Search Legislation

The Pollution Prevention and Control (Scotland) Regulations 2012

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Paragraph 11

 Help about opening options

Changes to legislation:

The Pollution Prevention and Control (Scotland) Regulations 2012, Paragraph 11 is up to date with all changes known to be in force on or before 05 March 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Monitoring of emissionsS

This section has no associated Policy Notes

11.[F1(1)] The operator of a solvents installation must monitor emissions from the installation in accordance with [F2sub-paragraphs (2) to (4)]

[F3(2) Channels to which abatement equipment is connected, and which at the final point of discharge emit more than an average of 10 kilogrammes per hour of total organic carbon, must be monitored continuously for compliance.

(3) In other cases, SEPA must ensure that either continuous or periodic measurements are carried out. For periodic measurements at least three measurement values must be obtained during each measurement exercise.

(4) Measurements are not required where end-of-pipe abatement equipment is not needed to comply with these Regulations.]

Back to top

Options/Help