Search Legislation

The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2019 No. 206

Highways, England

The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019

Made

31st January 2019

Coming into force in accordance with article 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980(1), and now vested in the Secretary of State(2):

1.  This Instrument may be cited as “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2.  The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018, and as set out in the Schedule, is hereby confirmed with modifications.

3.  The Scheme as confirmed is set out in the Schedule (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA and at the offices of the Cambridgeshire County Council, Shire Hall, Castle Hill, Cambridge CB3 0AP.

Signed by authority of the Secretary of State for Transport

A. Rhind

A Senior Civil Servant

Department for Transport

31st January 2019

Regulation 3

THE SCHEDULE

THE CAMBRIDGESHIRE COUNTY COUNCIL (CONSTRUCTION OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE) SCHEME 2018

The Cambridgeshire County Council (hereinafter referred to as “the Council”) makes this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.

1.  The Council are authorised to construct over the navigable waters of the River Cam the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the Chesterton and the Abbey wards of Cambridge in the said County.

2.  The Scheme may be cited as the Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018.

Given under the common seal of the Council on the 15th day of May 2018

C.S

THE COMMON SEAL of the COUNCIL was hereunto affixed in the presence of

Authorised Signatory

Regulation 3

THE SCHEDULE TO THE SCHEME

PLANS AND SPECIFICATIONS OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE (SCHEME 2018)

The location and general plan layout of Chesterton/ Abbey Bridge are shown on the plan marked “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey foot / cycle bridge) Scheme 2018” sealed with the Common Seal of the Cambridgeshire County Council and deposited at Shire Hall, Castle Hill, Cambridge CB3 0AP.

POINTS OF COMMENCEMENT AND TERMINATION

North Approach – Top of the North Abutment

Commencing from a point on the North bank of the River Cam 42.23 metres east of the existing railway bridge and situated on the Halingway towing path.

Ditton Meadows Approach – Top of the South Abutment

Terminating at a point on the South bank of the River Cam, 35.79 metres east of the existing railway bridge where the new bridge approach meets the existing Jubilee Cycle Path (Sustrans National Cycle Route 51).

Navigation Span

The bridge has a clear span of 44 metres (between abutments), spanning diagonally across the entire width of the River Cam (25 metres approx.). The bridge runs parallel and to the east of the Chesterton railway bridge. It will be constructed 10 metres away from the railway bridge.

Headway and Waterway

The navigation waterway is unrestricted for the full width of the river except where locally constrained by the jetty beneath the existing railway bridge. At which point the Waterway measures 28.97m. The soffit level of the bridge is +7.03m AOD, giving a 3.17m clearance above the current air-draught requirement set by the nearby Chesterton railway bridge.

Overall Dimensions

The proposed bridge consists of a segregated deck surface of separate lanes for pedestrian and cycle traffic separated by a white line.

The total clear width across both lanes at the abutments is 4.51 metres, with a wider section at the middle of the bridge of 4.92 metres. The bridge will carry a 2.69 metres wide cycle path and a 2.22 metres wide footpath at its widest point. The total clear width across both lanes at the abutments is 4.51 metres.

The structural parapet varies from a height of 1.1m (1.4m on the cycle side) above the deck at the abutments, to 2m above the deck at mid-span.

The length of the south ramp structure is 87.60 metres, whilst the north ramp is 81.3 metres long.

EXPLANATORY NOTE

(This note is not part of the Instrument)

This instrument confirms a Scheme to construct over the navigable waters of the River Cam the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the Chesterton and the Abbey wards of Cambridge in the said County.

The Secretary of State has modified this Bridge Scheme as follows:

1.  In the opening paragraph on page 1 of the Order a closed bracket has been inserted after the words “the Council”.

2.  In the Schedule to the Scheme, under “PLANS AND SPECIFICATIONS OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE (SCHEME 2018)” the “s” has been deleted from “plans” and the word “scheme” within the title of the plan has been amended to “Scheme”. The paragraph has also been amended to accord with the single replacement plan.

3.  In the Schedule to the Scheme, the paragraph titled “North Approach – Top of the North Abutment” the word “approximately” has been deleted and the measurement of 40 metres has been amended to 42.23 metres.

4.  In the Schedule to the scheme, the paragraph titled “Ditton Meadows Approach – Top of the South Abutment” the word “approximately” has been deleted and the measurement of 30 metres has been amended to 35.79 metres.

5.  In the Schedule to the Scheme, the heading “Headroom and Waterway” has been amended to “Headway and Waterway” and the measurements of 24.78m, +7.04m AOD and 109mm have been amended to 28.97m, +7.03m AOD and 3.17m respectively.

6.  In the Schedule to the Scheme, the second paragraph under “Overall Dimensions” the measurements of 4.5 metres, 2.64 metres, 2.19 metres and 4.5 metres have been amended to 4.51 metres, 2.69 metres, 2.22 metres and 4.51 metres respectively.

7.  In the Schedule to the Scheme, the fourth paragraph under “Overall Dimensions” the word “approximately” has been deleted and the measurements of 88 metres and 77 metres have been amended to 87.60 metres and 81.3 metres respectively.

8.  The plans titled “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 – General Arrangement Plan” and “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 – Longitudinal and Transverse Section” have been replaced by plan Drawing No. 5040126/BR/CB/SK/004 Rev F titled “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018”.

(1)

1980 c. 66. Section 106(3) is amended by the Infrastructure Act 2015 (c. 7), paragraph 34(2) of Schedule 1(1).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources