All relevant national permits for the project must be in place and in line with relevant requirements under Union legislation or the relevant permit procedures under way and sufficiently advanced to ensure start-up of commercial operation could take place by 31 December 2015 for the first round on the basis of the adoption of the respective award decision by 31 December 2011.

  • The project operator has to make a binding commitment to knowledge-sharing pursuant to the requirements laid down in Article 12.

  • Projects shall be located in the territories of the Member States, their exclusive economic zones and their continental shelves.

II. CCS demonstration projects U.K.

  • Each project has to implement the full chain (capture, transport and storage).

  • Each demonstration project must implement heat integration for the capture component of the process.

  • The capture rate has to be at least 85 % of CO2 from the flue gases to which capture is applied.

  • Each project has to contain an independent research block related to safety of storage sites and improvement of monitoring technologies especially in the field of brine migration, its possible pathways and impacts.

ANNEX IIU.K. KNOWLEDGE-SHARING REQUIREMENTS

A. Technical set-up and performance U.K.

  • reliability,

  • CO2 captured,

  • performance at different levels, including differences between expected and real performance,

  • increase in fuel demand; electricity, heat and cooling demand,

  • key inputs and outputs and design,

  • future identified Research and Development issues,

B. Cost level U.K.

  • capital and operating costs,

  • totals and costs per unit performance (tonne CO2 stored, clean MWh produced),

C. Project management U.K.

  • legislation/permitting,

  • stakeholder management, including interaction with Governments,

  • planning,

  • project organisation,

D. Environmental impact U.K.

  • effectiveness: reduction of CO2 emissions per unit energy,

  • other environmental impacts at undisturbed operation,

E. Health and safety U.K.

  • incidents and near misses occurred (disturbed operation),

  • monitoring and resolution systems to track safety,

  • health issues in undisturbed operation,

F. CCS storage site performance U.K.

  • models and simulations (development CO2 plume – pressure front),

  • history match results and adjustments (assessment to be made: normal within a deviation range or significant irregularity that needs action),

  • behaviour of displaced brine through CO2 injection.

(1)

CCS power thresholds are expressed as gross electrical output before capture.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources