Article 2
The works referred to in this Order and shown on the deposited plan are:–
Works No. 1 | An intake structure incorporating an arrangement of weirs to limit abstraction from the river such that a supply is taken only when the stream flow exceeds the specified residual flow rate and to ensure that the maximum rate of abstraction is not exceeded. It also includes an approved gauge to measure and record the compensation water taken from the river. |
Works No. 2 | A raw water main from the intake on Abhainn a' Mhinisteir to the new Treatment Works. |
Works No. 3 | A Treatment Works containing an approved gauge and instrumentation to measure and record the amount of water taken from the intake. |
Works No. 4 | A bankside storage reservoir for raw water. |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: