Regulation (EU) 2019/943 of the European Parliament and of the CouncilShow full title

Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast) (Text with EEA relevance)

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

There are currently no known outstanding effects by UK legislation for Regulation (EU) 2019/943 of the European Parliament and of the Council, Article 23. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 23U.K.[F1Methodology for] resource adequacy assessment

F21.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F22.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F23.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F24.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.The F3... resource adequacy assessment [F4must cover the territory of Great Britain and] shall be based on a transparent methodology which shall ensure that the assessment:

F5(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)is based on appropriate central reference scenarios of projected demand and supply including an economic assessment of the likelihood of retirement, mothballing, new-build of generation assets and measures to reach energy efficiency and electricity interconnection targets and appropriate sensitivities on extreme weather events, hydrological conditions, wholesale prices and carbon price developments;

(c)contains separate scenarios reflecting the differing likelihoods of the occurrence of resource adequacy concerns which [F6a capacity mechanism is] designed to address;

(d)appropriately takes account of the contribution of all resources including existing and future possibilities for generation, energy storage, sectoral integration, demand response, and import and export and their contribution to flexible system operation;

(e)anticipates the likely impact of the measures referred in Article 20(3);

(f)includes variants without existing or planned capacity mechanisms and, where applicable, variants with such mechanisms;

(g)is based on a market model using the flow-based approach, where applicable;

(h)applies probabilistic calculations;

(i)applies a single modelling tool;

(j)includes at least the following indicators referred to in Article 25:

  • (j)‘expected energy not served’, and

  • ‘loss of load expectation’;

(k)identifies the sources of possible resource adequacy concerns, in particular whether it is a network constraint, a resource constraint, or both;

(l)takes into account real network development;

(m)ensures that the national characteristics of generation, demand flexibility and energy storage, the availability of primary resources and the level of interconnection are properly taken into consideration.

F76.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F77.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources