Search Legislation

Commission Implementing Regulation (EU) No 908/2014Show full title

Commission Implementing Regulation (EU) No 908/2014 of 6 August 2014 laying down rules for the application of Regulation (EU) No 1306/2013 of the European Parliament and of the Council with regard to paying agencies and other bodies, financial management, clearance of accounts, rules on checks, securities and transparency

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

There are outstanding changes not yet made to Commission Implementing Regulation (EU) No 908/2014. Any changes that have already been made to the legislation appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to :

Changes and effects yet to be applied to the whole legislation item and associated provisions

ANNEX IU.K.F1...

Textual Amendments

F1Annexes 1-4 omitted (31.1.2020 in so far as they relate to the Common Agricultural Policy direct payment schemes) by virtue of The Financing, Management and Monitoring of Direct Payments to Farmers (Amendment) Regulations 2020 (S.I. 2020/90), regs. 1(2), 13(20); and Annexes 1-10 omitted (31.12.2020 in so far as they relate to common organisation of the markets and rural development measures) by virtue of The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(36); 2020 c. 1, Sch. 5 para. 1(1)

F1ANNEX IIU.K. Model table referred to in Article 29(f)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F1ANNEX IIIU.K.MODEL TABLE REFERRED TO IN ARTICLE 29(g)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F1ANNEX IVU.K.TRANSMISSION OF QUERIES REFERRED TO IN ARTICLE 31(4)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F2ANNEX VU.K.INFORMATION TO BE CONTAINED IN THE ANNUAL RISK ANALYSIS REFERRED TO IN ARTICLE 42(2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

F2Annexes 1-10 omitted (31.12.2020 in so far as they relate to common organisation of the markets and rural development measures) by virtue of The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(36); 2020 c. 1, Sch. 5 para. 1(1)

F2ANNEX VIU.K.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F2ANNEX VIIU.K.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F2ANNEX VIIIU.K.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F2ANNEX IXU.K.RESULTS OF SCRUTINY UNDER ARTICLE 45(4)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F2ANNEX XU.K.OVERVIEW REFERRED TO IN ARTICLE 45(5)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ANNEX XIU.K.ANNUAL PROGRAMME DOCUMENTS (ARTICLE 46(1))

SHEET AU.K.PROPOSED SCRUTINY PROGRAMME FOR THE PERIODU.K.(Article 84 of Regulation (EU) No 1306/2013)U.K.

1.

Calculation of the minimum number of undertakings

A (1)The number of undertakings whose receipts or payments, or the sum thereof amounted to more than EUR 150,000 for the [F3CMO support] financial year …
A (2)The minimum number
i.e.x 1/2 =

Textual Amendments

F3Words in Annex 11 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(a) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(7)); 2020 c. 1, Sch. 5 para. 1(1)

2.

Population from which the selection is made

The total number of undertakings having received or made payments subject to Chapter III of Title V of Regulation (EU) No 1306/2013 scrutiny during the financial year … was as follows:
A (3)Total number
Total number whose receipts or payments, or the sum thereof, were in the following categories:
A (4)Exceeding EUR 350 000
A (5)EUR 350 000 or less, but not less than EUR 40 000
A (6)Less than EUR 40 000

3.

Undertakings proposed for scrutiny:

A (7)Total number
A (8)Total based upon risk analysis
Total number whose receipts or payments, or the sum thereof, were in the following categories:
A (9)Exceeding EUR 350 000
A (10)EUR 350 000 or less, but not less than EUR 40 000
A (11)Less than EUR 40 000

Notes on boxes:U.K.

A (4)It is compulsory to scrutinise undertakings in this category which were not scrutinised in accordance with Article 42(3)during the two scrutiny periods preceding that scrutiny period, unless the payments that they received were under a measure or measures for which risk analysis techniques of selection have been adopted.U.K.
A (9)Undertakings in this category are to be scrutiniszed only for specific reasons which are to be indicated in sheet D of this Annex.U.K.

SHEET BU.K.PROPOSED SCRUTINY PROGRAMME FOR THE PERIODU.K.(Article 84 of Regulation (EU) No 1306/2013)U.K.

Scheme of scrutinies in relation to [F4CMO support] budget headings

F5... financial year …

B(1)[F6CMO support] Budget Article or Item No.B(2)Total expenditure by [F6CMO support] budget heading …(EUR)B(3)Total expenditure by [F6CMO support] budget heading relating to undertakings whose receipts or payments, or the sum thereof, were above 40 000 EUR …(EUR)B(4)Total expenditure by [F6CMO support] budget heading relating to undertakings included in the scrutiny programme …(EUR)B(5)Number of undertakings by [F6CMO support] budget heading included in the scrutiny programme
Totals:

Textual Amendments

F4Words in Annex 11 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(b)(i) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(7)); 2020 c. 1, Sch. 5 para. 1(1)

F5Words in Annex 11 omitted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by virtue of The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1)

F6Words in Annex 11 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(b)(iii) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(7)); 2020 c. 1, Sch. 5 para. 1(1)

SHEET CU.K.PROPOSED SCRUTINY PROGRAMME FOR THE PERIODU.K.(Article 84 of Regulation (EU) No 1306/2013)U.K.

Criteria adopted in drawing up the programme in the area of export refunds and other sectors where risk analysis selection techniques have been adopted where these differ from those included in the proposals for risk analysis sent to the [F7Accounting Officer] under Article 42(2).

Textual Amendments

F7Words in Annex 11 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(c)(i); 2020 c. 1, Sch. 5 para. 1(1)

Sector where scrutiny is proposed (show [F8CMO support] budget heading as set out in column B (1) of Sheet B of this Annex)Comments on risk and selection criteria adopted(give brief details — e.g. detected irregularities or exceptional increase in expenditure)

Textual Amendments

F8Words in Annex 11 substituted (31.12.2020 insofar as relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(c)(ii) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(7)); 2020 c. 1, Sch. 5 para. 1(1)

SHEET DU.K.PROPOSED SCRUTINY PROGRAMME FOR THE PERIODU.K.(Article 84 of Regulation (EU) No 1306/2013)U.K.

Proposed scrutinies, if any, of undertakings whose receipts or payments, or the sum thereof, were less than EUR 40,000 during the F9... financial year

Textual Amendments

F9Word in Annex 11 omitted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by virtue of The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(d)(i); 2020 c. 1, Sch. 5 para. 1(1)

[F10CMO support] budget heading(as set out in column B (1) of Sheet B)Number of undertakings that it is proposed to scrutiniseSpecific reason for scrutiny

Textual Amendments

F10Words in Annex 11 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(37)(d)(ii) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(7)); 2020 c. 1, Sch. 5 para. 1(1)

SHEET EU.K.PROPOSED SCRUTINY PROGRAMME FOR THE PERIODU.K.(Article 84 of Regulation (EU) No 1306/2013)U.K.

TOTAL:CONTROL BODY:
E (1)The total number of undertakings to be scrutinised:
E (2)The number of undertakings to be scrutinised:
CONTROL BODY:CONTROL BODY:
E (3)The number of undertakings to be scrutinised:
E (4)The number of undertakings to be scrutinised:
CONTROL BODY:CONTROL BODY:
E (5)The number of undertakings to be scrutinised:
E (6)The number of undertakings to be scrutinised:

Notes on boxes:U.K.

Where applicable, additional boxes e.g. E (7), E (8) etc. are to be addedU.K.

ANNEX XIIU.K.ANNUAL REPORT DOCUMENTS (ARTICLE 46(2))

PART IU.K.Information to be contained in the annual report provided for in Article 86(1) of Regulation (EU) No 1306/2013

1.Administration of Chapter III of Title V of Regulation (EU) No 1306/2013U.K.

Information shall be provided concerning the administration of Chapter III of Title V of Regulation (EU) No 1306/2013, including changes to the organisations responsible for scrutinies and to the special department responsible for monitoring the application of that Regulation, as referred to in Article 85 thereof, and to the competences of those organisations.

2.Legislative changesU.K.

Information shall be provided regarding any national legislative changes relevant to the application of Chapter III of Title V of Regulation (EU) No 1306/2013 that have intervened since the previous annual report.

3.Amendments to the scrutiny programmeU.K.

A description shall be provided of any amendments that were made to the scrutiny programme submitted to the [F11relevant accounting officer] under Article 84(2) of Regulation (EU) No 1306/2013 since the date of submission of that programme.

Textual Amendments

F11Words in Annex 12 Pt. 1 para. 3 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(38)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)

4.Application of the scrutiny programme covered by this reportU.K.

Information shall be provided on the application of the programme of scrutinies for the period ending on 30 June preceding the closing date for submission of the report, as referred to in Article 86(1) of Regulation (EU) No 1306/2013, including the following points, both in total and broken down by control body (where more than one control body carries out controls under that Regulation):

(a)

the number of undertakings scrutinised during the scrutiny period, in accordance with specimen form shown in Sheet A of Part II of this Annex;

(b)

the number of undertakings still in the course of being scrutinised, in accordance with specimen form shown in Sheet A of Part II of this Annex;

(c)

the number of undertakings that were not subject to scrutiny during the period in question as a result of the non-execution of some scrutinies, in accordance with specimen form shown in Sheet A of Part II of this Annex;

(d)

the reasons why the scrutinies referred to in point (c) were not carried out;

(e)

the breakdown, by amounts received by or paid to, and by measure, of the scrutinies referred to in points (a), (b), and (c), in accordance with the specimen form shown in Sheet B of Part II of this Annex;

(f)

the results of the scrutinies referred to in point (a), in accordance with specimen form shown in Sheet C of Part II of this Annex, including:

(i)

the number of scrutinies for which irregularities were discovered, and the number of undertakings involved,

(ii)

the nature of these irregularities,

(iii)

the measure concerned where an irregularity was discovered,

(iv)

the estimated financial consequence of each irregularity;

(g)

an indication of the average duration of scrutinies in person/days, indicating, where practicable, the time spent on planning, preparation, execution of controls, and reporting.

5.Application of the scrutiny programmes preceding the one covered by this programmeU.K.

The report shall contain the results of the scrutinies carried out in respect of previous scrutiny periods, for which the results were not available at the time of the submission of the reports for those scrutiny periods, including for each previous scrutiny period, including:

(a)

the status of scrutinies communicated under point 4(b) and (c) in previous scrutiny reports, in accordance with the specimen form shown in Sheet D of Part II of this Annex;

(b)

the number of scrutinies through which irregularities were discovered, and the number of undertakings involved, in accordance with the specimen form shown in Sheet C of Part II of this Annex;

(c)

the nature of those irregularities, in accordance with the specimen form shown in Sheet C of Part II of this Annex;

(d)

the measure concerned where an irregularity was discovered, in accordance with the specimen form shown in Sheet C of Part II of this Annex;

(e)

the estimated financial consequence of each irregularity, in accordance with the specimen form shown in Sheet C of Part II of this Annex.

6.F12...U.K.

Textual Amendments

F12Annex 12 Pt. 1 para. 6 omitted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by virtue of The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(38)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)

7.ResourcesU.K.

Details on the resources available to carry out the scrutinies under Chapter III of Title V of Regulation (EU) No 1306/2013 shall be transmitted, including:

(a)

the number of staff, expressed in person/years, allocated to those scrutinies, per control body, and, where appropriate, per region;

(b)

training received by staff working on those scrutinies, with an indication of the proportion of the staff referred to in point (a) who have received such training, and the nature of the training itself; and,

(c)

computer equipment and tools at the disposal of staff working on those scrutinies.

8.Difficulties in applying Chapter III of Title V of Regulation (EU) No 1306/2013U.K.

Information shall be provided on any difficulties encountered in the application of Chapter III of Title V of Regulation (EU) No 1306/2013 and the measures taken to overcome them or proposals to that end.

9.Suggestions for improvementU.K.

Where appropriate, suggestions shall be made for the improvement, either of the application of Chapter III of Title V of Regulation (EU) No 1306/2013, or of that Chapter itself.

PART IIU.K.

SHEET AU.K.SCRUTINY REPORT FOR THE PERIODU.K.(Article 86(1) of Regulation (EU) No 1306/2013)U.K.

TOTAL:CONTROL BODY:
1. (A)The total number of undertakings to be scrutinised:
(B)The number of undertakings to be scrutinised:
2. (A)The total number of undertakings scrutinised:
(B)The number of undertakings scrutinised:
3. (A)The total number of undertakings in the course of scrutiny:
(B)The number of undertakings in the course of scrutiny:
4. (A)The total number of undertakings not yet scrutinised:
(B)The number of undertakings not yet scrutinised:
CONTROL BODY:CONTROL BODY:
1. (C)The number of undertakings to be scrutinised:
(D)The number of undertakings to be scrutinised:
2. (C)The number of undertakings scrutinised:
(D)The number of undertakings scrutinised:
3. (C)The number of undertakings in the course of scrutiny:
(D)The number of undertakings in the course of scrutiny:
4. (C)The number of undertakings not yet scrutinised:
(D)The number of undertakings not yet scrutinised:
Notes on boxes:U.K.

Where applicable, additional boxes e.g. (E), (F) etc. are to be addedU.K.

SHEET BU.K.SCRUTINY REPORT FOR THE PERIOD …U.K.(Article 86(1) of Regulation (EU) No 1306/2013)U.K.

Report of scrutinies in relation to [F13CMO support] budget headings in respect of the [F13CMO support] financial year …

Scrutiny programme …

B(1) [F13CMO support] Budget Article or Item No.B(2)Total value of expenditure relating to undertakings selected for scrutiny…(EUR)B(3)Scrutinised undertakingsB(4)Undertakings in the course of scrutinyB(5)Undertakings not scrutinised
(i)expenditure actually scrutinised(EUR)(ii)total expenditure relating to those undertakings(EUR)(i)total expenditure relating to those undertakings(EUR)(i)total expenditure relating to those undertakings(EUR)
Totals:

Textual Amendments

F13Words in Annex 12 Pt. 2 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(38)(b)(i) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(8)(a)); 2020 c. 1, Sch. 5 para. 1(1)

SHEET CU.K.SCRUTINY REPORT FOR THE PERIOD …U.K.(Article 86(1) of Regulation (EU) No 1306/2013)U.K.

Potential irregularities discovered in relation to [F14CMO support] budget headings in respect of the [F14CMO support] financial year …

Scrutiny programme …

C(1) [F15CMO support] Budget Article or Item No.C(2)Number of potential irregularities discoveredC(3)Number of payments concernedC(4)Number of undertakings concernedC(5)Estimated value of potential irregularitiesC(6)Description and nature of each potential irregularity discovered, the reference number(s) of the undertaking(s) concerned and the OLAF reference number(s) (IMS notification numbers)
Totals:

Textual Amendments

F14Words in Annex 12 Pt. 2 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(38)(b)(ii)(aa) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(8)(a)); 2020 c. 1, Sch. 5 para. 1(1)

F15Words in Annex 12 Pt. 2 substituted (31.12.2020 in so far as it relates to common organisation of the markets and rural development measures) by The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(38)(b)(ii)(bb) (as amended by S.I. 2020/1445, regs. 1(2)(b), 7(8)(b)); 2020 c. 1, Sch. 5 para. 1(1)

SHEET DU.K. SCRUTINY REPORT FOR THE PERIODU.K.(Article 86(1) of Regulation (EU) No 1306/2013)U.K.

Execution of scrutinies relating to preceding scrutiny programmes; scrutiny programme …
D(1) Number of undertakings declared in previous report as in the course of scrutiny:D(2) Number of undertakings in D(1) for which scrutinies have been completed:D(3) Number of undertakings in D(1) for which scrutinies are still in course
D(4) Value of transactions concerned in D(1):D(5) Value of transactions concerned in D(2):D(6) Value of transactions concerned in D(3):
D(7) Number of undertakings for which scrutinies in previous report were declared as not started:D(8) Number of undertakings in D(7) for which scrutinies have been completed:D(9) Number of undertakings in D(7) for which scrutinies are still in course:D(10) Number of undertakings in D(7) for which scrutinies have not been started:
D(11) Value of transactions concerned in D(7):D(12) Value of transactions concerned in D(8):D(13) Value of transactions concerned in D(9):D(14) Value of transactions concerned in D(10):

ANNEX XIIIU.K.MEASURES REFERRED TO IN ARTICLE 57

[F161.The support schemes set out in Annex I to Regulation (EU) No 1307/2013 of the European Parliament and of the Council.]U.K.

Textual Amendments

F16Annex 13 paras. 1, 5, 6 omitted (31.12.2020 in so far as they relate to common organisation of the markets and rural development measures) by virtue of The Common Agricultural Policy (Financing, Management and Monitoring Supplementary Provisions) (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/765), regs. 1, 4(39) (as inserted by S.I. 2020/1445, regs. 1(2)(b), 7(9)); 2020 c. 1, Sch. 5 para. 1(1)

2.The following schemes and measures set out in Regulation (EU) No 1308/2013 of the European Parliament and of the Council(1).U.K.

  • public intervention;

  • aid for private storage;

  • school fruit and vegetable scheme;

  • school milk scheme;

  • aid in fruit and vegetables sector;

  • support measures in the wine sector;

  • aid in the apiculture sector;

  • aid in the hops sector;

  • export refunds.

F173.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .U.K.

4.The information and promotion measures provided for in Council Regulation (EC) No 3/2008(2).U.K.

[F165.The measures provided for in Regulation (EU) No 228/2013 of the European Parliament and of the Council(3), except those covered by Annex I to Regulation (EU) No 1307/2013.]U.K.

[F166.The measures provided for in Regulation (EU) No 229/2013 of the European Parliament and of the Council(4), except those covered by Annex I to Regulation (EU) No 1307/2013.]U.K.

7.The measures provided for in Chapter I of Title III of Regulation (EU) No 1305/2013 and included in the rural development programme concerned.U.K.

8.The measures provided for in Chapter I of Title IV of Regulation (EC) No 1698/2005(5) and included in the rural development programme concerned.U.K.

[F189.The support schemes set out in Annex I to Council Regulation (EC) No 73/2009.]U.K.

[F1910.The measures granted under Articles 219(1), 220(1) and 221(1) and (2) of Regulation (EU) No 1308/2013 as measures supporting agricultural markets in accordance with Article 4(1)(a) of Regulation (EU) No 1306/2013.]U.K.

(1)

Regulation (EU) No 1308/2013 of the European Parliament and of the Council of 17 December 2013 establishing a common organisation of the markets in agricultural products and repealing Council Regulations (EEC) No 922/72, (EEC) No 234/79, (EC) No 1037/2001 and (EC) No 1234/2007 (OJ L 347, 20.12.2013, p. 671).

(2)

Council Regulation (EC) No 3/2008 of 17 December 2007 on information provision and promotion measures for agricultural products on the internal market and in third countries (OJ L 3, 5.1.2008, p. 1).

(3)

Regulation (EU) No 228/2013 of the European Parliament and of the Council of 13 March 2013 laying down specific measures for agriculture in the outermost regions of the Union and repealing Council Regulation (EC) No 247/2006 (OJ L 78, 20.3.2013, p. 23).

(4)

Regulation (EU) No 229/2013 of the European Parliament and of the Council of 13 March 2013 laying down specific measures for agriculture in favour of the smaller Aegean islands and repealing Council Regulation (EC) No 1405/2006 (OJ L 78, 20.3.2013, p. 41).

(5)

Council Regulation (EC) No 1698/2005 of 20 September 2005 on support for rural development by the European Agricultural Fund for Rural Development (EAFRD) (OJ L 277, 21.10.2005, p. 1).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources