Search Legislation

Commission Regulation (EU) 2016/1447Show full title

Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance)

 Help about what version

What Version

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

Commission Regulation (EU) 2016/1447 is up to date with all changes known to be in force on or before 02 October 2024. There are changes that may be brought into force at a future date. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

  1. Introductory Text

  2. TITLE I GENERAL PROVISIONS

    1. Article 1.Subject matter

    2. Article 2.Definitions

    3. Article 3.Scope of application

    4. Article 4.Application to existing HVDC systems and DC-connected power park modules

    5. Article 5.Regulatory aspects

    6. Article 6.Multiple TSOs

    7. Article 7.Recovery of costs

    8. Article 8.Public consultation

    9. Article 9.Stakeholder involvement

    10. Article 10.Confidentiality obligations

  3. TITLE II GENERAL REQUIREMENTS FOR HVDC CONNECTIONS

    1. CHAPTER 1 Requirements for active power control and frequency support

      1. Article 11.Frequency ranges

      2. Article 12.Rate-of-change-of-frequency withstand capability

      3. Article 13.Active power controllability, control range and ramping rate

      4. Article 14.Synthetic inertia

      5. Article 15.Requirements relating to frequency sensitive mode, limited frequency sensitive mode overfrequency and limited frequency sensitive mode underfrequency

      6. Article 16.Frequency control

      7. Article 17.Maximum loss of active power

    2. CHAPTER 2 Requirements for reactive power control and voltage support

      1. Article 18.Voltage ranges

      2. Article 19.Short circuit contribution during faults

      3. Article 20.Reactive power capability

      4. Article 21.Reactive power exchanged with the network

      5. Article 22.Reactive power control mode

      6. Article 23.Priority to active or reactive power contribution

      7. Article 24.Power quality

    3. CHAPTER 3 Requirements for fault ride through capability

      1. Article 25.Fault ride through capability

      2. Article 26.Post fault active power recovery

      3. Article 27.Fast recovery from DC faults

    4. CHAPTER 4 Requirements for control

      1. Article 28.Energisation and synchronisation of HVDC converter stations

      2. Article 29.Interaction between HVDC systems or other plants and equipment

      3. Article 30.Power oscillation damping capability

      4. Article 31.Subsynchronous torsional interaction damping capability

      5. Article 32.Network characteristics

      6. Article 33.HVDC system robustness

    5. CHAPTER 5 Requirements for protection devices and settings

      1. Article 34.Electrical protection schemes and settings

      2. Article 35.Priority ranking of protection and control

      3. Article 36.Changes to protection and control schemes and settings

    6. CHAPTER 6 Requirements for power system restoration

      1. Article 37.Black start

  4. TITLE III REQUIREMENTS FOR DC-CONNECTED POWER PARK MODULES AND REMOTE-END HVDC CONVERTER STATIONS

    1. CHAPTER 1 Requirements for DC-connected power park modules

      1. Article 38.Scope

      2. Article 39.Frequency stability requirements

      3. Article 40.Reactive power and voltage requirements

      4. Article 41.Control requirements

      5. Article 42.Network characteristics

      6. Article 43.Protection requirements

      7. Article 44.Power quality

      8. Article 45.General system management requirements applicable to DC-connected power park modules

    2. CHAPTER 2 Requirements for remote-end HVDC converter stations

      1. Article 46.Scope

      2. Article 47.Frequency stability requirements

      3. Article 48.Reactive power and voltage requirements

      4. Article 49.Network characteristics

      5. Article 50.Power quality

  5. TITLE IV INFORMATION EXCHANGE AND COORDINATION

    1. Article 51.Operation of HVDC systems

    2. Article 52.Parameters and settings

    3. Article 53.Fault recording and monitoring

    4. Article 54.Simulation models

  6. TITLE V OPERATIONAL NOTIFICATION PROCEDURE FOR CONNECTION

    1. CHAPTER 1 Connection of new HVDC systems

      1. Article 55.General provisions

      2. Article 56.EON for HVDC systems

      3. Article 57.ION for HVDC systems

      4. Article 58.FON for HVDC systems

      5. Article 59.Limited operational notification for HVDC systems/derogations

    2. CHAPTER 2 Connection of new DC-connected power park modules

      1. Article 60.General provisions

      2. Article 61.EON for DC-connected power park modules

      3. Article 62.ION for DC-connected power park modules

      4. Article 63.FON for DC-connected power park modules

      5. Article 64.Limited operational notification for DC-connected power park modules

    3. CHAPTER 3 Cost benefit analysis

      1. Article 65.Identification of costs and benefits of application of requirements to existing HVDC systems or DC-connected power park modules

      2. Article 66.Principles of cost-benefit analysis

  7. TITLE VI COMPLIANCE

    1. CHAPTER 1 Compliance monitoring

      1. Article 67.Common provisions for compliance testing

      2. Article 68.Common provisions on compliance simulation

      3. Article 69.Responsibility of the HVDC system owner and DC-connected power park module owner

      4. Article 70.Tasks of the relevant system operator

    2. CHAPTER 2 Compliance testing

      1. Article 71.Compliance testing for HVDC systems

      2. Article 72.Compliance testing for DC-connected power park modules and remote-end HVDC converter units

    3. CHAPTER 3 Compliance simulations

      1. Article 73.Compliance simulations for HVDC systems

      2. Article 74.Compliance simulations for DC-connected power park modules and remote-end HVDC converter units

    4. CHAPTER 4 Non-binding guidance and monitoring of implementation

      1. Article 75.Non-binding guidance on implementation

      2. Article 76.Monitoring

  8. TITLE VII DEROGATIONS

    1. Article 77.Power to grant derogations

    2. Article 78.General provisions

    3. Article 79.Request for derogations by an HVDC system owner or DC-connected power park module owner

    4. Article 80.Request for a derogation by a relevant system operator or relevant TSO

    5. Article 81.Request for derogations from the provisions of Title III by a DC-connected power park module owner

    6. Article 82.Register of derogations from the requirements of this Regulation

    7. Article 83.Monitoring of derogations

  9. TITLE VIII FINAL PROVISIONS

    1. Article 84.Amendment of contracts and general terms and conditions

    2. Article 85.HVDC System or DC-connected power park modules connecting with synchronous areas or control areas not bound by EU legislation

    3. Article 86.Entry into force

  10. Signature

    1. ANNEX I

      Frequency ranges referred to in Article 11

      1. Table 1: Minimum time periods an HVDC system shall be...

    2. ANNEX II

      Requirements applying to frequency sensitive mode, limited frequency sensitive mode overfrequency and limited frequency sensitive mode underfrequency

      1. A. Frequency sensitive mode

        1. 1. When operating in frequency sensitive mode (FSM):

      2. B. Limited frequency sensitive mode overfrequency

      3. C. Limited frequency sensitive mode underfrequency

    3. ANNEX III

      Voltage ranges referred to in Article 18

      1. Table 4: Minimum time periods an HVDC system shall be...

      2. Table 5: Minimum time periods an HVDC system shall be...

    4. ANNEX IV

      Requirements for U-Q/Pmax-profile referred to in Article 20

      1. Figure 5: The diagram represents boundaries of a U-Q/Pmax-profile with...

      2. Table 6: Parameters for the Inner Envelope in the Figure....

    5. ANNEX V

      Voltage-against-time-profile referred to in Article 25

      1. Figure 6: Fault-ride-through profile of an HVDC converter station. The...

      2. Table 7: Parameters for Figure 6 for the fault-ride-through capability...

    6. ANNEX VI

      Frequency ranges and time periods referred to in Article 39(2)(a)

      1. Table 8: Minimum time periods for the 50 Hz nominal system...

    7. ANNEX VII

      Voltage ranges and time periods referred to in Article 40

      1. Table 9: Minimum time periods for which a DC-connected power...

      2. Table 10: Minimum time periods for which a DC-connected power...

      3. Figure 7: U-Q/Pmax-profile of a DC-connected power park module at...

      4. Table 11: Maximum and minimum range of both Q/Pmax and...

    8. ANNEX VIII

      Reactive power and voltage requirements referred to in Article 48

      1. Table 12: Minimum time periods for which a remote-end HVDC...

      2. Table 13: Minimum time periods for which a remote-end HVDC...

      3. Table 14: Maximum range of both Q/Pmax and steady-state voltage...

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources